CN105736079B - Electricity generation system operation of power networks control method - Google Patents

Electricity generation system operation of power networks control method Download PDF

Info

Publication number
CN105736079B
CN105736079B CN201610295812.2A CN201610295812A CN105736079B CN 105736079 B CN105736079 B CN 105736079B CN 201610295812 A CN201610295812 A CN 201610295812A CN 105736079 B CN105736079 B CN 105736079B
Authority
CN
China
Prior art keywords
steam
carbon dioxide
capture device
valve
vapor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610295812.2A
Other languages
Chinese (zh)
Other versions
CN105736079A (en
Inventor
赵东旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Dn Energy System Technology Co ltd
Original Assignee
Guangdong Southeast Transmission And Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Southeast Transmission And Transformation Engineering Co Ltd filed Critical Guangdong Southeast Transmission And Transformation Engineering Co Ltd
Priority to CN201610295812.2A priority Critical patent/CN105736079B/en
Priority claimed from CN201510517566.6A external-priority patent/CN105134317B/en
Publication of CN105736079A publication Critical patent/CN105736079A/en
Application granted granted Critical
Publication of CN105736079B publication Critical patent/CN105736079B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K17/00Using steam or condensate extracted or exhausted from steam engine plant
    • F01K17/04Using steam or condensate extracted or exhausted from steam engine plant for specific purposes other than heating
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A kind of electricity generation system operation of power networks control method, including:When the network load of electricity generation system is relatively low, by the first vapor steam blaster and the concatenated connection type of the second vapor steam blaster, secondary booster is carried out to the steam of extraction, the steam after secondary booster is transported to sufficient carbon dioxide capture device;When low during the network load of electricity generation system is in, the steam of extraction is pressurized by the second vapor steam blaster, steam after supercharged is transported to sufficient carbon dioxide capture device;When the network load of electricity generation system is in middle high, the steam of extraction is pressurized by the first vapor steam blaster, steam after supercharged is transported to sufficient carbon dioxide capture device;When the network load of electricity generation system is in higher, the steam of extraction is directly transported to sufficient carbon dioxide capture device.

