CN105743293A - Upper joint welding and joint box pouring plugging method for power generator stator winding - Google Patents

Upper joint welding and joint box pouring plugging method for power generator stator winding Download PDF

Info

Publication number
CN105743293A
CN105743293A CN201610288205.3A CN201610288205A CN105743293A CN 105743293 A CN105743293 A CN 105743293A CN 201610288205 A CN201610288205 A CN 201610288205A CN 105743293 A CN105743293 A CN 105743293A
Authority
CN
China
Prior art keywords
headgear
joint
insulation booth
bar
asbestos
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610288205.3A
Other languages
Chinese (zh)
Inventor
冯朝波
王利强
王光辉
张永君
孙成库
刘大雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Songhua River Hydropower Generation Co Ltd Jilin Baishan Power Plant
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Original Assignee
Baishan Power Plant
STATE GRID XINYUAN HYDROPOWER CO Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baishan Power Plant, STATE GRID XINYUAN HYDROPOWER CO Ltd, State Grid Corp of China SGCC filed Critical Baishan Power Plant
Priority to CN201610288205.3A priority Critical patent/CN105743293A/en
Publication of CN105743293A publication Critical patent/CN105743293A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K15/00Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines
    • H02K15/0056Manufacturing winding connections
    • H02K15/0068Connecting winding sections; Forming leads; Connecting leads to terminals
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K15/00Methods or apparatus specially adapted for manufacturing, assembling, maintaining or repairing of dynamo-electric machines
    • H02K15/12Impregnating, heating or drying of windings, stators, rotors or machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Insulation, Fastening Of Motor, Generator Windings (AREA)

Abstract

The invention relates to the field of a power generator, and particularly to an upper joint welding and joint box pouring and plugging method for a power generator stator winding. The upper joint welding and joint box pouring and plugging method comprises the steps of plugging before upper end welding, performing preparation operation, plugging and end welding. The upper joint welding and joint box pouring plugging method effectively prevent tin leakage in welding and glue leakage in pouring. The upper joint welding and joint box pouring plugging method has advantages of high maintenance quality, high efficiency, high safety, high stability, concise technology, high practicability, effective cost reduction and remarkable economic benefit improvement.

