CN105699758B - Power-factor meter with metering interface and its method - Google Patents

Power-factor meter with metering interface and its method Download PDF

Info

Publication number
CN105699758B
CN105699758B CN201610286474.6A CN201610286474A CN105699758B CN 105699758 B CN105699758 B CN 105699758B CN 201610286474 A CN201610286474 A CN 201610286474A CN 105699758 B CN105699758 B CN 105699758B
Authority
CN
China
Prior art keywords
jack
switch
binding post
power
successively
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610286474.6A
Other languages
Chinese (zh)
Other versions
CN105699758A (en
Inventor
魏利
王卫华
陈文须
谢海营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
91663 Army Of Chinese People's Liberation Army
Original Assignee
91663 Army Of Chinese People's Liberation Army
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 91663 Army Of Chinese People's Liberation Army filed Critical 91663 Army Of Chinese People's Liberation Army
Publication of CN105699758A publication Critical patent/CN105699758A/en
Application granted granted Critical
Publication of CN105699758B publication Critical patent/CN105699758B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R1/00Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
    • G01R1/02General constructional details
    • G01R1/04Housings; Supporting members; Arrangements of terminals
    • G01R1/0408Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
    • G01R1/0416Connectors, terminals
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/005Calibrating; Standards or reference devices, e.g. voltage or resistance standards, "golden" references
    • G01R35/007Standards or reference devices, e.g. voltage or resistance standards, "golden references"

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

A kind of power-factor meter and its method with metering interface, including measuring mechanism, electronic surveying circuit and its binding post A-G;Electronic surveying circuit between binding post A successively be equipped with jack A, switch A, jack B, to between binding post B successively be equipped with jack C, switch B, to between binding post C successively be equipped with jack D, switch C, jack E, to between post D successively be equipped with jack F, switch D, to between binding post E be equipped with jack G, to jack H is equipped between binding post F, until jack I, switch E are equipped between binding post G successively.Its method includes the method that the above-mentioned power-factor meter with metering interface is carried out On line inspection or measured in situ.The present invention devises nine fixed end electric connectors and two switches, avoids dismounting inspection or even disconnects ray examination and leads to the problem of, to realize On line inspection and metering in situ.Productivity effect and easy to operate can be improved under the premise of ensureing equipment safety.

Description

Power-factor meter with metering interface and its method
Technical field
The present invention relates to a kind of power-factor meters, and in particular to a kind of power-factor meter and its side with metering interface Method, having can On line inspection and function of measuring in situ.
Background technology
To ensure that the power-factor meter numerical value in use is accurate, issued according to Ministry of Water Resources and Electric Power of the People's Republic of China (PRC) SD110-83《Electrical measurement indicating meter inspection procedure》Regulation, needs to examine and determine power-factor meter, and the period is 1 year.Calibrating Main project includes:Visual examination, the calibrating of calibra tion, difference between rising and falling.
Currently, power-factor meter all without detection interface, testing staff can only not shut down, power off, be removed Measurement technology mechanism is sent to by verification worker in laboratory verification, installation is fetched again after qualified.During this, shut down disconnected Electricity, dismounting power-factor meter, road transport not only consume a large amount of manpower, financial resources and time, it is also possible to can be set because dismounting is brought Standby and power-factor meter failure.In addition, it is even more that can increase due to jolting, vibrating etc. on the way especially to return in transit Add the probability of malfunction of power-factor meter.Even if field environmental condition meets vertification regulation requirement, user of service is also required to shut down, break The connecting line of electricity, disconnection power-factor meter binding post and equipment is examined and determine.
Meanwhile when suspecting that power-factor meter display data is problematic during tracing to the source twice, it can only also shut down power-off, disconnect Power-factor meter binding post and the connecting line of equipment are checked, certain manpower, financial resources and time can be equally consumed.
Invention content
The object of the present invention is to provide a kind of power-factor meter and its method with metering interface, to overcome the prior art Deficiency, reduce and use unit manpower, financial resources and time loss, improve equipment with rate.
A kind of power-factor meter with metering interface, including measuring mechanism, it is characterised in that the measuring mechanism and electronics Measure circuit be connected, the electronic surveying circuit respectively with binding post A, binding post B binding posts C, post D, binding post E, connect Terminal F is connected with binding post G;Wherein from electronic surveying circuit between binding post A successively be equipped with jack A, switch A, jack B, From electronic surveying circuit between binding post B successively be equipped with jack C, switch B, from electronic surveying circuit between binding post C according to It is secondary to be equipped with jack D, switch C, jack E, from electronic surveying circuit to jack F, switch D is equipped between post D successively, from electronics Circuit is measured to jack G is equipped between binding post E, from electronic surveying circuit to jack H is equipped between binding post F, from electronic, horological Measure circuit between binding post G successively be equipped with jack I, switch E.
The above-mentioned power-factor meter with metering interface further includes multiple blockings, the jack A, jack B, jack C, Jack D, jack E, jack F, jack G, jack H and jack I, use plug for seal when not in use.
To the method that the above-mentioned power-factor meter with metering interface carries out On line inspection or measures in situ, feature exists In including the following steps:
(1) switch A, switch B, switch C, switch D, switch E are placed in the state of "off";
(2) blocking is removed, it is external high by jack A, jack B, jack D, jack E, jack G, jack H (10), jack I Grade power-factor meter or standard scale;
(3) switch B, switch D, switch E are placed in the state of " closed ", realized by external high-grade power-factor meter This is carried to the inspection of the power-factor meter with metering interface under current state, or by external standard scale realization The metering of the power-factor meter of metering interface;
(4) switch B, switch D, switch E are placed in the state of "off", remove high-grade power-factor meter or standard scale, Block blocking;
(5) switch A, switch B, switch C, switch D, switch E are placed in the state of " closed ", it should be with the work(of metering interface Rate factor table works normally.
The present invention devises nine fixed end electric connectors and two switches on power factor watch shell, avoids dismounting Inspection even disconnects ray examination and leads to the problem of, to realize On line inspection and metering in situ.Work(with metering interface Rate factor table realizes the break-make for measuring circuit by switch button, can be in the case where instrument is not dismantled, by measuring jack External standard scale (high-grade power-factor meter) completes the metering (inspection) of power-factor meter.It can be before ensureing equipment safety Raising productivity effect is put, table is easy to use, easy to operate.
Description of the drawings
The line construction schematic diagram of Fig. 1 present invention.
The appearance diagram of Fig. 2 present invention.
Wherein, 1, measuring mechanism;2, electronic surveying circuit;3, jack A;4, jack B;5, jack C;6, jack D;7, jack E;8, jack F;9, jack G;10, jack H;11, jack I;12, switch A;13, switch B;14, switch C;15, switch D;16, it opens Close E;17, binding post A;18, binding post B;19, binding post C;20, post D;21, binding post E;22, binding post F;23, wiring Column G;24, metering interface;25, control switch A;26, control switch B;27, control module;.
Specific implementation mode
Such as Fig. 1, a kind of power-factor meter with metering interface, including measuring mechanism (1), it is characterised in that the measuring machine Structure (1) is connected with electronic surveying circuit (2), the electronic surveying circuit (2) respectively with binding post A (17), binding post B (18), Binding post C (19), post D (20), binding post E (21), binding post F (22) are connected with binding post G (23);Wherein binding post A (17) and binding post B (18) connection A phase currents IA, binding post C (19) and post D (20) connect C phase currents IC, binding post E (21) and binding post F (22) is separately connected A phase voltages UAWith C phase voltages UC, binding post G (23) connection zero curves N;Wherein from electronics Circuit (2) is measured to jack A (3), switch A (12), jack B (4) is equipped between binding post A (17) successively, from electronic surveying line Road (2) to jack C (5), switch B (13) is equipped with successively between binding post B (18), from electronic surveying circuit (2) to binding post C (19) between successively be equipped with jack D (6), switch C (14), jack E (7), from electronic surveying circuit (2) to post D (20) it Between be equipped with jack F (8), switch D (15) successively, from electronic surveying circuit (2) between binding post E (21) equipped with jack G (9), From electronic surveying circuit (2) to jack H (10) is equipped between binding post F (22), from electronic surveying circuit (2) to binding post G (23) jack I (11), switch E (16) are equipped between successively.
The above-mentioned power-factor meter with metering interface further includes multiple blockings, the jack A (3), jack B (4), Jack C (5), jack D (6), jack E (7), jack F (8), jack G (9), jack H (10) and jack I (11), are used when not in use Plug for seal.
To the method that the above-mentioned power-factor meter with metering interface carries out On line inspection or measures in situ, feature exists In including the following steps:
(1) switch A (12), switch B (13), switch C (14), switch D (15), switch E (16) are placed in the shape of "off" State;
(2) blocking is removed, jack A (3), jack B (4), jack D (6), jack E (7), jack G (9), jack H are passed through (10), the external high-grade power-factor meters of jack I (11) or standard scale;
(3) switch B (13), switch D (15), switch E (16) are placed in the state of " closed ", complete that metering interface should be carried Inspection of the power-factor meter under current state, or complete the metering of the power-factor meter with metering interface;
(4) switch B (13), switch D (15), switch E (16) are placed in the state of "off", remove high-grade power factor Table or standard scale block blocking;
(5) switch A (12), switch B (13), switch C (14), switch D (15), switch E (16) are placed in the shape of " closed " State, the power-factor meter that should carry metering interface work normally.
Such as Fig. 2, the switch A (12) and switch C (14) composition control switch A (25), On line inspection or metering in situ When, by controlling switch A (25) while realizing the disconnection for switch A (12) and switch C (14) in above-mentioned steps (1), By controlling switch A (25) while realizing the closure for switch A (12) and switch C (14) in above-mentioned steps (5);Switch B (13), when switch D (15) and switch E (16) composition control switch B (26), On line inspection or metering in situ, in above-mentioned steps (1), by controlling switch B (26) while realizing the disconnection of switch B (13), switch D (15) and switch E (16) in step (4), By controlling switch B (26) while realizing switch B (13), switch D (15) and switch E (16) in above-mentioned steps (3), step (5) Closure;Switch A (25) and control switch B (26) composition control module 27 in power factor surface plate are controlled, it can be outside Connect high-grade power-factor meter or the front and back completion electronic surveying module of standard scale and binding post A (17), binding post B (18), wiring The switching of column C (19), post D (20) and binding post G (23).Jack A (3), jack B (4), jack C (5), jack D (6), Jack E (7), jack F (8), jack G (9), jack H (10) and jack I (11) composition metering interfaces 24, the jack A (3), Jack B (4), jack C (5), jack D (6), jack E (7), jack F (8), jack G (9), jack H (10) and jack I (11) are used In the electronic component being connect with external equipment, the knot of high-grade power-factor meter or standard scale can be separately connected in different time Structure body, uses plug for seal when not in use.

Claims (1)

1. a kind of power-factor meter with metering interface, including measuring mechanism(1), it is characterised in that the measuring mechanism(1)With Electronic surveying circuit(2)It is connected, the electronic surveying circuit(2)Respectively with binding post A(17), binding post B(18), binding post C (19), post D(20), binding post E(21), binding post F(22)With binding post G(23)It is connected;Wherein from electronic surveying circuit (2)To binding post A(17)Between successively be equipped with jack A(3), switch A(12), jack B(4), from electronic surveying circuit(2)To connecing Terminal B(18)Between successively be equipped with jack C(5), switch B(13), from electronic surveying circuit(2)To binding post C(19)Between according to It is secondary to be equipped with jack D(6), switch C(14), jack E(7), from electronic surveying circuit(2)To post D(20)Between be equipped with successively Jack F(8), switch D(15), from electronic surveying circuit(2)To binding post E(21)Between be equipped with jack G(9), from electronic surveying Circuit(2)To binding post F(22)Between be equipped with jack H(10), from electronic surveying circuit(2)To binding post G(23)Between successively Equipped with jack I(11), switch E(16);
The power-factor meter with metering interface further includes multiple blockings, blocks and is located at the jack A(3), jack B (4), jack C(5), jack D(6), jack E(7), jack F(8), jack G(9), jack H(10)With jack I(11)It is interior.
CN201610286474.6A 2016-03-02 2016-05-04 Power-factor meter with metering interface and its method Active CN105699758B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610118755 2016-03-02
CN2016101187550 2016-03-02

Publications (2)

Publication Number Publication Date
CN105699758A CN105699758A (en) 2016-06-22
CN105699758B true CN105699758B (en) 2018-10-30

Family

ID=56216612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610286474.6A Active CN105699758B (en) 2016-03-02 2016-05-04 Power-factor meter with metering interface and its method

Country Status (1)

Country Link
CN (1) CN105699758B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111505353B (en) * 2020-06-18 2022-06-07 中国人民解放军91286部队航空仪器计量站 Electrical detection instrument and method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1449920A1 (en) * 1987-06-08 1989-01-07 Харьковский политехнический институт им.В.И.Ленина Apparatus for measuring power factor
EP0961124A2 (en) * 1998-05-28 1999-12-01 Matsushita Electric Industrial Co., Ltd. Multicircuit type instrument and split type current transformer for measuring various electric power quantities
CN201199263Y (en) * 2008-01-09 2009-02-25 上海市电力公司市东供电公司 Test device for load-matching monitoring instrument
CN201466441U (en) * 2009-06-01 2010-05-12 浙江恒达高电器有限公司 Power supply device with wireless metering function
CN201583647U (en) * 2009-10-31 2010-09-15 西北电网有限公司 Long-distance online detecting system for substation gate electric energy meter
CN102053201A (en) * 2009-10-31 2011-05-11 郑州三足科技发展有限公司 Multi-channel field standard electrical energy meter
CN201955466U (en) * 2011-01-20 2011-08-31 安徽省电力公司蚌埠供电公司 Multifunctional electric apparatus parameter test instrument
CN203572957U (en) * 2013-12-05 2014-04-30 国家电网公司 On-site meter calibration system
CN103777169A (en) * 2014-01-09 2014-05-07 广西电网公司电力科学研究院 Electric energy metering transformer simulation verification system
CN203745538U (en) * 2014-04-01 2014-07-30 惠州出入境检验检疫局检验检疫综合技术中心 Circuit of testing external power supply with switching of relay
CN104267373A (en) * 2014-10-17 2015-01-07 成都思晗科技有限公司 Gateway meter assessment device
CN205562676U (en) * 2016-03-02 2016-09-07 中国人民解放军91663部队 Power factor meter with measurement interface

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1449920A1 (en) * 1987-06-08 1989-01-07 Харьковский политехнический институт им.В.И.Ленина Apparatus for measuring power factor
EP0961124A2 (en) * 1998-05-28 1999-12-01 Matsushita Electric Industrial Co., Ltd. Multicircuit type instrument and split type current transformer for measuring various electric power quantities
CN201199263Y (en) * 2008-01-09 2009-02-25 上海市电力公司市东供电公司 Test device for load-matching monitoring instrument
CN201466441U (en) * 2009-06-01 2010-05-12 浙江恒达高电器有限公司 Power supply device with wireless metering function
CN201583647U (en) * 2009-10-31 2010-09-15 西北电网有限公司 Long-distance online detecting system for substation gate electric energy meter
CN102053201A (en) * 2009-10-31 2011-05-11 郑州三足科技发展有限公司 Multi-channel field standard electrical energy meter
CN201955466U (en) * 2011-01-20 2011-08-31 安徽省电力公司蚌埠供电公司 Multifunctional electric apparatus parameter test instrument
CN203572957U (en) * 2013-12-05 2014-04-30 国家电网公司 On-site meter calibration system
CN103777169A (en) * 2014-01-09 2014-05-07 广西电网公司电力科学研究院 Electric energy metering transformer simulation verification system
CN203745538U (en) * 2014-04-01 2014-07-30 惠州出入境检验检疫局检验检疫综合技术中心 Circuit of testing external power supply with switching of relay
CN104267373A (en) * 2014-10-17 2015-01-07 成都思晗科技有限公司 Gateway meter assessment device
CN205562676U (en) * 2016-03-02 2016-09-07 中国人民解放军91663部队 Power factor meter with measurement interface

Also Published As

Publication number Publication date
CN105699758A (en) 2016-06-22

Similar Documents

Publication Publication Date Title
CN107064693B (en) Relay protection device outlet matrix test device and test method
Henriques et al. Development of adapted ammeter for fraud detection in low-voltage installations
CN202886460U (en) PCIE video card maintenance tester
CN205067714U (en) Single -phase electric energy meter calibrating installation and single -phase electric energy meter credible test platform that resets
CN105699758B (en) Power-factor meter with metering interface and its method
CN105372620A (en) Power metering detector
CN103675746A (en) High-voltage switch tester calibration device and calibration method
CN203164305U (en) Grounding resistor testing instrument
CN206460144U (en) A kind of extra-high voltage switch intelligent device for measuring
CN105807129B (en) Power meter with metering interface and its method
CN204203445U (en) Measuring equipment rolling inspection device
CN104459451B (en) Transformer current mutual inductor polarity tester and testing method
CN205562676U (en) Power factor meter with measurement interface
CN102707117A (en) Relaying multifunctional tester
CN205539181U (en) Power meter with measurement interface
CN207020295U (en) A kind of insulating check device and insulating check instrument
CN205539435U (en) On --spot check gauge of multi -functional electric energy meter
CN205643683U (en) Ampere meter with measurement interface
CN205809179U (en) Circuit resistance tester
CN212433255U (en) High-voltage safety indicating device based on nematic polymer polarization
CN107390158B (en) Automobile charging pile system and method capable of carrying out electric energy metering virtual load test
CN103954869A (en) Cable power frequency parameter testing device based on PXI system
CN209446991U (en) A kind of signal control device for measurement verification system
CN202583442U (en) Calibrating apparatus for grounding device characteristic parameter test system
CN201421497Y (en) Anti-interference device of field calibrating device of current transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant