CN105722122A CN201610239148.XA CN201610239148A CN105722122A CN 105722122 A CN105722122 A CN 105722122A CN 201610239148 A CN201610239148 A CN 201610239148A CN 105722122 A CN105722122 A CN 105722122A
Authority
CN
China
Prior art keywords
test packet
packet
terminal
moment
described terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610239148.XA
Other languages
Chinese (zh)
Inventor
李彬
陈细生
罗远科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Comba Network Systems Co Ltd
Original Assignee
Comba Telecom Technology Guangzhou Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Comba Telecom Technology Guangzhou Ltd filed Critical Comba Telecom Technology Guangzhou Ltd
Priority to CN201610239148.XA priority Critical patent/CN105722122A/en
Publication of CN105722122A publication Critical patent/CN105722122A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Abstract

The invention discloses a method and device for optimizing a user plane time delay. The method comprises following steps of receiving uplink data packets sent by a terminal; if the uplink data packets are the uplink test data packets of the PING request of an internet packet explorer, determining the period of sending the uplink test data packets by the terminal; according to the period, predicting a moment of receiving the follow-up uplink test data packets sent by the terminal; and according to the predicted moment, through combination of the existing service data quantity of the terminal, pre-allocating air interface resources to the terminal, thus saving the time for the terminal to request for allocation of the air interface resources. The method and the device are used for solving the problem in the prior art that the user plane test time delay is relatively long when the terminal services normally and the user communication experience effect is poor.