Description

The welding of generator unit stator winding upper connection and connector box perfusion method for blocking
Technical field
The present invention relates to electrical generator fields, i.e. the welding of generator unit stator winding upper connection and connector box perfusion method for blocking.
Background technology
In the prior art, the stator winding of electromotor is made up of the many welded series connection of bar, these plumb joints to be subject to the impact of various mechanical vibration in generator operation, short circuit current and the electrodynamic effect of short circuit current generation is subject to when fault, all it is likely to make the resistance of some plumb joints increase and cause heating, for guaranteeing that in unit running process, each connector temperature of generator unit stator winding is in normal range, prevent the generation of the accident of snapping, need the D.C. resistance of periodic measurement generator unit stator winding, and substantial portion of D.C. resistance exceeds standard not good with the welding quality of stator joint own, such as disconnected stock, rosin joints etc. have very big relation, in installation process, the quality control efforts of stator weld is particularly important;Stator winding splice insulation is realized by connector box, and whether splice insulation quality, leakage current be qualified, depends on splice insulation box pouring quality.Conventional bar joint adopts and headgear soldering process, and splice insulation is the perfusion of insulation booth epoxy resin.The welding of upper end adopted asbestos nest to encase termination headgear in the past, also headgear heating will add Colophonium and scolding tin after reaching uniform temperature, make and in headgear, be full of scolding tin, welding to check asbestos nest bottom leaky situation at any time, and leak stopping in time prevents molten stannum from flowing in end crevice, due to scolding tin weight in welding, asbestos nest is made well also very easily occurs leakage stannum phenomenon again.And for technology that welding and the insulation booth of upper end is poured in " hydraulic generator stator assembled in situ technique directive/guide " and " maintenance procedure of electrical equipment " all without molding, difficult point in maintenance is in that leak stopping difficulty, in welding and perfusion, leakage stannum and leakage glue phenomenon happen occasionally, this had both affected the efficiency of maintenance, also contributed to repair quality.The perfusion of upper end insulation booth was mix up position after being inserted in by insulation booth in the past, with epoxy putty, insulation booth end opening is blocked, owing between stator end connector box, gap is big compared with gap between little, levels bar, in addition cannot see many reasons such as closure situation during closure, want closure and do not leak extremely difficult.
Summary of the invention
It is an object of the invention to provide a kind of generator unit stator winding upper connection welding and connector box perfusion method for blocking for above-mentioned deficiency, effectively prevent the phenomenon of welding hourglass stannum and perfusion hourglass glue and occur.
The technical solution of the present invention is: a kind of generator unit stator winding upper connection welding method, it is characterised in that step is as follows:
One, closure before upper end welding
One) preparation
1, stator end and gap are cleaned up.
2, carefully clear up bar joint area with acetone, thoroughly remove the remaining glue of joint surface, oxide layer and other dirt, see true qualities with 0# sand paper and brass wire brush polishing bar joint, and clean with alcohol washes.
3, with shaping tool, upper and lower layer line rod lead riser being corrected alignment, left and right tolerance is less than 5mm.
4, correct in qualified rear enclosure and headgear, load copper wedge, copper cash and and headgear between gap be not more than 0.3mm.
5, with locking pliers will and after headgear and bar strand combine closely, then cut winding termination redundance copper cash with crop instrument, make and headgear top simultaneously.
Two) closure
1, asbestos cloth being cut into corresponding size, on asbestos cloth, spacing and width according to also headgear end face cut strip mouth, are enclosed within and on headgear, use hands compacting after packaging, it is ensured that asbestos cloth and bar close contact.
2, tight with soaking asbestos cloth plug between stator upper and lower layer line rod and between adjacent bar, it is prevented that solder is fallen in iron core slot, and asbestos cloth is not easily overly wet, in order to avoid water droplet instills bar and makes stator make moist.
3, cable paper is cut into T-shaped, and " horizontal stroke " length is and the girth of headgear, and wide be also headgear height;" erecting " width is the width of crotch fork between levels bar, and length is and headgear height adduction headgear thickness;By bottom T-shaped cable paper alignment headgear between levels bar crotch fork hold and one layer of headgear, then take a T-shaped cable paper and wrap one layer along opposite again.
4, with wide medical white glue cloth along crotch fork upwards wrapping one layer between the line of rabbet joint rod of front and back, respectively being wrapped up one layer by crotch fork lower end between levels bar to angle, 45 degree of both sides again, same method wraps one layer again, it is desirable to the interspersed overlap joint of each layer white glue cloth, the lap of splice is not less than 15mm, will and obturage bottom headgear.
5, also headgear facade entirety wrapping up two-layer with wide medical white glue cloth, facade white glue cloth and the bottom surface white glue cloth lap of splice are not less than 15mm, with hands by the white glue cloth compacting of all wrappings.
6, make asbestos putty with asbestos wool, select common asbestos wool to reduce cost, incite somebody to action with the asbestos putty become reconciled and all seal around headgear, seal tightly, during envelope asbestos putty, the joint needing weldering is once carried out, for the adjacent joint not welded, with asbestos cloth every good, it is prevented that damage splice insulation.
Three) soldering tip
1, during plumb joint, first clean a lower contact with hairbrush, also headgear spills some Colophonium powder, process of heating is continuously added scolding tin and Colophonium, until added scolding tin illustrates that joint scolding tin has been filled with when no longer penetrating into and do not emit bubble, when joint soon welds, put into Colophonium powder, and headgear two, fill and lead up with scolding tin.
2, after being soldered joint, scolding tin needs full, smooth surface, removes clean by the scolding tin being attached to outside joint.
3, measuring joint D.C. resistance, it is qualified for recording DC resistance less than 4 micro-ohms.
A kind of generator unit stator winding upper connection connector box perfusion method for blocking, it is characterised in that step is as follows:
One) prepare
1, checking that insulation booth answers flawless, bubble, wall thickness is consistent and is not less than 3mm, is thoroughly cleaned up by insulation booth inwall with ethanol.
2, thoroughly clean with ethanol blank area dirty and and headgear welding time cotton mud and foreign material.
Two) closure
1, go out notch place pad rag in levels bar to be hidden in all gaps, in order to clear up after potting compound seepage.
2, E type inserted sheet is made with 1mm thickness epoxy plate, size is just can insert and below headgear, levels bar crotch fork is advisable, with two pieces of E type inserted sheets to being inserted in and below headgear between levels bar crotch fork, it is determined that good highly and level, urgent with wedge shape negative and positive timber wedge below, hold epoxy plate.
3, block space between epoxy plate and bar with closure putty, during closure, note dynamics, in case the displacement of E type inserted sheet.
4, insulation booth is enclosed within and headgear on, insulation booth wants uniform with the gap of also headgear, range estimation insulation booth end opening and E type blade contact position, mention insulation booth, between insulation booth end opening and E type blade contact face, pad puts one layer of " gasket seal " made with closure putty, the light compacting of insulation booth have gentle hands put back to by gasket seal after carrying out, note dynamics during pressure, it is prevented that overexerts and makes E type inserted sheet conjugate.
Three) insulation booth perfusion
1, block after putty solidification until base opening, 881A potting compound is heated to 40 degrees Celsius and stirs, then add 881B potting compound to be sufficiently stirred for immediately, so as to mix homogeneously, then pour into respectively in the insulation booth sealing base opening, note first injecting potting compound thicker on a small quantity when irrigating, observe after 30 minutes with or without Seepage, again by potting compound filling to connector box top slowly after ne-leakage, with without trickling phenomenon for standard, note observing potting compound with or without sinkage simultaneously.
