CN105753238A - Beneficiation wastewater treating and recycling device - Google Patents

Beneficiation wastewater treating and recycling device Download PDF

Info

Publication number
CN105753238A
CN105753238A CN201610237076.5A CN201610237076A CN105753238A CN 105753238 A CN105753238 A CN 105753238A CN 201610237076 A CN201610237076 A CN 201610237076A CN 105753238 A CN105753238 A CN 105753238A
Authority
CN
China
Prior art keywords
fixing
drainage screen
casing
support bar
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610237076.5A
Other languages
Chinese (zh)
Other versions
CN105753238B (en
Inventor
龙江汇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Tianshui Li Zi Gold Mine Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610237076.5A priority Critical patent/CN105753238B/en
Publication of CN105753238A publication Critical patent/CN105753238A/en
Application granted granted Critical
Publication of CN105753238B publication Critical patent/CN105753238B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/02Treatment of water, waste water, or sewage by heating
    • C02F1/04Treatment of water, waste water, or sewage by heating by distillation or evaporation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/281Treatment of water, waste water, or sewage by sorption using inorganic sorbents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/283Treatment of water, waste water, or sewage by sorption using coal, charred products, or inorganic mixtures containing them
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/10Nature of the water, waste water, sewage or sludge to be treated from quarries or from mining activities
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2301/00General aspects of water treatment
    • C02F2301/08Multistage treatments, e.g. repetition of the same process step under different conditions

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Filtration Of Liquid (AREA)

Abstract

A beneficiation wastewater treating and recycling device comprises a bottom plate, a supporting plate, a frame device, a filtering device, a collecting device and an air cylinder device, wherein a first supporting rod, a second supporting rod, a first spring and a positioning ball are arranged on the bottom plate, the supporting plate is provided with a first through hole, a water outlet hopper, a first connecting rod, a shaking frame, a first filter screen, a second spring, a first box, a second filter screen, a third filter screen, a heat dissipation frame and a heating rod, the frame device comprises a frame, a feeding hopper, a fourth filter screen, a first pipeline, a first water pump, a first valve, a third supporting rod, a first transverse rod, a first oblique rod and a first roller, the filtering device comprises a fifth filter screen, a sixth filter screen, a first connecting line, a vibrator and a second connecting line, the collecting device comprises a second box, a guide block and a baffle, and the air cylinder device comprises a first support, an air cylinder, a push rod, a push plate and a positioning rod.The beneficiation wastewater treating and recycling device is capable of filtering beneficiation water thoroughly, remarkable in filtering effect and high in filtering efficiency.

