CN105657850A - Frequency division duplex system subframe scheduling method and apparatus, base station, and terminal - Google Patents

Frequency division duplex system subframe scheduling method and apparatus, base station, and terminal Download PDF

Info

Publication number
CN105657850A
CN105657850A CN201410740627.0A CN201410740627A CN105657850A CN 105657850 A CN105657850 A CN 105657850A CN 201410740627 A CN201410740627 A CN 201410740627A CN 105657850 A CN105657850 A CN 105657850A
Authority
CN
China
Prior art keywords
subframe
flexible
duplex
indication information
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410740627.0A
Other languages
Chinese (zh)
Inventor
潘峮
陈卓
童辉
何丽峰
李男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201410740627.0A priority Critical patent/CN105657850A/en
Publication of CN105657850A publication Critical patent/CN105657850A/en
Pending legal-status Critical Current

Links

Landscapes

  • Mobile Radio Communication Systems (AREA)
  • Bidirectional Digital Transmission (AREA)

Abstract

The present invention provides a frequency division duplex system subframe scheduling method and apparatus, a base station, and a terminal. The subframe scheduling method comprises: according to current traffic transmitted to and from a terminal, generating change indication information of a flexible duplex subframe capable of being flexibly scheduled; and changing a duplex use manner on the flexible duplex subframe according to the change indication information. According to the scheme, the change indication information of the flexible duplex subframe capable of being flexibly scheduled is generated according to the current traffic transmitted to and from the terminal, and the duplex use manner is changed on the flexible duplex subframe according to the change indication information, thereby solving the problem that unequal uplink traffic and downlink traffic cause FDD frequency to be used in a wasted manner and inefficiently.

Description

The subframe scheduling method of a kind of frequency division duplex system, device, base station and terminal
Technical field
The present invention relates to wireless technical field, refer to the subframe scheduling method of a kind of frequency division duplex system, device, base station and terminal especially.
Background technology
FDD FDD frequency is generally appearance, and wherein one section for uplink, and another section is used for downlink transfer, there is a protection frequency range between two channels, to prevent produce interference mutually between when contiguous emitter and receiving apparatus work simultaneously. In the LTE specification of current 3GPP, the FDD frequency range numbering of definition is as shown in the table, and first is classified as the numbering of frequency range, and line frequency rate on its of this frequency range is shown in the 2nd list, and the descending frequency of this frequency range is shown in the 3rd list, and the 4th is classified as duplex mode.
Such as base station and terminal adopt Band1 to communicate, and so base station sends signal in 2110-2170MHz frequency, and in 1920-1980MHz frequency Received signal strength; And terminal sends signal on the contrary in 1920-1980 frequency, and in 2110-2170MHz frequency Received signal strength.
Whole frequency range numbering that terminal will report it to support after access base station, such as terminal to report band support numbering Band1, then mean that middle terminal can be launched at the upper line frequency rate 1920-1980MHz of Band1, and receive at the descending frequency 2110-2170MHz of corresponding Band1.
Although FDD solves the full duplex problem that up-downgoing is transmitted simultaneously, but FDD frequency requirement must occur in pairs, is also exactly that upper row number of frequencies is equal with descending number of frequencies. But in the middle of the data communication service of reality, uplink service and downlink traffic are usually not reciprocity, time such as downloading service amount is bigger, descending frequency takies more and upper line frequency rate and takies less, and on the contrary when upload traffic is bigger, line frequency rate takies more and descending frequency and takies less. Therefore, waste and the low effect phenomenon of frequency usage have occurred.
Summary of the invention
The technical problem to be solved in the present invention is to provide the subframe scheduling method of a kind of frequency division duplex system, device, base station and terminal, solves the problem of the not reciprocity FDD frequency usage waste that causes of upstream traffic and downlink traffic in prior art and poor efficiency.
In order to solve the problems of the technologies described above, the embodiment of the present invention provides the subframe scheduling method of a kind of frequency division duplex system, comprising:
According to portfolio that is current and terminal transmission, producing can by the change indication information of the flexible duplex subframe of flexible dispatching;
According to described change indication information, change duplex use-pattern in described flexible duplex subframe.
Wherein, according to portfolio that is current and terminal transmission, produce to be comprised by the step of the change indication information of the flexible duplex subframe of flexible dispatching:
When portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, determine to meet the part subframe that requires from the current current direction with terminal transmitting as can by the flexible duplexing subframe of flexible dispatching.
Wherein, the change indication information of described flexible duplexing subframe comprises: the triggering time delay information of the direction modification information of duplex subframe, flexibly duplex subframe and the persistence length information of flexible duplex subframe flexibly.
Wherein, the change indication information of described flexible duplex subframe is for presetting duplex sub-frame configuration MODE NUMBER flexibly.
Wherein, when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, the part subframe determining to meet requirement from current direction that is current and terminal transmitting is as being comprised by the step of the flexible duplex subframe of flexible dispatching:
Obtain portfolio that is current and terminal uplink transmission;
If the portfolio of uplink exceedes sub-frame of uplink propagation threshold, then the part descending sub frame determining to meet requirement from the current downlink transfer with terminal is as can by the flexible duplexing subframe of flexible dispatching;
Generation can by the change indication information of the described flexible duplex subframe of flexible dispatching, and the direction modification information of the flexible duplex subframe in described change indication information is: the direction of the part descending sub frame of the described satisfied requirement determined is revised as upper row.
Wherein, according to described change indication information, in described flexible duplex subframe, the step of change duplex use-pattern comprises:
The part descending sub frame of the described satisfied requirement determined is configured to sub-frame of uplink;
Abandon a subframe of the part descending sub frame previous moment of described satisfied requirement.
Wherein, when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, the part subframe determining to meet requirement from current direction that is current and terminal transmitting is as being comprised by the step of the flexible duplex subframe of flexible dispatching:
Obtain portfolio that is current and user equipment downlink transmission;
If the portfolio of downlink transfer exceedes descending sub frame propagation threshold, then the part sub-frame of uplink determining to meet requirement from the current uplink with terminal is as can by the flexible duplexing subframe of flexible dispatching;
Generation can by the change indication information of the described flexible duplex subframe of flexible dispatching, and the direction modification information of the flexible duplex subframe in described change indication information is: be revised as descending by the direction of the part sub-frame of uplink of the described satisfied requirement determined.
Wherein, according to described change indication information, in described flexible duplex subframe, the step of change duplex use-pattern comprises:
The part sub-frame of uplink of the described satisfied requirement determined is configured to descending sub frame;
Abandon a subframe in a moment after the part sub-frame of uplink of described satisfied requirement.
Wherein, produce also to be comprised after the change indication information of the flexible duplex subframe of flexible dispatching:
The change indication information of described flexible duplex subframe is sent to terminal.
Wherein, the step of the change indication information sending described flexible duplex subframe to terminal comprises:
The change indication information of described flexible duplex subframe is sent to default terminal by physics channel or default high-rise signaling.
Present invention also offers the subframe scheduling device of a kind of frequency division duplex system, comprising:
Generation module, for the portfolio according to current and terminal transmission, producing can by the change indication information of the flexible duplex subframe of flexible dispatching;
Change module, for according to described change indication information, changing duplex use-pattern in described flexible duplex subframe.
Present invention also offers a kind of base station, comprising: the subframe scheduling device of above-mentioned frequency division duplex system.
Present invention also offers the subframe scheduling method of a kind of frequency division duplex system, comprising:
Receive the change indication information of the flexible duplex subframe from base station;
According to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern.
Wherein, according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern step comprise:
According to described flexible duplex subframe change indication information determine meet requirement part descending sub frame as can by flexible dispatching flexible duplex subframe;
The direction of the part descending sub frame of the described satisfied requirement determined is configured to sub-frame of uplink;
Abandon a subframe of the part descending sub frame previous moment of described satisfied requirement.
Wherein, according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern step comprise:
According to described flexible duplex subframe change indication information determine meet requirement part sub-frame of uplink as can by flexible dispatching flexible duplex subframe;
The direction of the part sub-frame of uplink of the described satisfied requirement determined is configured to descending sub frame;
Abandon a subframe in a moment after the part sub-frame of uplink of described satisfied requirement.
