CN105672655A - Side wall self-propelled type triangular truss and construction method thereof - Google Patents

Side wall self-propelled type triangular truss and construction method thereof Download PDF

Info

Publication number
CN105672655A
CN105672655A CN201610212911.XA CN201610212911A CN105672655A CN 105672655 A CN105672655 A CN 105672655A CN 201610212911 A CN201610212911 A CN 201610212911A CN 105672655 A CN105672655 A CN 105672655A
Authority
CN
China
Prior art keywords
english truss
side wall
truss
english
epimere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610212911.XA
Other languages
Chinese (zh)
Inventor
任立志
朱瑞喜
唐勇
胡德华
张健
刘永波
王建辉
鲁志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 8 Co Ltd
PowerChina Railway Construction Co Ltd
Original Assignee
Sinohydro Bureau 8 Co Ltd
PowerChina Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 8 Co Ltd, PowerChina Railway Construction Co Ltd filed Critical Sinohydro Bureau 8 Co Ltd
Priority to CN201610212911.XA priority Critical patent/CN105672655A/en
Publication of CN105672655A publication Critical patent/CN105672655A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a side wall self-propelled type triangular truss. The side face of the triangular truss is connected with an all-steel large formwork through a back arris device, the triangular truss comprises an upper segment and a lower segment, the upper segment of the triangular truss is fixed above the lower segment of the triangular truss, and a counter pull system and an anti-thrust system are respectively fixed on the triangular truss. The construction method of the triangular truss comprises steps of preparation for construction, segmentation for construction side walls, processing of side wall formwork and side wall bracket formwork, installation of embedded parts and formwork installation. The triangular truss disclosed by the invention reduces the requirement for accuracy in installation of soleplate anchoring parts and is convenient in construction, and the construction method has the advantages of well arranged operation, high work efficiency, cost saving and the like.

Description

Side wall self-propelled English truss and construction method thereof
Technical field
The present invention is applicable to the side wall construction of the pile small spaces such as subway, railway, Factory Building, relates to a kind of set shaped steel formwork, specifically, relates to a kind of side wall self-propelled English truss and construction method thereof.
Background technology
Compared with constructing with general side wall, the local side wall such as subway station, railway station and Factory Building has the features such as highly big, length is big. For subway station, in City Subway Station agent structure side wall concrete is constructed, when supporting die system is constructed by full hall steel pipe support level commonly used at present, very easily occur that top is loosely caused race mould, invaded the mass defects such as limit, faulting of slab ends by steel pipe horizontal support.
Drawbacks described above, is worth solving.
Summary of the invention
In order to overcome the deficiency of existing technology, the present invention provides a kind of side wall self-propelled English truss and construction method thereof.
Technical solution of the present invention is as described below:
Side wall self-propelled English truss, it is characterized in that, including English truss epimere and English truss hypomere, described English truss epimere is fixed on above described English truss hypomere, the bottom of described English truss epimere and the upper end of described English truss hypomere are respectively equipped with steel plate, it is bolted between described steel plate
The rectangular triangle in cross section of described English truss epimere, the cross section of described English truss hypomere is at right angles trapezoidal, the right angle side of described English truss epimere and the right angle side of described English truss hypomere are connected with described all-steel big shuttering respectively through back cord locking device
Rail wheel system is connected by self-locking screw bottom described English truss hypomere, described rail wheel system is located on rail, outside bottom described English truss hypomere is connected with adjustment gad block by supporting, the outside of described support is connected with thrust beam by adjustable thrust jacking, the thrust bar connecting that the outside of described thrust beam is pre-buried with base plate, it is connected by the reverse drawing shackle that gib headed bolt is pre-buried with described base plate inside it, the end of described reverse drawing shackle is welded with bar dowel, described reverse drawing shackle is inverted U-shaped, inner side bottom described English truss hypomere is additionally provided with back-pressure crossbeam, described back-pressure crossbeam is provided with screw rod.
Further, being provided with cross support bottom described English truss epimere, on the shaped steel of described English truss epimere, pre-embedded steel slab perforation is connected with reinforcing bar two ends machinery hank knotting.
Further, described English truss surface scribbles epoxy red lead primer.
Further, the thickness of described epoxy red lead primer is not less than 80 μm.
Further, the straight vertical arm of angle of described English truss epimere upwardly extends, and its overall vertical height is 4.6m, and described English truss hypomere vertical edges height is 2.0m.
A kind of construction utilizing side wall self-propelled English truss described above, it is characterised in that comprise the following steps:
S1: preparation of construction, is respectively completed that all-steel big shuttering, back cord locking device, base plate be pre-buried and reverse drawing, thrust and English truss prop up the material preparation of support system;
S2: to construction side wall segmentation, construction side wall is divided into 14 sections, and completes base plate and middle plate is built;
S3: complete the processing of all-steel big shuttering and English truss, all-steel big shuttering adopts the punching block assembly of some piecemeals to form, and punching block group and back cord shaped steel is fixed with all-steel big shuttering gib headed bolt, English truss forms English truss epimere and English truss hypomere by some rod member assembly, the upper end of English truss epimere extends upward the rod member of certain length, and the bottom of English truss epimere carries out cross support by reinforcing bar tension and fixes, the rectangular triangle in cross section of English truss epimere, the cross section of English truss hypomere is at right angles trapezoidal, the bottom of English truss epimere and the upper end of English truss hypomere are respectively equipped with steel plate, it is bolted between steel plate, and then English truss epimere and English truss hypomere are fixing connects,
S4: built-in fitting and English truss carry out installing to be fixed, and is connected by the reverse drawing shackle that gib headed bolt is pre-buried with base plate on front side of English truss, and the support on rear side of every Pin English truss is connected with thrust beam by adjustable thrust jacking;
S5: complete model sheetinstallat.
Further, in described S1, step is specifically included:
S11: preparing the accessory of all-steel big shuttering, described accessory includes steel form, back cord shaped steel, plain bolt and all-steel big shuttering gib headed bolt;