Description

A kind of ore dressing wastewater treatment cyclic utilization device
Technical field
The present invention relates to ore dressing technical field of sewage, particularly relate to a kind of ore dressing wastewater treatment cyclic utilization device.
Background technology
Ore dressing wet concentration technique is the production technology of tradition molding, and sewage is all adopted many ponds circulation precipitation to utilize waste water by manufacturing enterprise.But wherein granule easily blocks filter mesh, filter pressing weak effect, yields poorly and can not meet normal production, this is the puzzlement that wet concentration industry is maximum.Large amount of sewage discharge is directly caused waste water source by the small-sized Mineral Processing Enterprises of some condition difference, affects environmental pollution river, and in the area that environmental protection supervision is tighter, ore dressing plant stopping production phenomenon is more.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
It is an object of the invention to provide a kind of ore dressing wastewater treatment cyclic utilization device that can effectively solve above-mentioned technical problem.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
nullA kind of ore dressing wastewater treatment cyclic utilization device,Described ore dressing wastewater treatment cyclic utilization device includes base plate、It is positioned at the gripper shoe above described base plate、It is positioned at the frame device above described gripper shoe、It is positioned at the defecator below described frame device、It is positioned at the collection device below described defecator and is positioned at the air cylinder device on the left of described collection device,Described base plate is provided with the first support bar above it、It is positioned at the second support bar on the left of described first support bar、It is positioned at the first spring on the right side of described second support bar and is positioned at the place kick on the right side of described first spring,Described gripper shoe is provided with through the first through hole of its upper and lower surface、What be disposed below goes out bucket、The head rod above bucket is gone out described in being positioned at、The shake frame below bucket is gone out described in being positioned at、It is arranged at the first drainage screen on described shake frame、It is positioned at the second spring above described shake frame、It is positioned at the first casing below described shake frame、It is contained in the second drainage screen in described first casing、It is positioned at the 3rd drainage screen below described second drainage screen、Heat radiation frame and be contained in the heating rod in described heat radiation frame,Described frame device includes framework、It is positioned at the feed hopper above described framework、It is contained in the 4th drainage screen in described framework、It is positioned at the first pipeline on the right side of described framework、It is arranged at the first water pump on described first pipeline、First valve、It is positioned at the 3rd support bar below described first pipeline、It is positioned at the first cross bar of the described framework left and right sides、It is positioned at the first brace on the left of described framework and is contained in the first roller of described framework,Described defecator includes the 5th drainage screen、It is arranged at the 6th drainage screen of the described 5th drainage screen left and right sides、It is arranged at the first connecting line on described 6th drainage screen、It is arranged at the vibrator on described 5th drainage screen and is positioned at the second connecting line on the left of described 5th drainage screen,Described collection device includes the second casing、It is positioned at the baffle of described second casing、It is positioned at the baffle plate above described second casing、It is positioned at the second pipe on the right side of described second casing and the second valve being arranged on described second pipe,Described air cylinder device includes the first support、It is positioned at the cylinder on described first support、It is positioned at the catch bar on the right side of described cylinder、It is positioned at the push pedal on the right side of described catch bar、It is positioned at the location bar of the upper and lower both sides of described catch bar、It is positioned at the 4th support bar above described gripper shoe and is positioned at the second support above described cylinder.
Described first support bar is cuboid, described first support bar is vertically placed, the lower end of described first support bar is fixing with described base plate to be connected, the upper end of described first support bar is fixing with described gripper shoe to be connected, described second support bar is cuboid, described second support bar is vertically placed, the lower end of described second support bar is fixing with described base plate to be connected, the upper end of described second support bar is fixing with described gripper shoe to be connected, described first spring is provided with two, described first spring is horizontal, the left end of described first spring is fixing with described second support bar to be connected, the right-hand member of described first spring is fixing with described place kick to be connected, described place kick is spherical.
Described go out bucket be hollow round table-like, described go out bucket upper end be directed at described first through hole and fixing with the lower surface of described gripper shoe be connected, described head rod is provided with two and goes out the left and right sides of bucket described in laying respectively at, described head rod is vertical shape, the upper end of described head rod is fixing with the lower surface of described gripper shoe to be connected, the lower end of described head rod with described go out bucket is fixing is connected, the cross section of described shake frame is bending, described shake frame goes out the lower section of bucket described in being positioned at, described shake frame is provided with the second through hole, described first drainage screen is bending, described first drainage screen is contained in described second through hole and fixes with described shake frame and is connected.
nullDescribed second spring is vertical shape,The lower end of described second spring is fixing with described shake frame to be connected,The upper end of described second spring is fixing with described gripper shoe to be connected,Described first casing is hollow cuboid,Described first casing is placed on,Described place kick acts against on the left surface of described first casing,Described second drainage screen is cuboid,Described second drainage screen is horizontal,The side of described second drainage screen is fixing with the inner surface of described first casing to be connected,Described heat radiation frame is hollow cuboid,The cross section of described heat radiation frame is inverted concave shape,The lower surface of described heat radiation frame is fixing with the inner surface of described first casing to be connected,Described 3rd drainage screen is cuboid,Described 3rd drainage screen horizontal positioned,The side of described 3rd drainage screen is fixing with the inner surface of described first casing to be connected,Described heat radiation frame runs through the upper and lower surface of described 3rd drainage screen and is secured to connect,Activated carbon is placed between described second drainage screen and described 3rd drainage screen.
