CN105728556B - New bearding machine - Google Patents

New bearding machine Download PDF

Info

Publication number
CN105728556B
CN105728556B CN201610243281.2A CN201610243281A CN105728556B CN 105728556 B CN105728556 B CN 105728556B CN 201610243281 A CN201610243281 A CN 201610243281A CN 105728556 B CN105728556 B CN 105728556B
Authority
CN
China
Prior art keywords
hook
processed
matrix
block
die briquetting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610243281.2A
Other languages
Chinese (zh)
Other versions
CN105728556A (en
Inventor
陆健华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610243281.2A priority Critical patent/CN105728556B/en
Publication of CN105728556A publication Critical patent/CN105728556A/en
Application granted granted Critical
Publication of CN105728556B publication Critical patent/CN105728556B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D35/00Combined processes according to or processes combined with methods covered by groups B21D1/00 - B21D31/00
    • B21D35/002Processes combined with methods covered by groups B21D1/00 - B21D31/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/10Die sets; Pillar guides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/006Feeding elongated articles, such as tubes, bars, or profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Holders For Apparel And Elements Relating To Apparel (AREA)

Abstract

The invention discloses new bearding machine, the bearding machine, including frame, frame are provided with hook matrix processed and hook assembly processed;The hook matrix processed is provided with molding basal plane;The hook assembly processed includes can be periodically close to the die briquetting of hook matrix processed, hooked scarf processed, bending block and closure blocks;The lifting hole being additionally provided with frame between die briquetting and hooked scarf processed and the bending matrix between lifting hole and hook matrix processed;The lifting block in the lifting hole can be in and out of by being provided with the lifting hole.The present invention has the advantages such as simple in construction, hook production is convenient, production efficiency is high, production cost is low.

