CN105714756B - 厚层风积沙路基压实度快速检测方法 - Google Patents
厚层风积沙路基压实度快速检测方法 Download PDFInfo
- Publication number
- CN105714756B CN105714756B CN201610075813.6A CN201610075813A CN105714756B CN 105714756 B CN105714756 B CN 105714756B CN 201610075813 A CN201610075813 A CN 201610075813A CN 105714756 B CN105714756 B CN 105714756B
- Authority
- CN
- China
- Prior art keywords
- sand
- drift
- embankment
- detection
- compactness
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/08—Investigation of foundation soil in situ after finishing the foundation structure
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Soil Sciences (AREA)
- Analytical Chemistry (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明涉及一种厚层风积沙路基压实度快速检测方法。风积沙路堤现场压实度检测一般采用灌砂法,工序多,受天气情况、人为因素影响较大,难以满足路堤大规模连续填筑碾压作业的要求。本发明首先确定风积沙最大干密度作为标准干密度ρmax;对上下相邻的两层路堤进行检测深度范围内的压实度逐层检测:对待检风积沙路堤段取若干代表点进行灌砂法测定风积沙路堤干密度ρi,结合计算风积沙分层压实度Di,建立压实度与动力触探锤击数N10‑15和检测深度h之间的相关关系式。其他待检路段检测时,采用动力触探试验得出风积沙路堤分层压实度。本发明检测深度大,数据多,方法简单,且受天气及人为等因素影响小,可在风沙天气进行检测。
Description
技术领域
本发明属于交通建设技术领域,具体涉及一种厚层风积沙路基压实度快速检测方法。
背景技术
风积沙路堤现场压实度检测一般采用灌砂法。
灌砂法存在的主要缺陷有:灌砂法需要进行场地整平、灌砂桶标定、凿洞、灌砂、称重等工作,其工序较多,费时、费力,获得一个数据需时半小时以上;其结果受天气情况、人为因素影响较大。另一方面,试样含水率常采用烘干法,对于砂类土,烘干时间不少于6小时,试验周期长,难以满足路堤大规模连续填筑碾压作业的要求;而酒精燃烧法,在大风天气无法使用,且酒精燃烧法所得含水率数据与烘干法偏差较大,无法作为标准方法使用。
发明内容
本发明的目的是提供一种厚层风积沙路基压实度快速检测方法,通过单次的轻型动力触探测试获得路堤顶面下15~75cm深度范围内每15cm厚度层风积沙的压实度,一次试验可获得4个分层的风积沙压实度,大大地提高了检测工作效率。
本发明所采用的技术方案为:
厚层风积沙路基压实度快速检测方法,其特征在于:
由以下步骤实现:
步骤一:在风积沙路堤填筑施工前,分段取样进行颗粒分析试验,确定风积沙颗粒组成,进行风积沙室内最大干密度试验和铺筑现场试验,取两者中最大干密度作为标准干密度ρmax;
步骤二:分层填筑的路堤,在相邻两层路堤分层碾压完成后,对上下相邻的两层路堤进行检测深度范围内的压实度逐层检测,施工和检测的工序为:下层填筑碾压→上层填筑碾压→上、下层压实度一次性自上而下检测;
具体为:
(1)对待检风积沙路堤段取若干代表点进行灌砂法测定风积沙路堤干密度ρi;
(2)清除检测点1m范围内的路堤顶面松散风积沙,清除厚度为15cm;灌砂法检测的分层厚度为15cm,检测总深度范围为15~75cm,检测总层数为1~4层;
(3)风积沙分层压实度Di计算采用下式计算:
;
步骤三:在检测点1m范围内进行10kg级轻型动力触探,记录动力触探仪每贯入15cm的锤击数N10-15,N表示锤击数,10表示锤重10kg,15表示触探仪击入检测层15cm的锤击数,与灌砂桶检测的单层深度相对应,触探仪贯入总深度与灌砂筒检测总深度相对应,为15~75cm;
建立压实度与动力触探锤击数N10-15和检测深度h之间的相关关系式;正常待检路堤清除待检点1m范围内路堤顶面下15cm厚的松散沙层,进行分层轻型动力触探检测,将分层动力触探锤击数N10-15带入关系式,得出风积沙路堤分层压实度;检测深度为15~75cm,一次动力触探可得出连续4层风积沙的压实度。
步骤一中,相邻两段或数段现场风积沙试样颗粒分析结果相同或比较接近,则采用相同的标准干密度。
本发明具有以下优点:
本发明一次轻型动力触探可以得到路堤顶面下15~75cm深度范围内每15cm厚度层风积沙的压实度,检测深度大,检测数据多,一次检测可获得4层风积沙路堤的压实度;检测效率高,一次检测约需耗时10分钟,而灌砂法测得4层风积沙压实度需耗时数小时。轻型动力触探操作方法简单,且受天气及人为等因素影响小,可在风沙天气进行检测。