nullDescribed framework is hollow cuboid,Described framework is provided with the third through-hole on its right surface,Described 4th drainage screen is hollow hemispherical,The right surface of described 4th drainage screen is fixing with the inner surface of described framework to be connected,Described 4th drainage screen is positioned at the left side of described third through-hole,The lower surface of described feed hopper is fixing with the upper surface of described framework to be connected,One end of described first pipeline is directed at described third through-hole and fixing with the right surface of described framework is connected,Described 3rd support bar is vertical shape,The upper end of described 3rd support bar is fixing with described first pipeline to be connected,The lower end of described 3rd support bar is fixing with described first cross bar to be connected,Described first cross bar is provided with two and lays respectively at the left and right sides of described framework,Described first cross bar is horizontal,One end of described first cross bar is fixing with the side of described framework to be connected,The described first inclined shape of brace,The lower end of described first brace is fixing with described first cross bar to be connected,The upper end of described first brace is fixing with described framework to be connected,Described first roller is cylinder,Described first roller water placing flat,Described first roller turns with framework axle and is connected,Described first roller is provided with some first bristles,Described first bristle is evenly distributed on described first roller and is secured to connect.
The cross section of described 5th drainage screen is inverted v-shaped, described 5th drainage screen is positioned at the lower section of described framework, described 6th drainage screen is provided with two and lays respectively at the left and right sides of described 5th drainage screen, the described 6th inclined shape of drainage screen, the lower end of described 6th drainage screen is fixing with described 5th drainage screen to be connected, described first connecting line is provided with two, the upper end of described first connecting line is fixing with described first cross bar to be connected, the lower end of described first connecting line is fixing with described 6th drainage screen to be connected, described vibrator is provided with two and lays respectively at the left and right sides of described 5th drainage screen, described vibrator is fixing with described 5th drainage screen to be connected, the right-hand member of described second connecting line is fixing with described 5th drainage screen to be connected.
Described second casing is hollow cuboid, described second casing is placed in described gripper shoe, described second casing is placed on the lower section of described 5th drainage screen, the right surface of described second casing is provided with fourth hole, the right surface of described baffle is fixing with the inner surface of described second casing to be connected, the inclined shape of upper surface of described baffle, described baffle plate is bending, the lower end of described baffle plate is fixing with the upper surface of described second casing to be connected, the inclined shape of described second pipe, the upper end of described second pipe is directed at described fourth hole and fixing with the right surface of described second casing is connected, first through hole described in the lower end aligned of described second pipe and fixing with the upper surface of described gripper shoe be connected.
Described first support is L-shaped, one end of described first support is fixing with described second support bar to be connected, the other end of described first support is vertical shape and fixing with the lower surface of described cylinder is connected, described 4th support bar is cuboid, described 4th support bar is vertically placed, the lower end of described 4th support bar is fixing with described gripper shoe to be connected, the upper end of described 4th support bar is fixing with described first cross bar to be connected, described catch bar is cuboid, described catch bar horizontal positioned, the left end of described catch bar is connected with described cylinder, described catch bar runs through the surface, left and right of described 4th support bar and is slidably connected with it, described catch bar runs through the left surface of described second casing and extends to the inside of described second casing, described catch bar is connected with described second box body-sliding.
Described push pedal is cuboid, described push pedal is vertically placed, described push pedal is contained in described second casing, the inner surface of described push pedal and described second casing is slidably connected, described second support is L-shaped, one end of described second support is fixing with the upper surface of described cylinder to be connected, the other end of described second support is fixing with described 4th support bar to be connected, described location bar is provided with two, described location bar is cuboid, described location bar horizontal positioned, the left end of described location bar is fixing with described 4th support bar to be connected, the right-hand member of described location bar is fixing with described second casing to be connected, the left end of described second connecting line is fixing with the right surface of described 4th support bar to be connected.
After adopting technique scheme, present invention have the advantage that
Ore dressing wastewater treatment cyclic utilization device simple in construction of the present invention, easy to use, ore dressing water can be filtered thoroughly, filter effect is notable and efficiency is higher, the time of filtration can be greatly saved, improve the efficiency utilized, and can effectively prevent being normally carried out of filtering holes blocking impact filtration, facilitate simultaneously and the water after filtering is collected, in order to follow-up utilization.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the detailed description of the invention of ore dressing wastewater treatment cyclic utilization device of the present invention is described further:
Fig. 1 is the structural representation of ore dressing wastewater treatment cyclic utilization device of the present invention;
Detailed description of the invention
As it is shown in figure 1, ore dressing wastewater treatment cyclic utilization device of the present invention includes base plate 1, is positioned at the gripper shoe 2 above described base plate 1, is positioned at the frame device 3 above described gripper shoe 2, is positioned at the defecator 4 below described frame device 3, is positioned at the collection device 5 below described defecator 4 and is positioned at the air cylinder device 6 on the left of described collection device 5.
As shown in Figure 1, described base plate 1 is in cuboid, described base plate 1 horizontal positioned, described base plate 1 is provided with the first support bar 11 above it, is positioned at the second support bar 12 on the left of described first support bar 11, is positioned at the first spring 13 on the right side of described second support bar 12 and is positioned at the place kick 14 on the right side of described first spring 13.Described first support bar 11 is in cuboid, and described first support bar 11 is vertically placed, and the lower end of described first support bar 11 is fixing with described base plate 1 to be connected, and the upper end of described first support bar 11 is fixing with described gripper shoe 2 to be connected.Described second support bar 12 is in cuboid, and described second support bar 12 is vertically placed, and the lower end of described second support bar 12 is fixing with described base plate 1 to be connected, and the upper end of described second support bar 12 is fixing with described gripper shoe 2 to be connected.Described first spring 13 is provided with two, and described first spring 13 is horizontal, and the left end of described first spring 13 is fixing with described second support bar 12 to be connected, and the right-hand member of described first spring 13 is fixing with described place kick 14 to be connected.Described place kick 14 is in spherical, and described place kick 14 can be moved on described base plate 1.
As shown in Figure 1, described gripper shoe 2 is in cuboid, described gripper shoe 2 horizontal positioned, described gripper shoe 2 is provided with through the first through hole 21 of its upper and lower surface, what be disposed below goes out bucket 22, the head rod 23 above bucket 22 is gone out described in being positioned at, the shake frame 24 below bucket 22 is gone out described in being positioned at, it is arranged at the first drainage screen 25 on described shake frame 24, it is positioned at the second spring 26 above described shake frame 24, it is positioned at the first casing 27 below described shake frame 24, it is contained in the second drainage screen 28 in described first casing 27, it is positioned at the 3rd drainage screen 29 below described second drainage screen 28, heat radiation frame 20 and be contained in the heating rod 201 in described heat radiation frame 20.Described first through hole 21 is in cylindrical shape.Described go out bucket 22 in hollow round table-like, described in go out the upper end of bucket 22 and be directed at described first through hole 21 and fixing with the lower surface of described gripper shoe 2 be connected.Described head rod 23 is provided with two and goes out the left and right sides of bucket 22 described in laying respectively at, described head rod 23 is in vertical shape, the lower surface of the upper end of described head rod 23 and described gripper shoe 2 is fixing to be connected, the lower end of described head rod 23 with described go out bucket 22 fix and be connected.The cross section of described shake frame 24 is bending, described shake frame 24 goes out the lower section of bucket 22 described in being positioned at, making to go out bucket 22 described in water traverse to enter in shake frame 24, described shake frame 24 is provided with the second through hole 241, and described second through hole 241 communicates with the surfaces externally and internally of described shake frame 24.Described first drainage screen 25 is in bending, and described first drainage screen 25 is contained in described second through hole 241 and fixes with described shake frame 24 and is connected.Described second spring 26 is provided with two and lays respectively at the left and right sides above described shake frame 24, described second spring 26 is in vertical shape, the lower end of described second spring 26 is fixing with described shake frame 24 to be connected, the upper end of described second spring 26 is fixing with described gripper shoe 2 to be connected, thus described shake frame 24 is played a supporting role.Described first casing 27 is in hollow cuboid, and described first casing 27 cross section is concave shape, and described first casing 27 is placed on base plate 1, and described place kick 14 acts against on the left surface of described first casing 27.Described second drainage screen 28 is in cuboid, and described second drainage screen 28 is horizontal, and the side of described second drainage screen 28 is fixing with the inner surface of described first casing 27 to be connected.Described heat radiation frame 20 is in hollow cuboid, and the cross section of described heat radiation frame 20 is inverted concave shape, and the lower surface of described heat radiation frame 20 is fixing with the inner surface of described first casing 27 to be connected, and described heat radiation frame 20 adopts Heat Conduction Material to make.Described 3rd drainage screen 29 is in cuboid, described 3rd drainage screen 29 horizontal positioned, the side of described 3rd drainage screen 29 is fixing with the inner surface of described first casing 27 to be connected, and described heat radiation frame 20 runs through the upper and lower surface of described 3rd drainage screen 29 and is secured to connect.Described heating rod 201 is contained in described heat radiation frame 20, and described heating rod 20 is electrically connected with the power supply.Activated carbon is placed between described second drainage screen 28 and described 3rd drainage screen 29.
As it is shown in figure 1, described frame device 3 includes framework 31, is positioned at the feed hopper 33 above described framework 31, is contained in the 4th drainage screen 32 of described framework 31, is positioned at the first pipeline 34 on the right side of described framework 31, first water pump the 36, first valve 35 of being arranged on described first pipeline 34, is positioned at the 3rd support bar 37 below described first pipeline 34, is positioned at the first cross bar 38 of described framework 31 left and right sides, is positioned at the first brace 39 on the left of described framework 31 and is contained in the first roller 30 of described framework 31.Described framework 31 is in hollow cuboid, and the upper and lower surface of described framework 31 communicates, and described framework 31 is provided with the third through-hole 311 on its right surface, described third through-hole 311 in cylindrical shape and the inside with described framework 31 communicate.Described 4th drainage screen 32 is in hollow hemispherical, the right surface of described 4th drainage screen 32 is fixing with the inner surface of described framework 31 to be connected, described 4th drainage screen 32 is positioned at the left side of described third through-hole 311, and described 4th drainage screen 32 encases described third through-hole 311.Described feed hopper 33 is in hollow shape, and the lower surface of described feed hopper 33 is fixing with the upper surface of described framework 31 to be connected so that the inside of described feed hopper 33 communicates with the inside of described framework 31.One end of described first pipeline 34 is directed at described third through-hole 311 and fixing with the right surface of described framework 31 is connected so that the inside of described first pipeline 34 communicates with the inside of described framework 31.Described first water pump 36 is for being pumped into extraneous water in the first pipeline 34.Described 3rd support bar 37 is in vertical shape, and the upper end of described 3rd support bar 37 is fixing with described first pipeline 34 to be connected, and the lower end of described 3rd support bar 37 is fixing with described first cross bar 38 to be connected.Described first cross bar 38 is provided with two and lays respectively at the left and right sides of described framework 31, and described first cross bar 38 is horizontal, and one end of described first cross bar 38 is fixing with the side of described framework 31 to be connected.The described first inclined shape of brace 39, the lower end of described first brace 39 is fixing with described first cross bar 38 to be connected, and the upper end of described first brace 39 is fixing with described framework 31 to be connected.Described first roller 30 is in cylinder, described first roller 30 horizontal positioned, described first roller 30 turns with framework 31 axle and is connected, described first roller 30 can be rotated in described framework 31, described first roller 30 is connected with motor, and then drive described first roller 30 to rotate, described first roller 30 is provided with some first bristles 301, described first bristle 301 is evenly distributed on described first roller 30 and is secured to connect, described first bristle 301 rotates along with the rotation of described first roller 30, and then can so that water and ore dressing water are sufficiently mixed, further dilution ore dressing water.
As it is shown in figure 1, described defecator 4 includes the 5th drainage screen 41, is arranged at the 6th drainage screen 42, the first connecting line 43 being arranged on described 6th drainage screen 42, the vibrator 44 being arranged on described 5th drainage screen 41 of described 5th drainage screen 41 left and right sides and is positioned at the second connecting line 45 on the left of described 5th drainage screen 41.The cross section of described 5th drainage screen 41 is inverted v-shaped, and described 5th drainage screen 41 is positioned at the lower section of described framework 31.Described 6th drainage screen 42 is provided with two and lays respectively at the left and right sides of described 5th drainage screen 41, the described 6th inclined shape of drainage screen 42, and the lower end of described 6th drainage screen 42 is fixing with described 5th drainage screen 41 to be connected.Described first connecting line 43 is provided with two, and the upper end of described first connecting line 43 is fixing with described first cross bar 38 to be connected, and the lower end of described first connecting line 43 is fixing with described 6th drainage screen 42 to be connected.Described vibrator 44 is provided with two and lays respectively at the left and right sides of described 5th drainage screen 41, and described vibrator 44 is fixing with described 5th drainage screen 41 to be connected, and described vibrator 44 is electrically connected with the power supply so that described vibrator 44 can vibrate.The right-hand member of described second connecting line 45 is fixing with described 5th drainage screen 41 to be connected.