Description

Electricity generation system operation of power networks control method
Technical field
The present invention relates to a kind of electricity generation systems, more particularly, to a kind of environmental protection power generation system with carbon dioxide capture device System and its operation of power networks method.
Background technology
In recent years, the generation of greenhouse gases clearly results in global warming, and the generation of greenhouse gases further increase by More increase from global warming.Since carbon dioxide is considered as main greenhouse gases, using carbon dioxide as the greenhouse of representative Gas largely discharges and the Global climate change of initiation, is the most serious and need most urgent solve the problems, such as that the mankind face at present One of, carbon capture and storage are considered as a kind of possible master for reducing greenhouse gases and discharging into the atmosphere and control global warming Want means.
Carbon dioxide mostlys come from the burning of fossil fuel, the flue gases of conventional power plants generally comprise from about 4% to About 14% carbon dioxide.In China, fossil fuel especially Coal Energy Source is in important ground for a long time in power industry Position, power industry be especially a large amount of coal-burning power plants CO2 emissions account for national CO2 emission total amount 40~ 50%.Therefore, Development of Novel environment-friendly power generation system reduces CO2 emissions, coal fired power plant or even whole society's carbon is subtracted The importance of row is self-evident.
It is now recognized that the collecting carbonic anhydride technology closest to large-scale industrial application is after-combustion trapping.It is caught in after-combustion It concentrates, carbon dioxide is removed from flue gas, remaining flue gas is discharged into the atmosphere and by carbon dioxide compression for transporting and storing. The carbon dioxide being captured can be used for sealing up for safekeeping, methanol manufacture and three times in a variety of applications such as oil recycling.
Chemical absorbing carbon dioxide separation method be it is a kind of be widely used, adaptable flue gas decarbonization technology.Its Removing carbon dioxide is removed using absorbing from burning gases, and followed by steam stripping regeneration solvent and is captured comprising two in a solvent Carbonoxide.But this method needs to warm to supply Analytic Tower, to realize the carbon dioxide resolving in Analytic Tower in consuming. To provide this partial heat, the steam for extracting specified pressure from steam turbine cycle flow path is needed to be boiled again for heating Analytic Tower Device.
In the prior art, 201110172955.1 patent of invention proposes a kind of hair with carbon dioxide capture and compression Electric equipment, wherein by using the connection of clutch control steam turbine and generator, to make permission carbon dioxide capture system System can flexibly be operated with compressor according to load.201080063370.X patent of invention disclose and a kind of carrying dioxy The power generator for changing carbon capture is used therein by using two steam jet ejectors according to the selection of the load of power generator One is used to increase the steam pressure extracted from power generator vapour-cycling, to make it meet carbon dioxide capture device The demand of operating pressure.
The patent of invention of 201080063370.X makes the steam pressure of extraction meet carbon dioxide to catch by steam jet ejector Obtain the demand of the operating pressure of device.But it is when the load of power generator is relatively low, in order to meet carbon dioxide capture device Operating pressure demand, even directly can only extract steam or use from boiler export by the high pressure section from steam turbine The higher steam jet ejector of pressurization amplitude.And if causing the steam of acting to reduce from the drawn upstream steam of steam turbine, meeting If the generating efficiency of reduction system needs to increase cost using the higher vapor steam blaster of pressurization amplitude.
Invention content
The present invention provides a kind of environmentally friendly steam power-generating system with carbon dioxide capture, can improve The above-mentioned deficiency of the invention of 201080063370.X can also make in the case where that need not use more high pressure vapor steam blaster The steam pressure extracted from steam turbine low pressure stage meets the demand of the operating pressure of carbon dioxide capture device.
As one aspect of the present invention, provide a kind of environment-friendly power generation system, including turbine, vapor steam blaster and Carbon dioxide capture device, the turbine include pressure turbine, middle-pressure turbine and low-pressure turbine;The steam spray Emitter can receive low-pressure turbine outlet steam, and increase the pressure of the steam;Steaming after the vapor steam blaster pressurization Gas introduces carbon dioxide capture device by pipeline;The vapor steam blaster includes that the first steam jet ejector and the second steam spray Emitter can change according to the network load of electricity generation system between first vapor steam blaster and the second vapor steam blaster In parallel and series relationship, and the change flowed to by steam, make the steam by vapor steam blaster meet carbon dioxide and catch Obtain the requirement of device operating pressure.
Preferably, the outlet line of the low-pressure turbine is divided into two-way, wherein leading to condenser all the way, in addition divides all the way For three-way connection (pipe) line;First via pipeline is communicated by the first valve with the carbon dioxide capture device in three tunnel, the second tunnel Pipeline passes sequentially through the second valve, the first vapor steam blaster and third valve and is communicated with the carbon dioxide capture device, the It is identical as the carbon dioxide capture device that three-way connection (pipe) line passes sequentially through the 4th valve and the second vapor steam blaster;Described first Pipeline between vapor steam blaster and the third valve is communicated by the 5th valve with the entrance of second vapor steam blaster.
Preferably, the pressurization amplitude of second vapor steam blaster is more than the pressurization amplitude of the first vapor steam blaster.
Preferably, second valve and the 4th valve are flow valve, when low-pressure turbine outlet steam can not expire The requirement of sufficient carbon dioxide capture device operating pressure, and the steam pressure for passing through the pressurization of the first vapor steam blaster is more than titanium dioxide When the requirement of carbon acquisition equipment operating pressure, opens first and arrive third flow valve, close the 4th valve and the 5th valve, pass through The flow for adjusting the second valve makes the steam pressure of inflow carbon dioxide capture device be equal to or slightly greater than carbon dioxide capture Pressure needed for the operation of device.
Preferably, when it is impossible to meet carbon dioxide capture device fortune for the steam pressure by the pressurization of the first vapor steam blaster The requirement of row pressure, and the steam pressure for passing through the pressurization of the second vapor steam blaster is more than carbon dioxide capture device operating pressure It is required that when, the first valve and the 5th valve are closed, the second valve, third valve and the 4th valve are opened, by adjusting the The flow of two valves and the 4th valve makes the steam pressure of inflow carbon dioxide capture device be equal to or slightly greater than titanium dioxide Pressure needed for the operation of carbon acquisition equipment.
As another aspect of the present invention, the operation of power networks method of above-mentioned environment-friendly power generation system is provided, including such as Lower flow:When the network load of electricity generation system is at full capacity or is higher than specific first load, the low-pressure turbine goes out Mouth steam meets the requirement of carbon dioxide capture device operating pressure, opens the first valve, closes the second valve to the 5th valve, By the vapor stream of extraction by the first pipeline introducing carbon dioxide acquisition equipment, to run the carbon dioxide capture device;When When the network load of electricity generation system is higher than specific second load less than specific first load, low-pressure turbine outlet steam can not Meet the requirement of carbon dioxide capture device operating pressure, and the steam pressure for passing through the pressurization of the first vapor steam blaster meets dioxy Change the requirement of carbon acquisition equipment operating pressure, open second and third valve, closes the first valve, the 4th valve and the 5th Valve is filled by the vapor stream of extraction by the second pipeline introducing carbon dioxide acquisition equipment with running the carbon dioxide capture It sets;