S12: every Pin English truss prepares 4 set back cord locking devices, and it includes steel pipe, 3 type fasteners and locking bail hook bolt;
S13: the pre-buried baseplate reinforcing bar in short side wall position and bed bolt, short side wall place arranges the groove of support all-steel big shuttering, and as the short side wall template of bottom slab concreting;
S14: the pre-buried reverse drawing shackle of base plate armpit, and the gib headed bolt corresponding with reverse drawing shackle is set, fixing back-pressure crossbeam, back-pressure crossbeam adopts Two bors d's oeuveres groove, and reverse drawing shackle is inverted U-shaped, and its end is welded with bar dowel;
S15: the pre-buried thrust reinforcing bar of base plate, fixes thrust beam on thrust reinforcing bar, fixedly adjustable thrust jacking on thrust beam, and the every Pin English truss of adjustable thrust jacking arranges two, and is welded in the support of sub-truss rear support leg;
S16: weld adjustable thrust jacking under every Pin sub-truss front leg strut, every Pin sub-truss rear support leg both sides welding adjustable thrust jacking, every Pin sub-truss rear support leg and sill place increase back-pressure crossbeam and carry out reinforcing support.
Further, in described step S3, English truss is one group by 5 Pin and carries out spelling, installs four road wheels, can move along the rail of base plate paving, when English truss group moves to side wall position to be poured, then with 16t gantry crane hoisted in position under often organizing truss;After English truss group is in place, with gib headed bolt, template back arris and single side bracing part is linked to be an entirety, and regulates single side bracing rear support, until form surfacing is suitable for reading to the about 10mm that inclines within the walls; Gib headed bolt between locking back-pressure crossbeam and pre-buried shackle, finally fastens and checks that a built-in fitting is by Force system, it is ensured that during concrete placings, template end opening will not spillage again.
Further, in described step S5, step is specifically included:
S51: play exterior wall sideline;
S52: side wall waterproof and reinforcing bar binding are also checked and accepted;
S53: close outer wall template;
S54: the transfer of one side formwork support is in place;
S55: install single side bracing;
S56: regulate support vertical degree;
S57: install back-pressure gib headed bolt;
S58: fastening checks an embedded part system again;
S59: concrete placings after acceptance(check).
Further, in described step S5, when closing outer wall template, align in the wall sideline that template end opening is good with bullet in advance, then installs steel pipe back cord, is propped up by wall form with steel pipe temporarily.
The present invention according to said structure, it has the beneficial effects that, the English truss in the present invention divides upper and lower two joints, it is simple to be adapted to the requirement of different floor height, and English truss bottom line walking apparatus can horizontal sliding, longitudinally walking, it is ensured that be longitudinally, laterally accurately positioned; English truss lock foot screw rod in the present invention freely can regulate at 45 °~60 °, reduces the installation accuracy requirement of base plate anchoring piece, convenient construction; This invention ensures that the firmness of whole construction, decrease steel pipe horizontal support and top is loosely caused race mould, invades the mass defects such as limit, faulting of slab ends. .
Construction of the present invention has the advantages such as operation level is clearly demarcated, work efficiency is high, saving cost; The present invention builds highly big, can reach 6.7m, and integral rigidity is big, builds side wall surfacing; Construction of the present invention can adopt the line production that set shaped steel formwork is standardized simultaneously, and 15 days durations are saved at each station, and side wall concrete flat appearance is smooth, without invading limit.
Accompanying drawing explanation
Fig. 1 is the structural representation that the present invention supports side;
Fig. 2 is the structural representation of support underframe plane of the present invention;
Fig. 3 is the attachment structure schematic diagram of English truss epimere of the present invention and English truss hypomere;
Fig. 4 is the structural representation of rail wheel system of the present invention.
In the drawings, 1, English truss epimere; 2, English truss hypomere; 3, cross support; 4, concrete; 5, self-locking screw; 6, rail wheel system; 7, rail; 8, gib headed bolt; 9, reverse drawing shackle; 10, screw rod; 11, back cord locking device; 12, all-steel big shuttering; 13, support; 14, gad block is adjusted; 15, adjustable thrust jacking; 16, thrust beam; 17, thrust reinforcing bar; 18, back-pressure crossbeam.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, the present invention is conducted further description:
As Figure 1-4, side wall self-propelled English truss, including English truss epimere 1 and English truss hypomere 2, English truss epimere 1 is fixed on above English truss hypomere 2, the bottom of English truss epimere 1 and the upper end of English truss hypomere 2 are respectively equipped with steel plate, are bolted between steel plate. The rectangular triangle in cross section of English truss epimere 1, the cross section of English truss hypomere 2 is at right angles trapezoidal, the right angle side of English truss epimere 1 and the right angle side of English truss hypomere 2 are connected with all-steel big shuttering 12 respectively through back cord locking device 11, the straight vertical arm of angle of English truss epimere 1 upwardly extends, its overall vertical height is 4.6m, and English truss hypomere 2 vertical edges height is 2.0m.
Rail wheel system 6 is connected by self-locking screw 5 bottom English truss hypomere 2, rail wheel system 6 is located on rail 7, outside bottom English truss hypomere 2 is connected with adjusting gad block 14 by supporting 13, the outside of support 13 is connected with thrust beam 16 by adjustable thrust jacking 15, the outside of the thrust beam 16 thrust reinforcing bar 17 pre-buried with base plate is connected, it is connected by the reverse drawing shackle 9 that gib headed bolt 8 is pre-buried with base plate inside it, the end of reverse drawing shackle 9 is welded with bar dowel, reverse drawing shackle 9 is in inverted U-shaped, inner side bottom English truss hypomere 2 is additionally provided with back-pressure crossbeam 18, back-pressure crossbeam 18 is provided with screw rod 10.
Being provided with cross support 3 bottom English truss epimere 1, on the shaped steel of English truss epimere 1, pre-embedded steel slab perforation is connected with reinforcing bar two ends machinery hank knotting.
Preferably, English truss surface scribbles epoxy red lead primer, and the thickness of epoxy red lead primer is not less than 80 μm.
The present invention relies on No. 7 lines of Shenzhen Metro to construct, and generally includes following four step:
(1) English truss is pressed the spacing of 1.2m/ Pin and is connected in a row, puts in place along rail 7 walking laid in advance;
(2) lock with all-steel big shuttering 12 after transversely stirring 30cm:
(3) installing back-pressure crossbeam 18 in truss front end, the reverse drawing shackle 9 pre-buried by screw rod 10 and base plate is locked, and holds out against thrust beam 16 at truss rear end adjustable thrust jacking 15 and is embedded in the thrust reinforcing bar 17 of base plate;
(4) complete shuttering supporting and reinforcing, build 3.9~6.7m height side wall.
Concrete, the construction of this side wall self-propelled English truss, detailed step is:
One, preparation of construction
1, side wall all-steel big shuttering 12 is prepared; Every wide 3.6m × high 5.2m, accessory includes steel form, back cord shaped steel, plain bolt, all-steel big shuttering gib headed bolt. 21.6 ÷ 3.6 × 4=24 are needed to open altogether.
2, the back cord locking device 11 between all-steel big shuttering 12 and English truss support is prepared: every triangle truss structure corresponding 4 overlaps back cord locking devices 11, and often set back cord locking device 11 includes 2 Φ 48X3.5 steel pipes, 3 type fasteners and Φ 16 locking bail hook bolt 8. Amounting to 12m steel pipe 48,3 type fasteners and locking bail hook bolt are a collection of.
3, prepare that base plate is pre-buried and reverse drawing, thrust: short side wall position pre-buried Φ 14 bed bolt, pre-buried with baseplate reinforcing bar, spacing 400mm; The groove 20b of short side wall place support large form, as the short side wall template of bottom slab concreting, every section of length 3m, bed bolt hole dimension, spacing consistent with all-steel big shuttering (Φ 14150); The pre-buried HRB300 Φ 28 reverse drawing shackle 9 of base plate armpit, pre-buried with baseplate reinforcing bar, spacing 400mm; Falsework gib headed bolt 8, by the processing of cooperation team, should check processing situation in advance, and tissue puts in place in time; Falsework back-pressure crossbeam 18, adopts Two bors d's oeuveres groove 16b; The pre-buried HRB335 Φ 32 thrust reinforcing bar 17 of base plate, pre-buried with baseplate reinforcing bar, spacing 300mm, buried depth 300mm, expose base plate 200mm; Falsework thrust beam 16, adopts H200x200x8x12; The adjustable thrust jacking 15 of falsework, adopts the rim of a bowl frame adjustable jack, every Pin two, is welded in falsework rear support leg.
4, prepare English truss and prop up support system: every long 6.6m of Pin, by every 5 Pin composition one joints, assemble, leveling, reinforcing are weight difficult points, spelling (18 ÷ 1.2+1) × 2=32 Pin, and connect into three groups by the form of 5+6+5, often group installs 4 road wheels, adjustable thrust jacking 15 is welded under every Pin sub-truss front leg strut, every Pin sub-truss rear support leg both sides welding adjustable thrust jacking 15, every Pin sub-truss rear support leg increases with sill place reinforces support, adopts groove 10 to weld, epimere back-pressure crossbeam 18 Two bors d's oeuveres groove 10, bolt Φ 14.
Two, stratified construction
In the subway work of the present embodiment, station main body side wall construction point 2 layers: negative two layers of side wall, negative one layer of side wall. Every layer of side wall is divided into 14 sections according to construction drawing, i.e. SS01~SS14, and side, each standard paragraphs north and south is respectively arranged with one section of side wall (except SS01, SS14). Negative two layers, negative one layer of side wall construct after having built at base plate, middle plate respectively.
Three, the processing of all-steel big shuttering and English truss
1, template processing
Side wall template adopts piecemeal punching block spelling to become large form, negative two layers adopt 3 × 3 pieces of wide 1.2m ×+3 × 1 piece of P3012 spellings of high 1.5m punching block, negative one layer adopts 3 × 3 pieces of wide 1.5m ×+3 × 2 pieces of P3015 spellings of high 1.2m punching block, template back arris all adopts work 10, Two bors d's oeuveres groove 10, with the fixing all-steel big shuttering 12 of gib headed bolt 8 and spot welding and back cord locking device 11.
Side wall support adopts shaped steel English truss, main rod member adopts H150 × 150 × 7 × 10, Two bors d's oeuveres groove 20b, work 16, Φ 32 reverse drawing shackle 9 back-pressure that English truss passes through to be embedded on base plate is to balance lateral pressure when concrete 4 is built, back-pressure crossbeam 18 adopts Two bors d's oeuveres groove 16b, simultaneously at support rear with jail, adjustable thrust jacking 15 stretching top.
2, installation of embedded parts
At each 30cm place, every Pin English truss both sides, the pre-buried reverse drawing shackle 9 in position of distance side wall 25cm, built-in fitting adopts Φ 28, and processing in inverted U-shaped, imbeds the long 55cm of bottom parts, the long 8cm in exposed portion. Pre-buried row's Φ 32 reinforcing bar at sub-truss rear simultaneously, spacing 40cm, as thrust steel 17 muscle, H150 × 150 × 7 × 10 thrust beam 16 is placed in thrust reinforcing bar 17 front, and every Pin English truss holds out against thrust beam 16 by two adjustable thrust jackings 15.
3, model sheetinstallat
The installation steps of template: play exterior wall sideline → side wall waterproof and reinforcing bar binding and check and accept → close outer wall template → one side formwork support transfer in place → concrete placings after single side bracing → adjustments support vertical degree → installations back-pressure gib headed bolt → fasten again embedded part system → acceptance(check) of inspection is installed.
In above-mentioned steps, when closing wall form, align in the wall sideline that template end opening is good with bullet in advance, then installs steel pipe back cord, is propped up by wall form with steel pipe temporarily; English truss is one group by 5 Pin and carries out spelling, installs four road wheels, can move along the rail 7 of base plate paving, when English truss group moves to side wall position to be poured, then with 16t gantry crane hoisted in position under often organizing truss; After English truss group is in place, with gib headed bolt 8, template back arris and single side bracing part is linked to be an entirety, and regulates single side bracing rear support, until form surfacing is suitable for reading to the about 10mm that inclines within the walls; Gib headed bolt 8 between locking back-pressure crossbeam 18 and pre-buried reverse drawing shackle 9, finally fastens and checks that a built-in fitting is by Force system, it is ensured that during concrete placings, template end opening will not spillage again.
Application Example:
City Subway Station side wall self-propelled English truss construction achieves good economic benefit and social benefit in husky station, sand tail station, the construction of stone tall building station owner's body structure side wall on No. 7 lines of Shenzhen Metro, produce economic benefit 1,060,000 yuan, adopt the line production that set shaped steel formwork is standardized simultaneously, 15 days durations are saved at each station, side wall concrete 4 flat appearance is smooth, without invading limit, obtain the consistent favorable comment of each side's unit. After this section research success, the construction method of the present invention has carried out comprehensive popularization in water power group subway work field, respond well.
The invention have the characteristics that: 1, triangular truss structure globality is better, and each component junction point is few, and structure is more reliable;2, English truss mechanization of building operation degree is high, and artificial splice point is less, reduces the mass defect owing to artificial origin causes; 3, owing to globality is better, mechanization degree height English truss precision is higher, and deformation produced by all steel English truss is lower; 4, English truss lateral pressure resistant ability is excellent, cuts triangular form more stability.
It should be appreciated that for those of ordinary skills, it is possible to improved according to the above description or converted, and all these are improved and convert the protection domain that all should belong to claims of the present invention.
Above in conjunction with accompanying drawing, patent of the present invention is carried out exemplary description; the realization of obvious patent of the present invention is not subject to the restrictions described above; as long as have employed the various improvement that the design of the method for patent of the present invention carries out with technical scheme; or the not improved design by patent of the present invention and technical scheme directly apply to other occasion, all in protection scope of the present invention.

Claims (10)

1. side wall self-propelled English truss, it is characterized in that, the side of described English truss is connected with all-steel big shuttering by back cord locking device, it includes English truss epimere and English truss hypomere, described English truss epimere is fixed on above described English truss hypomere, the rectangular triangle in cross section of described English truss epimere, the cross section of described English truss hypomere is at right angles trapezoidal;
Rail wheel system is connected by self-locking screw bottom described English truss hypomere, described rail wheel system is located on rail, outside bottom described English truss hypomere is connected with adjustment gad block by supporting, the outside of described support is connected with thrust beam by adjustable thrust jacking, the thrust bar connecting that the outside of described thrust beam is pre-buried with base plate, it is connected by the reverse drawing shackle that gib headed bolt is pre-buried with described base plate inside it, inner side bottom described English truss hypomere is additionally provided with back-pressure crossbeam, and described back-pressure crossbeam is provided with screw rod.
2. side wall self-propelled English truss according to claim 1, it is characterised in that be provided with cross support bottom described English truss epimere, on the shaped steel of described English truss epimere, pre-embedded steel slab perforation is connected with reinforcing bar two ends machinery hank knotting.
3. side wall self-propelled English truss according to claim 1, it is characterised in that described English truss surface scribbles epoxy red lead primer.
4. side wall self-propelled English truss according to claim 3, it is characterised in that the thickness of described epoxy red lead primer is not less than 80 μm.
5. side wall self-propelled English truss according to claim 1, it is characterised in that the straight vertical arm of angle of described English truss epimere upwardly extends, its overall vertical height is 4.6m, and described English truss hypomere vertical edges height is 2.0m.
6. the construction of the side wall self-propelled English truss utilized as described in claim 1-5 any one, it is characterised in that comprise the following steps:
S1: preparation of construction, is respectively completed that all-steel big shuttering, back cord locking device, base plate be pre-buried and reverse drawing, thrust and English truss prop up the material preparation of support system;
S2: to construction side wall segmentation, construction side wall is divided into 14 sections, and completes base plate and middle plate is built;
S3: complete the processing of all-steel big shuttering and English truss, all-steel big shuttering adopts the punching block assembly of some piecemeals to form, and punching block group and back cord shaped steel is fixed with all-steel big shuttering gib headed bolt, English truss forms English truss epimere and English truss hypomere by some rod member assembly, the upper end of English truss epimere extends upward the rod member of certain length, and the bottom of English truss epimere carries out cross support by reinforcing bar tension and fixes, the rectangular triangle in cross section of English truss epimere, the cross section of English truss hypomere is at right angles trapezoidal, the bottom of English truss epimere and the upper end of English truss hypomere are respectively equipped with steel plate, it is bolted between steel plate, and then English truss epimere and English truss hypomere are fixing connects,
S4: built-in fitting and English truss carry out installing to be fixed;
S5: complete model sheetinstallat.
7. the construction method of side wall self-propelled English truss according to claim 6, it is characterised in that in described S1, specifically include step:
S11: preparing the accessory of all-steel big shuttering, described accessory includes steel form, back cord shaped steel, plain bolt and all-steel big shuttering gib headed bolt;
S12: every Pin English truss prepares 4 set back cord locking devices, and it includes steel pipe, 3 type fasteners and locking bail hook bolt;
S13: the pre-buried baseplate reinforcing bar in short side wall position and bed bolt, short side wall place arranges the groove of support all-steel big shuttering, and as the short side wall template of bottom slab concreting;
S14: the pre-buried reverse drawing shackle of base plate armpit, and the gib headed bolt corresponding with reverse drawing shackle is set, fixing back-pressure crossbeam, back-pressure crossbeam adopts Two bors d's oeuveres groove;
S15: the pre-buried thrust reinforcing bar of base plate, fixes thrust beam on thrust reinforcing bar, fixedly adjustable thrust jacking on thrust beam, and the every Pin English truss of adjustable thrust jacking arranges two, and is welded in the support of sub-truss rear support leg;
S16: weld adjustable thrust jacking under every Pin sub-truss front leg strut, every Pin sub-truss rear support leg both sides welding adjustable thrust jacking, every Pin sub-truss rear support leg and sill place increase back-pressure crossbeam and carry out reinforcing support.
8. the construction method of side wall self-propelled English truss according to claim 6, it is characterized in that, in described step S3, English truss is one group by 5 Pin and carries out spelling, four road wheels are installed under often organizing truss, can move along the rail of base plate paving, when English truss group moves to side wall position to be poured, then with 16t gantry crane hoisted in position; After English truss group is in place, with gib headed bolt, template back arris and single side bracing part is linked to be an entirety, and regulates single side bracing rear support, until form surfacing is suitable for reading to the about 10mm that inclines within the walls; Gib headed bolt between locking back-pressure crossbeam and pre-buried shackle, finally fastens and checks that a built-in fitting is by Force system, it is ensured that during concrete placings, template end opening will not spillage again.
9. the construction method of side wall self-propelled English truss according to claim 6, it is characterised in that in described step S5, specifically include step:
S51: play exterior wall sideline;
S52: side wall waterproof and reinforcing bar binding are also checked and accepted;
S53: close outer wall template;
S54: the transfer of one side formwork support is in place;
S55: install single side bracing;
S56: regulate support vertical degree;
S57: install back-pressure gib headed bolt;
S58: fastening checks an embedded part system again;
S59: concrete placings after acceptance(check).
10. the construction method of side wall self-propelled English truss according to claim 9, it is characterised in that in described step S5, when closing outer wall template, aliging in the wall sideline that template end opening is good with bullet in advance, then installs steel pipe back cord, propped up by wall form with steel pipe temporarily.
CN201610212911.XA 2016-04-07 2016-04-07 Side wall self-propelled type triangular truss and construction method thereof Pending CN105672655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610212911.XA CN105672655A (en) 2016-04-07 2016-04-07 Side wall self-propelled type triangular truss and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610212911.XA CN105672655A (en) 2016-04-07 2016-04-07 Side wall self-propelled type triangular truss and construction method thereof

Publications (1)

Publication Number Publication Date
CN105672655A true CN105672655A (en) 2016-06-15

Family

ID=56309499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610212911.XA Pending CN105672655A (en) 2016-04-07 2016-04-07 Side wall self-propelled type triangular truss and construction method thereof

Country Status (1)

Country Link
CN (1) CN105672655A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130631A (en) * 2017-05-22 2017-09-05 中冶建工集团有限公司 A kind of basement Retaining wall method based on concreting moulding wall
CN108533290A (en) * 2018-05-31 2018-09-14 中铁隧道局集团有限公司 Silicon walks the light-duty lateral wall formwork jumbo of formula
CN108979130A (en) * 2018-07-30 2018-12-11 中铁十六局集团北京轨道交通工程建设有限公司 A kind of the side wall unilateral side vertical mold device and construction method of adjustable formwork height
CN109208890A (en) * 2018-10-30 2019-01-15 庆益石家庄建材租赁有限公司 Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate
CN110512656A (en) * 2019-07-12 2019-11-29 中冶天工集团有限公司 A kind of waterproofing node method at outer wall of underground structure formwork erection and construction joint
CN111236626A (en) * 2020-03-11 2020-06-05 中铁二局第一工程有限公司 Side wall unilateral template support system combining composite fiber template and steel truss
CN114059585A (en) * 2021-12-01 2022-02-18 中建八局深圳科创发展有限公司 Construction method of unilateral aluminum mould of subway side wall tripod
CN114922426A (en) * 2022-04-29 2022-08-19 中建五局华东建设有限公司 Quick-built single-side formwork

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212150Y (en) * 2008-06-06 2009-03-25 中铁十四局集团有限公司 Big template lining trolley for subway stationg constructed by open-cut method
CN204266228U (en) * 2014-12-08 2015-04-15 中铁上海工程局有限公司 Deep foundation ditch large area concrete side wall movable stencil
TWM500790U (en) * 2015-01-16 2015-05-11 Sung-Yu Hsu Underground structure wall surface composite truss system single-sided formwork
CN204662952U (en) * 2015-05-25 2015-09-23 中建五局土木工程有限公司 A kind of self-propelled tool single side formwork formwork system
CN204738536U (en) * 2015-06-11 2015-11-04 中国水利水电第八工程局有限公司 Subway station side wall concrete form support frame
CN105401599A (en) * 2015-12-24 2016-03-16 中铁十四局集团有限公司 Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof
CN205476492U (en) * 2016-04-07 2016-08-17 中国电建集团铁路建设有限公司 Side wall self -propelled english truss