As it is shown in figure 1, described collection device 5 includes the second casing 51, is positioned at the baffle 52 of described second casing 51, is positioned at the baffle plate 53 above described second casing 51, is positioned at the second pipe 54 on the right side of described second casing 51 and the second valve 55 being arranged on described second pipe 54.Described second casing 51 is in hollow cuboid, described second casing 51 is placed in described gripper shoe 2, described second casing 51 is placed on the lower section of described 5th drainage screen 41, the water after the 5th drainage screen 41 filters is made to enter in the second casing 51, the right surface of described second casing 51 is provided with fourth hole 511, and described fourth hole 511 is in cylindrical shape.The right surface of described baffle 52 is fixing with the inner surface of described second casing 51 to be connected, and the inclined shape of upper surface of described baffle 52, such that it is able to focus on the left side in the second casing 51 by the water after the 5th drainage screen 41 filters.Described baffle plate 53 is in bending, the lower end of described baffle plate 53 is fixing with the upper surface of described second casing 51 to be connected, described baffle plate 53 is positioned at the right side of described 5th drainage screen 41 and the 6th drainage screen 42, prevent the water after the 5th drainage screen 41 filters from splashing the right side of the second casing 51, cause the waste of resource.The described inclined shape of second pipe 54, the upper end of described second pipe 54 is directed at described fourth hole 511 and fixing with the right surface of described second casing 51 is connected, first through hole 21 described in the lower end aligned of described second pipe 54 and fixing with the upper surface of described gripper shoe 2 be connected so that the inside of described second pipe 54 with described go out bucket 22 inside communicate.
As it is shown in figure 1, described air cylinder device 6 includes the first support 61, the cylinder 62 that is positioned on described first support 61, be positioned at the catch bar 63 on the right side of described cylinder 62, be positioned at the push pedal 64 on the right side of described catch bar 63, be positioned at the location bar 67 of described catch bar about 63 both sides, be positioned at the 4th support bar 65 above described gripper shoe 2 and be positioned at the second support 66 above described cylinder 62.Described first support 61 is L-shaped, and one end of described first support 61 is fixing with described second support bar 12 to be connected, and the other end of described first support 61 is that vertical shape and fixing with the lower surface of described cylinder 62 is connected.Described 4th support bar 65 is in cuboid, and described 4th support bar 65 is vertically placed, and the lower end of described 4th support bar 65 is fixing with described gripper shoe 2 to be connected, and the upper end of described 4th support bar 65 is fixing with described first cross bar 38 to be connected.Described catch bar 63 is in cuboid, described catch bar 63 horizontal positioned, the left end of described catch bar 63 is connected with described cylinder 62, described cylinder 62 is made to drive described catch bar 63 to move left and right, described catch bar 63 runs through the surface, left and right of described 4th support bar 65 and is slidably connected with it, described catch bar 63 can be moved left and right, described catch bar 63 runs through the left surface of described second casing 51 and extends to the inside of described second casing 51, and described catch bar 63 is slidably connected with described second casing 51.Described push pedal 64 is in cuboid, and described push pedal 64 is vertically placed, and described push pedal 64 is contained in described second casing 51, and the inner surface of described push pedal 64 and described second casing 51 is slidably connected so that described push pedal 64 can move left and right in described second casing 51.Described second support 66 is L-shaped, and one end of described second support 66 is fixing with the upper surface of described cylinder 62 to be connected, and the other end of described second support 66 is fixing with described 4th support bar 65 to be connected.Described location bar 67 is provided with two, and described location bar 67 is in cuboid, and described location bar 67 horizontal positioned, the left end of described location bar 67 is fixing with described 4th support bar 65 to be connected, and the right-hand member of described location bar 67 is fixing with described second casing 51 to be connected.The left end of described second connecting line 45 is fixing with the right surface of described 4th support bar 65 to be connected.
As shown in Figure 1, when described ore dressing wastewater treatment cyclic utilization device of the present invention uses, first ore dressing water is placed in feed hopper 33, start the first water pump 36 simultaneously, and one end of the first pipeline 34 is placed in pond, then water is pumped in the first pipeline 34, then the first valve 35 is opened, water is made to enter in framework 31, after the filtration of the 4th drainage screen 32, it is sufficiently mixed with ore dressing water, and then dilution ore dressing water, then the motor being connected with the first roller 30 is started, first roller 30 is rotated, and then the first bristle 301 is rotated with, ore dressing water and clear water can be sufficiently mixed, dilution effect is better.Then the water after dilution drops on the 5th drainage screen 41, then Vibration on Start-up device 44,5th drainage screen 41 and the 6th drainage screen 42 are vibrated therewith, and then can filter fully by the ore dressing water after dilution on which, then the water after filtering drops on the second casing 51, and described 5th drainage screen 41 is served supporting role by described first connecting line 43.In the filtration that ore dressing water is filtered by described 5th drainage screen 41, ore dressing water is also being filtered by described 6th drainage screen 42, and fall through into from the both sides of the 5th drainage screen 41 in second casing 51, and the setting due to baffle 52 so that water enters in the second casing 51 through the upper surface of baffle 52.Described 5th drainage screen 41 and the 6th drainage screen 42 are when being filtered ore dressing water, and the water in described second casing 51 is precipitating so that impurity focuses on the bottom within the second casing 51.nullAfter to be filtered,Open the second valve 55,The water on upper strata in second casing 51 is entered into out in bucket 22 through second pipe 54,Then in shake frame 24,Start cylinder 62 simultaneously,Catch bar 63 is made to promote to the right push pedal 64,The impurity making the water in the second casing 51 and bottom moves to the right,Described impurities accumulation more and more higher,The water making upper strata also more comes also high,And then water is entered in second pipe 54 from fourth hole 511,Then into going out in bucket 22,Then drop in shake frame 24,Until the water in described second casing 51 is all introduced in shake frame 24,When water drops in shake frame 24,Described shake frame 24 is shaken,And then its interior water is entered in the first casing 27 from the filtration of described first drainage screen 25 as soon as possible,It is then passed through the second drainage screen 28、The bottom in the second casing 27 is entered into after the filtration of activated carbon and the 3rd drainage screen 29.Start heating rod 201 so that temperature in the first casing 27 rises, and then make the water in the first casing 27 flash to steam to be dispersed in air, environment friendly and pollution-free.So far, ore dressing wastewater treatment cyclic utilization device use procedure of the present invention is described.
The above; being only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any those skilled in the art are in the technical scope that the invention discloses; change can be readily occurred in or replace, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.