Description

New bearding machine
Technical field
The present invention relates to the production equipment of hook, more particularly, to a kind of new bearding machine.
Background technology
As shown in figure 1, existing hook is made up of hanger bulk 1' and hook coupler body 2' mostly.Modern production links up with operation In, the production operation largely linked up with all uses manual type, and manual operation labor intensity is big, and working environment is severe, work effect Rate is low, and larger potential safety hazard be present, is all a kind of potential risks for enterprise and operating personnel itself.
For this reason, it is necessary to research and develop a kind of bearding machine, to simplify the production technology of hook, production efficiency is improved.
The content of the invention
It is an object of the invention to provide a kind of bearding machine that can quickly produce hook.
To achieve these goals, the present invention adopts the following technical scheme that:
New bearding machine, including frame, particularly, frame are provided with hook matrix processed and hook assembly processed;On the hook matrix processed Provided with molding basal plane;The hook assembly processed includes can be periodically close to the die briquetting of hook matrix processed, hooked scarf processed, bending block and closure Block;
It is provided between the die briquetting and hook matrix processed and is used to enter material space for feedstock;Die briquetting is provided with and can be embedded in Molding groove in hook matrix processed and the hook basal plane processed for being molded hook coupler body;
The hooked scarf processed is located at the side that hook matrix processed is provided with molding basal plane;Hooked scarf processed, which is provided with, to be used to be molded hook coupler body Hook and slot processed;
The bending block is oppositely arranged with hooked scarf coiling hook matrix processed;The bending block, which is provided with, to be used to make the curved of hanger bulk Folding part;
The closure blocks are oppositely arranged with die briquetting coiling hook matrix;The closure blocks, which are provided with, to be used to close closing for hanger bulk Conjunction portion;
The lifting hole that is additionally provided with frame between die briquetting and hooked scarf processed and positioned at lifting hole and hook matrix processed it Between bending matrix;The lifting block in the lifting hole can be in and out of by being provided with the lifting hole.
The operation principle of the present invention is as follows:
Several actuating units can be provided with frame, each actuating unit is provided with can be with respect to the fortune that hook matrix processed moves back and forth Dynamic portion.Die briquetting, hooked scarf processed, bending block and the closure blocks for forming hook assembly processed are connected with the motion portion of each actuating unit respectively, Property performance period is close to hook matrix processed.And it is located at the lifting block in lifting hole and can also enters under the drive of corresponding actuating unit For lifting hole.
Hook raw material processed enters in material space through feed device feeding bearding machine, and stretches out die briquetting.Die briquetting is in engine Close to hook matrix processed under the drive of structure, hook raw material processed is promoted toward hook matrix side processed, until molding groove is embedded in hook matrix processed And hook raw material touching processed, on bending matrix, hook raw material processed is tentatively molded out the profile of hanger bulk.Then, bearding machine Carry out hanger bulk and link up with the Making programme of coupler body.
Make hanger bulk:
After hook raw material processed is tentatively molded out the profile of hanger bulk, block is bent under the drive of corresponding actuating unit, Close to hook matrix processed, kink touches hook raw material processed and bends hook raw material processed toward hooked scarf side processed, and then, closure blocks are close to system Hook matrix, closure touch hook raw material processed and hook raw material processed are pressed together on molding basal plane, and hanger bulk is drawn so as to be molded.It is curved Folding part can be integrally formed with bending block, can also be arranged on by connected modes such as screw thread, buckles on bending block;Closure can be with Closure blocks are integrally formed, and can also be arranged on by connected modes such as screw thread, buckles in closure blocks.
Make hook coupler body:
After hook raw material processed is tentatively molded out the profile of hanger bulk, lifting block under the drive of corresponding actuating unit, Lifting hole is stretched out, the part touched hook raw material processed and hook raw material processed is stretched out to die briquetting is bent, and then, hooked scarf processed is corresponding Actuating unit drive under, close to hook matrix processed, hook raw material processed that hook and slot touching processed is bent and by the part hook raw material On molding to hook basal plane processed, hook coupler body is drawn so as to be molded.
Raw material due in actual production, producing hook is generally continuous bonding jumper.To intercept the gold of appropriate length Belong to bar and make hook, limited block can be provided with frame.Along feedstock direction, the limited block is located at the downstream into material space, for limiting The charging depth of the raw material of system production hook.And cut-off knife part can be then provided with die briquetting, for cutting off bonding jumper.Along feedstock Direction, the cut-off knife part may be provided in the most upstream of die briquetting.
The quality of hook is influenceed to avoid die briquetting from hitting impact caused by hook matrix processed, can be also provided with die briquetting can Stopper slot in embedded bending matrix.When die briquetting is embedded in hook matrix processed, the stopper slot is also embedded in bending matrix, makes molding Block stops.
Linked up with for ease of taking out, the bootstrap block in strip structure can be also provided with this bearding machine, one end of guiding piece connects Connect and be fixed on hook matrix processed, the other end is obliquely directed towards ground.The bootstrap block can be distortion, and the scope of distortion is at 165 ° , can be according to being actually needed to link up with 195 °, the position of rotational hook coupler body is so as to falling into follow-up production equipment.This Outside, several discharging block vias can be also provided with frame, the discharging block via is set around hook matrix processed;Set in discharging block via Having can be along the discharging block of discharging block via disengaging.After the completion for the treatment of hook production, discharging block stretches out discharging block via, and hook is pushed away Hook matrix processed is simultaneously included in bootstrap block, hook is removed bearding machine.
To ensure that molding groove can be accurately embedded in hook matrix processed, the positioning for calibrating positioning can be also connected with die briquetting Block, the locating piece are provided with check and correction groove, and the check and correction groove is embedded in bootstrap block, so as to ensure that die briquetting can be in the guiding of bootstrap block Under, in embedded hook matrix processed.
The present invention has the advantages such as simple in construction, hook production is convenient, production efficiency is high, production cost is low.
Brief description of the drawings
Fig. 1 is the schematic diagram of hook;
Fig. 2 is the schematic diagram of bearding machine in the embodiment of the present invention 1;
Fig. 3 is the first step schematic diagram being tentatively molded in the embodiment of the present invention 1;
Fig. 4 is the second step schematic diagram being tentatively molded in the embodiment of the present invention 1;
Fig. 5 is the third step schematic diagram being tentatively molded in the embodiment of the present invention 1;