When the network load of electricity generation system is higher than specific third load less than specific second load, sprayed by the first steam It is impossible to meet the requirements of carbon dioxide capture device operating pressure for the steam pressure of emitter pressurization, and pass through the second vapour injection The steam pressure of device pressurization meets the requirement of carbon dioxide capture device operating pressure, opens the 4th valve, close the first valve, Second valve, third valve and the 5th valve, by the vapor stream of extraction by third pipeline introducing carbon dioxide acquisition equipment, To run the carbon dioxide capture device;When the network load of electricity generation system is less than specific third load, steamed by second The steam pressure of gas blowout emitter pressurization it is impossible to meet the requirement of carbon dioxide capture device operating pressure, open the second valve with And the 5th valve, the first valve, third valve and the 4th valve are closed, the vapor stream of extraction is passed sequentially through into the spray of the first steam After emitter and the second vapor steam blaster carry out secondary booster, introducing carbon dioxide acquisition equipment, to run the carbon dioxide Acquisition equipment.
Description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is described in further detail.
Referring to the embodiment of the environment-friendly power generation system of the present invention shown in Fig. 1 comprising steam generator 6, steam turbine Machine, generator 5, vapor steam blaster, carbon dioxide capture device 10 and condenser 7.Steam generator 6 is used for by entering Its internal water is heated, and generates the high pressure steam for power generation.Steam turbine plant includes pressure turbine 1, middle pressure whirlpool Turbine 2 and low-pressure turbine 3 are arranged on common axis 4.The steam that steam generator 6 generates passes through pressure turbine 1 Afterwards, after being heated by reheating pipeline, middle-pressure turbine, low-pressure turbine 3 are passed sequentially through, to drive coupled generator 5 and produce electricl energy.
The vapor exit line of low-pressure turbine 3 is divided into two-way, wherein leading to condenser 7 all the way, is condensed in condenser 7 Steam generator 6 is imported by conducting wire 8 again, is recycled after heating and degassing apparatus at condensed water;Other one Road reaches the capture that carbon dioxide capture device is used for carbon dioxide by vapor steam blaster or directly by pipeline.
Vapor steam blaster includes the first steam jet ejector 26 and the second vapor steam blaster 32, can will be by therein Steam pressurizes, wherein the pressurization amplitude of the second vapor steam blaster 32 is more than the pressurization amplitude of the first vapor steam blaster 26.
In addition low-pressure turbine vapor exit line is divided into three-way connection (pipe) line all the way, wherein first via pipeline 20 passes through first Valve 21 is communicated with carbon dioxide capture device 10;Second road pipeline 24 passes sequentially through the second valve 25, the first vapor steam blaster 26 and third valve 28 communicate 10 with carbon dioxide capture device;Third road pipeline 30 passes sequentially through the 4th valve 31 and Two vapor steam blasters 32 identical as carbon dioxide capture device 10;Pipeline between first vapor steam blaster 26 and third valve 28 27 are communicated by the 5th valve 29 with the entrance of the second vapor steam blaster 32.
Carbon dioxide capture device 10 include for example based on freezing ammonia or amine technological operation absorber and for compress from It is vented one or more carbon-dioxide gas compressors of the carbon dioxide extracted.The carbon dioxide being captured and compressed is by means of pipeline 11 It is transported to storage or transportation facility.Not carbonated gas is released to air or is oriented to via pipeline 12 further to divide From or processing.The condensate water of carbon dioxide capture process is directed to steam generator 6 by pipeline 13.
The operation of power networks method of the electricity generation system of the embodiment of the present invention, including following flow.When the power grid of electricity generation system is negative When lotus is at full capacity or is higher than specific first load, low-pressure turbine 3 exports steam and meets carbon dioxide capture device 10 The first valve 21 is opened in the requirement of operating pressure, closes 25 to the 5th valve 29 of the second valve, and the vapor stream of extraction is passed through the One pipeline, 20 introducing carbon dioxide acquisition equipment 10, to run carbon dioxide capture device 10.
When the network load of electricity generation system is higher than specific second load less than specific first load, low-pressure turbine 3 goes out It is impossible to meet the requirements of 10 operating pressure of carbon dioxide capture device for mouth steam, and pass through the pressurization of the first vapor steam blaster 26 Steam pressure meets the requirement of 10 operating pressure of carbon dioxide capture device, opens the second valve 25 and third valve 28, closes The first valve 21, the 4th valve 31 and the 5th valve 27 are closed, the vapor stream of extraction is passed through into the second pipeline introducing carbon dioxide Acquisition equipment 10, to run carbon dioxide capture device 10.
When the network load of electricity generation system is higher than specific third load less than specific second load, sprayed by the first steam It is impossible to meet the requirements of 10 operating pressure of carbon dioxide capture device for the steam pressure that emitter 26 is pressurizeed, and pass through the second steam The steam pressure that injector 32 pressurizes meets the requirement of 10 operating pressure of carbon dioxide capture device.The 4th valve 31 is opened, is closed The first valve 21, the second valve 25, third valve 28 and the 5th valve 29 are closed, the vapor stream of extraction is passed through into third pipeline 30 Introducing carbon dioxide acquisition equipment 10, to run carbon dioxide capture device 10;
When the network load of electricity generation system is less than specific third load, by the steam of the second vapor steam blaster 32 pressurization It is impossible to meet the requirements of 10 operating pressure of carbon dioxide capture device for pressure, open the second valve 25 and the 5th valve 29, Close the first valve 21, third valve 28 and the 4th valve 31.At this moment, the first vapor steam blaster 26 and the second vapor steam blaster Series relationship is changed to by parallel connection between 32, the first vapor steam blaster outlet steam is changed by directly reaching carbon dioxide capture device 10 For by reaching carbon dioxide capture device 10 after the second vapor steam blaster 32, therefore vapor stream passes sequentially through the first vapour injection After device 26 and the second vapor steam blaster 32 carry out secondary booster, introducing carbon dioxide acquisition equipment 10, to run the dioxy Change carbon acquisition equipment 10.
Above-mentioned setting through the invention, when the load of electricity generation system is relatively low, by the connection for changing vapor steam blaster Mode carries out secondary booster to the steam of extraction, to use high pressure steam injector or extract high-pressure turbine In the case of machine steam, the requirement of 10 operating pressure of carbon dioxide capture device can also be met.
Preferably, the second valve 25 and the 4th valve 31 can be set to flow valve, is steamed when low-pressure turbine 3 exports It is impossible to meet the requirements of 10 operating pressure of carbon dioxide capture device for gas, and pass through the steam of the first vapor steam blaster 26 pressurization When pressure is more than the requirement of 10 operating pressure of carbon dioxide capture device, opens first and arrive third valve, close the 4th valve 30 And the 5th valve 29 makes the steam pressure etc. of inflow carbon dioxide capture device 10 by adjusting the flow of the second valve 25 In or slightly larger than carbon dioxide capture device 10 operation needed for pressure.When the steam by the pressurization of the first vapor steam blaster 26 It is impossible to meet the requirements of 10 operating pressure of carbon dioxide capture device for pressure, and pass through the steaming of the second vapor steam blaster 32 pressurization When atmospheric pressure is more than the requirement of 10 operating pressure of carbon dioxide capture device, the first valve 21 and the 5th valve 29 are closed, is opened The second valve 25, third valve 28 and the 4th valve 31 are opened, by adjusting the flow of the second valve 25 and the 4th valve 31, The steam pressure of inflow carbon dioxide capture device 10 is set to be equal to or slightly greater than needed for the operation of carbon dioxide capture device 10 Pressure.
Certainly, the present invention can also have other various embodiments, without deviating from the spirit and substance of the present invention, ripe Various corresponding change and deformations, but these corresponding change and deformations can be made according to the present invention by knowing those skilled in the art The protection domain of the claims in the present invention should all be belonged to.