Claims (9)

  1. null1. an ore dressing wastewater treatment cyclic utilization device,It is characterized in that: described ore dressing wastewater treatment cyclic utilization device includes base plate、It is positioned at the gripper shoe above described base plate、It is positioned at the frame device above described gripper shoe、It is positioned at the defecator below described frame device、It is positioned at the collection device below described defecator and is positioned at the air cylinder device on the left of described collection device,Described base plate is provided with the first support bar above it、It is positioned at the second support bar on the left of described first support bar、It is positioned at the first spring on the right side of described second support bar and is positioned at the place kick on the right side of described first spring,Described gripper shoe is provided with through the first through hole of its upper and lower surface、What be disposed below goes out bucket、The head rod above bucket is gone out described in being positioned at、The shake frame below bucket is gone out described in being positioned at、It is arranged at the first drainage screen on described shake frame、It is positioned at the second spring above described shake frame、It is positioned at the first casing below described shake frame、It is contained in the second drainage screen in described first casing、It is positioned at the 3rd drainage screen below described second drainage screen、Heat radiation frame and be contained in the heating rod in described heat radiation frame,Described frame device includes framework、It is positioned at the feed hopper above described framework、It is contained in the 4th drainage screen in described framework、It is positioned at the first pipeline on the right side of described framework、It is arranged at the first water pump on described first pipeline、First valve、It is positioned at the 3rd support bar below described first pipeline、It is positioned at the first cross bar of the described framework left and right sides、It is positioned at the first brace on the left of described framework and is contained in the first roller of described framework,Described defecator includes the 5th drainage screen、It is arranged at the 6th drainage screen of the described 5th drainage screen left and right sides、It is arranged at the first connecting line on described 6th drainage screen、It is arranged at the vibrator on described 5th drainage screen and is positioned at the second connecting line on the left of described 5th drainage screen,Described collection device includes the second casing、It is positioned at the baffle of described second casing、It is positioned at the baffle plate above described second casing、It is positioned at the second pipe on the right side of described second casing and the second valve being arranged on described second pipe,Described air cylinder device includes the first support、It is positioned at the cylinder on described first support、It is positioned at the catch bar on the right side of described cylinder、It is positioned at the push pedal on the right side of described catch bar、It is positioned at the location bar of the upper and lower both sides of described catch bar、It is positioned at the 4th support bar above described gripper shoe and is positioned at the second support above described cylinder.
  2. 2. ore dressing wastewater treatment cyclic utilization device according to claim 1, it is characterized in that: described first support bar is cuboid, described first support bar is vertically placed, the lower end of described first support bar is fixing with described base plate to be connected, the upper end of described first support bar is fixing with described gripper shoe to be connected, described second support bar is cuboid, described second support bar is vertically placed, the lower end of described second support bar is fixing with described base plate to be connected, the upper end of described second support bar is fixing with described gripper shoe to be connected, described first spring is provided with two, described first spring is horizontal, the left end of described first spring is fixing with described second support bar to be connected, the right-hand member of described first spring is fixing with described place kick to be connected, described place kick is spherical.
  3. 3. ore dressing wastewater treatment cyclic utilization device according to claim 2, it is characterized in that: described in go out bucket be hollow round table-like, described go out bucket upper end be directed at described first through hole and fixing with the lower surface of described gripper shoe be connected, described head rod is provided with two and goes out the left and right sides of bucket described in laying respectively at, described head rod is vertical shape, the upper end of described head rod is fixing with the lower surface of described gripper shoe to be connected, the lower end of described head rod with described go out bucket is fixing is connected, the cross section of described shake frame is bending, described shake frame goes out the lower section of bucket described in being positioned at, described shake frame is provided with the second through hole, described first drainage screen is bending, described first drainage screen is contained in described second through hole and fixes with described shake frame and is connected.
  4. null4. ore dressing wastewater treatment cyclic utilization device according to claim 3,It is characterized in that: described second spring is vertical shape,The lower end of described second spring is fixing with described shake frame to be connected,The upper end of described second spring is fixing with described gripper shoe to be connected,Described first casing is hollow cuboid,Described first casing is placed on,Described place kick acts against on the left surface of described first casing,Described second drainage screen is cuboid,Described second drainage screen is horizontal,The side of described second drainage screen is fixing with the inner surface of described first casing to be connected,Described heat radiation frame is hollow cuboid,The cross section of described heat radiation frame is inverted concave shape,The lower surface of described heat radiation frame is fixing with the inner surface of described first casing to be connected,Described 3rd drainage screen is cuboid,Described 3rd drainage screen horizontal positioned,The side of described 3rd drainage screen is fixing with the inner surface of described first casing to be connected,Described heat radiation frame runs through the upper and lower surface of described 3rd drainage screen and is secured to connect,Activated carbon is placed between described second drainage screen and described 3rd drainage screen.