Fig. 6 is the first step schematic diagram that hanger bulk is prepared in the embodiment of the present invention 1;
Fig. 7 is the second step schematic diagram that hanger bulk is prepared in the embodiment of the present invention 1;
Fig. 8 is the first step schematic diagram that hook coupler body is prepared in the embodiment of the present invention 1;
Fig. 9 is the second step schematic diagram that hook coupler body is prepared in the embodiment of the present invention 1;
Figure 10 is the schematic diagram of bootstrap block in the embodiment of the present invention 2;
Figure 11 is in the embodiment of the present invention 2
Description of reference numerals:1'- hanger bulks;2'- links up with coupler body;1- frames;2- hook matrixs;6- bending matrixs;7- Lifting hole;8- die briquettings;9- hooked scarfs;10- bends block;11- closure blocks;12- enters material space;13- is molded groove;14- hook bases Face;16- kinks;17- closures;18- limited blocks;19- cut-off knife parts;20- stopper slots;21- bootstrap blocks;22- locating pieces;23- Proofread groove;24- lifting blocks.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Embodiment 1:
As shown in Fig. 2 the frame 1 of this bearding machine is provided with hook matrix 2 processed and hook assembly processed.The hook matrix 2 processed is provided with It is molded basal plane.4 discharging block vias are provided with around hook raw material processed, 4 discharging block vias are set around hook matrix 2 processed.Respectively Discharging block is equipped with discharging block via, each block that discharges is respectively connected with actuating unit, so as to be in and out of discharging block via.
The side of molding basal plane is provided with hook matrix 2 processed, bending matrix 6 and lifting hole 7 are additionally provided with frame 1.Bending base Block 6 is located between lifting hole 7 and hook matrix 2 processed, for bending hook raw material, hook raw material processed is turned down toward die briquetting side.Lift Rise in hole 7 and be provided with lifting block 24, the lifting block 24 is connected with actuating unit, so as to be in and out of lifting hole 7.
In the present embodiment 1, hook assembly processed includes die briquetting 8, hooked scarf processed 9, bending block 10 and closure blocks 11.As illustrated, Die briquetting 8 is located at the left side of hook matrix 2 processed, is provided between die briquetting 8 and hook matrix 2 processed and is used to enter material space for feedstock 12, die briquetting 8 is provided with the molding groove 13 that can be embedded in hook matrix 2 processed and the hook basal plane 14 processed for being molded hook coupler body;System Hooked scarf 9 is located at the top of hook matrix 2 processed, is located at the side that hook matrix 2 processed is provided with molding basal plane, and hooked scarf 9 processed, which is provided with, is used for mould The hook and slot processed of pressure hook coupler body;Bending block 10 is located at the lower section of hook matrix 2 processed, is oppositely arranged with the coiling hook matrix 2 of hooked scarf 9 processed, Bend on block 10 integrally formed with the kink 16 for making hanger bulk;The closure blocks 11 are located at the right side of hook matrix 2 processed, It is oppositely arranged with the coiling hook matrix 2 of die briquetting 8, integrally formed with the closure 17 for closing hanger bulk in closure blocks 11.
Die briquetting 8, hooked scarf processed 9, bending block 10 and the closure blocks 11 of above-mentioned composition hook assembly are moved corresponding to being respectively connected with Force mechanisms, so that die briquetting 8, hooked scarf processed 9, bending block 10 and closure blocks 11 can periodically close, remote hook matrixs 2 processed.Respectively Actuating unit can use existing conventional design, repeat no more here.
In addition, limited block 18 is additionally provided with frame 1.Along feedstock direction, the limited block 18 is located at into the downstream of material space 12, For the charging depth for the raw material for limiting production hook.And cut-off knife part 19 can be then provided with die briquetting 8, for cutting off bonding jumper. Along hook feedstock direction processed, the cut-off knife part 19 is located at the most upstream of die briquetting 8.
The quality of hook is influenceed to avoid die briquetting 8 from hitting impact caused by hook matrix 2 processed, is additionally provided with die briquetting 8 The stopper slot 20 that can be embedded in bending matrix 6.When die briquetting 8 is embedded in hook matrix 2 processed, the stopper slot 20 is also embedded in bending matrix In 6, stop die briquetting 8.
The operation principle of this bearding machine is as follows:
As shown in Fig. 3,4,5, hook raw material processed is sent into material space 12 through feed device, and stretches out die briquetting 8.Die briquetting 8 under the drive of actuating unit close to hook matrix 2 processed, hook raw material processed is promoted toward the side of hook matrix 2 processed, until molding groove 13 is embedding Enter in hook matrix 2 processed and hook raw material processed touching is on bending matrix 6, hook raw material processed is tentatively molded out the profile of hanger bulk. Then, bearding machine can carry out hanger bulk and link up with the Making programme of coupler body.
Make hanger bulk:
As shown in Figure 6,7, after hook raw material processed is tentatively molded out the profile of hanger bulk, bending block 10 is in corresponding power Under the drive of mechanism, close to hook matrix 2 processed, kink 16 touches hook raw material processed and bends hook raw material processed toward the side of hooked scarf 9 processed, Then, closure blocks 11 close to hook matrix 2 processed, touch hook raw material processed and hook raw material processed be pressed together on molding basal plane by closure 17, Hanger bulk is drawn so as to be molded
Make hook coupler body:
As shown in Figure 8,9, after hook raw material processed is tentatively molded out the profile of hanger bulk, lifting block 24 is in corresponding power Under the drive of mechanism, lifting hole 7 is stretched out, the part touched hook raw material processed and hook raw material processed is stretched out to die briquetting 8 is bent, with Afterwards, hooked scarf 9 processed is under the drive of corresponding actuating unit, and close to hook matrix 2 processed, the hook raw material processed that hook and slot touching processed is bent is simultaneously The part hook raw material is molded to hook basal plane 14 processed, hook coupler body is drawn so as to be molded.
Embodiment 2:
The present embodiment 2 and the difference of embodiment 1 are, in the present embodiment 2, as shown in Figure 10,11, and hook matrix 2 processed On be connected with bootstrap block 21 in strip structure.The bootstrap block 21 distorts 180 °, and one end of bootstrap block 21 is fastened on system On hook matrix 2, the other end is obliquely directed towards ground.After the completion for the treatment of hook production, discharging block stretches out discharging block via, and hook is pushed away From hook matrix 2 processed and it is included in the bootstrap block 21 as guiding piece, hook is removed bearding machine.Link up with bootstrap block 21, In the presence of self gravitation, slid along bootstrap block 21 to follow-up equipment.
In addition, to ensure that molding groove 13 can be accurately embedded in hook matrix 2 processed, it is also associated with being used to calibrate on die briquetting 8 determining The locating piece 22 of position, the locating piece 22 are provided with check and correction groove 23, and the check and correction groove 23 is embedded in bootstrap block 21, so as to ensure die briquetting 8 can be under the guiding of bootstrap block 21, in embedded hook matrix 2 processed.
What this specification was enumerated is only better embodiment of the invention, all institutes under the operation principle and thinking of the present invention The equivalent technologies conversion done, is accordingly to be regarded as protection scope of the present invention.

