CN105697029A - Multi-purpose drilling and excavating trolley for single track railway tunnel - Google Patents

Multi-purpose drilling and excavating trolley for single track railway tunnel Download PDF

Info

Publication number
CN105697029A
CN105697029A CN201610105545.8A CN201610105545A CN105697029A CN 105697029 A CN105697029 A CN 105697029A CN 201610105545 A CN201610105545 A CN 201610105545A CN 105697029 A CN105697029 A CN 105697029A
Authority
CN
China
Prior art keywords
chassis
platform
column
bore operation
bearing pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610105545.8A
Other languages
Chinese (zh)
Other versions
CN105697029B (en
Inventor
张馨
彭仕国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201610105545.8A priority Critical patent/CN105697029B/en
Publication of CN105697029A publication Critical patent/CN105697029A/en
Application granted granted Critical
Publication of CN105697029B publication Critical patent/CN105697029B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/11Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • E21B7/025Rock drills, i.e. jumbo drills

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Earth Drilling (AREA)

Abstract

Provides is a multi-purpose drilling and excavating trolley for a single track railway tunnel. A third platform is mounted on a second platform; and the two ends of the bottom of the second platform are connected with stand columns on the two sides correspondingly. First outer platforms are arranged on the outer sides of the stand columns on the two sides correspondingly; pin shafts are arranged on the inner sides of the stand columns on the two sides; and first inner platforms are connected with the stand columns through the pin shafts correspondingly. Telescopic supporting legs are arranged at the bottoms of the stand columns, and are connected with a bottom longitudinal beam. High-strength hinges are mounted on the first inner platforms correspondingly, and the high-strength hinges on the two sides are connected through telescopic rods. The multi-purpose drilling and excavating trolley has a low requirement for configuration of mechanical equipment, and special machines are of no need; the economical efficiency is good; time and expenses occupied by repeated towage of a drilling trolley and a two-lining trolley due to exchanging of the drilling trolley are reduced; the phenomenon that two-lining operation is stopped for waiting due to exchange of the drilling trolley is avoided; procedure connection is closer; the work efficiency is improved; the construction progress is accelerated; the total construction period is shortened; and the construction organization cost is greatly lowered.

Description

A kind of single-track railway tunnel Drillhole excavation chassis
Technical field
The present invention relates to a kind of single-track railway tunnel Drillhole excavation chassis, be specifically related to a kind of can the boring excavation chassis of simultaneous adaptation single-track railway tunnel full section method and benching tunnelling method excavation construction。
Background technology
Single-track railway tunnel II, III country rock adopts full face tunneling method construction, and IV, V country rock adopts bench cut method construction, and the height of the boring excavation chassis that tunnel bench cut method shows with full face tunneling differs relatively big, and tunneling boring chassis to increase an operation layer。Tunnel surrounding is ever-changing, various grade country rocks often interlaced together, country rock bypass the immediate leadership change situation be also frequent appearance, excavation method after Change in surrounding rocks is it is possible to can change, particularly country rock bypass the immediate leadership change time often cause full section method and the change of two kinds of excavation methods of benching tunnelling method, and excavation method changes, boring excavation chassis is necessary for changing, owing to tunneling boring boring excavation chassis differs bigger with benching tunnelling method boring excavation chassis height, therefore two kinds of excavation chassis are generally processed during construction, tunneling boring boring excavation chassis is adopted when adopting tunneling boring, more small-sized boring excavation chassis is adopted during benching tunnelling method construction, and single-track tunnel section is less, it is necessary for splash guard laying chassis below and lining trolley to exit outside hole to change boring excavation chassis, when short tunnel, impact is also not as big, and move back a chassis when tunnel is longer and will affect for a long time, strong influence Tunnel Construction Schedule will be had a strong impact on, cause the waste on construction cost。
Summary of the invention
The purpose of the present invention is that and overcomes the deficiency existed in above-mentioned existing construction technology, and a kind of single-track railway tunnel height and all telescopic Drillhole excavation chassis of width are provided, when adopting bench cut method construction, boring excavation chassis can provide the operating platform required for bore operation of topping bar;When full face tunneling method is constructed, extract the bearing pin of locking on chassis column out, with loader, drilling jumbo is raised up to the operating platform height that full face tunneling method construction is required, telescopic outrigger in chassis column puts in place because of deadweight whereabouts, put on locking bearing pin, installing outside bottom drilling operation platform and put down one layer of drilling operation platform inside chassis, chassis can provide the operating platform required for full face tunneling method construction drill operation after flexible converting to;Reverse operating, also can be reduced into bench cut method boring excavation chassis the full fault plane drilling jumbo changed。Expansion link in little operating platform outside drilling jumbo can be protruding according to excavated section simultaneously, can meet the bore operation requirement of widened section。Adopt this Drillhole chassis, can carry out that the tunnel constructed is few processes a boring excavation chassis than common bore operation chassis, and decreasing the impact exchanging boring excavation chassis to lining trolley and two lining constructions, two lining constructions can uninterruptedly continue to be normally carried out。This trolley device, without using professed machine, only uses loader and hand fit to be completed in a relatively short time the mutual conversion to full section method drilling jumbo of the benching tunnelling method drilling jumbo, and construction technology is simple, safe, economic, practical。
The technical scheme is that when single-track railway tunnel adopts bench cut method to construct, telescopic supporting leg is increased in the column of step boring excavation chassis, when interior supporting leg is in contraction state, drilling jumbo can provide the operating platform needed for benching tunnelling method construction drill operation, when interior supporting leg is in and stretches out state, put down one layer of drilling operation platform inside chassis, installing outside bottom drilling operation platform, the boring excavation chassis after flexible conversion meets full face tunneling method construction drill job requirements。Outside drilling jumbo in operating platform expansion link overhanging after, moreover it is possible to meet the bore operation requirement of widened section。
A kind of single-track railway tunnel Drillhole excavation chassis, this chassis includes column (1), telescopic legs (2), bottom girder (3), bearing pin (4), an interior platform (5), an outer platform (6), expansion link (7), high intensity hinge (8), two platforms (9), three platforms (10)。
Three platforms (10) are arranged on two platforms (9), and two ends, two platforms (9) bottom are connected with two heel posts (1) respectively;An outer platform (6) is respectively provided at both sides the outside of column (1), the inner side of two heel posts (1) is provided with bearing pin (4), and an interior platform (5) is connected with column (1) by bearing pin (4);The bottom of column (1) is provided with telescopic legs (2), and telescopic legs (2) is connected with bottom girder (3)。
High intensity hinge (8) is separately mounted on an interior platform (5), is connected by expansion link (7) between the high intensity hinge (8) of both sides。
The construction digging section needs design, and the length of telescopic legs (2) is to ensure the headroom of chassis after stretching out, and leaves anchoring space。
The column (1) of chassis is processed into hollow structure, empty cross section in the section ratio column (1) of telescopic legs (2) is slightly smaller, to ensure the flexible of telescopic legs (2) and will not cause trolley inclination because of the excessive with column (1) interior spatial joint clearance of telescopic legs (2)。
The bearing pin (4) that the column (1) of chassis and telescopic legs (2) anchor meets shearing resistance requirement。
The strength and stiffness of the high intensity hinge (8) on an interior platform (5) protective screen plate of chassis want to meet load during bore operation。
This chassis carries out according to the following step:
S1 tops bar excavated section design basis chassis height according to bench cut method, and under chassis, door opening width must is fulfilled for construction equipment and vehicle pass-through requirement。
S2 chassis column design is hollow type, sets telescopic legs in post, and telescopic outrigger welds with chassis bottom girder, and telescopic outrigger height should make chassis can meet the operation height that full face tunneling method boring is required after increasing。
S3 chassis column and interior supporting leg set lock hole, after the elongation of chassis supporting leg or contraction, penetrate locked chassis column and interior telescopic outrigger in lock hole with bearing pin。
S4 adopts bench cut method construction, and during bore operation, interior supporting leg is contracted in chassis column, and boring personnel carry out bore operation on chassis。
S5 adopts full face tunneling method construction, pull out the locking bearing pin on chassis column, height needed for holing when chassis being raised to full face tunneling with loader, telescopic outrigger in column falls, put on locking bearing pin, transfer inside expansion chassis operating platform, installing bottom layer operation outer platform in one layer of bore operation, full face tunneling method bore operation can be carried out。
S6 packs up one layer of bore operation operating platform inside chassis, exterior bottom of dismantling bore operation operating platform, chassis is held with loader, pull out the locking bearing pin on column, loader slowly falls, supporting leg shrinks chassis and restores, and plugs bearing pin and can be reduced into the bore operation benchmark chassis of bench cut method construction, carries out bench cut method bore operation。
Being provided with expansion link in little operating platform outside S7 drilling jumbo, when widened section, expansion link all according to the protruding applicable length of excavated section, can be satisfied by the bore operation requirement of widened section after spreading reinforcing bar protection network。
Above-mentioned Multipurpose trolley, both the operating platform of the bore operation that bench cut method constructs it had been provided that, and increase chassis stretching out supporting leg, the operating platform needed for the bore operation that full face tunneling method is constructed it is provided that again after opening and install corresponding operating platform, widened section boring requirement can be met, a chassis multiple use simultaneously。
Present invention have the advantage that and good effect:
1, this device is low to plant equipment configuration requirement, and its landing leg stretching and job platform are opened only needs the required conventional machinery (loader) of constructing tunnel and hand fit namely to realize, it is not necessary to use professed machine。
2, single-track railway tunnel bench cut method and full face tunneling method construction, a difficult problem for boring excavation chassis conversion are solved。
3, easy to operate, the contracting of drilling jumbo supporting leg is stretched, platform companding conversion can complete at short notice, and after loader lifts or puts down chassis, artificial insertion locks bearing pin。
4, good economy performance, decrease and exchange the drilling jumbo that causes of drilling jumbo and two lining chassis haul shared time and expense repeatedly, two lining operations will not be exchanged and wait of stopping work because of boring excavation chassis, procedure connection is tightlier urged, improve work efficiency, construction speed is accelerated, and the overall duration shortens, and construction organization cost is greatly reduced。
Accompanying drawing explanation
Fig. 1 bench cut method drilling jumbo schematic diagram。
Fig. 2 full face tunneling method drilling jumbo schematic diagram。
Fig. 3 bench cut method widened section drilling jumbo schematic diagram。
Fig. 4 full face tunneling method widened section drilling jumbo schematic diagram。
A platform plane schematic diagram in Fig. 5 drilling jumbo。
Fig. 6 drilling jumbo inner platform, expansion link schematic diagram。
Fig. 7 chassis landing leg stretching detail structure schematic diagram。
In figure: 1, column, 2, telescopic legs, 3, bottom girder, 4, bearing pin, 5, an interior platform, 6, an outer platform, 7, expansion link, 8, high intensity hinge, 9, two platforms, 10, three platforms。
Detailed description of the invention
A kind of single-track railway tunnel Drillhole excavation chassis, the column (1) of chassis is set to hollow structure, column (1) inside groove arranges telescopic legs (2), column (1) is locked by bearing pin (4) with internal telescopic outrigger (2), in layer bore operation, a platform (5) is safeguard structure at ordinary times, can form work platform for boring after expansion;Implementation carries out according to the following step
S1 tops bar excavated section design basis chassis height according to bench cut method, and under chassis, door opening width must is fulfilled for construction equipment and vehicle pass-through requirement。
S2 chassis column (1) is designed as hollow type, telescopic legs (2) is set in post, telescopic outrigger (2) and chassis bottom girder (3) are welded into one, and telescopic outrigger (2) highly makes chassis be provided that the operating platform needed for full face tunneling method bore operation after increasing。
S3 chassis column (1) and interior telescopic outrigger (2) set lock hole, after the elongation of chassis supporting leg or contraction, penetrate locked chassis column (1) and interior telescopic outrigger (2) in lock hole with bearing pin (4)。
S4 adopts bench cut method construction, and during bore operation, interior telescopic outrigger (2) is contracted in chassis column (1), and boring personnel carry out bore operation on chassis。
S5 adopts full face tunneling method construction, pull out the locking bearing pin (4) on chassis column (1), height needed for holing when chassis being raised to full face tunneling with loader, telescopic outrigger (2) in column (1) falls with deadweight, put on locking bearing pin (4), a platform (5) protective screen plate in turntable car bore operation under high intensity hinge (8), expansion link (7) in a platform (5) protective screen plate in pull-out, form a complete interior platform (5), installing bottom layer operation outer platform, full face tunneling method bore operation can be carried out。
Expansion link (7) in a platform (5) protective screen plate in S6 retraction, it is rotated up packing up in bore operation a platform (5) protective screen plate along high intensity hinge (8), exterior bottom of dismantling bore operation operating platform, chassis is held up with loader, pull out the locking bearing pin (4) on column (1), loader slowly falls, telescopic outrigger (2) shrinks chassis and restores, plug bearing pin (4) and the bore operation benchmark chassis of bench cut method construction can be reduced into, carry out bench cut method bore operation。
Being provided with expansion link (7) in little operating platform outside S7 drilling jumbo, when widened section, expansion link (7) all according to the protruding applicable length of excavated section, can meet the bore operation requirement of widened section after spreading reinforcing bar protection network。

Claims (6)

1. a single-track railway tunnel Drillhole excavation chassis, it is characterised in that: this chassis includes column (1), telescopic legs (2), bottom girder (3), bearing pin (4), an interior platform (5), an outer platform (6), expansion link (7), high intensity hinge (8), two platforms (9), three platforms (10);
Three platforms (10) are arranged on two platforms (9), and two ends, two platforms (9) bottom are connected with two heel posts (1) respectively;An outer platform (6) is respectively provided at both sides the outside of column (1), the inner side of two heel posts (1) is provided with bearing pin (4), and an interior platform (5) is connected with column (1) by bearing pin (4);The bottom of column (1) is provided with telescopic legs (2), and telescopic legs (2) is connected with bottom girder (3);
High intensity hinge (8) is separately mounted on an interior platform (5), is connected by expansion link (7) between the high intensity hinge (8) of both sides。
2. a kind of single-track railway tunnel Drillhole excavation chassis according to claim 1, it is characterised in that: the construction digging section needs design, and the length of telescopic legs (2) is to ensure the headroom of chassis after stretching out, and leaves anchoring space。
3. a kind of single-track railway tunnel Drillhole excavation chassis according to claim 1, it is characterized in that: the column (1) of chassis is processed into hollow structure, empty cross section in the section ratio column (1) of telescopic legs (2) is slightly smaller, to ensure the flexible of telescopic legs (2) and will not cause trolley inclination because of the excessive with column (1) interior spatial joint clearance of telescopic legs (2)。
4. a kind of single-track railway tunnel Drillhole excavation chassis according to claim 1, it is characterised in that: the bearing pin (4) that the column (1) of chassis and telescopic legs (2) anchor meets shearing resistance requirement。
5. a kind of single-track railway tunnel Drillhole excavation chassis according to claim 1, it is characterised in that: the strength and stiffness of the high intensity hinge (8) on an interior platform (5) protective screen plate of chassis want to meet load during bore operation。
6. a single-track railway tunnel Drillhole excavation chassis excavation method, it is characterised in that: implementation carries out according to the following step,
S1 tops bar excavated section design basis chassis height according to bench cut method, and under chassis, door opening width must is fulfilled for construction equipment and vehicle pass-through requirement;
S2 chassis column (1) is designed as hollow type, telescopic legs (2) is set in post, telescopic outrigger (2) and chassis bottom girder (3) are welded into one, and telescopic outrigger (2) highly makes chassis be provided that the operating platform needed for full face tunneling method bore operation after increasing;
S3 chassis column (1) and interior telescopic outrigger (2) set lock hole, after the elongation of chassis supporting leg or contraction, penetrate locked chassis column (1) and interior telescopic outrigger (2) in lock hole with bearing pin (4);
S4 adopts bench cut method construction, and during bore operation, interior telescopic outrigger (2) is contracted in chassis column (1), and boring personnel carry out bore operation on chassis;
S5 adopts full face tunneling method construction, pull out the locking bearing pin (4) on chassis column (1), height needed for holing when chassis being raised to full face tunneling with loader, telescopic outrigger (2) in column (1) falls with deadweight, put on locking bearing pin (4), a platform (5) protective screen plate in turntable car bore operation under high intensity hinge (8), expansion link (7) in a platform (5) protective screen plate in pull-out, form a complete interior platform (5), installing bottom layer operation outer platform, full face tunneling method bore operation can be carried out;
Expansion link (7) in a platform (5) protective screen plate in S6 retraction, it is rotated up packing up in bore operation a platform (5) protective screen plate along high intensity hinge (8), exterior bottom of dismantling bore operation operating platform, chassis is held up with loader, pull out the locking bearing pin (4) on column (1), loader slowly falls, telescopic outrigger (2) shrinks chassis and restores, plug bearing pin (4) and the bore operation benchmark chassis of bench cut method construction can be reduced into, carry out bench cut method bore operation;
Being provided with expansion link (7) in little operating platform outside S7 drilling jumbo, when widened section, expansion link (7) all according to the protruding applicable length of excavated section, can meet the bore operation requirement of widened section after spreading reinforcing bar protection network。
CN201610105545.8A 2016-02-25 2016-02-25 A kind of single-track railway tunnel Drillhole excavation trolley Active CN105697029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610105545.8A CN105697029B (en) 2016-02-25 2016-02-25 A kind of single-track railway tunnel Drillhole excavation trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610105545.8A CN105697029B (en) 2016-02-25 2016-02-25 A kind of single-track railway tunnel Drillhole excavation trolley

Publications (2)

Publication Number Publication Date
CN105697029A true CN105697029A (en) 2016-06-22
CN105697029B CN105697029B (en) 2018-10-26

Family

ID=56222561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610105545.8A Active CN105697029B (en) 2016-02-25 2016-02-25 A kind of single-track railway tunnel Drillhole excavation trolley

Country Status (1)

Country Link
CN (1) CN105697029B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457666A (en) * 2018-03-20 2018-08-28 中建隧道建设有限公司 A kind of liftable adjustable type tunnel multi-step excavates rack
CN109538234A (en) * 2019-01-16 2019-03-29 涪特智能装备(重庆)有限公司 A kind of tunnel excavation trolley
CN110043285A (en) * 2019-04-26 2019-07-23 中国水利水电第八工程局有限公司 Municipal underpass two serves as a contrast construction formwork system and two lining construction methods
CN110500113A (en) * 2019-09-20 2019-11-26 中铁二局第二工程有限公司 A kind of micro- bench excavation combination rack in tunnel and the micro- bench excavation method in tunnel
CN111520145A (en) * 2020-04-29 2020-08-11 中铁七局集团有限公司 Underground excavation tunnel primary support slope adjusting and arch changing construction method
CN111734431A (en) * 2020-06-24 2020-10-02 高军 Trolley for soft rock tunnel full-section micro-step excavation construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550832A (en) * 2009-05-04 2009-10-07 中国水利水电第七工程局有限公司 A safety protecting work trolley for chamber
CN201428461Y (en) * 2009-05-04 2010-03-24 中国水利水电第七工程局有限公司 Safety protection working bogie for cavern
CN202560245U (en) * 2012-05-11 2012-11-28 中国建筑第五工程局有限公司 Multifunctional trolley with freely retractable arms
CN103195439A (en) * 2013-04-10 2013-07-10 中国长江三峡集团公司 Multifunctional working platform car for tunnel construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550832A (en) * 2009-05-04 2009-10-07 中国水利水电第七工程局有限公司 A safety protecting work trolley for chamber
CN201428461Y (en) * 2009-05-04 2010-03-24 中国水利水电第七工程局有限公司 Safety protection working bogie for cavern
CN202560245U (en) * 2012-05-11 2012-11-28 中国建筑第五工程局有限公司 Multifunctional trolley with freely retractable arms
CN103195439A (en) * 2013-04-10 2013-07-10 中国长江三峡集团公司 Multifunctional working platform car for tunnel construction