  5. null5. ore dressing wastewater treatment cyclic utilization device according to claim 4,It is characterized in that: described framework is hollow cuboid,Described framework is provided with the third through-hole on its right surface,Described 4th drainage screen is hollow hemispherical,The right surface of described 4th drainage screen is fixing with the inner surface of described framework to be connected,Described 4th drainage screen is positioned at the left side of described third through-hole,The lower surface of described feed hopper is fixing with the upper surface of described framework to be connected,One end of described first pipeline is directed at described third through-hole and fixing with the right surface of described framework is connected,Described 3rd support bar is vertical shape,The upper end of described 3rd support bar is fixing with described first pipeline to be connected,The lower end of described 3rd support bar is fixing with described first cross bar to be connected,Described first cross bar is provided with two and lays respectively at the left and right sides of described framework,Described first cross bar is horizontal,One end of described first cross bar is fixing with the side of described framework to be connected,The described first inclined shape of brace,The lower end of described first brace is fixing with described first cross bar to be connected,The upper end of described first brace is fixing with described framework to be connected,Described first roller is cylinder,Described first roller water placing flat,Described first roller turns with framework axle and is connected,Described first roller is provided with some first bristles,Described first bristle is evenly distributed on described first roller and is secured to connect.
  6. 6. ore dressing wastewater treatment cyclic utilization device according to claim 5, it is characterized in that: the cross section of described 5th drainage screen is inverted v-shaped, described 5th drainage screen is positioned at the lower section of described framework, described 6th drainage screen is provided with two and lays respectively at the left and right sides of described 5th drainage screen, the described 6th inclined shape of drainage screen, the lower end of described 6th drainage screen is fixing with described 5th drainage screen to be connected, described first connecting line is provided with two, the upper end of described first connecting line is fixing with described first cross bar to be connected, the lower end of described first connecting line is fixing with described 6th drainage screen to be connected, described vibrator is provided with two and lays respectively at the left and right sides of described 5th drainage screen, described vibrator is fixing with described 5th drainage screen to be connected, the right-hand member of described second connecting line is fixing with described 5th drainage screen to be connected.
  7. 7. ore dressing wastewater treatment cyclic utilization device according to claim 6, it is characterized in that: described second casing is hollow cuboid, described second casing is placed in described gripper shoe, described second casing is placed on the lower section of described 5th drainage screen, the right surface of described second casing is provided with fourth hole, the right surface of described baffle is fixing with the inner surface of described second casing to be connected, the inclined shape of upper surface of described baffle, described baffle plate is bending, the lower end of described baffle plate is fixing with the upper surface of described second casing to be connected, the inclined shape of described second pipe, the upper end of described second pipe is directed at described fourth hole and fixing with the right surface of described second casing is connected, first through hole described in the lower end aligned of described second pipe and fixing with the upper surface of described gripper shoe be connected.
  8. null8. ore dressing wastewater treatment cyclic utilization device according to claim 7,It is characterized in that: described first support is L-shaped,One end of described first support is fixing with described second support bar to be connected,The other end of described first support is vertical shape and fixing with the lower surface of described cylinder is connected,Described 4th support bar is cuboid,Described 4th support bar is vertically placed,The lower end of described 4th support bar is fixing with described gripper shoe to be connected,The upper end of described 4th support bar is fixing with described first cross bar to be connected,Described catch bar is cuboid,Described catch bar horizontal positioned,The left end of described catch bar is connected with described cylinder,Described catch bar runs through the surface, left and right of described 4th support bar and is slidably connected with it,Described catch bar runs through the left surface of described second casing and extends to the inside of described second casing,Described catch bar is connected with described second box body-sliding.
  9. 9. ore dressing wastewater treatment cyclic utilization device according to claim 8, it is characterized in that: described push pedal is cuboid, described push pedal is vertically placed, described push pedal is contained in described second casing, the inner surface of described push pedal and described second casing is slidably connected, described second support is L-shaped, one end of described second support is fixing with the upper surface of described cylinder to be connected, the other end of described second support is fixing with described 4th support bar to be connected, described location bar is provided with two, described location bar is cuboid, described location bar horizontal positioned, the left end of described location bar is fixing with described 4th support bar to be connected, the right-hand member of described location bar is fixing with described second casing to be connected, the left end of described second connecting line is fixing with the right surface of described 4th support bar to be connected.
CN201610237076.5A 2016-04-15 2016-04-15 A kind of ore dressing wastewater treatment cyclic utilization device Expired - Fee Related CN105753238B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610237076.5A CN105753238B (en) 2016-04-15 2016-04-15 A kind of ore dressing wastewater treatment cyclic utilization device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610237076.5A CN105753238B (en) 2016-04-15 2016-04-15 A kind of ore dressing wastewater treatment cyclic utilization device

