CN105701617A - Overall process information management and control visualization method based on electric power material supply chain and system thereof - Google Patents

Overall process information management and control visualization method based on electric power material supply chain and system thereof Download PDF

Info

Publication number
CN105701617A
CN105701617A CN201610023752.9A CN201610023752A CN105701617A CN 105701617 A CN105701617 A CN 105701617A CN 201610023752 A CN201610023752 A CN 201610023752A CN 105701617 A CN105701617 A CN 105701617A
Authority
CN
China
Prior art keywords
data
supply chain
overall process
resource
information management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610023752.9A
Other languages
Chinese (zh)
Inventor
卢国筠
蒋瑞金
陈�峰
钱昆
张世伟
吴金刚
郑慧林
杨青山
沈洪涛
李健
李鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MATERIAL SUPPLY COMPANY SHANDONG ELECTRIC POWER Corp
Materials Branch of State Grid Shandong Electric Power Co Ltd
Original Assignee
MATERIAL SUPPLY COMPANY SHANDONG ELECTRIC POWER Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MATERIAL SUPPLY COMPANY SHANDONG ELECTRIC POWER Corp filed Critical MATERIAL SUPPLY COMPANY SHANDONG ELECTRIC POWER Corp
Priority to CN201610023752.9A priority Critical patent/CN105701617A/en
Publication of CN105701617A publication Critical patent/CN105701617A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an overall process information management and control visualization method based on an electric power material supply chain. The method comprises the following steps of receiving an allocation demand, carrying out integration butt joint on an ERP system and a data center, gathering and analyzing a Shandong electric power storage resource and a contract resource, carrying out service tracking and controlling available resource information; using an ABAP to collect and gather a whole service process and alarm data of the ERP system in a timing mode, through an Oracle task, using an increment or full dose mode to collect data to the data center; after the data center receives the data, carrying out data cleaning on the data; and generating a chart on a client. In the invention, visual analysis functions of service tracking, monitoring early warning and the like of an overall process information management and control node of the electric power material supply chain are realized, which is convenient for comprehensively tracking and monitoring the whole electric power material supply chain.

Description

The overall process information management and control method for visualizing of electrically-based materials supply chain and system
Technical field
The present invention relates to the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain and system。
Background technology
Current electric company's ERP system meets conversational traffic and processes demand, wherein handling of goods and materials part includes planning management, purchasing management, contract management, stock control, supplier relationship management etc., Power Material supply chain is provided and necessarily manages support, but remain in following deficiency:
1) lack the intuitive analysis function of the Service tracing to Power Material supply chain overall process information management and control node and monitoring and early warning etc., be unfavorable for comprehensively following the tracks of and monitoring whole Power Material supply chain。
2) performance indicators can only postmortem analysis, it is impossible to real-time tracking, it is big that performance promotes difficulty in time。
3) diagrammatic representation form is single, and content analysis is not comprehensive。
Summary of the invention
The present invention is to solve the problems referred to above, propose overall process information management and control method for visualizing and the system of a kind of electrically-based materials supply chain, this system application Flex visual presentation technological incorporation giant-screen resource, realize the intuitive analysis function of the Service tracing to Power Material supply chain overall process information management and control node and monitoring and early warning etc., it is simple to comprehensively following the tracks of and monitoring whole Power Material supply chain;Realize performance indicators real-time tracking, adjust in time, promote that performance promotes;Realizing the variation of diagrammatic representation form, content analysis is detailed comprehensively。
To achieve these goals, the present invention adopts the following technical scheme that
The overall process information management and control method for visualizing of a kind of electrically-based materials supply chain, comprises the following steps:
(1) receiving allotment demand, ERP system is integrated with data center docks, and Shandong Electric Power Group inventory resource, contract resource are carried out Macro or mass analysis, carries out Service tracing, controls available resources information;
(2) timed collection collects the business overall process of ERP system, alert data, by Oracle task, adopts the mode of increment or full dose by data acquisition to data center;
(3), after data center receives data, data are carried out data cleansing;
(4) goods and materials data, inventory resource and contract resource information are processed accordingly by data center by different service logics, by the data after analysis, by FusionChars chart components, are generated in client by chart。
In described step (1), Service tracing pays close attention to the overall process management and control of materials supply chain, by the analysis to each Service Period implementation progress, utilize the technological means of business report, diagrammatic representation, index decomposition, reflection planning management, bidding Management, contract signing, contract are honoured an agreement and the progress of each service link of Office Of Contract Settlements and circulation situation, promote that each service link effective performs。
Described step (3) method particularly includes: after data center receives data, data are carried out data cleansing, such as Uniform data format, deletes repetition values, process missing data and check data correctness。
In described step (4), concrete grammar includes: uses XML as data-interface, is combined with AJAX application program or JavaScript module by chart, conveniently provides interactive animation chart to present to end user。
In described step (4), concrete grammar includes: uses XML as data-interface, is combined with AJAX application program or JavaScript module by chart, presents to end user by different report styles。
In described step (4), report style includes: form, pie chart, curve chart, block diagram, bar diagram, instrumental panel are or/and honeycomb figure。
In described step (4), analysis process includes: according to goods and materials data, inventory resource and contract resource information, emergency disposal goods and materials are alloted。Concrete grammar includes:
(4-1) event type and grade are judged;According to the character of event, content, event type is divided, according to the event order of severity, divide its specific grade;
(4-2) it is analyzed studying and judging to the time;According to event type and grade, in conjunction with topological structure and the spatial geographic information of electrical network, it is analyzed studying and judging on the scope of accident impact and the installations and facilities of electrical network;
(4-3) emergency disposal prediction scheme is called;Emergency disposal prediction scheme is divided into different templates according to the type difference of accident, it it is a set of disposal template standardized, normalized, the all corresponding Response project template of each event, type according to accident calls the Response project masterplate of correspondence, reads the processing method to accident in prediction scheme masterplate;
(4-4) personnel's goods and materials are analyzed: the result through step (1)-(3) and call existing material information in material on hand data base, it is determined that need the goods and materials alloted;According to event class, it is determined that the quantity that allot;
(4-5) Algorithm Analysis is alloted;According to accident geographical position, the geographical position of material depot, road link and speed, select the preferential vehicle arrived;And consider that material storage deficiency needs situation about alloting from contiguous material depot, the time of advent and the goods and materials quantity alloting warehouse are comprehensively analyzed;Evaluate optimal case;
(4-6) optimum is alloted scheme and practical situation combines, finely tune, form final scheme;Disposal personnel carries out the fine setting of scheme according to the practical situation of traffic congestion, road construction。
In described step (4-1), the type of event, divided rank are determined according to " the overall emergency preplan of Utilities Electric Group Co.'s accident ";Event type specifically includes electric power accident class, power supply service class, public health event class, natural disaster class, accident class and security incident class, and wherein, electric power accident class includes electric power accident and large-area power-cuts event;Power supply service class includes electricity shortage time, important guarantor's electricity event and power supply service event;Natural disaster class includes bloods and droughts, meteorological disaster, earthquake disaster, geological disaster, Oceanic disasters and forest fire;Accident class includes fire, road public transport event, power infrastructures accident, communication system accident and environmental pollution accident;Security incident class includes Mass disturbance network and information burst event, casualties event and event concerning foreign affairs。
The concrete grammar of described step (4-5) is as follows: according to accident geographical position, the geographical position of material depot and road distribution, calculate the path between accident, material depot, set speed as n, 60km/h≤n≤110km/h, calculate running time T1i, i=1,2 ..., m, m is the total quantity of material depot, if the allocated supplies quantity of this material depot is inadequate, it is necessary to calculate the running time T from other warehouse relaies2i;Calculate the running time T=T between different material depots and accident successively1i+T2i, obtain T more little, then it is assumed that scheme is optimum。
A kind of system based on above-mentioned method for visualizing, including ERP system, data center and Visualization Platform, wherein:
Described ERP system, is used for providing goods and materials data, inventory resource and contract resource information, connects data center;
Described data center, for all available resources of Macro or mass analysis, supports with optimizing to provide for goods and materials allotment, connects Visualization Platform;
Described Visualization Platform, for showing the diagrammatic representation of the pool of Service tracing, monitoring and early warning, resource and emergency command。
The same split screen region of described Visualization Platform, the information content of the different index of display of rotating at regular intervals。
The key commodity data that each for material supply link is paid close attention to by described Visualization Platform in addition combing combination is also patterned output with curve chart, block diagram mode, convenient intuitively, fast finds the flex point causing data fluctuations。
The invention have the benefit that the intuitive analysis function realizing the Service tracing to Power Material supply chain overall process information management and control node and monitoring and early warning etc., it is simple to comprehensively following the tracks of and monitoring whole Power Material supply chain;Realize performance indicators real-time tracking, adjust in time, promote that performance promotes;Realizing the variation of diagrammatic representation form, content analysis is detailed comprehensively。Total interface is attractive in appearance, feature richness, practical。
Accompanying drawing explanation
Fig. 1 is present system block diagram;
Detailed description of the invention:
Below in conjunction with accompanying drawing, the invention will be further described with embodiment。
As it is shown in figure 1, the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain, comprise the following steps:
(1) receiving allotment demand, ERP system is integrated with data center docks, and Shandong Electric Power Group inventory resource, contract resource are carried out Macro or mass analysis, carries out Service tracing, controls available resources information;
(2) use ABAP timed collection to collect the business overall process of ERP system, alert data, by Oracle task, adopt the mode of increment or full dose by data acquisition to data center;
(3), after data center receives data, data are carried out data cleansing;
(4) goods and materials data, inventory resource and contract resource information are processed accordingly by data center by different service logics, by the data after analysis, by FusionChars chart components, are generated in client by chart。
In described step (1), Service tracing pays close attention to the overall process management and control of materials supply chain, by the analysis to each Service Period implementation progress, utilize the technological means of business report, diagrammatic representation, index decomposition, reflection planning management, bidding Management, contract signing, contract are honoured an agreement and the progress of each service link of Office Of Contract Settlements and circulation situation, promote that each service link effective performs。
Described step (3) method particularly includes: after data center receives data, data are carried out data cleansing, such as Uniform data format, deletes repetition values, process missing data and check data correctness。
In described step (4), concrete grammar includes: uses XML as data-interface, is combined with AJAX application program or JavaScript module by chart, conveniently provides interactive animation chart to present to end user。
In described step (4), concrete grammar includes: uses XML as data-interface, is combined with AJAX application program or JavaScript module by chart, presents to end user by different report styles。
In described step (4), report style includes: form, pie chart, curve chart, block diagram, bar diagram, instrumental panel and honeycomb figure。
A kind of system based on above-mentioned method for visualizing, including ERP system, data center and Visualization Platform, wherein:
Described ERP system, is used for providing goods and materials data, inventory resource and contract resource information, connects data center;
Described data center, for all available resources of Macro or mass analysis, supports with optimizing to provide for goods and materials allotment, connects Visualization Platform;
Described Visualization Platform, for showing the diagrammatic representation of the pool of Service tracing, monitoring and early warning, resource and emergency command。
The same split screen region of described Visualization Platform, the information content of the different index of display of rotating at regular intervals。
The key commodity data that each for material supply link is paid close attention to by described Visualization Platform in addition combing combination is also patterned output with curve chart, block diagram mode, convenient intuitively, fast finds the flex point causing data fluctuations。
Visualization Platform is allocated center giant-screen based on goods and materials supply company and is built, Data Source is in ERP system, according to giant-screen split screen quantity, Classification Index information shows content item, each content can be shown by the chart of different patterns, by configuring early warning information, it is achieved the early warning prompting function of goods and materials index of correlation, the deep layer entering relevant marker information by clicking correlation graph drills through and the comprehensive inquiry page。Analyze ways of presentation and mainly have following several, form, pie chart, curve chart, block diagram, bar diagram, instrumental panel, honeycomb figure etc.。Multidimensional analysis is based on a kind of analysis means of on-line analytical processing (OLAP) technology, it is possible to realize drilling through by multidimensional analysis, cut into slices and stripping and slicing and rotate, drill-through, the operation such as drill through。
The customizable renewal type of service of platform, renewal time, business page type etc.。Such as same split screen region, the information content of the different index of display of can rotating at regular intervals。For same operational indicator, the information of the display different monitoring page of can rotating at regular intervals。System realizes indication information and collects the personalized customization management of the displaying patterns such as look & feel, animation effect, special effect of web。
Using for the ease of data editor in a document, the data content of its displaying needs possess locally downloading function。
Visualization Platform design content includes: Service tracing, monitoring and early warning, resource are planned as a whole and emergency command。
1) Service tracing
Service tracing pays close attention to the overall process management and control of materials supply chain, by the analysis to each Service Period implementation progress, utilize the means such as business report, diagrammatic representation, index decomposition, the progress of each service links such as reflection planning management, bidding Management, contract signing, contract are honoured an agreement, Office Of Contract Settlements and circulation situation, promote that each service link effective performs。
Visualization Platform is intended to the key commodity data in addition combing combination each for material supply link paid close attention to and is patterned output in the mode such as curve chart, block diagram, convenient intuitively, fast finds the flex point causing data fluctuations。It addition, by penetrating inquiry, Ge Wangsheng company and supplier can also be tracked and inquire the detailed data causing unusual fluctuation to fluctuate, improve operational analysis efficiency。
2) monitoring and early warning
Set up key commodity management and monitoring early warning mechanism by goods and materials deployment platform, comprehensively analyze and monitoring handling of goods and materials key node implementation status, find early and process produced problem in handling of goods and materials process。Pass through predetermined threshold value, it is achieved active forewarning, in time supervisor and process management and control, and by early warning information opening to supplier, urge it to complete corresponding service in Warning years and process。
3) resource is planned as a whole
By docking with the integrated of ERP system, Shandong Electric Power Group inventory resource, contract resource are carried out Macro or mass analysis, thus controlling company's available resources further, providing Informational support for goods and materials allotment with Optimal Decision-making, meeting material supply demand to greatest extent。When company of various places cities and counties proposes goods and materials allotment demand, allotment specific responsibility is allocated practical platform by goods and materials and is checked available resources in firm-wide, sets up pool scheme。
Inventory resource major embodiment entity storehouse (the stock ground of F beginning) stock and emergency materials storehouse (the stock ground of 96 beginnings) stock, showing stock's total amount, then subdivision city is finely divided by following 3 groups of dimensions: storehouse, region and week stock relocation (block diagram), general factory and generation keeping factory (block diagram), an account type (pie chart)。It addition, show 17 districts and cities' stock at the end of month amount of money trend with broken line graph, can month selects per year。
Vitalizing profit database data from manual importing, platform provides manual and imports interface, then shows the entry number overstocking profit storehouse goods and materials and the amount of money with block diagram subdivision city。It addition, show, with block diagram, the monthly profit storehouse progress that 17 districts and cities collect, relate to profit storehouse total amount and overstocked total amount。
Contract resource can extract effective purchase order according to the time period chosen, and the order resource not completing to receive is shown with block diagram。Contract resource carries out dimension division with districts and cities, and can provide and penetrate inquiry, it is provided that detailed service details。
4) emergency guarantee
Under emergency conditions, available materials and equipment resources in comprehensive control province, city, county, works out emergency materials guarantee plan, carries out command deployment according to division of duty and range of management, realize resource pool allotment, demand quickly responds, ensures precise and high efficiency, promotes goods and materials emergency response capabilities。
(1) there is goods and materials situation, it is possible to emergency materials is allocated, method particularly includes: judge event type and grade;According to the character of event, content, event type is divided, according to the event order of severity, divide its specific grade;
(2) it is analyzed studying and judging to the time;According to event type and grade, in conjunction with topological structure and the spatial geographic information of electrical network, it is analyzed studying and judging on the scope of accident impact and the installations and facilities of electrical network;
(3) emergency disposal prediction scheme is called;Emergency disposal prediction scheme is divided into different templates according to the type difference of accident, it it is a set of disposal template standardized, normalized, the all corresponding Response project template of each event, type according to accident calls the Response project masterplate of correspondence, reads the processing method to accident in prediction scheme masterplate;
(4) personnel's goods and materials are analyzed: the result through step (1)-(3) and call existing material information in material on hand data base, it is determined that need the goods and materials alloted;According to event class, it is determined that the quantity that allot;
(5) Algorithm Analysis is alloted;According to accident geographical position, the geographical position of material depot, road link and speed, select the preferential vehicle arrived;And consider that material storage deficiency needs situation about alloting from contiguous material depot, the time of advent and the goods and materials quantity alloting warehouse are comprehensively analyzed;Evaluate optimal case;
(6) optimum is alloted scheme and practical situation combines, finely tune, form final scheme;Disposal personnel carries out the fine setting of scheme according to the practical situation of traffic congestion, road construction。
In step (1), the type of event, divided rank are determined according to " the overall emergency preplan of Utilities Electric Group Co.'s accident ";Event type specifically includes electric power accident class, power supply service class, public health event class, natural disaster class, accident class and security incident class, and wherein, electric power accident class includes electric power accident and large-area power-cuts event;Power supply service class includes electricity shortage time, important guarantor's electricity event and power supply service event;Natural disaster class includes bloods and droughts, meteorological disaster, earthquake disaster, geological disaster, Oceanic disasters and forest fire;Accident class includes fire, road public transport event, power infrastructures accident, communication system accident and environmental pollution accident;Security incident class includes Mass disturbance network and information burst event, casualties event and event concerning foreign affairs。
The concrete grammar of step (5) is as follows: according to accident geographical position, the geographical position of material depot and road distribution, calculate the path between accident, material depot, set speed as n, 60km/h≤n≤110km/h, calculate running time T1i, i=1,2 ..., m, m is the total quantity of material depot, if the allocated supplies quantity of this material depot is inadequate, it is necessary to calculate the running time T from other warehouse relaies2i;Calculate the running time T=T between different material depots and accident successively1i+T2i, obtain T more little, then it is assumed that scheme is optimum。
The specific embodiment of the present invention is described in conjunction with accompanying drawing although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme, those skilled in the art need not pay various amendments or deformation that creative work can make still within protection scope of the present invention。

Claims (10)

1. an overall process information management and control method for visualizing for electrically-based materials supply chain, is characterized in that: comprise the following steps:
(1) receiving allotment demand, ERP system is integrated with data center docks, and Shandong Electric Power Group inventory resource, contract resource are carried out Macro or mass analysis, carries out Service tracing, controls available resources information;
(2) timed collection collects the business overall process of ERP system, alert data, by Oracle task, adopts the mode of increment or full dose by data acquisition to data center;
(3), after data center receives data, data are carried out data cleansing;
(4) goods and materials data, inventory resource and contract resource information are processed accordingly by data center by different service logics, by the data after analysis, by FusionChars chart components, are generated in client by chart。
2. the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain as claimed in claim 1, it is characterized in that: in described step (1), Service tracing pays close attention to the overall process management and control of materials supply chain, by the analysis to each Service Period implementation progress, utilizing the technological means of business report, diagrammatic representation, index decomposition, reflection planning management, bidding Management, contract signing, contract are honoured an agreement and the progress of each service link of Office Of Contract Settlements and circulation situation。
3. the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain as claimed in claim 1, it is characterized in that: described step (3) method particularly includes: after data center receives data, data are carried out data cleansing, Uniform data format, deletion repetition values, process missing data and inspection data correctness。
4. the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain as claimed in claim 1, it is characterized in that: in described step (4), concrete grammar includes: use XML as data-interface, chart is combined with AJAX application program or JavaScript module, conveniently provides interactive animation chart to present to end user。
5. the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain as claimed in claim 4, it is characterized in that: in described step (4), concrete grammar includes: use XML as data-interface, chart is combined with AJAX application program or JavaScript module, presents to end user by different report styles。
6. the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain as claimed in claim 5, it is characterized in that: in described step (4), report style includes: form, pie chart, curve chart, block diagram, bar diagram, instrumental panel are or/and honeycomb figure。
7. the overall process information management and control method for visualizing of a kind of electrically-based materials supply chain as claimed in claim 1, it is characterized in that: in described step (4), analysis process includes: according to goods and materials data, inventory resource and contract resource information, emergency disposal goods and materials are alloted。
8., based on a system for method for visualizing according to any one of such as claim 1-7, it is characterized in that: include ERP system, data center and Visualization Platform, wherein:
Described ERP system, is used for providing goods and materials data, inventory resource and contract resource information, connects data center;
Described data center, for all available resources of Macro or mass analysis, supports with optimizing to provide for goods and materials allotment, connects Visualization Platform;
Described Visualization Platform, for showing the diagrammatic representation of the pool of Service tracing, monitoring and early warning, resource and emergency command。
9. system as claimed in claim 8, is characterized in that: the same split screen region of described Visualization Platform, the information content of the different index of display of rotating at regular intervals。
10. system as claimed in claim 8, it is characterized in that: the key commodity data that each for material supply link is paid close attention to by described Visualization Platform in addition combing combination is also patterned output with curve chart, block diagram mode, convenient intuitively, fast find the flex point causing data fluctuations。
CN201610023752.9A 2016-01-14 2016-01-14 Overall process information management and control visualization method based on electric power material supply chain and system thereof Pending CN105701617A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610023752.9A CN105701617A (en) 2016-01-14 2016-01-14 Overall process information management and control visualization method based on electric power material supply chain and system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610023752.9A CN105701617A (en) 2016-01-14 2016-01-14 Overall process information management and control visualization method based on electric power material supply chain and system thereof

Publications (1)

Publication Number Publication Date
CN105701617A true CN105701617A (en) 2016-06-22

Family

ID=56227322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610023752.9A Pending CN105701617A (en) 2016-01-14 2016-01-14 Overall process information management and control visualization method based on electric power material supply chain and system thereof

Country Status (1)

Country Link
CN (1) CN105701617A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106682238A (en) * 2017-01-25 2017-05-17 九三粮油工业集团有限公司 Data display and early warningdevice and data display and warning method
CN106815675A (en) * 2016-12-07 2017-06-09 国网北京市电力公司 The concocting method and device of emergency electric power goods and materials
CN111144632A (en) * 2019-12-19 2020-05-12 深圳供电局有限公司 Prediction management and control model for power storage materials
CN111179114A (en) * 2019-12-09 2020-05-19 国网浙江省电力有限公司丽水供电公司 Internet of things technology-based distribution network material global visual display system and method
CN111199309A (en) * 2019-12-19 2020-05-26 深圳供电局有限公司 Early warning management and control system of electric power material supply chain operation
CN111210108A (en) * 2019-12-19 2020-05-29 深圳供电局有限公司 Performance management and control model of electric power material supply chain
CN111598500A (en) * 2020-04-11 2020-08-28 中广核风电有限公司 Production material management system based on micro-service architecture
CN112488612A (en) * 2020-11-26 2021-03-12 国网河北省电力有限公司物资分公司 Visualization-based full inventory resource monitoring and displaying method
CN112926854A (en) * 2021-02-24 2021-06-08 贵州电网有限责任公司 Distribution network emergency material demand reporting method based on data intelligent perception
CN113052650A (en) * 2021-03-04 2021-06-29 国网山东省电力公司物资公司 Material production overall process information perception visualization system based on supply chain control tower
CN116029671A (en) * 2023-01-04 2023-04-28 国家电网有限公司华东分部 Power grid project material early warning method and device, storage medium and electronic equipment
CN117076894A (en) * 2023-10-17 2023-11-17 国网浙江省电力有限公司金华供电公司 Supply chain risk overall process monitoring prevention and control management method and management system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102376039A (en) * 2011-12-08 2012-03-14 重庆市电力公司 Method for realizing three-dimensional real-time scheduling commanding of power materials
CN104134121A (en) * 2014-07-30 2014-11-05 国家电网公司 Method for achieving visualization of power grid information system business data
CN104573892A (en) * 2013-10-17 2015-04-29 王丽华 Whole process visual project management system for engineering construction
CN104657823A (en) * 2015-02-09 2015-05-27 云南电网有限责任公司西双版纳供电局 KPI dynamic analysis method for improving decision accuracy of power supply enterprise

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102376039A (en) * 2011-12-08 2012-03-14 重庆市电力公司 Method for realizing three-dimensional real-time scheduling commanding of power materials
CN104573892A (en) * 2013-10-17 2015-04-29 王丽华 Whole process visual project management system for engineering construction
CN104134121A (en) * 2014-07-30 2014-11-05 国家电网公司 Method for achieving visualization of power grid information system business data
CN104657823A (en) * 2015-02-09 2015-05-27 云南电网有限责任公司西双版纳供电局 KPI dynamic analysis method for improving decision accuracy of power supply enterprise

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈少波: "基于Oracle的数据仓库的实现", 《福建电脑》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106815675A (en) * 2016-12-07 2017-06-09 国网北京市电力公司 The concocting method and device of emergency electric power goods and materials
CN106682238A (en) * 2017-01-25 2017-05-17 九三粮油工业集团有限公司 Data display and early warningdevice and data display and warning method
CN111179114B (en) * 2019-12-09 2023-07-11 国网浙江省电力有限公司丽水供电公司 Distribution network material global visual display system and method based on Internet of things technology
CN111179114A (en) * 2019-12-09 2020-05-19 国网浙江省电力有限公司丽水供电公司 Internet of things technology-based distribution network material global visual display system and method
CN111210108B (en) * 2019-12-19 2023-08-08 深圳供电局有限公司 Performance management and control model of electric power material supply chain
CN111210108A (en) * 2019-12-19 2020-05-29 深圳供电局有限公司 Performance management and control model of electric power material supply chain
CN111199309A (en) * 2019-12-19 2020-05-26 深圳供电局有限公司 Early warning management and control system of electric power material supply chain operation
CN111144632A (en) * 2019-12-19 2020-05-12 深圳供电局有限公司 Prediction management and control model for power storage materials
CN111598500A (en) * 2020-04-11 2020-08-28 中广核风电有限公司 Production material management system based on micro-service architecture
CN111598500B (en) * 2020-04-11 2024-06-07 中广核风电有限公司 Production material management system based on micro-service architecture
CN112488612A (en) * 2020-11-26 2021-03-12 国网河北省电力有限公司物资分公司 Visualization-based full inventory resource monitoring and displaying method
CN112926854A (en) * 2021-02-24 2021-06-08 贵州电网有限责任公司 Distribution network emergency material demand reporting method based on data intelligent perception
CN112926854B (en) * 2021-02-24 2024-03-29 贵州电网有限责任公司 Distribution network emergency material demand reporting method based on data intelligent perception
CN113052650A (en) * 2021-03-04 2021-06-29 国网山东省电力公司物资公司 Material production overall process information perception visualization system based on supply chain control tower
CN116029671A (en) * 2023-01-04 2023-04-28 国家电网有限公司华东分部 Power grid project material early warning method and device, storage medium and electronic equipment
CN117076894A (en) * 2023-10-17 2023-11-17 国网浙江省电力有限公司金华供电公司 Supply chain risk overall process monitoring prevention and control management method and management system
CN117076894B (en) * 2023-10-17 2024-01-26 国网浙江省电力有限公司金华供电公司 Supply chain risk overall process monitoring prevention and control management method and management system

Similar Documents

Publication Publication Date Title
CN105701617A (en) Overall process information management and control visualization method based on electric power material supply chain and system thereof
Moghadam et al. Urban energy planning procedure for sustainable development in the built environment: A review of available spatial approaches
Noonan-Wright et al. Developing the US wildland fire decision support system
Jarkas et al. Factors affecting construction labor productivity in Kuwait
US8761948B1 (en) System and method for managing and monitoring renewable energy power generation
CN105608541A (en) Electric power material supply whole-course early-warning supervise system and method
CN103236163A (en) Traffic jam avoiding prompting system based on collective intelligence network
CN105931014A (en) Gridding management service system and method for town community
Wickramasuriya et al. Using geospatial business intelligence to support regional infrastructure governance
CN112036766A (en) Gridding distribution network service management method and device, computer equipment and storage medium
US20190086878A1 (en) Systems and methods for determining baseline consumption
CN103390218A (en) Three-chain coupling integrated emergency security system and method for emergencies
CN114841662A (en) Infrastructure construction project management and control method and device, computer equipment and storage medium
KR101330519B1 (en) Intelligent program management information system
CN111105204A (en) Construction project progress reporting and managing method and information processing device
Meehan GIS for enhanced electric utility performance
CN115358522A (en) Enterprise online monitoring system and method
CN115470940A (en) Building engineering operation and maintenance management system based on BIM technology
Obedin et al. The developing program system of social monitoring of road improvement and urban infrastructure
Chen et al. FSLens: A Visual Analytics Approach to Evaluating and Optimizing the Spatial Layout of Fire Stations
Veers et al. Grand Challenges Revisited: Wind Energy Research Needs for a Global Energy Transition
Singhee et al. OPRO: Precise emergency preparedness for electric utilities
Bonino et al. Design recommendations for smart energy monitoring: A case study in Italy
CN114266128A (en) Atmospheric environment assessment system and method based on cloud platform
CN110378802A (en) A kind of water power fortune inspection management system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160622