Claims (9)

1. new bearding machine, including frame, it is characterized in that:Frame is provided with hook matrix processed and hook assembly processed;The hook matrix processed It is provided with molding basal plane;The hook assembly processed is including that periodically close to the die briquetting of hook matrix processed, hooked scarf processed, bending block and can close Close block;
It is provided between the die briquetting and hook matrix processed and is used to enter material space for feedstock;The die briquetting is provided with can be embedding Enter the molding groove in hook matrix processed and the hook basal plane processed for being molded hook coupler body;
The hooked scarf processed is located at the side that hook matrix processed is provided with molding basal plane;The hooked scarf processed, which is provided with, to be used to be molded hook coupler body Hook and slot processed;
The bending block is oppositely arranged with hooked scarf coiling hook matrix processed;The bending block, which is provided with, to be used to make the curved of hanger bulk Folding part;
The closure blocks are oppositely arranged with die briquetting coiling hook matrix;The closure blocks, which are provided with, to be used to close closing for hanger bulk Conjunction portion;
The lifting hole that is additionally provided with the frame between die briquetting and hooked scarf processed and positioned at lifting hole and hook matrix processed it Between bending matrix;The lifting block in the lifting hole can be in and out of by being provided with the lifting hole.
2. new bearding machine according to claim 1, it is characterized in that:The frame is provided with limited block;Along feedstock Direction, the limited block are located at the downstream into material space.
3. new bearding machine according to claim 1, it is characterized in that:The die briquetting is provided with cut-off knife part;Enter along raw material Expect direction, the cut-off knife part is located at the most upstream of die briquetting.
4. new bearding machine according to claim 1, it is characterized in that:The die briquetting is provided with and can be embedded in bending matrix Stopper slot.
5. new bearding machine according to claim 1, it is characterized in that:Several discharging block vias are provided with the frame; The discharging block via is set around hook matrix processed;Being provided with the discharging block via can be along the discharging of discharging block via disengaging Block.
6. new bearding machine according to claim 1, it is characterized in that:The guiding piece in strip structure is additionally provided with, it is described One end of guiding piece is fastened on hook matrix processed, and the other end is obliquely directed towards ground.
7. new bearding machine according to claim 6, it is characterized in that:It is connected with the die briquetting for calibrating positioning Locating piece;The locating piece is provided with check and correction groove, and the check and correction groove is embedded in bootstrap block.
8. new bearding machine according to claim 6, it is characterized in that:The guiding piece is distortion.
9. new bearding machine according to claim 8, it is characterized in that:The guiding piece distorts 165 ° to 195 °.
CN201610243281.2A 2016-04-19 2016-04-19 New bearding machine Expired - Fee Related CN105728556B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610243281.2A CN105728556B (en) 2016-04-19 2016-04-19 New bearding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610243281.2A CN105728556B (en) 2016-04-19 2016-04-19 New bearding machine