Claims (1)

1. a kind of electricity generation system operation of power networks control method, including:It is negative less than specific third in the network load when electricity generation system When lotus, by the first vapor steam blaster and the concatenated connection type of the second vapor steam blaster, low-pressure turbine outlet steam is received, Secondary booster is carried out to the steam of extraction, the steam after secondary booster is transported to carbon dioxide capture device;Work as electricity generation system Network load less than specific second load be higher than specific third load when, pass through the second vapor steam blaster receive low-pressure turbine Steam is exported, the steam of extraction is pressurized, steam after supercharged is transported to carbon dioxide capture device;Work as electricity generation system Network load be at full capacity or higher than specific first load when, by the first vapor steam blaster receive low-pressure turbine go out Mouth steam, is pressurized the steam of extraction, steam after supercharged is transported to carbon dioxide capture device;When electricity generation system When network load is at full capacity or is higher than specific first load, directly the low-pressure turbine outlet steam of extraction is transported to Carbon dioxide capture device;The pressurization amplitude of wherein the second vapor steam blaster is more than the pressurization amplitude of the first vapor steam blaster.
CN201610295812.2A 2015-08-22 2015-08-22 Electricity generation system operation of power networks control method Expired - Fee Related CN105736079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610295812.2A CN105736079B (en) 2015-08-22 2015-08-22 Electricity generation system operation of power networks control method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510517566.6A CN105134317B (en) 2015-08-22 2015-08-22 A kind of environment-friendly power generation system and its operation of power networks method
CN201610295812.2A CN105736079B (en) 2015-08-22 2015-08-22 Electricity generation system operation of power networks control method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510517566.6A Division CN105134317B (en) 2015-08-22 2015-08-22 A kind of environment-friendly power generation system and its operation of power networks method

Publications (2)

Publication Number Publication Date
CN105736079A CN105736079A (en) 2016-07-06
CN105736079B true CN105736079B (en) 2018-08-03

Family

ID=56288069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610295812.2A Expired - Fee Related CN105736079B (en) 2015-08-22 2015-08-22 Electricity generation system operation of power networks control method

Country Status (1)

Country Link
CN (1) CN105736079B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4528811A (en) * 1983-06-03 1985-07-16 General Electric Co. Closed-cycle gas turbine chemical processor
DE3616797A1 (en) * 1986-05-17 1987-11-19 Koerting Ag Steam turbine system
DE19535318C2 (en) * 1995-09-22 1997-11-27 Steag Ag Method and arrangement for preheating the feed water of a steam generator in power plant processes
EP2333256B1 (en) * 2009-12-08 2013-10-16 Alstom Technology Ltd Power plant with CO2 capture and method to operate such power plant

Also Published As

Publication number Publication date
CN105736079A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN102741508B (en) With CO 2the electricity generating device of catching and the method running such electricity generating device
RU2456060C2 (en) Absorbent recovery by compressed top flow bled for heating purposes
CN204827564U (en) Low temperature heat source power generation facility
CN103272467A (en) Improved heat integration coal-fired power plant decarbonization system and method
CN204672125U (en) A kind of coal fired power plant decarburization integrated system based on steam ejector
CN108709216B (en) Combined heating system of gas and steam combined cycle and decarburization system
CN102084105A (en) Thermal power plant with CO2 sequestration
CN104791031B (en) A kind of collecting carbonic anhydride regenerative system with Unit Steam Water system combination
CN105134317B (en) A kind of environment-friendly power generation system and its operation of power networks method
CN105736079B (en) Electricity generation system operation of power networks control method
CN106930791B (en) The operation of power networks method of the electricity generation system of low-carbon emission
CN205556107U (en) Cascade utilization system of supplementary carbon dioxide entrapment of low temperature geothermal energy in utilization
CN204677248U (en) A kind of collecting carbonic anhydride reclaimer with Unit Steam Water system combination
CN204476486U (en) Steam classified utilization device
RU2650238C1 (en) Gas distribution station power plant or the gas control unit operation method
CN103234213B (en) A kind of method of oxygen-enriched combusting Btu utilization and device
CN112879117B (en) System and method for recycling waste heat of fixed continuous exhaust of thermal power plant by using hot press
CN115680809A (en) Shunt recompression pure oxygen combustion circulation system
US9108123B2 (en) Steam efficiency with non depletive condensing and adiabatic solvent heating
CN113175829A (en) Carbon dioxide gas suction and separation device and method of mixed working medium circulation system
CN105585015A (en) Gradient utilization system by medium/low-temperature geothermal energy assisted carbon dioxide capture
AU2012386010B2 (en) Steam efficiency with non depletive condensing and adiabatic solvent heating
CN103196136B (en) A kind of method of oxygen-enriched combusting heat cascade utilization and device
RU2211343C1 (en) Method of and plant for recovery of heat in contact-type steam-gas plant
CN216767497U (en) High-low pressure heat supply turbo generator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180625

Address after: 510000 East 501, No. 64, 66, Jianzhong Road, Tianhe District, Guangzhou, Guangdong.

Applicant after: Guangdong southeast transmission and Transformation Engineering Co.,Ltd.

Address before: 215124 46 Xingguo Road, Guo Xiang, Wuzhong District, Suzhou, Jiangsu

Applicant before: Zhao Dongxu

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510000 East 501, No. 64, 66, Jianzhong Road, Tianhe District, Guangzhou, Guangdong.

Patentee after: GUANGDONG DN ENERGY SYSTEM TECHNOLOGY Co.,Ltd.

Address before: 510000 East 501, No. 64, 66, Jianzhong Road, Tianhe District, Guangzhou, Guangdong.

Patentee before: Guangdong southeast transmission and Transformation Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

CF01 Termination of patent right due to non-payment of annual fee