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457666A (en) * 2018-03-20 2018-08-28 中建隧道建设有限公司 A kind of liftable adjustable type tunnel multi-step excavates rack
CN109538234A (en) * 2019-01-16 2019-03-29 涪特智能装备(重庆)有限公司 A kind of tunnel excavation trolley
CN110043285A (en) * 2019-04-26 2019-07-23 中国水利水电第八工程局有限公司 Municipal underpass two serves as a contrast construction formwork system and two lining construction methods
CN110043285B (en) * 2019-04-26 2020-10-02 中国水利水电第八工程局有限公司 Municipal underground passage two-lining construction formwork system and two-lining construction method
CN110500113A (en) * 2019-09-20 2019-11-26 中铁二局第二工程有限公司 A kind of micro- bench excavation combination rack in tunnel and the micro- bench excavation method in tunnel
CN111520145A (en) * 2020-04-29 2020-08-11 中铁七局集团有限公司 Underground excavation tunnel primary support slope adjusting and arch changing construction method
CN111520145B (en) * 2020-04-29 2021-10-01 中铁七局集团有限公司 Underground excavation tunnel primary support slope adjusting and arch changing construction method
CN111734431A (en) * 2020-06-24 2020-10-02 高军 Trolley for soft rock tunnel full-section micro-step excavation construction
CN111734431B (en) * 2020-06-24 2022-04-08 高军 Trolley for soft rock tunnel full-section micro-step excavation construction

Also Published As

Publication number Publication date
CN105697029B (en) 2018-10-26

Similar Documents

Publication Publication Date Title
CN105697029A (en) Multi-purpose drilling and excavating trolley for single track railway tunnel
CN103643979B (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
DE2615395C2 (en) Arrangement for the step-by-step successive movement of at least three structural or supporting parts one behind the other
CN101338678A (en) Supporting arch hidden digging top-down construction method
CN106837334A (en) A kind of full-mechanized roadway multi rack automatic moving type props up anchor combined machine set system
DE102008038391A1 (en) Drilling rig and assembly process for this
CN112253160A (en) Complete equipment for quick tunneling, drilling and anchoring without repeated support under coal mine
CN107120124A (en) A kind of method for protecting support for tunnel
CN105134269A (en) Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN104863597A (en) Transverse tunnel cover method for shallow-buried underground excavation large underground space construction
CN109723445A (en) Parallel three steps full section of tunnel entirety driving method
CN109707399A (en) Tunnel outlet support structure and its construction method
CN201826837U (en) Movable double-platform partitioned four-arm drill carriage for construction of hangwall anchor rods and anchor cables
CN103397888A (en) Frame device for lifting and transporting tunneling head-on temporary bracket, and operation method
CN106677813A (en) Novel temporary supporting device for coal mine roadway comprehensive digging face
CN109869145A (en) A kind of portal support type pick, branch, fortune, bores all-in-one machine at anchor
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN202441387U (en) Multifunctional tunnel working rack
CN104712356A (en) Hydraulic self-moving circulating supporting tunnel combined support and construction method
CN206844193U (en) Bore support integral type pile hole forming device
CN103628903B (en) Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN110118097A (en) A kind of backpack full-mechanized roadway gib equipment and its application
CN213869711U (en) Construction is with doing pore-forming rig in narrow and small space
CN107227735B (en) Steel reinforcement cage construction technology suitable for different supporting courses
CN209799865U (en) Roadway excavation of taking extending structure is with boring dress anchor all-in-one

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant