CN105735996A - 一种薄矿脉预裂削壁充填采矿法 - Google Patents
一种薄矿脉预裂削壁充填采矿法 Download PDFInfo
- Publication number
- CN105735996A CN105735996A CN201610067459.2A CN201610067459A CN105735996A CN 105735996 A CN105735996 A CN 105735996A CN 201610067459 A CN201610067459 A CN 201610067459A CN 105735996 A CN105735996 A CN 105735996A
- Authority
- CN
- China
- Prior art keywords
- ore
- filling
- presplitting
- country rock
- vein
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Abstract
本发明公开了一种薄矿脉预裂削壁充填采矿法,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,实施预裂爆破,矿脉与削壁围岩分次爆破,分别出矿或充填;如此循环直至整个矿块回采完毕。预裂孔与先期爆破矿体或削壁围岩同期微差爆破,即先起爆预裂孔,然后起爆矿体或削壁围岩。出矿(先采矿时)或充填(先削壁时)后,再二期爆破围岩就地充填或爆破矿体出矿。如此循环直至整个矿块回采完毕。本发明通过在削壁充填法中引入预裂爆破技术,实现了真正意义上的薄矿脉矿岩分采,大大降低了薄矿脉开采贫化率,不仅降低了因矿石过度贫化而增加的破碎、提升费用,而且有利于改善选矿工艺指标,减轻尾矿堆放压力,具有较高的经济效益和社会效益。
Description
技术领域
本发明涉及一种非煤地下矿山采矿方法,尤其是涉及一种适用于薄矿脉的低贫化率矿岩分离安全高效采矿方法。
背景技术
许多黄金矿床和有色金属矿床属于极薄至薄矿脉,这部分矿脉由于采幅过小,为保证足够的作业空间,一般采用削壁充填法进行回采。普通削壁充填法由于不可避免地要同时崩落矿脉上盘或下盘围岩,造成矿石严重贫化,矿石贫化率高达30~50%,甚至部分矿山矿石贫化率达到80%以上。即使采用矿脉和上盘(或下盘)围岩分次爆破(即分采),由于矿脉厚度小,也容易造成较高的贫化。贫化率高,不仅增加了破碎成本和提升压力,而且会恶化选矿工艺指标,增加尾矿排放压力。
发明内容
本发明所要解决的技术问题是提供一种能降低薄矿脉开采时贫化率的薄矿脉预裂削壁充填采矿法。
为解决上述技术问题,本发明提供的薄矿脉预裂削壁充填采矿法,其特征是:在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,实施预裂爆破,矿脉与削壁围岩分次爆破,分别出矿或充填;如此循环直至整个矿块回采完毕。
矿块拉底后,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,预裂孔与上盘或下盘围岩同次微差爆破,先起爆预裂孔,再爆破围岩主炮孔,崩落围岩就地充填,然后再爆破矿体,采用电耙或铲运机将崩落矿石运出采场。
矿块拉底后,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,预裂孔与矿脉同次微差爆破,先起爆预裂孔,再爆破矿体主炮孔,采用电耙或铲运机将崩落矿石运出采场,然后崩落围岩就地充填。
为避免崩落矿石混入削壁充填围岩中造成二次贫化,矿体爆破前,在充填围岩表明铺设隔离垫层,或进行注浆胶面充填。
采用上述技术方案的薄矿脉预裂削壁充填采矿法,通过在削壁充填法中引入预裂爆破技术,实现了真正意义上的薄矿脉矿岩分采,大大降低了薄矿脉开采贫化率,不仅降低了因矿石过度贫化而增加的破碎、提升费用,而且有利于改善选矿工艺指标,减轻尾矿堆放压力,具有较高的经济效益和社会效益。
综上所述,本发明是一种能降低薄矿脉开采时贫化率的薄矿脉预裂削壁充填采矿法。
附图说明
图1是利用预裂爆破技术先崩落围岩就地充填后,再崩落矿体(矿脉)的预裂削壁充填法示意图。
图2是利用预裂爆破技术先崩落矿体(矿脉),再崩落围岩就地充填的预裂削壁充填法示意图。
图3是图1和图2的I-I剖面图。
图4是利用预裂爆破技术先崩落围岩就地充填后,再崩落矿体(矿脉)的预裂削壁充填法炮孔布置示意图。
图5是利用预裂爆破技术先崩落矿体(矿脉),再崩落围岩就地充填的预裂削壁充填法炮孔布置示意图。
图中:1-矿体,2-主炮孔,3-垫层,4-预裂面,5-崩落矿石,6-废石充填,7-人行通风天井,8-主运输巷道,9-顺路溜矿井,10-预裂孔,11-拟削壁围岩。
具体实施方式
下面结合附图和实施例对本发明作进一步说明。
本发明提供的薄矿脉预裂削壁充填采矿法,是一种实现薄矿脉与削壁围岩分采,降低矿石贫化率的薄矿脉采矿方法。
一种薄矿脉预裂削壁充填采矿法,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,实施预裂爆破,矿脉与削壁围岩分次爆破,分别出矿或充填;如此循环直至整个矿块回采完毕。
具体地,矿块拉底后,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,预裂孔与上盘或下盘围岩同次微差爆破,先起爆预裂孔,再爆破围岩主炮孔,崩落围岩就地充填,然后再爆破矿体,采用电耙或铲运机将崩落矿石运出采场。
具体地,矿块拉底后,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,预裂孔与矿脉同次微差爆破,先起爆预裂孔,再爆破矿体主炮孔,采用电耙或铲运机将崩落矿石运出采场,然后崩落围岩就地充填。
进一步地,为避免崩落矿石混入削壁充填围岩中造成二次贫化,矿体爆破前,在充填围岩表明铺设隔离垫层,或进行注浆胶面充填。
实施例1:
参见图1、图3和图4,首先利用预裂爆破技术崩落围岩就地充填后,再崩落矿体(矿脉)
矿块拉底工作完成后,首先崩落围岩(根据围岩稳固程度,可崩落上盘围岩,也可崩落下盘围岩)。沿矿岩交界面按预裂爆破要求施工预裂孔。预裂孔孔距为炮孔直径的8~12倍,不装药或少装药。崩落围岩厚度根据矿块(采场)最小工作面空间要求确定,围岩爆破参数按正常采场爆破设计。预裂孔与围岩崩落孔(主炮孔)同次微差起爆,预裂孔先于主炮孔起爆,形成一条预裂缝,降低围岩爆破时爆轰波对矿脉的破坏程度,实现保护矿体(矿脉)的目的。
围岩崩落后就地平场充填,充填高度以保证第二步矿体(矿脉)回采必要的作业空间为准,超过充填需要的多余废石采用人工、电耙或铲运机将其运出采场。人工矿脉极薄(如小于0.5m),削壁充填废石余量较多时,也可在脉内布设废石溜井或通过脉内矿石溜井(利用溜矿井时,需放空溜矿井,矿、岩分别溜放,避免因废石混入造成矿石损失和贫化),通过溜井运出采场。充填平场后,根据需要在废石表明铺设隔离垫层,以降低矿体(矿脉)回采时因充填废石混入而造成二次贫化。隔离垫层可采用废旧皮带或其他人工隔离物,也可采用注浆等方式进行胶面充填。隔离垫层(需要情况下)形成后,按采场正常爆破方式崩落矿体(矿脉),采用人工、电耙或铲运机将矿石(脉内布设溜矿井时通过溜矿井)运出采场。如此循环,直至整个矿块回采结束。
实施例2:
参见图2、图3和图5,首先利用预裂爆破技术崩落矿体(矿脉),出矿后,再崩落围岩就地充填
如果矿体(矿脉)厚度超过0.8~1m,也可矿块拉底工作完成后,首先崩落矿体(矿脉)。沿矿岩交界面按预裂爆破要求施工预裂孔。预裂孔孔距为炮孔直径的8~12倍,不装药或少装药。矿体(矿脉)爆破参数按正常采场爆破设计。预裂孔与矿体(矿脉)崩落孔(主炮孔)同次微差起爆,预裂孔先于主炮孔起爆,形成一条预裂缝,降低矿体(矿脉)爆破时爆轰波对周围岩石的破坏程度,避免因围岩垮落而造成矿石贫化。矿体(矿脉)爆破后,采用人工、电耙或铲运机将矿石(脉内布设溜矿井时通过溜矿井)运出采场。
出矿工作完成后,再崩落围岩(根据围岩稳固程度,可崩落上盘围岩,也可崩落下盘围岩)就地充填。崩落围岩厚度根据矿块(采场)最小工作面空间要求确定,围岩爆破参数按正常采场爆破设计。充填平场后,根据需要在废石表明铺设隔离垫层,以降低下一循环矿体(矿脉)回采时因充填废石混入而造成二次贫化。隔离垫层可采用废旧皮带或其他人工隔离物,也可采用注浆等方式进行胶面充填。如此循环,直至整个矿块回采结束。
上例所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制。虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的方法及技术内容做出些许的更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所作的任何简单修改,等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (4)
1.一种薄矿脉预裂削壁充填采矿法,其特征是:在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,实施预裂爆破,矿脉与削壁围岩分次爆破,分别出矿或充填;如此循环直至整个矿块回采完毕。
2.根据权利要求1所述的薄矿脉预裂削壁充填采矿法,其特征是:矿块拉底后,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,预裂孔与上盘或下盘围岩同次微差爆破,先起爆预裂孔,再爆破围岩主炮孔,崩落围岩就地充填,然后再爆破矿体,采用电耙或铲运机将崩落矿石运出采场。
3.根据权利要求1所述的薄矿脉预裂削壁充填采矿法,其特征是:矿块拉底后,在薄矿脉与拟削壁上盘或下盘围岩分界面钻凿预裂孔,预裂孔与矿脉同次微差爆破,先起爆预裂孔,再爆破矿体主炮孔,采用电耙或铲运机将崩落矿石运出采场,然后崩落围岩就地充填。
4.根据权利要求1所述的薄矿脉预裂削壁充填采矿法,其特征是:为避免崩落矿石混入削壁充填围岩中造成二次贫化,矿体爆破前,在充填围岩表明铺设隔离垫层,或进行注浆胶面充填。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610067459.2A CN105735996A (zh) | 2016-02-01 | 2016-02-01 | 一种薄矿脉预裂削壁充填采矿法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610067459.2A CN105735996A (zh) | 2016-02-01 | 2016-02-01 | 一种薄矿脉预裂削壁充填采矿法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105735996A true CN105735996A (zh) | 2016-07-06 |
Family
ID=56247162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610067459.2A Pending CN105735996A (zh) | 2016-02-01 | 2016-02-01 | 一种薄矿脉预裂削壁充填采矿法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105735996A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107489421A (zh) * | 2017-10-11 | 2017-12-19 | 韦立坚 | 一种硐室削壁充填采矿工艺 |
CN107524444A (zh) * | 2017-09-18 | 2017-12-29 | 长春黄金研究院 | 一种提高削壁充填法落矿效率的控制爆破方法 |
CN107829741A (zh) * | 2017-11-27 | 2018-03-23 | 西北矿冶研究院 | 一种缓倾斜薄矿体开采方法 |
CN108362181A (zh) * | 2018-02-09 | 2018-08-03 | 内蒙古金陶股份有限公司 | 一种极薄矿脉矿体的掘进开采方法 |
CN109356584A (zh) * | 2018-09-28 | 2019-02-19 | 长春黄金研究院有限公司 | 一种井下充填采矿现浇垫层的施工方法 |
CN110566206A (zh) * | 2019-10-14 | 2019-12-13 | 中钢集团马鞍山矿山研究院有限公司 | 一种急倾斜极薄矿脉上下削壁矿岩分采充填采矿法 |
CN110617065A (zh) * | 2019-10-14 | 2019-12-27 | 中钢集团马鞍山矿山研究院有限公司 | 一种急倾斜极薄矿脉削壁充填采矿法采场结构布置方式 |
CN110952982A (zh) * | 2019-11-14 | 2020-04-03 | 西安建筑科技大学 | 一种急倾斜薄脉至极薄脉矿体的中深孔预裂爆破采矿法 |
CN113482618A (zh) * | 2021-08-04 | 2021-10-08 | 中国恩菲工程技术有限公司 | 辅助崩落的采矿方法 |
RU2782917C1 (ru) * | 2022-04-26 | 2022-11-07 | Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) | Способ отработки крутопадающих рудных тел малой мощности с валовой выемкой |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2418167C1 (ru) * | 2010-01-14 | 2011-05-10 | Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) | Способ подземной разработки маломощных жил |
CN102493806A (zh) * | 2011-12-01 | 2012-06-13 | 中南大学 | 一种壁式缓倾斜薄矿体机械化连续采矿方法 |
RU2464421C2 (ru) * | 2007-08-02 | 2012-10-20 | Рокмек Интернэшнл Инк. | Извлечение руды с использованием взрыва и термического дробления |
CN103017621A (zh) * | 2012-11-29 | 2013-04-03 | 青海山金矿业有限公司 | 一种在急倾斜薄矿体回采中降低贫化的爆破方法 |
CN103206215A (zh) * | 2013-04-11 | 2013-07-17 | 中南大学 | 一种预控顶上向进路充填采矿法 |
CN104213918A (zh) * | 2014-08-06 | 2014-12-17 | 中钢集团马鞍山矿山研究院有限公司 | 一种多层缓倾斜极薄矿脉回采爆破技术 |
CN104612692A (zh) * | 2014-12-11 | 2015-05-13 | 中南大学 | 分段崩矿底部结构跟随形成连续充填采矿法 |
-
2016
- 2016-02-01 CN CN201610067459.2A patent/CN105735996A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2464421C2 (ru) * | 2007-08-02 | 2012-10-20 | Рокмек Интернэшнл Инк. | Извлечение руды с использованием взрыва и термического дробления |
RU2418167C1 (ru) * | 2010-01-14 | 2011-05-10 | Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) | Способ подземной разработки маломощных жил |
CN102493806A (zh) * | 2011-12-01 | 2012-06-13 | 中南大学 | 一种壁式缓倾斜薄矿体机械化连续采矿方法 |
CN103017621A (zh) * | 2012-11-29 | 2013-04-03 | 青海山金矿业有限公司 | 一种在急倾斜薄矿体回采中降低贫化的爆破方法 |
CN103206215A (zh) * | 2013-04-11 | 2013-07-17 | 中南大学 | 一种预控顶上向进路充填采矿法 |
CN104213918A (zh) * | 2014-08-06 | 2014-12-17 | 中钢集团马鞍山矿山研究院有限公司 | 一种多层缓倾斜极薄矿脉回采爆破技术 |
CN104612692A (zh) * | 2014-12-11 | 2015-05-13 | 中南大学 | 分段崩矿底部结构跟随形成连续充填采矿法 |
Non-Patent Citations (1)
Title |
---|
陈忠毅: "浅论缓倾斜极薄矿体削壁充填采矿法发展方向", 《黄金》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524444A (zh) * | 2017-09-18 | 2017-12-29 | 长春黄金研究院 | 一种提高削壁充填法落矿效率的控制爆破方法 |
CN107524444B (zh) * | 2017-09-18 | 2019-03-05 | 长春黄金研究院 | 一种提高削壁充填法落矿效率的控制爆破方法 |
CN107489421A (zh) * | 2017-10-11 | 2017-12-19 | 韦立坚 | 一种硐室削壁充填采矿工艺 |
CN107829741A (zh) * | 2017-11-27 | 2018-03-23 | 西北矿冶研究院 | 一种缓倾斜薄矿体开采方法 |
CN108362181A (zh) * | 2018-02-09 | 2018-08-03 | 内蒙古金陶股份有限公司 | 一种极薄矿脉矿体的掘进开采方法 |
CN109356584A (zh) * | 2018-09-28 | 2019-02-19 | 长春黄金研究院有限公司 | 一种井下充填采矿现浇垫层的施工方法 |
CN110566206A (zh) * | 2019-10-14 | 2019-12-13 | 中钢集团马鞍山矿山研究院有限公司 | 一种急倾斜极薄矿脉上下削壁矿岩分采充填采矿法 |
CN110617065A (zh) * | 2019-10-14 | 2019-12-27 | 中钢集团马鞍山矿山研究院有限公司 | 一种急倾斜极薄矿脉削壁充填采矿法采场结构布置方式 |
CN110617065B (zh) * | 2019-10-14 | 2021-09-07 | 中钢集团马鞍山矿山研究总院股份有限公司 | 一种急倾斜极薄矿脉削壁充填采矿法采场结构布置方式 |
CN110952982A (zh) * | 2019-11-14 | 2020-04-03 | 西安建筑科技大学 | 一种急倾斜薄脉至极薄脉矿体的中深孔预裂爆破采矿法 |
CN110952982B (zh) * | 2019-11-14 | 2021-03-02 | 西安建筑科技大学 | 一种急倾斜薄脉至极薄脉矿体的中深孔预裂爆破采矿法 |
CN113482618A (zh) * | 2021-08-04 | 2021-10-08 | 中国恩菲工程技术有限公司 | 辅助崩落的采矿方法 |
CN113482618B (zh) * | 2021-08-04 | 2023-07-25 | 中国恩菲工程技术有限公司 | 辅助崩落的采矿方法 |
RU2782917C1 (ru) * | 2022-04-26 | 2022-11-07 | Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) | Способ отработки крутопадающих рудных тел малой мощности с валовой выемкой |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735996A (zh) | 一种薄矿脉预裂削壁充填采矿法 | |
CN104154830B (zh) | 一种用于井下采矿的中深孔爆破方法 | |
CN101967973B (zh) | 空场—崩落组合采矿方法 | |
CN100535387C (zh) | 一种改进的无底柱分段崩落法 | |
CN102182461A (zh) | 倾斜中厚金属矿体高效采矿方法 | |
CN109236295B (zh) | 一种适用于深部厚大矿床的三步骤回采方法 | |
CN105626071B (zh) | 一种缓倾斜薄矿体采矿方法 | |
US8826820B2 (en) | High energy blasting | |
CN109029168B (zh) | 一种井下悬顶的爆破处理方法 | |
CN102808622A (zh) | 中深孔、深孔联合爆破技术回收矿柱的方法 | |
CN107178367A (zh) | 一种急倾斜中厚矿体分段空场法卸压回采方法 | |
CN102997763A (zh) | 一种倾斜薄矿体沿脉巷道掘进矿岩分区爆破方法 | |
CN110595308B (zh) | 露天矿超深孔爆破处理采空区的方法 | |
CN110530219B (zh) | 一种降低损失贫化的控制爆破方法 | |
CN104265297B (zh) | 一种多层易碎缓倾斜极薄矿脉的开采方法 | |
CN105674816A (zh) | 用于非煤矿山的中深孔爆破一次成井方法 | |
CN103114855A (zh) | 露天转地下开采中的矿柱回收和垫层成形一体化技术 | |
CN107339920B (zh) | 超深孔预裂爆破的方法 | |
CN107524444B (zh) | 一种提高削壁充填法落矿效率的控制爆破方法 | |
CN109630120A (zh) | 一种用于缓倾斜贫富共层矿体的采矿方法 | |
CN106121652A (zh) | 一种闭坑露天矿山矿石回采方法 | |
CN110186340A (zh) | 综采工作面遇断层时顺利推进的方法 | |
CN104594903A (zh) | 用于全段高组合凿岩爆破的落矿方法 | |
CN106640080A (zh) | 一种深部高应力环境下自稳窿形采场布置采矿方法 | |
CN108150173A (zh) | 一种急倾斜中厚破碎矿体单进路诱导冒落采矿法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20161124 Address after: Yuelu District City, Hunan province 410083 Changsha Lushan Road No. 932 Applicant after: Central South University Applicant after: Hunan company limited of Zhong great designing institute Address before: Yuelu District City, Hunan province 410083 Changsha Lushan Road No. 932 Applicant before: Central South University |
|
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160706 |