具体实施方式
下面结合具体实施方式对本发明进行详细的说明。
本发明涉及的厚层风积沙路基压实度快速检测方法,由以下步骤实现:
步骤一:在风积沙路堤填筑施工前,分段取样进行颗粒分析试验,确定风积沙颗粒组成,进行风积沙室内最大干密度试验和铺筑现场试验,取两者中最大干密度作为标准干密度ρmax;
相邻两段或数段现场风积沙试样颗粒分析结果相同或比较接近,则采用相同的标准干密度。
步骤二:分层填筑的路堤,在相邻两层路堤分层碾压完成后,对上下相邻的两层路堤进行检测深度范围内的压实度逐层检测,施工和检测的工序为:下层填筑碾压→上层填筑碾压→上、下层压实度一次性自上而下检测;
具体为:
(1)对待检风积沙路堤段取若干代表点进行灌砂法测定风积沙路堤干密度ρi,操作方法按照《公路路基路面现场测试规程》(JTG E60-2008)执行。
(2)用铁锹或钢尺等工具清除检测点1m范围内的路堤顶面松散风积沙,清除厚度为15cm(鉴于风积沙路堤表层不易压实的特点,在检验分层填筑路基压实度时,表层15cm不进行压实度检测,应对15cm以下路堤进行压实度检测);灌砂法检测的分层厚度为15cm,检测总深度范围为15~75cm,检测总层数为1~4层。
(3)风积沙分层压实度Di计算采用下式计算:
。
步骤三:在检测点1m范围内进行10kg级轻型动力触探,记录动力触探仪每贯入15cm的锤击数N10-15,N表示锤击数,10表示锤重10kg,15表示触探仪击入检测层15cm的锤击数,与灌砂桶检测的单层深度相对应,触探仪贯入总深度与灌砂筒检测总深度相对应,为15~75cm;
建立压实度Di与动力触探锤击数N10-15和检测深度h之间的相关关系式;正常待检路堤清除待检点1m范围内路堤顶面下15cm厚的松散沙层,进行分层轻型动力触探检测,将分层动力触探锤击数N10-15带入关系式,得出风积沙路堤分层压实度;检测深度为15~75cm,一次动力触探可得出连续4层风积沙的压实度。
具体实施例:
试验地点位于内蒙古境内腾格里沙漠穿沙公路,现场取样确定风积沙颗粒组成。采用现场铺筑试验路和室内表面振动法确定风积沙的标准密度。现场进行风积沙路堤灌砂法压实度检测和轻型动力触探检测,建立压实度与动力触探锤击数N10-15和检测深度h之间的相关关系式。正常检测路段,进行轻型动力触探检测,将动力触探锤击数N10-15代入上述关系式得出厚层风积沙分层压实度。通过在内蒙古境内腾格里沙漠200多公里的穿沙公路使用效果验证,新方法检测速度快,一次检测可得出多组试验结果,大大减少了检测工作量,满足工程进度的要求。
实施例1:
风积沙颗粒分析结果与动力触探试验结果见表1和表2。
风积沙试样,大于0.25mm颗粒含量为40.6%,大于0.075mm颗粒含量为99.6%,风积沙为细砂。
压实度Di与动力触探锤击数N10-15和检测深度h之间的相关关系式:
R-拟合关系式相关系数。
h-检测深度(cm)。检测深度15~30cm时,取15;检测深度30~45cm时,取30;检测深度45~60cm时,取45;检测深度60~75cm时,取60。
实施例2:
风积沙颗粒分析结果与动力触探试验结果见表3和表4。
风积沙颗粒分析结果,大于0.25mm颗粒含量为12.6%,大于0.075mm颗粒含量为98.6%,风积沙为细砂。
R-拟合关系式相关系数。
h-检测深度(cm)。检测深度15~30cm时,取15;检测深度30~45cm时,取30;检测深度45~60cm时,取45;检测深度60~75cm时,取60。
实施例3:
风积沙颗粒分析结果与动力触探试验结果见表5和表6。
风积沙颗粒分析结果,大于0.25mm颗粒含量为2.8%,大于0.075mm颗粒含量为96.5%,风积沙为细砂。
R-拟合关系式相关系数。
h-检测深度(cm)。检测深度15~30cm时,取15;检测深度30~45cm时,取30;检测深度45~60cm时,取45;检测深度60~75cm时,取60。
本发明的内容不限于实施例所列举,本领域普通技术人员通过阅读本发明说明书而对本发明技术方案采取的任何等效的变换,均为本发明的权利要求所涵盖。
Claims (1)
1.厚层风积沙路基压实度快速检测方法,其特征在于:
由以下步骤实现:
步骤一:在风积沙路堤填筑施工前,分段取样进行颗粒分析试验,确定风积沙颗粒组成,进行风积沙室内最大干密度试验和铺筑现场试验,取两者中最大干密度作为标准干密度ρmax;
步骤二:分层填筑的路堤,在相邻两层路堤分层碾压完成后,对上下相邻的两层路堤进行检测深度范围内的压实度逐层检测,施工和检测的工序为:下层填筑碾压→上层填筑碾压→上、下层压实度一次性自上而下检测;
具体为:
(1)对待检风积沙路堤段取若干代表点进行灌砂法测定风积沙路堤干密度ρi;
(2)清除检测点1m范围内的路堤顶面松散风积沙,清除厚度为15cm;灌砂法检测的分层厚度为15cm,检测总深度范围为15~75cm,检测总层数为1~4层;
(3)风积沙分层压实度Di计算采用下式计算:
;
步骤三:在检测点1m范围内进行10kg级轻型动力触探,记录动力触探仪每贯入15cm的锤击数N10-15,N表示锤击数,10表示锤重10kg,15表示触探仪击入检测层15cm的锤击数,与灌砂桶检测的单层深度相对应,触探仪贯入总深度与灌砂筒检测总深度相对应,为15~75cm;