2, after insulation booth potting compound solidifies, if glue surface is suitable for reading lower than insulation booth, should mend in insulation booth and fill out potting compound to being full of insulation booth, after insulation booth perfusion, should not have penetrability pore and crackle.
3, insulation booth potting compound carries out after solidifying overflowing potential test, it is desirable to it is qualified for overflowing current potential below 1000 volts.
Carry out upper end with cable paper with medical white glue cloth weld front closure and adopt timber wedge block and E type epoxy plate to carry out the front blocking technology of insulation booth perfusion, preferably resolve the difficult problems such as closure difficulty is loaded down with trivial details with construction.
Now adopting cable paper and the wrapping of medical white glue cloth, the method reinforced with asbestos putty blocks, and well solves Lou stannum problem.
Timber wedge block is now adopted to support, E type epoxy plate grafting method for blocking, simple, convenient and efficient.
The invention have the advantage that 1, repair quality is good, efficiency is high.Change the speed caused with single traditional method closure slow, ropy shortcoming, the brewed asbestos putty of conventional asbestos board that blocks before welding blocks, owing to density is inadequate, pressure-bearing property is poor, when scolding tin pressure reaches to a certain degree, and the asbestos putty bottom headgear is easy to produce gap with also headgear so that scolding tin leaks outside.The simple insulation booth with epoxy putty closure in the past, owing to the space between levels bar is relatively big, the epoxy putty of closure can depart from insulation booth under self gravitation effect, produces gap, causes that insulating cement leaks outside.Leak stopping is the difficult point in these two work, sometimes even needs the closure repeatedly of five or six times.Can not again block after leakage stannum at once, after need to waiting until that closing on joint is soldered, in order to avoid damaging, when removing leakage stannum joint asbestos putty, the asbestos putty closing on joint, also need joint cooling by the time, this just makes work efficiency be greatly lowered, and clears up the scolding tin spilt simultaneously and is also required to substantial amounts of time and efforts.The repairing of leakage glue need to wait until that the closure putty of mending-leakage solidifies, and closure putty solidifies the six hours times of need, add after encapsulating etc. to be seen, repairing several times will waste a lot of time, and leak the cleaning of glue and also need the cost plenty of time.New method disposable can be welded after adopting, irrigated successfully, and quality and efficiency are greatly improved.2, security and stability is high.Before the welding of conventional upper end, stannum is very easily leaked in closure, the cleaning of leakage stannum is very difficult, if the scolding tin cleaning leaked outside is unclean and is retained between adjacent bar or between bar and iron core gap, by the insulation of serious threat bar, bury greatly hidden danger for equipment safety operation;The joint of failure welding generates heat at unit operation center tap, if finding not in time and place comprehends and causes joint fusing, overhang insulation to burn, causes generator unit stator open circuit, ground connection or short trouble, and consequence is serious, loses great.The harm of leakage glue is also very big, and leakage glue drops down the ventilation and heat radiation that can affect stator on iron core, and leakage glue drops down in stator core slot, and to next time, the replacing beating again especially bar of slot wedge increases great difficulty.Use the joint of new method welding and the insulation booth substantially once success of perfusion, avoid the harm of Lou stannum and leakage adhesive tape, operation there is not once overheated, crackle, creepage phenomenon, the effective safety and stability performance improving unit, it is ensured that the safe operation of equipment.3, technique is simple and direct practical.The simple and direct practicality of new technology, well solve Lost circulation problems, it is to avoid the phenomenon repeatedly done over again because of leakage stannum, leakage glue, has won valuable time for service work, has also saved material, expense and labour force simultaneously, has been worth hydroelectric power plant to promote and uses.4, reduce cost and improve economic benefit.The accident that generator unit stator joint occurs because of failure welding is a lot, if finding in time, to process proper, can avoid the expansion that causes the accident, otherwise, cause overhang insulation to burn owing to accident spreads expansion, consequence is serious, loses great, is difficult to recover for the moment.The joint quality that new technology makes is good, one-shot forming, shorten maintenance duration and add economic benefit, for instance in maintenance, change 59 stator bars, maintenance duration 17 days altogether, if taking around 6 day duration according to conventional bar weld and insulation booth instillation process, selecting new method only to use 3 days just to complete this work, having won the 3 day time of preciousness, putting into operation for unit on schedule and provide guarantee, the economic benefit directly or indirectly created for enterprise cannot be estimated.
Below in conjunction with accompanying drawing, embodiments of the present invention are described in further detail.
Accompanying drawing explanation
Fig. 1 is cutting asbestos cloth strip mouth structure sketch of the present invention.
Fig. 2 is the T-shaped cable paper structure diagram of the present invention.
Fig. 3 is E type epoxy plate plate-inserting structure sketch.
Fig. 4 is and headgear parcel insulating paper, medical proof fabric, asbestos putty structure diagram.
Fig. 5 is and headgear installs insulation booth additional and with E shape inserted sheet and timber wedge fixed structure sketch.
Detailed description of the invention
Referring to Fig. 1,2,3,4,5, parts title is as follows: T-shaped cable paper 1, asbestos putty 2, stator bar end 3, and headgear 4, epoxy putty pad 5, insulation booth 6, negative and positive timber wedge 7, E type inserted sheet 8, asbestos cloth 9.
Embodiment 1
Generator unit stator winding upper connection welding method
One, closure before upper end welding
One) preparation:
1, stator end and gap are cleaned up.
2, carefully clear up bar joint area with acetone, it is necessary to thoroughly remove the remaining glue of joint surface, oxide layer and other dirt, see true qualities with 0# sand paper and brass wire brush polishing bar joint, and clean with alcohol washes.
3, with shaping tool, upper and lower layer line rod lead riser being corrected alignment, left and right tolerance is less than 5mm.
4, correct in qualified rear enclosure and headgear, load copper wedge, copper cash and and headgear between gap be generally no greater than 0.3mm.
5, with specific purpose tool locking pliers will and after headgear and bar strand combine closely, then cut winding termination redundance copper cash with crop instrument, make and headgear top simultaneously.
Two) closure:
1, asbestos cloth being cut into corresponding size, on asbestos cloth, spacing and width according to also headgear end face cut strip mouth, are enclosed within and on headgear, use hands compacting after packaging, it is ensured that asbestos cloth and bar close contact.
2, tight with soaking asbestos cloth plug between stator upper and lower layer line rod and between adjacent bar, it is prevented that solder is fallen in iron core slot, and asbestos cloth is not easily overly wet, in order to avoid water droplet instills bar and makes stator make moist.
3, cable paper is cut into T-shaped, and " horizontal stroke " length is and the girth of headgear, and wide be also headgear height;" erecting " width is the width of crotch fork between levels bar, and length is and headgear height adduction headgear thickness;By bottom T-shaped cable paper alignment headgear between levels bar crotch fork hold and one layer of headgear, then take a T-shaped cable paper and wrap one layer along opposite again.
4, with wide medical white glue cloth along crotch fork upwards wrapping one layer between the line of rabbet joint rod of front and back, respectively being wrapped up one layer by crotch fork lower end between levels bar to angle, 45 degree of both sides again, same method wraps one layer again, it is desirable to the interspersed overlap joint of each layer white glue cloth, the lap of splice is not less than 15mm, will and obturage bottom headgear.
5, also headgear facade entirety wrapping up two-layer with wide medical white glue cloth, facade white glue cloth and the bottom surface white glue cloth lap of splice are not less than 15mm, with hands by the white glue cloth compacting of all wrappings.
6, asbestos putty is made with asbestos wool, select common asbestos wool to reduce cost, to with the asbestos putty become reconciled and all seal around headgear, seal tightly, during envelope asbestos putty, the joint needing weldering is once carried out, for the adjacent joint not welded, with asbestos cloth every good, preventing damage splice insulation, asbestos putty height has not interfered with to heat and has been advisable.See Fig. 4.
Three) soldering tip:
1, during plumb joint, first clean a lower contact with hairbrush, also headgear spills some Colophonium powder, process of heating is continuously added scolding tin and suitable Colophonium, until added scolding tin illustrates that joint scolding tin has been filled with when no longer penetrating into and do not emit bubble, when joint soon welds, put into some Colophonium powder, and headgear two, fill and lead up with scolding tin.
2, after being soldered joint, scolding tin needs full, smooth surface, removes clean by the scolding tin being attached to outside joint.
3, measuring joint D.C. resistance, our factory requires that it is qualified for recording DC resistance less than 4 micro-ohms.
Embodiment 2
Generator unit stator winding upper connection connector box perfusion method for blocking.
Referring to Fig. 5, the closure before top connection box encapsulating.
One) prepare:
1, checking that insulation booth answers flawless, bubble, wall thickness is consistent and is not less than 3mm, is thoroughly cleaned up by insulation booth inwall with ethanol.
2, thoroughly clean with ethanol blank area dirty and and headgear welding time cotton mud and foreign material.
Two) closure:
1, go out notch place pad rag in levels bar to be hidden in all gaps, in order to clear up after potting compound seepage.
2, E type inserted sheet is made with 1mm thickness epoxy plate, size is just can insert and below headgear, levels bar crotch fork is advisable, with two pieces of E type inserted sheets to being inserted in and below headgear between levels bar crotch fork, it is determined that good highly and level, urgent with wedge shape negative and positive timber wedge below, hold epoxy plate.
3, block space between epoxy plate and bar with closure putty HDJ-18, during closure, note dynamics, in case the displacement of E type inserted sheet.
4, insulation booth is enclosed within and headgear on, insulation booth wants uniform with the gap of also headgear, range estimation insulation booth end opening and E type blade contact position, mention insulation booth, between insulation booth end opening and E type blade contact face, pad puts one layer with blocking putty HDJ-18 " gasket seal " made, the light compacting of insulation booth have gentle hands put back to by gasket seal after carrying out, note dynamics during pressure, it is prevented that overexerts and makes E type inserted sheet conjugate.See Fig. 5.
Three) insulation booth perfusion:
1, block after putty HDJ-18 solidification until base opening, appropriate 881A potting compound is heated to 40 degrees centigrade and stirs, then add 881B potting compound to be sufficiently stirred for immediately, so as to mix homogeneously, then pour into respectively in the insulation booth sealing base opening, note first injecting potting compound thicker on a small quantity when irrigating, observe after 30 minutes with or without Seepage, again by potting compound filling to connector box top slowly after ne-leakage, with nothing trickling phenomenon for standard, note observing potting compound with or without sinkage simultaneously.
2, after insulation booth potting compound solidifies, if glue surface is suitable for reading lower than insulation booth, should mend in insulation booth and fill out potting compound to being full of insulation booth, after insulation booth perfusion, should not have penetrability pore and crackle.
3, insulation booth potting compound carries out after solidifying overflowing potential test, and our factory requires that it is qualified for overflowing current potential below 1000 volts.
Being described above, simply the specific embodiment of the present invention, the flesh and blood of the present invention is not construed as limiting by various illustrations.

Claims (2)

1. a generator unit stator winding upper connection welding method, it is characterised in that step is as follows:
One, closure before upper end welding
One) preparation:
(1) stator end and gap are cleaned up;
(2) carefully clear up bar joint area with acetone, thoroughly remove the remaining glue of joint surface, oxide layer and other dirt, see true qualities with 0# sand paper and brass wire brush polishing bar joint, and clean with alcohol washes;
(3) with shaping tool, upper and lower layer line rod lead riser being corrected alignment, left and right tolerance is less than 5mm;
(4) correct in qualified rear enclosure and headgear, load copper wedge, copper cash and also gap≤0.3mm between headgear;
(5) with locking pliers will and after headgear and bar strand combine closely, then cut winding termination redundance copper cash with crop instrument, make and headgear top simultaneously;
Two) closure:
(1) asbestos cloth being cut into correspondingly-sized, on asbestos cloth, spacing and width according to also headgear end face cut strip mouth, are enclosed within and on headgear, use hands compacting after packaging, it is ensured that asbestos cloth and bar close contact;
(2) tight with soaking asbestos cloth plug between stator upper and lower layer line rod and between adjacent bar, it is prevented that solder is fallen in iron core slot;
(3) cable paper is cut into T-shaped, and " horizontal stroke " length is the girth of also headgear, and wide is and headgear height that " erecting " width is the width of crotch fork between levels bar, and length is and headgear height adduction headgear thickness;By bottom T-shaped cable paper alignment headgear between levels bar crotch fork hold and one layer of headgear, then take a T-shaped cable paper and wrap one layer along opposite again;
(4) with wide medical white glue cloth along crotch fork upwards wrapping one layer between the line of rabbet joint rod of front and back, respectively being wrapped up one layer by crotch fork lower end between levels bar to angle, 45 degree of both sides again, same method wraps one layer again, it is desirable to the interspersed overlap joint of each layer white glue cloth, the lap of splice >=15mm, will and obturage bottom headgear;
(5) also headgear facade entirety wrapping up two-layer with wide medical white glue cloth, facade white glue cloth and the bottom surface white glue cloth lap of splice are not less than 15mm, with hands by the white glue cloth compacting of all wrappings;
(6) make asbestos putty with asbestos wool, with the asbestos putty become reconciled will and headgear around all seal, seal tightly, during envelope asbestos putty, the joint needing weldering once carried out, for the adjacent joint not welded, with asbestos cloth every good, it is prevented that damage splice insulation;
Three) soldering tip:
(1) during plumb joint, first clean a lower contact with hairbrush, also headgear spills some Colophonium powder, process of heating is continuously added scolding tin and Colophonium, until added scolding tin illustrates that joint scolding tin has been filled with when no longer penetrating into and do not emit bubble, when joint soon welds, put into Colophonium powder, and headgear two, fill and lead up with scolding tin;
(2) after being soldered joint, scolding tin needs full, smooth surface, removes clean by the scolding tin being attached to outside joint;
(3) measuring joint D.C. resistance, it is qualified for recording DC resistance≤4 micro-ohm.
2. a generator unit stator winding upper connection connector box perfusion method for blocking, it is characterised in that step is as follows:
One) prepare
(1) checking that insulation booth answers flawless, bubble, wall thickness is consistent and >=3mm, is thoroughly cleaned up by insulation booth inwall with ethanol;
(2) thoroughly clean with ethanol blank area dirty and and headgear welding time cotton mud and foreign material;
Two) closure
(1) go out notch place pad rag in levels bar to be hidden in all gaps, in order to clear up after potting compound seepage;
(2) E type inserted sheet is made with 1mm thickness epoxy plate, size is just can insert and below headgear, levels bar crotch fork is advisable, with two pieces of E type inserted sheets to being inserted in and below headgear between levels bar crotch fork, it is determined that good highly and level, urgent with wedge shape negative and positive timber wedge below, hold epoxy plate;
(3) space between epoxy plate and bar is blocked with closure putty;
(4) insulation booth is enclosed within and headgear on, insulation booth wants uniform with the gap of also headgear, range estimation insulation booth end opening and E type blade contact position, mention insulation booth, between insulation booth end opening and E type blade contact face, pad puts one layer of " gasket seal " made with closure putty, and the light compacting of insulation booth have gentle hands put back to by gasket seal after carrying out;
Three) insulation booth perfusion
(1) block after putty solidification until base opening, 881A potting compound is heated to 40 degrees Celsius and stirs, then add 881B potting compound to be sufficiently stirred for immediately, so as to mix homogeneously, then pour into respectively in the insulation booth sealing base opening, note first injecting thicker potting compound when irrigating, observe after 30 minutes with or without Seepage, again by potting compound filling to connector box top slowly after ne-leakage, with without trickling phenomenon for standard, note observing potting compound with or without sinkage simultaneously;
(2) after insulation booth potting compound solidifies, if glue surface is suitable for reading lower than insulation booth, should mend in insulation booth and fill out potting compound to being full of insulation booth, after insulation booth perfusion, should not have penetrability pore and crackle;
(3) insulation booth potting compound carries out after solidifying overflowing potential test, it is desirable to it is qualified for overflowing current potential below 1000 volts.
CN201610288205.3A 2016-05-05 2016-05-05 Upper joint welding and joint box pouring plugging method for power generator stator winding Pending CN105743293A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610288205.3A CN105743293A (en) 2016-05-05 2016-05-05 Upper joint welding and joint box pouring plugging method for power generator stator winding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610288205.3A CN105743293A (en) 2016-05-05 2016-05-05 Upper joint welding and joint box pouring plugging method for power generator stator winding

Publications (1)

Publication Number Publication Date
CN105743293A true CN105743293A (en) 2016-07-06

Family

ID=56288643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610288205.3A Pending CN105743293A (en) 2016-05-05 2016-05-05 Upper joint welding and joint box pouring plugging method for power generator stator winding

Country Status (1)

Country Link
CN (1) CN105743293A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106685121A (en) * 2017-01-16 2017-05-17 嘉兴市大成电气新材料有限公司 Flexible plug sleeve for vertical hydraulic generator stator coil bar lead insulation box and assembly method of flexible plug sleeve
CN106787526A (en) * 2017-03-30 2017-05-31 上海电气集团上海电机厂有限公司 A kind of manufacture craft of brushless low speed synchromotor insulation booth infusion epoxy resin glue
CN111313298A (en) * 2020-03-09 2020-06-19 岭东核电有限公司 Method for overhauling pouring type current transformer for nuclear power station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯朝波: "发电机定子绕组上部接头焊接及接头盒灌注封堵工艺", 《水电自动化与大坝监测》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106685121A (en) * 2017-01-16 2017-05-17 嘉兴市大成电气新材料有限公司 Flexible plug sleeve for vertical hydraulic generator stator coil bar lead insulation box and assembly method of flexible plug sleeve
CN106685121B (en) * 2017-01-16 2023-12-05 浙江博菲电气股份有限公司 Flexible plugging sleeve for vertical hydraulic generator stator bar lead insulation box and assembly method thereof
CN106787526A (en) * 2017-03-30 2017-05-31 上海电气集团上海电机厂有限公司 A kind of manufacture craft of brushless low speed synchromotor insulation booth infusion epoxy resin glue
CN106787526B (en) * 2017-03-30 2019-03-29 上海电气集团上海电机厂有限公司 A kind of manufacture craft of brushless low speed synchromotor insulation booth infusion epoxy resin glue
CN111313298A (en) * 2020-03-09 2020-06-19 岭东核电有限公司 Method for overhauling pouring type current transformer for nuclear power station
CN111313298B (en) * 2020-03-09 2021-05-25 岭东核电有限公司 Method for overhauling pouring type current transformer for nuclear power station

Similar Documents

Publication Publication Date Title
CN105743293A (en) Upper joint welding and joint box pouring plugging method for power generator stator winding
ITPD970256A1 (en) PROCEDURE FOR SEALING THE END OF A WATER-COOLED STATOR COIL.
DE102009016914A1 (en) Waterproof plug and method of making the same
CN109586519A (en) The fast repairing method of variable-frequency high-voltage motor winding insulation breakage
CN103546000B (en) A kind of generator end insulation booth glue-pouring method
US5809632A (en) Method for repairing a cooling fluid box of an electric alternator stator bar
CN107276342A (en) A kind of poured with epoxy resin technique of motor stator winding
US6102105A (en) Repair of electrical generator stator leaks, cracks and crevices
CN110611236B (en) Vulcanization process for connecting copper bar in bus duct
CN211649435U (en) Welding interface is moulded to heat supply pipeline heat
CN103124120B (en) A kind of extruding strapping process electricity generator stator core silicon steel sheet loosens method
CN218377248U (en) Foundation bolt anticorrosion protection device
CN111313298B (en) Method for overhauling pouring type current transformer for nuclear power station
CN209948083U (en) Cable welding joint
CN104373680B (en) The installation method of prefabricated direct-buried thermal insulation pipe road system repaired mouth support
CN101282034A (en) Protective equipment for supplying power for input end of electric welding machine
CN204792421U (en) Transformer coil leading -out terminal welding set
CA2895032C (en) An arrangement for manufacturing a head winding cap
CN216344710U (en) Waterproof type electric hot melting heat preservation joint
CN219458651U (en) Power cable repairing device
JPS5821092A (en) Exchange work method of sodium apparatus piping
KR100466364B1 (en) One side auto welding method by using cut wire type tamping
CN218447342U (en) High flame retardant wire sheath
CN220387303U (en) Industrial ultrasonic vibration plate device
CN115928793B (en) Sealing device for basement lifting hole, mounting method and dismounting method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20171031

Address after: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: State Grid Xinyuan Hydropower Co., Ltd.

Applicant after: Songhua River hydropower generation Co., Ltd. Jilin Baishan power plant

Address before: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: State Grid Xinyuan Hydropower Co., Ltd.

Applicant before: Baishan Power Plant

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160706