Publications (2)

Publication Number Publication Date
CN105753238A true CN105753238A (en) 2016-07-13
CN105753238B CN105753238B (en) 2018-07-03

Family

ID=56335169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610237076.5A Expired - Fee Related CN105753238B (en) 2016-04-15 2016-04-15 A kind of ore dressing wastewater treatment cyclic utilization device

Country Status (1)

Country Link
CN (1) CN105753238B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106423499A (en) * 2016-10-07 2017-02-22 王杨 Environment-friendly solid waste disposal system
CN107098490A (en) * 2017-04-19 2017-08-29 许琴 A kind of construction site wastewater efficient processing equipment
CN107324526A (en) * 2017-08-24 2017-11-07 韩丹 A kind of sanitary wastewater purification apparatus
CN107899296A (en) * 2017-11-27 2018-04-13 青岛海盈智高新技术有限公司 A kind of multi-stage sewage filtration processing equipment
CN111252944A (en) * 2020-02-25 2020-06-09 广州隆盛景观建设有限公司 Combined type garden sewage treatment method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1085738A (en) * 1996-07-23 1998-04-07 Mitsuhiro Fujiwara Suspended matter removing device
CN105299995A (en) * 2015-10-21 2016-02-03 王杨 Cooling system for petroleum drilling rig
CN105330083A (en) * 2015-10-26 2016-02-17 张萍 Petroleum and petrochemical wastewater recycling and treating device
CN205501023U (en) * 2016-04-15 2016-08-24 龙江汇 Ore dressing sewage treatment cyclic utilization device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1085738A (en) * 1996-07-23 1998-04-07 Mitsuhiro Fujiwara Suspended matter removing device
CN105299995A (en) * 2015-10-21 2016-02-03 王杨 Cooling system for petroleum drilling rig
CN105330083A (en) * 2015-10-26 2016-02-17 张萍 Petroleum and petrochemical wastewater recycling and treating device
CN205501023U (en) * 2016-04-15 2016-08-24 龙江汇 Ore dressing sewage treatment cyclic utilization device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106423499A (en) * 2016-10-07 2017-02-22 王杨 Environment-friendly solid waste disposal system
CN107098490A (en) * 2017-04-19 2017-08-29 许琴 A kind of construction site wastewater efficient processing equipment
CN107098490B (en) * 2017-04-19 2021-03-12 浡江生态建设集团有限公司 Building site sewage high efficiency treatment equipment
CN107324526A (en) * 2017-08-24 2017-11-07 韩丹 A kind of sanitary wastewater purification apparatus
CN107324526B (en) * 2017-08-24 2019-11-05 中蓝环境科技有限公司 A kind of sanitary wastewater purification apparatus
CN107899296A (en) * 2017-11-27 2018-04-13 青岛海盈智高新技术有限公司 A kind of multi-stage sewage filtration processing equipment
CN111252944A (en) * 2020-02-25 2020-06-09 广州隆盛景观建设有限公司 Combined type garden sewage treatment method

Also Published As

Publication number Publication date
CN105753238B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN205501023U (en) Ore dressing sewage treatment cyclic utilization device
CN105753238A (en) Beneficiation wastewater treating and recycling device
CN105879491A (en) Sewage purification treatment equipment for ore production
CN104803513A (en) Bioreaction wastewater treatment device
CN105771530A (en) Dust removal system for mineral production workshop
CN105645656B (en) A kind of industrial waste water purifying processing equipment
CN205473016U (en) Sewage rapidly transacting device
CN203303707U (en) Drift sand filter
CN207224234U (en) A kind of concrete slab automatic mold cleaning device
CN206783507U (en) A kind of excrement material dewaterer
CN205684451U (en) A kind of industrial chemicals storage bottle cleans device
CN208071503U (en) A kind of steel construction production sewage disposal device
CN208082090U (en) A kind of plastic film workshop flue dust exclusion machine
CN203264364U (en) 360-degree water feeding rotary underwater filter bed device
CN211069490U (en) Production of PVC cavity composite tile is with dust extraction that noise is little
CN205683683U (en) A kind of rotating cylinder vacuum filtering system
CN109205746A (en) It is a kind of for handling the filter device of coal chemical industry high-concentration sewage
CN107081001A (en) A kind of fiber filter disc filtration system
CN107235522A (en) A kind of industrial waste water disposal device
CN106477844A (en) A kind of excrement material dewaterer
CN103555567A (en) Large-scale microalgae separation, collection and drying equipment
CN208757069U (en) A kind of sewage treatment device easy to use
CN106377937A (en) Sludge treatment purification system used in industry field
CN105727671B (en) A kind of dust arrester in chemical pharmaceutical workshop
CN106606903A (en) Environment-friendly building material production sewage treatment equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180523

Address after: 741000 Li Zi Township, Qinzhou District, Tianshui, Gansu

Applicant after: Gansu Tianshui Li Zi Gold Mine Co.,Ltd.

Address before: 325200 No. 2111, Shanghai East Road, Ruian Economic Development Zone, Wenzhou, Zhejiang

Applicant before: Long Jianghui

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703

CF01 Termination of patent right due to non-payment of annual fee