建立压实度与动力触探锤击数N10-15和检测深度h之间的相关关系式;正常待检路堤清除待检点1m范围内路堤顶面下15cm厚的松散沙层,进行分层轻型动力触探检测,将分层动力触探锤击数N10-15带入关系式,得出风积沙路堤分层压实度;检测深度为15~75cm,一次动力触探可得出连续4层风积沙的压实度;
步骤一中,相邻两段或数段现场风积沙试样颗粒分析结果相同或比较接近,则采用相同的标准干密度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610075813.6A CN105714756B (zh) | 2016-02-03 | 2016-02-03 | 厚层风积沙路基压实度快速检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610075813.6A CN105714756B (zh) | 2016-02-03 | 2016-02-03 | 厚层风积沙路基压实度快速检测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105714756A CN105714756A (zh) | 2016-06-29 |
CN105714756B true CN105714756B (zh) | 2017-12-26 |
Family
ID=56155618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610075813.6A Active CN105714756B (zh) | 2016-02-03 | 2016-02-03 | 厚层风积沙路基压实度快速检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105714756B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106771104A (zh) * | 2017-01-16 | 2017-05-31 | 江苏中路工程技术研究院有限公司 | 一种碎石土路基压实度指标的检测方法 |
CN106959131B (zh) * | 2017-04-27 | 2019-11-05 | 西南交通大学 | 一种采空区风积沙充填试验方法 |
CN107190721A (zh) * | 2017-07-13 | 2017-09-22 | 福建省永正工程质量检测有限公司 | 一种用地基承载力代替灌砂法检测压实度的动力触探方法 |
CN110700231A (zh) * | 2019-11-01 | 2020-01-17 | 陕西建工第六建设集团有限公司 | 一种建筑施工砖渣换填层压实度指标的检测方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4180495B2 (ja) * | 2003-11-26 | 2008-11-12 | ガラス・リソーシング株式会社 | ガラス質破砕材からなる路床材料等の埋め戻し材料及びこれらの材料を用いた施工方法 |
RU2323292C1 (ru) * | 2006-07-12 | 2008-04-27 | Государственное образовательное учреждение высшего профессионального образования "Мордовский государственный университет им. Н.П. Огарева" | Способ укрепления основания автомобильных дорог |
CN102621038A (zh) * | 2012-02-29 | 2012-08-01 | 长安大学 | 风积沙最大干密度的试验方法 |
CN103364308A (zh) * | 2013-07-10 | 2013-10-23 | 中交公路养护工程技术有限公司 | 一种基于压实功等效的风积砂最大干密度确定方法 |
-
2016
- 2016-02-03 CN CN201610075813.6A patent/CN105714756B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105714756A (zh) | 2016-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105714756B (zh) | 厚层风积沙路基压实度快速检测方法 | |
Olivares et al. | Shallow flowslides triggered by intense rainfalls on natural slopes covered by loose unsaturated pyroclastic soils | |
Kim et al. | Deformation characteristics during construction and after impoundment of the CFRD-type Daegok Dam, Korea | |
Cotecchia et al. | Slope-atmosphere interaction in a tectonized clayey slope: a case study | |
Zhang et al. | Research on the rainfall-induced regional slope failures along the Yangtze River of Anhui, China | |
Bo et al. | Ground investigations for Changi East reclamation projects | |
CN104060637A (zh) | 一种碎石桩加固软土路基的土工离心模拟试验方法 | |
CN111236199A (zh) | 一种基于动态回弹模量的公路路基压实质量快速检测方法 | |
Egan et al. | Installation effects of vibro replacement stone columns in soft clay | |
Ghali et al. | Laboratory simulator for geotechnical penetration tests | |
Sarkar et al. | Compressibility and monotonic shearing behaviour of Toronto peat | |
CN109142108B (zh) | 基于轻型动力触探试验指标评价石英土相对密实度的方法 | |
CN109797729A (zh) | 一种路基砖渣换填层压实度指标的检测方法 | |
Mawlood et al. | Reversible and irreversible deformations of expansive clays | |
CN109826175A (zh) | 一种土工合成材料加筋土填筑质量的检测方法 | |
CN106248038B (zh) | 滑坡表面倾斜角转化为位移的方法 | |
CN109143381B (zh) | 一种黄土高填方滞水层探测方法 | |
CN105910929A (zh) | 一种测试软岩填料长期路用特性的方法 | |
Lekstutytė et al. | Engineering geological and geotechnical properties of till soil of the Middle Pleistocene glacial period | |
Cui | Real-time diagnosis method of compaction state of subgrade during dynamic compaction | |
CN115758067A (zh) | 桩基冲击钻孔地质分层方法 | |
Nguyen et al. | Evaluation on the performance of field embankment testing biodegradable drains based on spectral method analysis | |
CN108645997A (zh) | 一种控制地下水位监测路基沉降规律试验模型及试验方法 | |
Jarushi et al. | Prediction of High Pile Rebound with Fines Content and Uncorrected Blow Counts from Standard Penetration Test | |
Abelev et al. | Determining the Deformability Characteristics of Sandy Soils at a Construction Base Using Field and Laboratory Techniques. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230607 Address after: Floor 16, Building 11, CCCC Technopole, No. 168, Wei 28 Road, High tech Zone, Xi'an, Shaanxi Patentee after: Xi'an CCCC first public hospital Ruitong scientific research test and Testing Co.,Ltd. Address before: 710075 No. 63 Science and Technology Second Road, Xi'an High-tech Development Zone, Shaanxi Province Patentee before: CCCC FIRST HIGHWAY CONSULTANTS Co.,Ltd. |
|
TR01 | Transfer of patent right |