Publications (2)

Publication Number Publication Date
CN105728556A CN105728556A (en) 2016-07-06
CN105728556B true CN105728556B (en) 2018-01-12

Family

ID=56255874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610243281.2A Expired - Fee Related CN105728556B (en) 2016-04-19 2016-04-19 New bearding machine

Country Status (1)

Country Link
CN (1) CN105728556B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106040838B (en) * 2016-08-12 2018-01-05 南南铝业股份有限公司 Aluminium links up with the automation integrated machine of bending

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002192262A (en) * 2000-12-25 2002-07-10 Nippon Reinz Co Ltd Method for forming hook on metal plate
CN102172726A (en) * 2011-03-11 2011-09-07 昆山鑫泰利精密模具有限公司 Automatic feeding and hooking mechanism for punching die
CN102371306A (en) * 2011-11-22 2012-03-14 冠达星股份有限公司 Full-automatic forming device for metal clothes hanger of cloth wardrobe
CN202606671U (en) * 2012-04-25 2012-12-19 杭州大鑫电力设备有限公司 Forming die of cable cover plate frame hook
CN203316601U (en) * 2013-06-14 2013-12-04 黄石市蓝天环保节能设备有限公司 Special combined die for molding hook part
CN203508694U (en) * 2013-11-12 2014-04-02 上海昭程整流子科技有限公司 Automatic hook production device
CN205887807U (en) * 2016-04-19 2017-01-18 陆健华 Novel bearding machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002192262A (en) * 2000-12-25 2002-07-10 Nippon Reinz Co Ltd Method for forming hook on metal plate
CN102172726A (en) * 2011-03-11 2011-09-07 昆山鑫泰利精密模具有限公司 Automatic feeding and hooking mechanism for punching die
CN102371306A (en) * 2011-11-22 2012-03-14 冠达星股份有限公司 Full-automatic forming device for metal clothes hanger of cloth wardrobe
CN202606671U (en) * 2012-04-25 2012-12-19 杭州大鑫电力设备有限公司 Forming die of cable cover plate frame hook
CN203316601U (en) * 2013-06-14 2013-12-04 黄石市蓝天环保节能设备有限公司 Special combined die for molding hook part
CN203508694U (en) * 2013-11-12 2014-04-02 上海昭程整流子科技有限公司 Automatic hook production device
CN205887807U (en) * 2016-04-19 2017-01-18 陆健华 Novel bearding machine

Also Published As

Publication number Publication date
CN105728556A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN203830613U (en) LED bending and pin-cutting mechanism
CN105728556B (en) New bearding machine
CN202316872U (en) Automatic nail bending machine
CN205887807U (en) Novel bearding machine
CN204673950U (en) A kind of Angle Pin spring core-pulling sliding block mechanism
CN202570947U (en) Wire box punching machine
CN105479692B (en) A kind of substep ramp-roof structure
CN202062593U (en) Shock pad mould with pneumatic device for compressors of household appliances
CN105033089B (en) A kind of drawing mechanism of tube forming equipment
CN106360883A (en) Automatic shoe tree machine
CN204095069U (en) A kind of arc core pulling structure of injection mould
CN204885764U (en) Beat improvement structure of terminal machine
CN202137927U (en) Die overlapping linkage mechanism
CN103286562B (en) Chute type automatic hinge machine
CN103434682A (en) U-shaped fastener double-card punched-card machine
CN204262350U (en) Valve retainer powder press forming machine
CN104249118B (en) Riveted joint device in a kind of pneumatic type mould
CN205342055U (en) Unloader mould is tailor to automobile shock absorber sheathed tube
CN204303582U (en) A kind of anxious stopping twists release explosive operation head
CN206519505U (en) A kind of assembling device of thermistor temperature limiter
CN205343656U (en) Novel shovel quick -witted structure
CN203356435U (en) Pneumatic type intra-mould riveting device
CN203696563U (en) Feeding device for hinge piece inlaying machine
CN204687269U (en) A kind of injection mold slide guide slot type side core-pulling mechanism
CN202491361U (en) Injection molding machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112

Termination date: 20210419