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212150Y (en) * 2008-06-06 2009-03-25 中铁十四局集团有限公司 Big template lining trolley for subway stationg constructed by open-cut method
CN204266228U (en) * 2014-12-08 2015-04-15 中铁上海工程局有限公司 Deep foundation ditch large area concrete side wall movable stencil
TWM500790U (en) * 2015-01-16 2015-05-11 Sung-Yu Hsu Underground structure wall surface composite truss system single-sided formwork
CN204662952U (en) * 2015-05-25 2015-09-23 中建五局土木工程有限公司 A kind of self-propelled tool single side formwork formwork system
CN204738536U (en) * 2015-06-11 2015-11-04 中国水利水电第八工程局有限公司 Subway station side wall concrete form support frame
CN105401599A (en) * 2015-12-24 2016-03-16 中铁十四局集团有限公司 Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof
CN205476492U (en) * 2016-04-07 2016-08-17 中国电建集团铁路建设有限公司 Side wall self -propelled english truss

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
中国市政工程协会等: "《2011中国城市地下空间开发高峰论坛论文集》", 30 November 2011, 武汉:武汉理工大学出版社 *
李旭等: "深圳地铁单侧墙体模板支架施工技术", 《福建建筑》 *
钟汉华等: "《建筑工程施工工艺》", 31 October 2015, 重庆大学出版社 *
钱若军等: "高频直缝焊管理论与实践", 北京:冶金工业出版社 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130631A (en) * 2017-05-22 2017-09-05 中冶建工集团有限公司 A kind of basement Retaining wall method based on concreting moulding wall
CN108533290A (en) * 2018-05-31 2018-09-14 中铁隧道局集团有限公司 Silicon walks the light-duty lateral wall formwork jumbo of formula
CN108533290B (en) * 2018-05-31 2022-11-22 中铁隧道局集团有限公司 \36332mmlight single-side wall formwork trolley
CN108979130A (en) * 2018-07-30 2018-12-11 中铁十六局集团北京轨道交通工程建设有限公司 A kind of the side wall unilateral side vertical mold device and construction method of adjustable formwork height
CN109208890A (en) * 2018-10-30 2019-01-15 庆益石家庄建材租赁有限公司 Truss and truss aluminium alloy tunnel form for aluminum alloy mould plate
CN110512656A (en) * 2019-07-12 2019-11-29 中冶天工集团有限公司 A kind of waterproofing node method at outer wall of underground structure formwork erection and construction joint
CN111236626A (en) * 2020-03-11 2020-06-05 中铁二局第一工程有限公司 Side wall unilateral template support system combining composite fiber template and steel truss
CN114059585A (en) * 2021-12-01 2022-02-18 中建八局深圳科创发展有限公司 Construction method of unilateral aluminum mould of subway side wall tripod
CN114922426A (en) * 2022-04-29 2022-08-19 中建五局华东建设有限公司 Quick-built single-side formwork
CN114922426B (en) * 2022-04-29 2023-05-02 中建五局华东建设有限公司 Quick-to-build single-side formwork

Similar Documents

Publication Publication Date Title
CN105672655A (en) Side wall self-propelled type triangular truss and construction method thereof
CN104389313B (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column and positioning and plumbing method thereof
CN107489098B (en) Concrete prefabricated welding type guardrail and installation construction method
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN103939114B (en) A kind of outstanding rail chassis lining construction method
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN107700648A (en) Prefabricated component and cast-in-place post assembled integral concrete frame structure construction
CN109457615A (en) A kind of construction method of installation of abnormity bowstring arch bridge arch ring
CN104234079A (en) Subway station Y-shaped cast steel combining steel pipe post processing and construction method
CN106087752A (en) Multispan cable-carried arch bridge construction method
CN106930194A (en) Inter-tie and pier stud global formation construction method and template used support
CN107599149A (en) Template method of adjustment when a kind of curved section is immersed tube prefabricated
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN109235292A (en) Railroad bridge changes beam process and changes girder system system
CN108842624A (en) High pier Cast-in-place Bent Cap combined type overhanging formwork system and construction method
CN110424455A (en) The underground confined space is without fertile slot structure side wall big steel form plate system and construction method
CN108677962A (en) A kind of subway comes in and goes out line segment foundation pit fixing of the forming frame and method for dismounting
CN207277541U (en) Prefabricated component and cast-in-place column assembled integral concrete frame structure
CN112663516A (en) Construction method of bridge thin-wall hollow pier column
CN206495233U (en) Door shape assembled armored concrete box culvert
CN205662832U (en) Under hold formula beiLei beam steel suspension bridge
CN207062652U (en) A kind of city track traffic engineering assembled track laying device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160615