CN105674378A - Parallel type multi-heat-source series-connection grid-connected heating device - Google Patents

Parallel type multi-heat-source series-connection grid-connected heating device Download PDF

Info

Publication number
CN105674378A
CN105674378A CN201510787558.3A CN201510787558A CN105674378A CN 105674378 A CN105674378 A CN 105674378A CN 201510787558 A CN201510787558 A CN 201510787558A CN 105674378 A CN105674378 A CN 105674378A
Authority
CN
China
Prior art keywords
heat
water inlet
source
pipe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510787558.3A
Other languages
Chinese (zh)
Inventor
李微
毛建涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang North Tianheng Energy Saving Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510787558.3A priority Critical patent/CN105674378A/en
Publication of CN105674378A publication Critical patent/CN105674378A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The invention relates to the technical field of heating devices, in particular to a parallel type multi-heat-source series-connection grid-connected heating device. The parallel type multi-heat-source series-connection grid-connected heating device comprises a primary water return pipeline, a primary water supply pipeline and at least two heat sources arranged in parallel. A water inlet of each heat source communicates with the primary water return pipeline through a water inlet pipe, a water outlet of each heat source communicates with the primary water supply pipeline through a water outlet pipe, and a pressure equalizing pipe is arranged between the water inlet pipe and water outlet pipe of each heat source and is capable of enabling the water inlet pipe and water outlet pipe of each heat source to communicate. According to the parallel type multi-heat-source series-connection grid-connected heating device, a whole primary pipe grid is used as a large heat storage container, the heat sources are responsible for heating heat media of the container and delivering heat, the pressure equalizing pipes are installed between the water inlet pipes and water outlet pipes of the heat sources, and residual return water and supplied water are mixed and then enter the primary pipe grid so as to achieve water supply. The defect that traditional heat sources cannot be connected with the grid is overcome, the heat sources in a whole system can be adjusted at any time, peak regulation and emergency response can be achieved, and manpower cost and material cost can be lowered.

Description

The run-in index multi-heat source grid-connected heating plant of series connection
Technical field
The present invention relates to heating plant technical field, be a kind of run-in index multi-heat source grid-connected heating plant of series connection.
Background technology
Northern China cities and towns are low due to winter temperature, in the winter time commonly used central heating. When initial construction for avoiding boiler room low load with strong power occur, causing that energy consumption wasting phenomenon occurs, the installed capacity of designed thermal source substantially adds reserved planning surplus based on existing construction area. Along with the fast development of country's Urbanization Construction, the load of original boiler room can not meet demand, can only newly constructed boiler room. By the restriction of the aspects such as place, region and environmental protection, it is typically chosen in the boiler room that the other newly-built installed capacity in former address is big or the local construction in its conveying capacity deficiency, heats for dilatation load, and old boiler room still uses. Owing to the circulatory system pressure of original boiler room and the circulatory system pressure in newly constructed boiler room are not mated, these boiler rooms new, old are independent operating substantially each, does not network each other, without peak regulation, standby functions, forms the situation of multiple thermal source heat supply together. Owing to each thermal source can not be incorporated into the power networks, cannot regulate, old thermal source is big because of area of heat-supply service, its thermic load cannot meet heat demand, and although new thermal source is close at hand because of low load with strong power, thermic load is underutilized, and thermal source resource, human resources and energy consumption waste are bigger, even if networking is also for when certain boiler room has an accident, heating for avoiding pipe network bursting by freezing temporarily.
Summary of the invention
The invention provides a kind of run-in index multi-heat source grid-connected heating plant of series connection, overcome the deficiency of above-mentioned prior art, it can effectively solve boiler room new, old each independent operating that existing central heating system exists, do not network, without peak regulation, standby functions, thermal source resource, waste of human resource are big, it is impossible to the problem meeting energy-conserving and environment-protective requirement.
The technical scheme is that and realized by following measures: a kind of run-in index multi-heat source is connected grid-connected heating plant, including the thermal source that primary water pipeline, a water supply line and at least two be arranged in parallel, the water inlet of each thermal source is connected with primary water pipeline by water inlet pipe, the outlet of each thermal source, by outlet pipe and a water supply line connection, is provided with connecting the balance pipe of water inlet pipe and outlet pipe between the water inlet pipe of each thermal source and outlet pipe.
Further optimization and/or improvements to foregoing invention technical scheme are presented herein below:
The above-mentioned run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source and Secondary Heat Source, the water inlet of the first thermal source is connected with primary water pipeline by the first water inlet pipe, the outlet of the first thermal source is by the first outlet pipe and a water supply line connection, being provided with the first balance pipe between first water inlet pipe and the first outlet pipe, the first water inlet pipe is provided with the first heat-source Cycles pump; The water inlet of Secondary Heat Source is connected with primary water pipeline by the second water inlet pipe, the outlet of Secondary Heat Source is by the second outlet pipe and a water supply line connection, being provided with the second balance pipe between second water inlet pipe and the second outlet pipe, the second water inlet pipe is provided with Secondary Heat Source circulating pump.
The above-mentioned run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source, Secondary Heat Source and the 3rd thermal source, the water inlet of the first thermal source is connected with primary water pipeline by the first water inlet pipe, the outlet of the first thermal source is by the first outlet pipe and a water supply line connection, being provided with the first balance pipe between first water inlet pipe and the first outlet pipe, the first water inlet pipe is provided with the first heat-source Cycles pump; The water inlet of Secondary Heat Source is connected with primary water pipeline by the second water inlet pipe, the outlet of Secondary Heat Source is by the second outlet pipe and a water supply line connection, being provided with the second balance pipe between second water inlet pipe and the second outlet pipe, the second water inlet pipe is provided with Secondary Heat Source circulating pump; The water inlet of the 3rd thermal source is connected with primary water pipeline by the 3rd water inlet pipe, the outlet of the 3rd thermal source is by the 3rd outlet pipe and a water supply line connection, being provided with the 3rd balance pipe between 3rd water inlet pipe and the 3rd outlet pipe, the 3rd water inlet pipe is provided with Three-heat-source cycle pump.
The above-mentioned run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source, Secondary Heat Source, the 3rd thermal source and the 4th thermal source, the water inlet of the first thermal source is connected with primary water pipeline by the first water inlet pipe, the outlet of the first thermal source is by the first outlet pipe and a water supply line connection, being provided with the first balance pipe between first water inlet pipe and the first outlet pipe, the first water inlet pipe is provided with the first heat-source Cycles pump; The water inlet of Secondary Heat Source is connected with primary water pipeline by the second water inlet pipe, the outlet of Secondary Heat Source is by the second outlet pipe and a water supply line connection, being provided with the second balance pipe between second water inlet pipe and the second outlet pipe, the second water inlet pipe is provided with Secondary Heat Source circulating pump; The water inlet of the 3rd thermal source is connected with primary water pipeline by the 3rd water inlet pipe, the outlet of the 3rd thermal source is by the 3rd outlet pipe and a water supply line connection, being provided with the 3rd balance pipe between 3rd water inlet pipe and the 3rd outlet pipe, the 3rd water inlet pipe is provided with Three-heat-source cycle pump; The water inlet of the 4th thermal source is connected with primary water pipeline by the 4th water inlet pipe, the outlet of the 4th thermal source is by the 4th outlet pipe and a water supply line connection, being provided with the 4th balance pipe between 4th water inlet pipe and the 4th outlet pipe, the 4th water inlet pipe is provided with four heat source cycle pump.
The flow of above-mentioned heat-source Cycles pump is more than the metered flow of the thermal source corresponding with this heat-source Cycles pump.
Above-mentioned heat-source Cycles pump lift is more than the design resistance of the thermal source corresponding with this heat-source Cycles pump.
It is parallel with the heat exchange station no less than two between an above-mentioned water supply line and primary water pipeline, the return pipe of each heat exchange station is respectively equipped with a recuperated cycle pump.
Present configuration is reasonable and compact, easy to use, it is by transforming for return pipe net thermal source, a whole pipe network is considered as a big heat storage container, each thermal source is responsible for the heating medium for heating of this container, conveying heat, and each heat exchange station only need to from this container on-demand acquirement heat, the start and stop simultaneously of the heat-source Cycles pump of boiler and its metered flow, for avoiding starting trouble to cause whole thermal source that traffic bottlenecks effect occurs because metered flow is little, balance pipe is installed between the outlet pipe and water inlet pipe of thermal source, more than backwater and supply water mixing after enter a pipe network water supply,Overcoming the drawback that traditional heat source can not network, whole heating system, according to its heat demand, determines that each thermal source enables and suspends, and the number of units of boiler startup in thermal source; Thermal source in whole system can regulate at any time, namely can peak regulation, emergent, moreover it is possible to reduce human and material resources cost to greatest extent, make cost efficiency fulfill, have feature safe, laborsaving, easy, efficient.
Accompanying drawing explanation
Accompanying drawing 1 is the hydraulic principle structural representation of the embodiment of the present invention one.
Accompanying drawing 2 is the hydraulic principle structural representation of the embodiment of the present invention two.
Accompanying drawing 3 is the hydraulic principle structural representation of the embodiment of the present invention three.
Coding in accompanying drawing is respectively as follows: 1 for primary water pipeline, 2 is a water supply line, 3 is the first thermal source, 4 is Secondary Heat Source, 5 is the first water inlet pipe, 6 is the first outlet pipe, 7 is the first balance pipe, 8 is the first heat-source Cycles pump, 9 is the second water inlet pipe, 10 is the second outlet pipe, 11 is the second balance pipe, 12 is Secondary Heat Source circulating pump, 13 is heat exchange station, 14 is recuperated cycle pump, 15 is the 3rd thermal source, 16 is the 3rd water inlet pipe, 17 is the 3rd outlet pipe, 18 is the 3rd balance pipe, 19 is Three-heat-source cycle pump, 20 is the 4th thermal source, 21 is the 4th water inlet pipe, 22 is the 4th outlet pipe, 23 is the 4th balance pipe, 24 is four heat source cycle pump.
Detailed description of the invention
The present invention, not by the restriction of following embodiment, can determine specific embodiment according to technical scheme and practical situation.
In the present invention, for the ease of describing, the Butut mode that the description of the relative position relation of each parts is all according to Figure of description 1 is described, as: the position relationship of forward and backward, upper and lower, left and right etc. is based on what the Butut direction of Figure of description was determined.
Below in conjunction with embodiment and accompanying drawing, the invention will be further described:
As shown in accompanying drawing 1,2,3, this run-in index multi-heat source is connected the thermal source that grid-connected heating plant includes 1, water supply line 2 of primary water pipeline and at least two be arranged in parallel, the water inlet of each thermal source is connected with primary water pipeline 1 by water inlet pipe, the outlet of each thermal source is connected by outlet pipe and a water supply line 2, is provided with connecting the balance pipe of water inlet pipe and outlet pipe between the water inlet pipe of each thermal source and outlet pipe. In the present invention, thermal source is boiler, the present invention is by transforming for return pipe net thermal source, a whole pipe network (including primary water pipeline 1 and a water supply line 2) is considered as a big heat storage container, each thermal source is responsible for the heating medium for heating of this container, conveying heat, and each heat exchange station only need to from this container on-demand acquirement heat. Every boiler inlet of each thermal source installs a heat-source Cycles pump, its flow is slightly larger than the metered flow of this boiler, lift is slightly larger than the design resistance of this boiler, and determine the power of heat-source Cycles pump on this basis, the start and stop simultaneously of the heat-source Cycles pump of boiler and its metered flow, for avoiding starting trouble to cause whole thermal source that traffic bottlenecks effect occurs because metered flow is little, between the outlet pipe and water inlet pipe of thermal source install balance pipe, more than backwater and supply water mixing after enter a pipe network water supply; The return pipe of each heat exchange station is installed recuperated cycle pump, its metered flow is determined according to its area of heat-supply service and radiator pattern (floor heating, hot-water heating), lift is slightly larger than this heat exchange station heat exchanger, pipe fitting resistance and arrives nearest thermal source resistance of pipe system sum, and determines the power of recuperated cycle pump on this basis.Technical scheme provided by the invention can overcome the drawback that traditional heat source can not network, and whole heating system, according to its heat demand, determines that each thermal source enables and suspends, and the number of units of boiler startup in thermal source; Thermal source in whole system can regulate at any time, namely can peak regulation, emergent, moreover it is possible to reduce human and material resources cost to greatest extent, make cost efficiency fulfill.
Embodiment one: as shown in Figure 1, in the present embodiment, the run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source 3 and Secondary Heat Source 4, the water inlet of the first thermal source 3 is connected with primary water pipeline 1 by the first water inlet pipe 5, the outlet of the first thermal source 3 is connected with a water supply line 2 by the first outlet pipe 6, being provided with the first balance pipe 7 between first water inlet pipe 5 and the first outlet pipe 6, the first water inlet pipe 5 is provided with the first heat-source Cycles pump 8; The water inlet of Secondary Heat Source 4 is connected with primary water pipeline 1 by the second water inlet pipe 9, the outlet of Secondary Heat Source 4 is connected with a water supply line 2 by the second outlet pipe 10, being provided with the second balance pipe 11 between second water inlet pipe 9 and the second outlet pipe 10, the second water inlet pipe 9 is provided with Secondary Heat Source circulating pump 12. The present embodiment includes two thermals source, if disclosure satisfy that heat demand during the first thermal source 3 independent operating, then do not start Secondary Heat Source 4, now, first thermal source 3 is drawn back water from primary water pipeline 1 and is heated, and the water pump after heating is delivered on a water supply line 2; If heat demand can not be met during the first thermal source 3 independent operating, then start Secondary Heat Source 4, now, Secondary Heat Source 4 is drawn back water from primary water pipeline 1 and is heated, water pump after heating is delivered on a water supply line 2, is equivalent to the first thermal source 3 and Secondary Heat Source 4 simultaneously for whole pipe network heating; Certainly, along with the change of weather, it is also possible to suspend the first power supply or second source, after as warm in sky cyclostrophic, heat demand declines, then only need to run the first thermal source 3 or Secondary Heat Source 4 can meet needs, it is possible to suspend the first thermal source 3 or Secondary Heat Source 4. The present invention can need start and stop boiler for producing heat according to system thermal so that it is thermal power is fully used, reach peak regulation, standby, improve the function of whole heat source of heat-supply system utilization rate, it is achieved the purpose of cost efficiency.
Can according to actual needs, grid-connected heating plant that above-mentioned run-in index multi-heat source is connected makes further optimization and/or improvements:
As shown in Figure 1, the flow of above-mentioned heat-source Cycles pump is more than the metered flow of the thermal source corresponding with this heat-source Cycles pump, and heat-source Cycles pump lift is more than the design resistance of the thermal source corresponding with this heat-source Cycles pump. In the present invention, every boiler inlet of each thermal source installs a heat-source Cycles pump, and its flow is slightly larger than the metered flow of this boiler, and lift is slightly larger than the design resistance of this boiler, and determines the power of heat-source Cycles pump on this basis.
As shown in Figure 1, it is parallel with the heat exchange station 13 no less than two between an above-mentioned water supply line 2 and primary water pipeline 1, the return pipe of each heat exchange station 13 is respectively equipped with a recuperated cycle pump 14. In the present invention, the return pipe of each heat exchange station 13 is installed recuperated cycle pump 1414, its metered flow is determined according to its area of heat-supply service and radiator pattern (floor heating, hot-water heating), lift is slightly larger than this heat exchange station 13 heat exchanger, pipe fitting resistance and arrives nearest thermal source resistance of pipe system sum, and determines the power of recuperated cycle pump 14 on this basis.
Embodiment two: as shown in Figure 2, the present embodiment is essentially identical with embodiment one, it is different in that: the run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source 3, Secondary Heat Source 4 and the 3rd thermal source 15, the water inlet of the first thermal source 3 is connected with primary water pipeline 1 by the first water inlet pipe 5, the outlet of the first thermal source 3 is connected with a water supply line 2 by the first outlet pipe 6, being provided with the first balance pipe 7 between first water inlet pipe 5 and the first outlet pipe 6, the first water inlet pipe 5 is provided with the first heat-source Cycles pump 8; The water inlet of Secondary Heat Source 4 is connected with primary water pipeline 1 by the second water inlet pipe 9, the outlet of Secondary Heat Source 4 is connected with a water supply line 2 by the second outlet pipe 10, being provided with the second balance pipe 11 between second water inlet pipe 9 and the second outlet pipe 10, the second water inlet pipe 9 is provided with Secondary Heat Source circulating pump 12; The water inlet of the 3rd thermal source 15 is connected with primary water pipeline 1 by the 3rd water inlet pipe 16, the outlet of the 3rd thermal source 15 is connected with a water supply line 2 by the 3rd outlet pipe 17, being provided with the 3rd balance pipe 18 between 3rd water inlet pipe 16 and the 3rd outlet pipe 17, the 3rd water inlet pipe 16 is provided with Three-heat-source cycle pump 19. The present embodiment includes three thermals source, if disclosure satisfy that heat demand during the first thermal source 3 independent operating, then do not start Secondary Heat Source 4 or the 3rd thermal source 15, now, first thermal source 3 is drawn back water from primary water pipeline 1 and is heated, and the water pump after heating is delivered on a water supply line 2; If heat demand can not be met during the first thermal source 3 independent operating, then start Secondary Heat Source 4, now, Secondary Heat Source 4 is drawn back water from primary water pipeline 1 and is heated, water pump after heating is delivered on a water supply line 2, is equivalent to the first thermal source 3 and Secondary Heat Source 4 simultaneously for whole pipe network heating; If still can not meet heat demand when the first thermal source 3 and Secondary Heat Source 4 run simultaneously, then start the 3rd thermal source 15, now, 3rd thermal source 15 is drawn back water from primary water pipeline 1 and is heated, water pump after heating is delivered on a water supply line 2, is equivalent to the first thermal source 3, Secondary Heat Source 4, the 3rd thermal source 15 simultaneously for whole pipe network heating; Certainly, along with the change of weather, it is also possible to suspend the first power supply, second source or the 3rd thermal source 15, after as warm in sky cyclostrophic, heat demand declines, then only need to run a thermal source and can meet needs, it is possible to suspend two thermals source therein. Compared with embodiment one, the present embodiment has three thermals source, therefore more flexible in peak regulation, standby application, simultaneously, whole heat source of heat-supply system utilization rate is higher, need start and stop boiler for producing heat according to system thermal so that it is thermal power is fully used, there is the feature of cost efficiency significantly.
Embodiment three: as shown in Figure 3, the present embodiment is essentially identical with embodiment two, it is different in that: the run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source 3, Secondary Heat Source the 4, the 3rd thermal source 15 and the 4th thermal source 20, the water inlet of the first thermal source 3 is connected with primary water pipeline 1 by the first water inlet pipe 5, the outlet of the first thermal source 3 is connected with a water supply line 2 by the first outlet pipe 6, being provided with the first balance pipe 7 between first water inlet pipe 5 and the first outlet pipe 6, the first water inlet pipe 5 is provided with the first heat-source Cycles pump 8; The water inlet of Secondary Heat Source 4 is connected with primary water pipeline 1 by the second water inlet pipe 9, the outlet of Secondary Heat Source 4 is connected with a water supply line 2 by the second outlet pipe 10, being provided with the second balance pipe 11 between second water inlet pipe 9 and the second outlet pipe 10, the second water inlet pipe 9 is provided with Secondary Heat Source circulating pump 12;The water inlet of the 3rd thermal source 15 is connected with primary water pipeline 1 by the 3rd water inlet pipe 16, the outlet of the 3rd thermal source 15 is connected with a water supply line 2 by the 3rd outlet pipe 17, being provided with the 3rd balance pipe 18 between 3rd water inlet pipe 16 and the 3rd outlet pipe 17, the 3rd water inlet pipe 16 is provided with Three-heat-source cycle pump 19; The water inlet of the 4th thermal source 20 is connected with primary water pipeline 1 by the 4th water inlet pipe 21, the outlet of the 4th thermal source 20 is connected with a water supply line 2 by the 4th outlet pipe 22, being provided with the 4th balance pipe 23 between 4th water inlet pipe 21 and the 4th outlet pipe 22, the 4th water inlet pipe 21 is provided with four heat source cycle pump 24. The present embodiment includes four thermals source, if disclosure satisfy that heat demand during the first thermal source 3 independent operating, then do not start Secondary Heat Source 4 or the 3rd thermal source 15, now, first thermal source 3 is drawn back water from primary water pipeline 1 and is heated, and the water pump after heating is delivered on a water supply line 2; If heat demand can not be met during the first thermal source 3 independent operating, then start Secondary Heat Source 4, now, Secondary Heat Source 4 is drawn back water from primary water pipeline 1 and is heated, water pump after heating is delivered on a water supply line 2, is equivalent to the first thermal source 3 and Secondary Heat Source 4 simultaneously for whole pipe network heating; If still can not meet heat demand when the first thermal source 3 and Secondary Heat Source 4 run simultaneously, then start the 3rd thermal source 15, now, 3rd thermal source 15 is drawn back water from primary water pipeline 1 and is heated, water pump after heating is delivered on a water supply line 2, is equivalent to the first thermal source 3, Secondary Heat Source 4, the 3rd thermal source 15 simultaneously for whole pipe network heating; If the first thermal source 3, Secondary Heat Source 4 and the 3rd thermal source 15 run simultaneously, still heat demand can not be met, then start the 4th thermal source 20, now, 4th thermal source 20 is drawn back water from primary water pipeline 1 and is heated, water pump after heating is delivered on a water supply line 2, is equivalent to the first thermal source 3, Secondary Heat Source 4, the 3rd thermal source 15, the 4th thermal source 20 simultaneously for whole pipe network heating; Certainly, along with the change of weather, it is also possible to suspend one or more thermal source, after as warm in sky cyclostrophic, heat demand declines, then only need to run a thermal source and can meet needs, it is possible to suspend three thermals source therein. Compared with embodiment two, the present embodiment has four thermals source, therefore more flexible in peak regulation, standby application, simultaneously, whole heat source of heat-supply system utilization rate is higher, need start and stop boiler for producing heat according to system thermal so that it is thermal power is fully used, there is the feature of cost efficiency significantly.
Above technical characteristic constitutes embodiments of the invention, and it has stronger adaptability and implementation result, can increase and decrease non-essential technical characteristic according to actual needs, meet the demand of different situations.
The use procedure of preferred embodiment:
The cogeneration of heat and power function of current power plant is based on power generating capacity, and the waste heat for heat supply is more stable, and contained thermic load can only with most algid stage building heat Calculation. Annual full boundary or even whole nation CHP Heating System are in In The Initial Period Of Heating and latter stage, and only some heat is used effectively, and quite a few heat is not owing to having thermic load to be available for being wasted. Technical scheme provided by the invention can effectively solve the peaking problem of CHP Heating System heating period heat, and residual heat of electric power plant can be fully utilized, and while energy-saving and emission-reduction, produces considerable economic benefit.
After solving the technical problem that multi-heat source is grid-connected, only need to according to the actual requirements by grid-connected with CHP Heating System to one of distance cogeneration of heat and power pipe network or many centralized heating boiler plants (its installed capacity and thermoelectricity unit and location building thermic load match).Heating is first, latter stage directly to whole system heat supply, is enabled peaking boiler in algid stage according to heating system demand by thermoelectricity, and whole CHP Heating System is carried out heat supplement. Thermoelectricity co-generating heat supplying can calculate heating demand by In The Initial Period Of Heating and latter stage, thermal power plant unit can oepration at full load, improve utilization rate of waste heat, not only make energy-conservation emission reduction work attain a yet higher goal, economic benefit is also considerable.
For steam power plant of Urumqi City, this steam power plant install two 125MW thermoelectricity units, except normal power generation, install two 110MW bleed unit by saturated vapor (220 DEG C) for civil heating heat supply. According to " city thermal net design specification " (CJJ34-2010), heat, design heating load and indoor temperature relation be:
According to meteorological department add up, the temperature on average of Urumchi 1971-2000 as shown in Table 1:
Urumchi is commercial, civil buildings thermic load aggregative indicator presses 55W/s rice2Calculating, this steam power plant's area of heat-supply service is: (110 × 2) × 106W ÷ 55=400 myriametre2, Urumqi City's heating period 182 days, according to statistics, only December and 2 months January of the coming year, temperature was relatively low, and 90 days outdoor mean temperatures-10.7 DEG C, mean heat flux demand is 39.46w/m2S, and its excess-three month (92 day late October, November and March in the coming year, early April) mean temperature only has 3.5 DEG C, mean heat flux demand is 19.93w/m2S, its thermal load demands of grid-connected calculating is with calculating on November-2.5 DEG C, for 28.18w/m2S, calculates with this index, and steam power plant's area of heat-supply service can expand to (110 × 2) × 106W ÷ 28.18=780 myriametre2
It peaking boiler room burns amount of natural gas:
All the other 3 months (92 days) average heat consumption is 0.16GJ/m2;
With the existing heating use gas standard (17m in Urumchi3/m2), a Heating Season can save natural gas: 3,700,000 m2×(17-10.52)m3/m2=2,398 ten thousand m3
With the existing caloric value standard (22 yuan/m in Urumchi2) increase by 370 myriametres more2, Thermal Corp can new output value: 3,700,000 m2× 22 yuan/m2=8,360 ten thousand yuan.
Government saves combustion gas subsidy:
(0.796 yuan/m2): 23,980,000 m3× 0.796 yuan/m2=1908.8 ten thousand yuan.
According to the Committee of Development and Reform of autonomous region, General Office of Finance's cogeneration of heat and power heat energy price associated documents (10.88 yuan/GJ): power plant is utilized because of unnecessary load, can increase income:
3700000 m2×0.16GJ/m2× 10.88 yuan/GJ)=644.0 ten thousand yuan.
One: the 1-12 month of table (30 annual) temperature on average (DEG C)
Month 1 2 3 4 5 6 7 8 9 10 11 12
Temperature on average -12.6 -9.7 -1.7 9.9 16.7 21.5 23.7 22.4 16.7 7.7 -2.5 -9.8

Claims (10)

1. the run-in index multi-heat source grid-connected heating plant of series connection, it is characterized in that including the thermal source that primary water pipeline, a water supply line and at least two be arranged in parallel, the water inlet of each thermal source is connected with primary water pipeline by water inlet pipe, the outlet of each thermal source, by outlet pipe and a water supply line connection, is provided with connecting the balance pipe of water inlet pipe and outlet pipe between the water inlet pipe of each thermal source and outlet pipe.
2. the grid-connected heating plant of run-in index multi-heat source according to claim 1 series connection, it is characterized in that the run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source and Secondary Heat Source, the water inlet of the first thermal source is connected with primary water pipeline by the first water inlet pipe, the outlet of the first thermal source is by the first outlet pipe and a water supply line connection, being provided with the first balance pipe between first water inlet pipe and the first outlet pipe, the first water inlet pipe is provided with the first heat-source Cycles pump; The water inlet of Secondary Heat Source is connected with primary water pipeline by the second water inlet pipe, the outlet of Secondary Heat Source is by the second outlet pipe and a water supply line connection, being provided with the second balance pipe between second water inlet pipe and the second outlet pipe, the second water inlet pipe is provided with Secondary Heat Source circulating pump.
3. the grid-connected heating plant of run-in index multi-heat source according to claim 1 series connection, it is characterized in that the run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source, Secondary Heat Source and the 3rd thermal source, the water inlet of the first thermal source is connected with primary water pipeline by the first water inlet pipe, the outlet of the first thermal source is by the first outlet pipe and a water supply line connection, being provided with the first balance pipe between first water inlet pipe and the first outlet pipe, the first water inlet pipe is provided with the first heat-source Cycles pump;The water inlet of Secondary Heat Source is connected with primary water pipeline by the second water inlet pipe, the outlet of Secondary Heat Source is by the second outlet pipe and a water supply line connection, being provided with the second balance pipe between second water inlet pipe and the second outlet pipe, the second water inlet pipe is provided with Secondary Heat Source circulating pump; The water inlet of the 3rd thermal source is connected with primary water pipeline by the 3rd water inlet pipe, the outlet of the 3rd thermal source is by the 3rd outlet pipe and a water supply line connection, being provided with the 3rd balance pipe between 3rd water inlet pipe and the 3rd outlet pipe, the 3rd water inlet pipe is provided with Three-heat-source cycle pump.
4. the grid-connected heating plant of run-in index multi-heat source according to claim 1 series connection, it is characterized in that the run-in index multi-heat source grid-connected heating plant of series connection includes the first thermal source, Secondary Heat Source, the 3rd thermal source and the 4th thermal source, the water inlet of the first thermal source is connected with primary water pipeline by the first water inlet pipe, the outlet of the first thermal source is by the first outlet pipe and a water supply line connection, being provided with the first balance pipe between first water inlet pipe and the first outlet pipe, the first water inlet pipe is provided with the first heat-source Cycles pump; The water inlet of Secondary Heat Source is connected with primary water pipeline by the second water inlet pipe, the outlet of Secondary Heat Source is by the second outlet pipe and a water supply line connection, being provided with the second balance pipe between second water inlet pipe and the second outlet pipe, the second water inlet pipe is provided with Secondary Heat Source circulating pump; The water inlet of the 3rd thermal source is connected with primary water pipeline by the 3rd water inlet pipe, the outlet of the 3rd thermal source is by the 3rd outlet pipe and a water supply line connection, being provided with the 3rd balance pipe between 3rd water inlet pipe and the 3rd outlet pipe, the 3rd water inlet pipe is provided with Three-heat-source cycle pump; The water inlet of the 4th thermal source is connected with primary water pipeline by the 4th water inlet pipe, the outlet of the 4th thermal source is by the 4th outlet pipe and a water supply line connection, being provided with the 4th balance pipe between 4th water inlet pipe and the 4th outlet pipe, the 4th water inlet pipe is provided with four heat source cycle pump.
5. the run-in index multi-heat source grid-connected heating plant of series connection according to claim 1 or 2 or 3 or 4, it is characterised in that the flow of heat-source Cycles pump is more than the metered flow of the thermal source corresponding with this heat-source Cycles pump.
6. the run-in index multi-heat source grid-connected heating plant of series connection according to claim 1 or 2 or 3 or 4, it is characterised in that heat-source Cycles pump lift is more than the design resistance of the thermal source corresponding with this heat-source Cycles pump.
7. the grid-connected heating plant of run-in index multi-heat source according to claim 5 series connection, it is characterised in that heat-source Cycles pump lift is more than the design resistance of the thermal source corresponding with this heat-source Cycles pump.
8. the run-in index multi-heat source grid-connected heating plant of series connection according to claim 1 or 2 or 3 or 4 or 7, it is characterized in that being parallel with the heat exchange station no less than two between a water supply line and primary water pipeline, the return pipe of each heat exchange station is respectively equipped with a recuperated cycle pump.
9. the grid-connected heating plant of run-in index multi-heat source according to claim 5 series connection, it is characterised in that be parallel with the heat exchange station no less than two between a water supply line and primary water pipeline, the return pipe of each heat exchange station is respectively equipped with a recuperated cycle pump.
10. the grid-connected heating plant of run-in index multi-heat source according to claim 6 series connection, it is characterized in that being parallel with the heat exchange station no less than two between a water supply line and primary water pipeline, the return pipe of each heat exchange station is respectively equipped with a recuperated cycle pump.
CN201510787558.3A 2015-11-17 2015-11-17 Parallel type multi-heat-source series-connection grid-connected heating device Pending CN105674378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510787558.3A CN105674378A (en) 2015-11-17 2015-11-17 Parallel type multi-heat-source series-connection grid-connected heating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510787558.3A CN105674378A (en) 2015-11-17 2015-11-17 Parallel type multi-heat-source series-connection grid-connected heating device

Publications (1)

Publication Number Publication Date
CN105674378A true CN105674378A (en) 2016-06-15

Family

ID=56946861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510787558.3A Pending CN105674378A (en) 2015-11-17 2015-11-17 Parallel type multi-heat-source series-connection grid-connected heating device

Country Status (1)

Country Link
CN (1) CN105674378A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106091079A (en) * 2016-06-01 2016-11-09 西安交通大学 A kind of natural gas based on heat supply base station, electric coupling heating system
CN109579104A (en) * 2019-01-15 2019-04-05 西安热工研究院有限公司 A kind of heating system that double heat pumps are coupled with thermoelectricity unit and method
CN110030542A (en) * 2019-03-22 2019-07-19 桐昆集团股份有限公司 A kind of polyester device high/low temperature double loop heating system and its method
CN114216147A (en) * 2021-12-06 2022-03-22 中国建筑西北设计研究院有限公司 Internet type multi-heat-source urban low-carbon heat supply system and operation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201582901U (en) * 2009-12-30 2010-09-15 裴光泰 Hot-water heating system
CN203628791U (en) * 2013-11-26 2014-06-04 北京中矿博能节能科技有限公司 Pressure-equalizing hot water supply pipe network system
CN205481254U (en) * 2015-11-17 2016-08-17 新疆北方天恒节能科技有限公司 Many heats source of run -in heating device that is incorporated into power networks that establishes ties

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201582901U (en) * 2009-12-30 2010-09-15 裴光泰 Hot-water heating system
CN203628791U (en) * 2013-11-26 2014-06-04 北京中矿博能节能科技有限公司 Pressure-equalizing hot water supply pipe network system
CN205481254U (en) * 2015-11-17 2016-08-17 新疆北方天恒节能科技有限公司 Many heats source of run -in heating device that is incorporated into power networks that establishes ties

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
任腾飞: "天津市多热源供热管网调峰方式探讨", 《煤气与热力》 *
廖永章: "并联燃气供暖热水锅炉系统设计", 《煤气与热力》 *
王海超: "热电厂与燃气锅炉房联合供热的运行调节", 《煤气与热力》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106091079A (en) * 2016-06-01 2016-11-09 西安交通大学 A kind of natural gas based on heat supply base station, electric coupling heating system
CN106091079B (en) * 2016-06-01 2019-04-09 西安交通大学 A kind of natural gas based on heat supply base station is electrically coupled heating system
CN109579104A (en) * 2019-01-15 2019-04-05 西安热工研究院有限公司 A kind of heating system that double heat pumps are coupled with thermoelectricity unit and method
CN110030542A (en) * 2019-03-22 2019-07-19 桐昆集团股份有限公司 A kind of polyester device high/low temperature double loop heating system and its method
CN114216147A (en) * 2021-12-06 2022-03-22 中国建筑西北设计研究院有限公司 Internet type multi-heat-source urban low-carbon heat supply system and operation method thereof

Similar Documents

Publication Publication Date Title
Schmidt et al. Low temperature district heating for future energy systems
WO2018130231A1 (en) Integrated energy system optimization method based on heating grid and home thermal inertia
KR102198868B1 (en) Electric power peak-shaving and combined heat and power waste heat recovery device and operation method thereof
CN204648446U (en) A kind of new central heating regulating system
CN105674378A (en) Parallel type multi-heat-source series-connection grid-connected heating device
CN205481255U (en) Many heats source of main and secondary formula heating device that is incorporated into power networks that establishes ties
CN201715607U (en) Mixing water heating system
CN205481254U (en) Many heats source of run -in heating device that is incorporated into power networks that establishes ties
CN105674377A (en) Main-auxiliary type multi-heat-source series-connection grid-connected heating device
CN203657048U (en) Household air energy floor-heating central heating system
CN203349380U (en) Constant temperature automatic control heat supply circulating dynamic equilibrium system
CN104235930B (en) The integrated heating system of multi-heat source
CN203517984U (en) Floor heating system
CN202171276U (en) Stepped heat exchange system of a centralized heat-supply primary heat network according to different heating methods
CN214701335U (en) Multi-energy complementary centralized energy supply station with water source heat pump and gas-fired boiler coupled
CN204962923U (en) Adopt energy -conserving heating system who thoughtlessly supplies unit
CN210373658U (en) Central heating system
CN209978160U (en) Phase-change heat storage based floor heating and hot water supply system
CN112963989A (en) Multi-energy complementary centralized energy supply station with water source heat pump and gas-fired boiler coupled
CN206300248U (en) A kind of villa composite heating water system
CN107238232B (en) Regional centralized energy supply method
CN104848331A (en) heating system
CN105444243A (en) Waste heat recovery heat supply and water charging system and water charging method
CN217178686U (en) Distributed heat storage and cleaning heat supply system combining solar energy
CN209213966U (en) A kind of region clean heating system of electric energy substitution

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160701

Address after: 830000 the Xinjiang Uygur Autonomous Region shayibake Urumqi Friendship Road No. 136 Ruichang building room 1601

Applicant after: Xinjiang North Tianheng Energy Saving Technology Co., Ltd.

Address before: 830011, No. 801 South Road, 320 South Beijing Road, Xinshi District, the Xinjiang Uygur Autonomous Region, Urumqi, building 12, South Hospital

Applicant before: Li Wei

RJ01 Rejection of invention patent application after publication

Application publication date: 20160615

RJ01 Rejection of invention patent application after publication