Description

A kind of method of optimizing user plane time delay and device
Technical field
The present invention relates to the communications field, particularly relate to method and the device of a kind of optimizing user plane time delay.
Background technology
LTE (LongTermEvolution, Long Term Evolution) time delay refers to the time delay in user face and the time delay of chain of command, the time delay in so-called user face includes: time delay of eating dishes without rice or wine, EPC time delay and E2E time delay three part, as shown in Figure 1, refer to a packet and be dealt into offside from terminal, and receive the offside time delay responding needs about this packet.Delay testing generally adopts PING (the Internet packets survey meter) form wrapped to test in business conduct, a reference index of the limit capacity that the time delay of PING bag generally realizes as checking LTE technology and producer.PING bag is also the important means that base station equipment is checked and accepted in common carrier test simultaneously.
Generally adopt the method that the form of PING bag carries out testing as follows: user inputs initiation PING order in terminal, then the target side that terminal can provide to instruction periodically sends PING request (ICMP packet), and terminal also can receive the reply data bag of the ICMP form that target side returns, because the SN (serial number) according to ICMP data packet head, can determine that the delivery time of same ICMP packet and the time of reception, calculate the time delay of PING bag, size according to repeatedly continuous data packet delay contrasts or statistical average result, the time delay in user face of wireless communication system is weighed with this.
Considering that user plane time delay is more short, it was demonstrated that the performance of base station is more good, telex network experience effect is more good, and prior art there is no the method for the time delay shortening user face, a kind of method therefore needing time delay that can shorten existing user face badly.
Summary of the invention
The embodiment of the present invention provides a kind of method of optimizing user plane time delay and device, longer in order to solve to there is user plane time delay in prior art, the problem of telex network experience effect difference.
The inventive method includes a kind of method of optimizing user plane time delay, and the method includes: receive the upstream data bag that terminal sends;If the up test packet that described upstream data bag is the Internet packets survey meter PING request, it is determined that described terminal sends the cycle of up test packet;According to the described cycle, it was predicted that receive described terminal and send the moment of follow-up up test packet;Moment according to prediction is described terminal predistribution interface-free resources, and the purpose of do so is to save the time of described terminal request distribution interface-free resources.
Based on same inventive concept, the embodiment of the present invention provides the device of a kind of optimizing user plane time delay further, and this device includes:
Receive unit, for receiving the upstream data bag that terminal sends;
Determine unit, if for the up test packet that described upstream data bag is the Internet packets survey meter PING request, it is determined that described terminal sends the cycle of up test packet;
Pretreatment unit, for according to the described cycle, it was predicted that receive described terminal and send the moment of follow-up up test packet;Moment according to prediction is described terminal predistribution interface-free resources.This device achieves the purpose of the time saving described terminal request distribution interface-free resources equally.
The embodiment of the present invention is by receiving the upstream data bag that each terminal sends on the one hand, if the up test packet that described upstream data bag is PING request, it is determined that described terminal sends the cycle of up test packet;On the other hand according to the described cycle, it was predicted that receive described terminal and send the moment of follow-up up test packet;Moment according to prediction is described terminal predistribution interface-free resources, to save the time waiting distribution interface-free resources in base station after described terminal sends described follow-up up test packet.So, when terminal sends follow-up up test packet, base station is not yet receiving above-mentioned up test packet, it has been just that the up test packet being about to receive has distributed interface-free resources, thus saving terminal to send resource scheduling request to base station, then base station obtains the time of corresponding resource authorization again, therefore can by least unidirectional for time delay of the eating dishes without rice or wine time saving about 8ms, reduce user plane time delay, improve the communication experiences effect of user.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme in the embodiment of the present invention, below the accompanying drawing used required during embodiment is described is briefly introduced, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
A kind of user plane time delay schematic diagram that Fig. 1 provides for prior art;
Fig. 2 provides the method flow schematic diagram of a kind of optimizing user plane time delay for the embodiment of the present invention;
Fig. 3 provides the schematic flow sheet of a kind of user plane time delay optimization method for the embodiment of the present invention;
Fig. 4 provides the device schematic diagram of a kind of optimizing user plane time delay for the embodiment of the present invention.
Detailed description of the invention
In order to make the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, the present invention is described in further detail, it is clear that described embodiment is only some embodiments of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, all other embodiments that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of protection of the invention.
Herein in connection with terminal and/or base station, various aspect is described.Terminal, refers to provide a user with the equipment (device) of voice and/or data connectivity, including wireless terminal or catv terminal.Wireless terminal can be have the portable equipment of wireless connecting function or be connected to other process equipment of radio modem, through the mobile terminal that wireless access network and one or more core net communicate.Such as, wireless terminal can be mobile phone (or being called " honeycomb " phone) and the computer with mobile terminal.And for example, wireless terminal can also be portable, pocket, hand-held, built-in computer or vehicle-mounted mobile device.Accesspoint) or a part for subscriber equipment (English is: userequipment, be called for short UE) for another example, wireless terminal can be that (English is movement station: mobilestation), (English is access point:.
Existing user plane time delay method of testing is usually by the test command of user's triggering terminal, terminal periodic ground is (if without appointment, acquiescence was every one second) send ICMP request data package to target side address (such as: ping192.168.3.200), time delay of wherein eating dishes without rice or wine refers to the time that following process is used: terminal sends ICMP request data package to base station, then dispatch request (the SchedulingRequest that base station sends according to terminal, and the buffer status report (BufferStatusReporting of terminal to report SR), BSR) size, carry out resource authorization (DCI0), the mandate of this DCI0 that terminal gives according to base station carries out ICMP request data package transmission;Base station side receives core-network side and generates about ICMP reply data bag, and is sent to terminal.
It is true that in LTE system, the interface-free resources of base station is frequently not fixed allocation, because the size of the business datum received is uncertain, so according to base station real-time reception data business volume size real-time dynamic scheduling.But the up test packet that terminal sends, its size, cycle, number etc. all can detect that.So, base station can carry out the predistribution of accurate interface-free resources according to the rule of up test packet, so, both can shorten the length of time delay of eating dishes without rice or wine, it is possible to improving the utilization rate of interface-free resources, specifically method is as follows.
Shown in Figure 2, the embodiment of the present invention provides the method flow schematic diagram of a kind of optimizing user plane time delay, and the method that specifically realizes includes:
Step S101, receives the upstream data bag that terminal sends.
Step S102, if the up test packet that described upstream data bag is PING request, it is determined that described terminal sends the cycle of up test packet.
Step S103, according to the described cycle, it was predicted that receives described terminal and sends the moment of follow-up up test packet.
Step S104, is described terminal predistribution interface-free resources according to the moment of prediction, to save the time of described terminal request distribution interface-free resources.
Specifically, user's test command by triggering terminal, terminal can send up test packet periodically to base station, after the L2 layer (transport layer) of base station receives the upstream data bag of certain terminal, first judge whether this packet is ICMP (InternetControlMessageProtocol, network control message protocol) packet, if it is, illustrate that this packet is the up test packet sending PING request to base station by detecting Data Labels position.
Wherein it is possible to judge that the principle of the PING up test packet asked is by ICMP packet: because the packet that PING order is based on ICMP agreement realizes.According to ICMP agreement, resolve the special data position in the IP packet header of the upstream data bag received, if 73~81 of IP datagram literary composition equal to 0x01, then expression is this upstream data bag is ICMP packet, continue to resolve this ICMP data packet head, if bit instruction type in ICMP8 position is 8,8 bit instruction codes are 0, then represent that this icmp packet is request, i.e. PING request, otherwise if 8 bit instruction types are 0, and 8 bit instruction codes are 0, then represent that this icmp packet is reply, i.e. PING response.
Determine be ICMP packet after, the relevant parameter of base station notice MAC this terminal ICMP packet of scheduling controller record, including: pingSize (data package size), pingPeriod (ping bag cycle), pingId (ping bag process number).It practice, ICMP data package size has the size that 1~1472bytes is different, the ICMP packet that conventional test command is corresponding is 32bytes, and the Thread Count of the interval time of each packet, bag size and simultaneously ping bag freely can be set by test command.Additionally, serial number in the similar TCP session of serial number of ICMP packet, when the unimpeded not packet loss of communication link, each ICMPEchoRequest (PING request) that terminal sends can obtain the ICMPEchoReply (PING response) of an identical serial number.The SN=0x100 of such as, first up test packet under Windows system, follow-up No. SN adds 1 for increment with 0x100, and base station can return the reply data bag of SN=0x100 after receiving the ICMP packet of 0x100.
Further, according to serial number in the packet header of the up test packet received, it is determined that the up test packet of at least two serial number continuous print;The time difference of the time of reception according to the described at least two up test packet of serial number continuous print, it is determined that the cycle of described up test packet.
That is, add up the time of reception of multiple ICMP packet, the time difference of serial number continuous print each two ICMP packet time of reception is calculated, then using the meansigma methods of multiple time differences transmission cycle as up test packet, the time of reception of the ICMP packet that such as base station receives 0x100 is 01:59, the time of reception of the ICMP packet that base station receives 0x101 is 02:00, then time difference is one second, in like manner, record 0x102 can be continued in base station, the time of reception of the ICMP packet of the serial numbers such as 0x103, calculate time difference, all of time difference is taken average, just can draw the transmission cycle of ICMP packet.
It is understandable that, base station only can also draw the transmission cycle of ICMP packet according to the time difference of the ICMP packet of 0x100 and the time of reception of the ICMP packet of 0x101, additionally, as it is possible that part packet is at packet loss of eating dishes without rice or wine, cause the serial number of the ICMP packet that base station receives and discontinuous, so, the serial number not consecutive hours of the ICMP packet received before and after base station finds, then it is left out this ICMP packet, select the time difference of sequence of calculation continuous print ICMP packet, certainly, selection is averaged more accurate as ICMP packet, the impact of other factors can be excluded.
Consider that terminal can exist business datum and the concurrent scene of up test packet, further, the size of the business data packet being previously received according to the moment in described prediction and the fixed size of described up test packet, be defined as the preallocated interface-free resources size of described terminal before the moment of described prediction.
If terminal is simply carrying out delay testing, it is not related to the words of other business data packet, the cycle of the ICMP packet that base station can send according to the terminal determined before, prediction SS later sends the moment of ICMP packet, and then the base station interface-free resources that predistribution is sufficiently large before the corresponding moment occurs is to this terminal.When but if terminal also has other business datum being correlated with while transmission delay is tested, because the business data packet that this part is relevant is to be received by base station as one group of packet with next ICMP packet, so base station can obtain interface-free resources send in the lump in order to ensure the ICMP packet being about to receive, it is necessary to calculates the interface-free resources size distributed.
Such as terminal is carrying out while voice and video, user inputs dos command triggering terminal and initiates delay testing to destination address, now base station receives the packet of this terminal and had likely both comprised the business datum of voice and video, also comprises the ICMP packet of delay testing.After base station receives upstream data bag, BSR in MAC layer decoding MAC-CE (MACControlElements) of base station, decision logic channel group (packet that voice is relevant) also calculates the size that such packets need is dispatched, size in conjunction with the packet of each ICMP determines the total size of preallocated interface-free resources, the purpose of do so is to avoid because too high the robbing of packet priority that voice and video is correlated with account for preallocated interface-free resources, because there being the interface-free resources of enough sizes, so can while not affecting business datum communication, ensure that the time delay of delay testing is shorter.
Further, adjust the dispatching priority of described terminal, so that described terminal is by priority treatment, specifically, after base station L2 layer completes the detection of packet, judge whether it is the packet of ICMP, if so, record the mark of this terminal, start the dispatching priority treatment mechanism about this Terminal Type, namely when terminal sends the packet of next ICMP, the mark of this terminal of identification of base stations, the packet of this terminal of priority treatment.Visible, by adjusting the priority of terminal carrying out delay testing, it is possible to be further ensured that uplink/downlink test packet that this Terminal Type sends is by priority treatment, reduction is eated dishes without rice or wine the length of time delay further.
The preallocated process of interface-free resources is carried out, in order to avoid the waste of interface-free resources, when the moment of described prediction arrives, according to whether receive the up test packet that described terminal sends, it is judged that whether delay testing terminates based on above-mentioned base station;Wherein, if all not receiving, when the moment of the described prediction of N continuous arrives, the up test packet that described terminal sends, it is determined that delay testing terminates, and is recovered as the preallocated interface-free resources of described terminal, and the dispatching priority recovering described terminal is original state.
That is, base station is terminal distribution resource still according to the method for above-mentioned predistribution interface-free resources, but in order to avoid causing the waste of resource, base station also may proceed to judge, such as base station sets intervalometer, when intervalometer arrives, base station monitors is either with or without the ICMP packet receiving sequence number 0x102, if base station finds not receive, this packet is have sent in order to get rid of terminal, but in the probability of loss of eating dishes without rice or wine, when base station monitors next intervalometer arrival again, whether base station receives the ICMP packet of sequence number 0x103, and when later intervalometer arrives again, whether base station receives the ICMP packet of sequence number 0x104, if continuous three packets all do not receive, then illustrate that terminal stops sending up test packet, so base station just can stop distribution interface-free resources, and the priority of terminal is returned to original state, avoid because this Terminal Type continues to seize interface-free resources, affect base station and process normal business datum.
For the optimization method of the above-mentioned user plane time delay that describes in a systematic way, the embodiment of the present invention provides the flow chart shown in Fig. 3 further, elaborates base station and processes the process of up test packet.
Step one, the L2 layer (i.e. up RLC module) of base station is according to upstream data bag, judge whether to belong to ICMP packet, if, record No. SN (such as 0x100) of this terminal ICMP packet for the first time, data package size, receive system-frame and the subframe numbers of bag, then after base station is received again by the ICMP packet of 0x101, record System Frame Number and subframe numbers, calculate the cycle T 1 of ICMP packet, the information such as the size together with the ICMP packet obtained last time, send messages to MAC scheduler, intervalometer is set according to the cycle calculated simultaneously, intervalometer effect is for predicting the moment being successfully received ICMP packet.
Step 2, base station MAC scheduler start intervalometer, the transmission time of the ICMP packet of prediction sequence number 0x102, and determine the size of the business data packet received before the ICMP packet of 0x102 arrives, then the interface-free resources of enough sizes is distributed, by PDCCH (PhysicalDownlinkControlChannel, Physical Downlink Control Channel) carry out uplink authorization transmission to terminal, after terminal receives uplink authorization, send the ICMPPING request data package carrying 0x102 to base station side at PUSCH.
Step 3, base station L2 layer monitor in continuous 3 cycle T 1, whether receive sequence number to be 0x103, sequence number be 0x104, sequence number is the ICMP packet of 0x105, if all not receiving, then think that this terminal stops sending up test packet, by this delay testing termination instruction, the terminal iidentification together with serial number ownership sends the message stopping delay testing to the MAC scheduler of base station.
Step 4, base station MAC scheduler receive the delay testing about this terminal and stop after message, stop intervalometer, and cancel this terminal scheduling high priority, recover to original state.
On the other hand, when base station receives the PING response that core-network side sends, the downlink data packet that core-network side sends is received;If the descending test packet that described downlink data packet is PING response, then adjust the scheduling of resource priority of described descending test packet, so that described descending test packet is by priority treatment, the purpose of do so is to reduce packet in inside of base station residence time.
Because the downlink data packet that base station receives being likely to comprise business data packet and descending test packet, so base station needs to filter out descending test packet, the dispatching priority of the descending test packet screened is heightened, specifically specifically describes the processing procedure of descending test packet with following steps:
Step one, base station the L2 layer (the specifically descending PDCP module) downlink data packet according to network side, detect whether to belong to ICMP packet, if, then prove to belong to descending test packet, record No. SN (such as 0x110) of this descending test packet, data package size, receives system-frame and the subframe numbers (sfn, sf) of bag.
Step 2, base station MAC scheduler adjust the dispatching priority of descending test packet, after receiving ICMP packet, dispatching distribution downlink space interface resource gives this UE immediately, and ensures that at present frame, this packet being issued L1 issues UE eating dishes without rice or wine.
Whether step 3, base station monitors receive ICMP packet (such as 0x111,0x112,0x113) in continuous 3 cycles, if all not receiving, then it is assumed that core-network side stops sending descending test packet, stops priority adjustment.
The embodiment of the present invention is by receiving the upstream data bag that each terminal sends on the one hand, if the up test packet that described upstream data bag is PING request, it is determined that described terminal sends the cycle of up test packet;On the other hand according to the described cycle, it was predicted that receive described terminal and send the moment of follow-up up test packet;Moment according to prediction is described terminal predistribution interface-free resources, to save the time waiting distribution interface-free resources in base station after described terminal sends described follow-up up test packet.Same reason, after base station receives the descending test packet that core-network side issues, also predistribution interface-free resources processes this descending test packet in time, so, when terminal sends follow-up up-downgoing test packet, base station is not yet receiving above-mentioned up-downgoing test packet, it has been just that the up test packet being about to receive has distributed interface-free resources, thus saving terminal to send resource scheduling request to base station, then base station obtains the time of corresponding resource authorization again, therefore time delay of eating dishes without rice or wine at least can be saved about 10ms (descending about 2ms, up about 8ms) left and right time, reduce user plane time delay, improve the communication experiences effect of user.
Based on identical technology design, the embodiment of the present invention also provides for the device of a kind of optimizing user plane time delay, and this device can perform said method embodiment.The embodiment of the present invention provide device as shown in Figure 4, including: receive unit 401, determine unit 402, pretreatment unit 403, wherein:
Receive unit 401, for receiving the upstream data bag that terminal sends;
Determine unit 402, if for the up test packet that described upstream data bag is the Internet packets survey meter PING request, it is determined that described terminal sends cycle and the size of up test packet;
Pretreatment unit 403, for according to the described cycle, it was predicted that receive described terminal and send the moment of follow-up up test packet;Moment according to prediction is described terminal predistribution interface-free resources, to save the time of described terminal request distribution interface-free resources.
Further, when base station processes the downlink data packet from core net, described reception unit 401 is additionally operable to: receive the downlink data packet that core-network side sends;
Described downlink data packet is the descending test packet of PING response, and described pretreatment unit 403 is additionally operable to adjust the scheduling of resource priority of described descending test packet, so that described descending test packet is by priority treatment.
Further, described determine unit 402 specifically for: according to receive up test packet packet header in serial number, it is determined that the up test packet of at least two serial number continuous print;
The time difference of the time of reception according to the described at least two up test packet of serial number continuous print, it is determined that the cycle of described up test packet.
Further, described pretreatment unit 403, specifically for the size of the business data packet being previously received according to the moment in described prediction and the fixed size of described up test packet, was defined as the preallocated interface-free resources size of described terminal before the moment of described prediction;
Described pretreatment unit 403 is additionally operable to: adjust the dispatching priority of described terminal, so that described terminal is by priority treatment.
Further, described pretreatment unit 403 is additionally operable to: when the moment of described prediction arrives, according to whether receive the up test packet that described terminal sends, it is judged that whether delay testing terminates;
Wherein, if all not receiving, when the moment of the described prediction of N continuous arrives, the up test packet that described terminal sends, it is determined that delay testing terminates, and is recovered as the preallocated interface-free resources of described terminal, and the dispatching priority recovering described terminal is original state.
The present invention is that flow chart and/or block diagram with reference to method according to embodiments of the present invention, equipment (system) and computer program describe.It should be understood that can by the combination of the flow process in each flow process in computer program instructions flowchart and/or block diagram and/or square frame and flow chart and/or block diagram and/or square frame.These computer program instructions can be provided to produce a machine to the processor of general purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device so that the instruction performed by the processor of computer or other programmable data processing device is produced for realizing the device of function specified in one flow process of flow chart or multiple flow process and/or one square frame of block diagram or multiple square frame.
These computer program instructions may be alternatively stored in and can guide in the computer-readable memory that computer or other programmable data processing device work in a specific way, the instruction making to be stored in this computer-readable memory produces to include the manufacture of command device, and this command device realizes the function specified in one flow process of flow chart or multiple flow process and/or one square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, make on computer or other programmable devices, to perform sequence of operations step to produce computer implemented process, thus the instruction performed on computer or other programmable devices provides for realizing the step of function specified in one flow process of flow chart or multiple flow process and/or one square frame of block diagram or multiple square frame.
Although preferred embodiments of the present invention have been described, but those skilled in the art are once know basic creative concept, then these embodiments can be made other change and amendment.So, claims are intended to be construed to include preferred embodiment and fall into all changes and the amendment of the scope of the invention.
Obviously, the present invention can be carried out various change and modification without deviating from the spirit and scope of the present invention by those skilled in the art.So, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (10)

1. the method for an optimizing user plane time delay, it is characterised in that the method includes:
Receive the upstream data bag that terminal sends;
If the up test packet that described upstream data bag is the Internet packets survey meter PING request, it is determined that described terminal sends the cycle of up test packet;
According to the described cycle, it was predicted that receive described terminal and send the moment of follow-up up test packet;
Moment according to prediction is described terminal predistribution interface-free resources.
2. the method for claim 1, it is characterised in that also include:
Receive the downlink data packet that core-network side sends;
If the descending test packet that described downlink data packet is PING response, then heighten the scheduling of resource priority of described descending test packet.
3. the method for claim 1, it is characterised in that the described cycle determining that described terminal sends up test packet, including:
Serial number in packet header according to the up test packet received, it is determined that the up test packet of at least two serial number continuous print;
The time difference of the time of reception according to the described at least two up test packet of serial number continuous print, it is determined that the cycle of described up test packet.
4. the method for claim 1, it is characterised in that the moment according to predicting is described terminal predistribution interface-free resources, including:
The size of the business data packet being previously received according to the moment in described prediction and the fixed size of described up test packet, be defined as the preallocated interface-free resources size of described terminal before the moment of described prediction;
The method also includes:
Heighten the dispatching priority of described terminal.
5. the method for claim 1, it is characterised in that the described moment according to prediction is described terminal predistribution interface-free resources, also includes:
When the moment of described prediction arrives, according to whether receive the up test packet that described terminal sends, it is judged that whether delay testing terminates;
Wherein, if all not receiving, when the moment of the described prediction of N continuous arrives, the up test packet that described terminal sends, it is determined that delay testing terminates, and is recovered as the preallocated interface-free resources of described terminal, and the dispatching priority recovering described terminal is original state.
6. the device of an optimizing user plane time delay, it is characterised in that this device includes:
Receive unit, for receiving the upstream data bag that terminal sends;
Determine unit, if for the up test packet that described upstream data bag is the Internet packets survey meter PING request, it is determined that described terminal sends the cycle of up test packet;
Pretreatment unit, for according to the described cycle, it was predicted that receive described terminal and send the moment of follow-up up test packet;Moment according to prediction is described terminal predistribution interface-free resources.
7. device as claimed in claim 6, it is characterised in that
Described reception unit is additionally operable to: receive the downlink data packet that core-network side sends;
Described pretreatment unit is additionally operable to: if the descending test packet that described downlink data packet is PING response, then heighten the scheduling of resource priority of described descending test packet.
8. device as claimed in claim 6, it is characterised in that described determine unit specifically for:
Serial number in packet header according to the up test packet received, it is determined that the up test packet of at least two serial number continuous print;
The time difference of the time of reception according to the described at least two up test packet of serial number continuous print, it is determined that the cycle of described up test packet.
9. device as claimed in claim 6, it is characterised in that described pretreatment unit specifically for:
The size of the business data packet being previously received according to the moment in described prediction and the fixed size of described up test packet, be defined as the preallocated interface-free resources size of described terminal before the moment of described prediction;
Described pretreatment unit is additionally operable to: heighten the dispatching priority of described terminal.
10. device as claimed in claim 6, it is characterised in that described pretreatment unit is additionally operable to:
When the moment of described prediction arrives, according to whether receive the up test packet that described terminal sends, it is judged that whether delay testing terminates;
Wherein, if all not receiving, when the moment of the described prediction of N continuous arrives, the up test packet that described terminal sends, it is determined that delay testing terminates, and is recovered as the preallocated interface-free resources of described terminal, and the dispatching priority recovering described terminal is original state.
CN201610239148.XA 2016-04-18 2016-04-18 Method and device for optimizing user plane time delay Pending CN105722122A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610239148.XA CN105722122A (en) 2016-04-18 2016-04-18 Method and device for optimizing user plane time delay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610239148.XA CN105722122A (en) 2016-04-18 2016-04-18 Method and device for optimizing user plane time delay

Publications (1)

Publication Number Publication Date
CN105722122A true CN105722122A (en) 2016-06-29

Family

ID=56160271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610239148.XA Pending CN105722122A (en) 2016-04-18 2016-04-18 Method and device for optimizing user plane time delay

Country Status (1)

Country Link
CN (1) CN105722122A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109688594A (en) * 2017-10-18 2019-04-26 中国电信股份有限公司 Time delay monitoring method, base station and terminal and computer storage medium
CN109729592A (en) * 2019-01-17 2019-05-07 中磊电子(苏州)有限公司 Base station and its resource allocation methods
CN112189375A (en) * 2020-08-25 2021-01-05 北京小米移动软件有限公司 Transmission scheduling method, transmission scheduling device, communication equipment and storage medium
WO2022042380A1 (en) * 2020-08-28 2022-03-03 华为技术有限公司 Air interface delay determination method and apparatus
WO2023029773A1 (en) * 2021-08-31 2023-03-09 中兴通讯股份有限公司 Data scheduling method and system, electronic device, and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103108342A (en) * 2011-11-10 2013-05-15 中兴通讯股份有限公司 PING delay optimization method and device in long term evolution (LTE) system
CN103944835A (en) * 2013-01-18 2014-07-23 中兴通讯股份有限公司 Method and device for realizing scheduling in Packet Internet Grope (Ping) process

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103108342A (en) * 2011-11-10 2013-05-15 中兴通讯股份有限公司 PING delay optimization method and device in long term evolution (LTE) system
CN103944835A (en) * 2013-01-18 2014-07-23 中兴通讯股份有限公司 Method and device for realizing scheduling in Packet Internet Grope (Ping) process

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109688594A (en) * 2017-10-18 2019-04-26 中国电信股份有限公司 Time delay monitoring method, base station and terminal and computer storage medium
CN109688594B (en) * 2017-10-18 2022-05-31 中国电信股份有限公司 Time delay monitoring method, base station, terminal and computer storage medium
CN109729592A (en) * 2019-01-17 2019-05-07 中磊电子(苏州)有限公司 Base station and its resource allocation methods
CN112189375A (en) * 2020-08-25 2021-01-05 北京小米移动软件有限公司 Transmission scheduling method, transmission scheduling device, communication equipment and storage medium
CN112189375B (en) * 2020-08-25 2023-10-27 北京小米移动软件有限公司 Transmission scheduling method, device, communication equipment and storage medium
WO2022042380A1 (en) * 2020-08-28 2022-03-03 华为技术有限公司 Air interface delay determination method and apparatus
WO2023029773A1 (en) * 2021-08-31 2023-03-09 中兴通讯股份有限公司 Data scheduling method and system, electronic device, and storage medium

Similar Documents

Publication Publication Date Title
CN105722122A (en) Method and device for optimizing user plane time delay
US11418987B2 (en) Method for reporting latency of packet transmission in communication network
US8223708B2 (en) Method and apparatus for handling scheduling information report
TWI424776B (en) Method and apparatus for performing buffer status reporting
CN107734703A (en) A kind of resource regulating method and device
US20200178100A1 (en) Method, System and Device for Detecting a Silence Period Status in a User Equipment
CN104159306B (en) A kind of method, equipment and system for controlling interface-free resources
WO2008048173A1 (en) Playout based delay scheduler
CN101771521B (en) Management method of status report retransmission timer in buffer zone
US9813943B2 (en) Apparatus and method for controlling an occupancy ratio of each region in a buffer
CN106576294A (en) Network communication method and apparatus
CN105451345A (en) An uplink authorization information sending method and a base station
US20150124600A1 (en) Method for transmitting data in a packet-oriented communications network and correspondingly configured user terminal in said communications network
CN109462857A (en) Loss treating method, device, wireless net member and computer readable storage medium
CN109417446A (en) Dynamic media access control in crowded WLAN receives rearrangement time-out
CN101742513B (en) Counter check processing method, system and equipment
US20240040430A1 (en) Transmission Processing Method and Communications Device
JP2000244527A (en) Transmission method, transmitter and lan system
CN103108342A (en) PING delay optimization method and device in long term evolution (LTE) system
US20200084668A1 (en) Methods and Apparatus for Discarding Packets in a Wireless Communication Network
CN101938772B (en) Base station measuring method, system and equipment
CN108023686B (en) TCP (Transmission control protocol) delay processing method, device and system
CN111316742B (en) Reporting method of buffer status report, user equipment and computer storage medium
WO2023065283A1 (en) Ran enhancement taking into account cbs behaviour in tsc
WO2017206031A1 (en) Information transmission method and apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180305

Address after: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou, Guangzhou economic and Technological Development Zone, Guangdong Province, No. 10

Applicant after: Comba Telecom System (China) Co., Ltd.

Applicant after: Comba Telecom Systems (Guangzhou) Co., Ltd.

Applicant after: Jingxin Communication Technology (Guangzhou) Co., Ltd.

Applicant after: TIANJIN COMBA TELECOM SYSTEMS CO., LTD.

Address before: 510663 Guangdong city of Guangzhou Province Economic and Technological Development Zone Jinbi Road No. 6

Applicant before: Jingxin Communication Technology (Guangzhou) Co., Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200110

Address after: 510663 Shenzhou Road 10, Guangzhou Science City, Guangzhou economic and Technological Development Zone, Guangzhou, Guangdong

Applicant after: Jingxin Communication System (China) Co., Ltd.

Address before: 510663 Shenzhou Road, Guangzhou Science City, Guangzhou, Guangzhou economic and Technological Development Zone, Guangdong Province, No. 10

Applicant before: Jingxin Communication System (China) Co., Ltd.

Applicant before: Jingxin Communication System (Guangzhou) Co., Ltd.

Applicant before: Jingxin Communication Technology (Guangzhou) Co., Ltd.

Applicant before: TIANJIN COMBA TELECOM SYSTEMS CO., LTD.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20160629