Wherein, described subframe scheduling method also comprises:
Report to described base station and whether it is supported in sub-frame of uplink and carries out downlink reception or two frequencies of the up-downgoing in default frequency range receive simultaneously; And
Whether it is supported in descending sub frame and carries out upper row transmission or two frequencies of the up-downgoing in default frequency range send simultaneously.
Present invention also offers the subframe scheduling device of a kind of frequency division duplex system, comprising:
Receiver module, for receiving the change indication information of duplex subframe flexibly;
Determine change module, for according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern.
Present invention also offers a kind of terminal, comprising: the subframe scheduling device of above-mentioned frequency division duplex system.
The useful effect of the technique scheme of the present invention is as follows:
In such scheme, the subframe scheduling method of described frequency division duplex system is by the portfolio according to current and terminal transmission, generation can by the change indication information of the flexible duplex subframe of flexible dispatching, and according to described change indication information, change duplex use-pattern in described flexible duplex subframe, solves upstream traffic and the not reciprocity FDD frequency usage caused of downlink traffic is wasted and the problem of poor efficiency.
Accompanying drawing explanation
Fig. 1 is the subframe scheduling method step schematic diagram one of the frequency division duplex system of the embodiment of the present invention;
Fig. 2 is the scheduling schematic diagram that the descending sub frame of the embodiment of the present invention is configured to sub-frame of uplink;
Fig. 3 is the scheduling schematic diagram that the sub-frame of uplink of the embodiment of the present invention is configured to descending sub frame;
Fig. 4 is the upper line frequency rate transmitting downlink data schematic diagram of the embodiment of the present invention;
Fig. 5 is the descending frequency transmit ascending data schematic diagram of the embodiment of the present invention;
Fig. 6 is the subframe scheduling apparatus structure schematic diagram one of the frequency division duplex system of the embodiment of the present invention;
Fig. 7 is the subframe scheduling method step schematic diagram two of the frequency division duplex system of the embodiment of the present invention;
Fig. 8 is the subframe scheduling apparatus structure schematic diagram two of the frequency division duplex system of the embodiment of the present invention.
Embodiment
For making the technical problem to be solved in the present invention, technical scheme and advantage clearly, it is described in detail below in conjunction with the accompanying drawings and the specific embodiments.
The present invention is directed to the problem of the not reciprocity FDD frequency usage waste caused of upstream traffic and downlink traffic in existing technology with poor efficiency, it is provided that the subframe scheduling method of a kind of frequency division duplex system, as shown in Figure 1, comprising:
Step 11: according to portfolio that is current and terminal transmission, producing can by the change indication information of the flexible duplex subframe of flexible dispatching;
Step 12: according to described change indication information, change duplex use-pattern in described flexible duplex subframe.
The subframe scheduling method of the described frequency division duplex system that the embodiment of the present invention provides is by the portfolio according to current and terminal transmission, generation can by the change indication information of the flexible duplex subframe of flexible dispatching, and according to described change indication information, change duplex use-pattern in described flexible duplex subframe, solves upstream traffic and the not reciprocity FDD frequency usage caused of downlink traffic is wasted and the problem of poor efficiency.
Concrete, according to portfolio that is current and terminal transmission, generation can be comprised by the step of change indication information of the flexible duplex subframe of flexible dispatching: when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, determines to meet the part subframe that requires from the current current direction with terminal as can by the flexible duplexing subframe of flexible dispatching transmitting. Part subframe may be idle subframe also may be the subframe dispatching out (sparing) in order to meet business demand.
Wherein, the change indication information of described flexible duplexing subframe comprises: the triggering time delay information of the direction modification information of duplex subframe, flexibly duplex subframe and the persistence length information of flexible duplex subframe flexibly. Flexible duplex changes directional information and refers to that the direction informing user flexibility duplex is that sub-frame of uplink overturns as descending or descending sub frame overturn as upper row; Duplex triggering time delay information refers to and informs that user's system after how many subframes starts to trigger duplex configuration flexibly (if broadcast side does not adopt default value) flexibly; Duplex persistence length information refers to and informs that user flexibility duplex continuous overturning continues how many subframes (if broadcast side does not adopt default value) flexibly.
In order to reach effect easily when reality uses, wherein, the change indication information of described flexible duplex subframe can also for presetting duplex sub-frame configuration MODE NUMBER flexibly, namely the form of duplex configuration MODE NUMBER flexibly is adopted: set a series of flexible duplex inverted pattern in advance and be numbered, base station broadcast informs terminal number information, that is by the direction modification information of duplex subframe flexibly, the triggering time delay information of duplex subframe and the persistence length information fusion of flexible duplex subframe are that coding form informs user related information flexibly, such as: base station informs that upper line frequency rate will be configured to descending pattern for " 0110001100 " by terminal, then base station will the 1st, 2, 6, the upper line frequency rate of 7 work song frames transmits downlink information or base station informs that the pattern that terminal will be gone on descending frequency being configured to is " 0010000100 ", then base station will the 2nd, the descending frequency of 7 work song frames receives uplink information.
Exist in actual applications and sub-frame of uplink is configured to descending sub frame or descending sub frame is configured to sub-frame of uplink two kinds of situations, so, the embodiment of the present invention is also corresponding provides two kinds of measures, the first: when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, the part subframe determining to meet requirement from current direction that is current and terminal transmitting is as being comprised by the step of the flexible duplex subframe of flexible dispatching: obtain portfolio that is current and terminal uplink transmission; If the portfolio of uplink exceedes sub-frame of uplink propagation threshold, then the part descending sub frame determining to meet requirement from the current downlink transfer with terminal is as can by the flexible duplexing subframe of flexible dispatching; Generation can by the change indication information of the described flexible duplex subframe of flexible dispatching, and the direction modification information of the flexible duplex subframe in described change indication information is: the direction of the part descending sub frame of the described satisfied requirement determined is revised as upper row.
Further, according to described change indication information, in described flexible duplex subframe, the step of change duplex use-pattern comprises: the part descending sub frame of the described satisfied requirement determined is configured to sub-frame of uplink; Abandon a subframe of the part descending sub frame previous moment of described satisfied requirement, that is: on configuration uses, the descending frequency of row sends, if terminal is supported in line frequency rate and descending frequency sends simultaneously, so this user also can normally be dispatched in upper line frequency rate in base station, but do not allow user flexibly duplex subframe and flexibly a subframe before duplex subframe receive descending, as received, postpone to next non-flexible duplex subframe and receive, that is do not dispatch a subframe of the part descending sub frame previous moment meeting requirement.
2nd kind: when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, the part subframe determining to meet requirement from current direction that is current and terminal transmitting is as being comprised by the step of the flexible duplex subframe of flexible dispatching: obtain portfolio that is current and user equipment downlink transmission; If the portfolio of downlink transfer exceedes descending sub frame propagation threshold, then the part sub-frame of uplink determining to meet requirement from the current uplink with terminal is as can by the flexible duplexing subframe of flexible dispatching; Generation can by the change indication information of the described flexible duplex subframe of flexible dispatching, and the direction modification information of the flexible duplex subframe in described change indication information is: be revised as descending by the direction of the part sub-frame of uplink of the described satisfied requirement determined.
Further, according to described change indication information, in described flexible duplex subframe, the step of change duplex use-pattern comprises: the part sub-frame of uplink of the described satisfied requirement determined is configured to descending sub frame; Abandon a subframe in a moment after the part sub-frame of uplink of described satisfied requirement, namely descending upper line frequency rate is used to receive in configuration, if terminal is supported in line frequency rate and descending frequency receives simultaneously, so this user also can normally be dispatched in descending frequency in base station, but do not allow a subframe after duplex subframe flexibly and flexible duplex subframe sends row, as sent, the 2nd the non-flexible duplex subframe after terminating to flexibly duplex subframe that postpone carries out, and does not that is dispatch a subframe in a moment after the part sub-frame of uplink meeting requirement.
The present invention considers that terminal uplink sends needs certain timing advance, thus the upper row causing terminal sends subframe early than downlink reception subframe in order to ensure base station ascending-descending subframes alignment; So, take above two kinds of measures, that is: if flexible sub-frame 1 (in descending frequency) is that descending sub frame 2 is configured to sub-frame of uplink 3 and uses, then at the end of flexible sub-frame 1, flexible sub-frame 1 is about to descending the conflict in time with normal sub-frames (descending sub frame 3), now need to abandon first before flexible sub-frame 1 normal sub-frames 4 receives, as shown in Figure 2; It is configured to descending sub frame 7 uses if flexible sub-frame 5 (in upper line frequency rate) is sub-frame of uplink 6, then at the end of flexible sub-frame 5, flexible sub-frame is about to the upper row with normal sub-frames (sub-frame of uplink 6) for 5 times and is conflicted in time, now need to abandon first normal sub-frames 8 after flexible sub-frame 5 terminates sends, as shown in Figure 3.
In order to complete the complete use of duplex subframe flexibly, the described subframe scheduling method that the embodiment of the present invention provides produces also to be comprised after the change indication information of the flexible duplex subframe of flexible dispatching: the change indication information sending described flexible duplex subframe to terminal.
Further, the step to the change indication information of the described flexible duplex subframe of terminal transmission comprises: send the change indication information of described flexible duplexing subframe by physics channel or default high-rise signaling to default terminal.
Wherein, presetting high-rise signaling can be the signalings such as radio resource control signaling (RRC signaling), system message or two layers of signaling (MAC signaling), in this citing that differs.
Base station in physics channel can by broadcast inform all supports flexibly duplex terminal according to change indication information change duplex use-pattern; Can also by informing that selected terminal changes duplex use-pattern according to change indication information.
The subframe scheduling method of the described frequency division duplex system that the embodiment of the present invention provides adopts the signalling methods of duplex flexibly to solve the asymmetric problem brought of up-downgoing business in FDD frequency range, as shown in Figure 4, when the cell downlink business of base station service is more, base station scheduling uses the part time interval resource of the upper line frequency rate of FDD to be used for downlink transfer with the deficiency of supplementary downlink capacity; As shown in Figure 5, when the cell uplink business of base station service is more, base station scheduling uses the part time interval resource of the descending frequency of FDD to be used for uplink with the deficiency of supplementary up-link capacity.
In order to solve the problems of the technologies described above, the embodiment of the present invention additionally provides the subframe scheduling device of a kind of frequency division duplex system, as shown in Figure 6, comprising:
Generation module, for the portfolio according to current and terminal transmission, producing can by the change indication information of the flexible duplex subframe of flexible dispatching;
Change module, for according to described change indication information, changing duplex use-pattern in described flexible duplex subframe.
The subframe scheduling device of the described frequency division duplex system that the embodiment of the present invention provides is by the portfolio according to current and terminal transmission, generation can by the change indication information of the flexible duplex subframe of flexible dispatching, and according to described change indication information, change duplex use-pattern in described flexible duplex subframe, solves upstream traffic and the not reciprocity FDD frequency usage caused of downlink traffic is wasted and the problem of poor efficiency.
Concrete, described generation module comprises: the first determining unit, for when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, determine to meet the part subframe that requires from the current current direction with terminal transmitting as can by the flexible duplexing subframe of flexible dispatching.
Wherein, the change indication information of described flexible duplexing subframe comprises: the triggering time delay information of the direction modification information of duplex subframe, flexibly duplex subframe and the persistence length information of flexible duplex subframe flexibly.
Exist in actual applications and sub-frame of uplink is configured to descending sub frame or descending sub frame is configured to sub-frame of uplink two kinds of situations, so, the embodiment of the present invention is also corresponding provides two kinds of measures, the first: described first determining unit comprises: the first securing component, for obtaining portfolio that is current and terminal uplink transmission; First determines assembly, if the portfolio for uplink exceedes sub-frame of uplink propagation threshold, then the part descending sub frame determining to meet requirement from the current downlink transfer with terminal is as can by the flexible duplexing subframe of flexible dispatching; First generation component, for generation of can by flexible dispatching described flexible duplex subframe change indication information, in described change indication information flexible duplex subframe direction modification information be: upper row is revised as in the direction of the part descending sub frame of the described satisfied requirement determined.
Further, described change module comprises: the first arrangement unit, for the part descending sub frame of the described satisfied requirement determined is configured to sub-frame of uplink; First discarding unit, for abandoning a subframe of the part descending sub frame previous moment of described satisfied requirement.
2nd kind: described first determining unit comprises: the 2nd securing component, for obtaining portfolio that is current and user equipment downlink transmission; 2nd determines assembly, if the portfolio for downlink transfer exceedes descending sub frame propagation threshold, then the part sub-frame of uplink determining to meet requirement from the current uplink with terminal is as can by the flexible duplexing subframe of flexible dispatching; 2nd generation component, for generation of can by flexible dispatching described flexible duplex subframe change indication information, in described change indication information flexible duplex subframe direction modification information be: the direction of the part sub-frame of uplink of the described satisfied requirement determined is revised as descending.
Further, described change module comprises: the 2nd arrangement unit, for the part sub-frame of uplink of the described satisfied requirement determined is configured to descending sub frame; 2nd discarding unit, for abandoning a subframe in a moment after the part sub-frame of uplink of described satisfied requirement.
In order to complete the complete use of duplex subframe flexibly, the described subframe scheduling device that the embodiment of the present invention provides also comprises: sending module, for sending the change indication information of described flexible duplex subframe after described generation module executable operations to terminal.
Further, described sending module comprises: send unit, for sending the change indication information of described flexible duplex subframe by physics channel or default high-rise signaling to default terminal.
It should be noted that, the described embodiment that realizes of the subframe scheduling method of above-mentioned frequency division duplex system is all applicable in the embodiment of subframe scheduling device of this frequency division duplex system, also can reach identical technique effect.
In order to solve the problems of the technologies described above, the embodiment of the present invention additionally provides a kind of base station, comprising: the subframe scheduling device of above-mentioned frequency division duplex system.
Wherein, the described embodiment that realizes of the subframe scheduling device of above-mentioned frequency division duplex system is all applicable in the embodiment of this base station, also can reach identical technique effect.
In order to solve the problems of the technologies described above, the embodiment of the present invention additionally provides the subframe scheduling method of a kind of frequency division duplex system, as shown in Figure 7, comprising:
Step 71: the change indication information receiving the flexible duplex subframe from base station;
Step 72: according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern.
The subframe scheduling method of the described frequency division duplex system that the embodiment of the present invention provides is by receiving the change indication information of duplex subframe flexibly, then according to the change indication information of described flexible duplex subframe determine can by the flexible duplex subframe of flexible dispatching and in described flexible duplex subframe change duplex use-pattern, solve upstream traffic and the not reciprocity FDD frequency usage waste that causes of downlink traffic and the problem of poor efficiency.
Exist in actual applications and sub-frame of uplink is configured to descending sub frame or descending sub frame is configured to sub-frame of uplink two kinds of situations, so, the embodiment of the present invention is also corresponding provides two kinds of measures, the first: according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern step comprise: according to described flexible duplex subframe change indication information determine meet requirement part descending sub frame as can by flexible dispatching flexible duplex subframe; The direction of the part descending sub frame of the described satisfied requirement determined is configured to sub-frame of uplink; Abandon a subframe of the part descending sub frame previous moment of described satisfied requirement, that is: on configuration uses, the descending frequency of row sends, if terminal is supported in line frequency rate and descending frequency sends simultaneously, so this user also can normally be dispatched in upper line frequency rate in base station, but do not allow user flexibly duplex subframe and flexibly a subframe before duplex subframe receive descending, as received, postpone to next non-flexible duplex subframe and receive.
2nd kind: according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern step comprise: according to described flexible duplex subframe change indication information determine meet requirement part sub-frame of uplink as can by flexible dispatching flexible duplex subframe; The direction of the part sub-frame of uplink of the described satisfied requirement determined is configured to descending sub frame; Abandon a subframe in a moment after the part sub-frame of uplink of described satisfied requirement, namely descending upper line frequency rate is used to receive in configuration, if terminal is supported in line frequency rate and descending frequency receives simultaneously, so this user also can normally be dispatched in descending frequency in base station, but not allowing to send row in a subframe after duplex subframe flexibly with duplex subframe flexibly, as sent, the 2nd the non-flexible duplex subframe after terminating to duplexing subframe flexibly that postpone carries out.
Base station to be dispatched terminal and be carried out flexible duplex operation, it is necessary in aware networks, which terminal supports flexible operating, and which terminal does not support flexible duplex operation, so, in order to ensure the normal operation of base station, the described subframe scheduling method that the embodiment of the present invention provides also comprises: reports to described base station and whether is supported in sub-frame of uplink and carries out downlink reception or two frequencies of the up-downgoing in default frequency range receive simultaneously, and whether be supported in descending sub frame and carry out upper row transmission or two frequencies of the up-downgoing in default frequency range send simultaneously, that is: terminal is except normally reporting all frequency ranges of support to number except (traditional way), support that the terminal of duplex flexibly also reports whether certain frequency range numbering of support supports that line frequency rate carries out downlink reception thereon simultaneously, up-downgoing two frequencies whether further reporting terminal is supported in this frequency range receive simultaneously, reporting certain frequency range numbering of support whether to be supported in its descending frequency and carry out upper row transmitting, up-downgoing two frequencies whether further reporting terminal is supported in this frequency range are launched simultaneously.
In order to solve the problems of the technologies described above, the embodiment of the present invention additionally provides the subframe scheduling device of a kind of frequency division duplex system, as shown in Figure 8, comprising:
Receiver module, for receiving the change indication information of the flexible duplex subframe from base station;
Determine change module, for according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern.
The subframe scheduling device of the described frequency division duplex system that the embodiment of the present invention provides is by receiving the change indication information of duplex subframe flexibly, then according to the change indication information of described flexible duplex subframe determine can by the flexible duplex subframe of flexible dispatching and in described flexible duplex subframe change duplex use-pattern, solve upstream traffic and the not reciprocity FDD frequency usage waste that causes of downlink traffic and the problem of poor efficiency.
Exist in actual applications and sub-frame of uplink is configured to descending sub frame or descending sub frame is configured to sub-frame of uplink two kinds of situations, so, the embodiment of the present invention is also corresponding provides two kinds of measures, the first: described determine change module comprise: the 2nd determining unit, for according to described flexible duplex subframe change indication information determine meet requirement part descending sub frame as can by flexible dispatching flexible duplex subframe; 3rd arrangement unit, for being configured to sub-frame of uplink by the direction of the part descending sub frame of the described satisfied requirement determined; 3rd discarding unit, for abandoning a subframe of the part descending sub frame previous moment of described satisfied requirement.
2nd kind: described determine change module comprise: the 3rd determining unit, for according to described flexible duplex subframe change indication information determine meet requirement part sub-frame of uplink as can by flexible dispatching flexible duplex subframe; 4th arrangement unit, for being configured to descending sub frame by the direction of the part sub-frame of uplink of the described satisfied requirement determined; 4th discarding unit, for abandoning a subframe in a moment after the part sub-frame of uplink of described satisfied requirement.
Base station to be dispatched terminal and be carried out flexible duplex operation, it is necessary in aware networks, which terminal supports flexible operating, and which terminal does not support flexible duplex operation; So, in order to ensure the normal operation of base station, the described subframe scheduling device that the embodiment of the present invention provides also comprises: reporting module, whether it is supported in sub-frame of uplink carries out downlink reception or two frequencies of the up-downgoing in default frequency range receive simultaneously for reporting to described base station, and whether be supported in descending sub frame and carry out upper row transmission or two frequencies of the up-downgoing in default frequency range send simultaneously.
It should be noted that, the described embodiment that realizes of the subframe scheduling method of above-mentioned frequency division duplex system is all applicable in the embodiment of subframe scheduling device of this frequency division duplex system, also can reach identical technique effect.
In order to solve the problems of the technologies described above, the embodiment of the present invention additionally provides a kind of terminal, comprising: the subframe scheduling device of above-mentioned frequency division duplex system.
Wherein, the described embodiment that realizes of the subframe scheduling device of above-mentioned frequency division duplex system is all applicable in the embodiment of this terminal, also can reach identical technique effect.
Above-described is the preferred embodiment of the present invention; should be understood that the common personnel for the art; not departing under principle prerequisite of the present invention, it is also possible to make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (18)

1. the subframe scheduling method of a frequency division duplex system, it is characterised in that, comprising:
According to portfolio that is current and terminal transmission, producing can by the change indication information of the flexible duplex subframe of flexible dispatching;
According to described change indication information, change duplex use-pattern in described flexible duplex subframe.
2. subframe scheduling method as claimed in claim 1, it is characterised in that, according to portfolio that is current and terminal transmission, produce to be comprised by the step of the change indication information of the flexible duplex subframe of flexible dispatching:
When portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, determine to meet the part subframe that requires from the current current direction with terminal transmitting as can by the flexible duplexing subframe of flexible dispatching.
3. subframe scheduling method as claimed in claim 2, it is characterized in that, the change indication information of described flexible duplexing subframe comprises: the triggering time delay information of the direction modification information of duplex subframe, flexibly duplex subframe and the persistence length information of flexible duplex subframe flexibly.
4. subframe scheduling method as claimed in claim 2, it is characterised in that, the change indication information of described flexible duplex subframe is for presetting duplex sub-frame configuration MODE NUMBER flexibly.
5. subframe scheduling method as claimed in claim 3, it is characterized in that, when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, the part subframe determining to meet requirement from current direction that is current and terminal transmitting is as being comprised by the step of the flexible duplex subframe of flexible dispatching:
Obtain portfolio that is current and terminal uplink transmission;
If the portfolio of uplink exceedes sub-frame of uplink propagation threshold, then the part descending sub frame determining to meet requirement from the current downlink transfer with terminal is as can by the flexible duplexing subframe of flexible dispatching;
Generation can by the change indication information of the described flexible duplex subframe of flexible dispatching, and the direction modification information of the flexible duplex subframe in described change indication information is: the direction of the part descending sub frame of the described satisfied requirement determined is revised as upper row.
6. subframe scheduling method as claimed in claim 5, it is characterised in that, according to described change indication information, in described flexible duplex subframe, the step of change duplex use-pattern comprises:
The part descending sub frame of the described satisfied requirement determined is configured to sub-frame of uplink;
Abandon a subframe of the part descending sub frame previous moment of described satisfied requirement.
7. subframe scheduling method as claimed in claim 3, it is characterized in that, when portfolio that the is current and transmission of terminal one direction exceedes the party's sub-frame transmission threshold value upwards, the part subframe determining to meet requirement from current direction that is current and terminal transmitting is as being comprised by the step of the flexible duplex subframe of flexible dispatching:
Obtain portfolio that is current and user equipment downlink transmission;
If the portfolio of downlink transfer exceedes descending sub frame propagation threshold, then the part sub-frame of uplink determining to meet requirement from the current uplink with terminal is as can by the flexible duplexing subframe of flexible dispatching;
Generation can by the change indication information of the described flexible duplex subframe of flexible dispatching, and the direction modification information of the flexible duplex subframe in described change indication information is: be revised as descending by the direction of the part sub-frame of uplink of the described satisfied requirement determined.
8. subframe scheduling method as claimed in claim 7, it is characterised in that, according to described change indication information, in described flexible duplex subframe, the step of change duplex use-pattern comprises:
The part sub-frame of uplink of the described satisfied requirement determined is configured to descending sub frame;
Abandon a subframe in a moment after the part sub-frame of uplink of described satisfied requirement.
9. subframe scheduling method as claimed in claim 1, it is characterised in that, produce also to be comprised after the change indication information of the flexible duplex subframe of flexible dispatching:
The change indication information of described flexible duplex subframe is sent to terminal.
10. subframe scheduling method as claimed in claim 9, it is characterised in that, comprise to the step of the change indication information of the described flexible duplex subframe of terminal transmission:
The change indication information of described flexible duplex subframe is sent to default terminal by physics channel or default high-rise signaling.
The subframe scheduling device of 11. 1 kinds of frequency division duplex systems, it is characterised in that, comprising:
Generation module, for the portfolio according to current and terminal transmission, producing can by the change indication information of the flexible duplex subframe of flexible dispatching;
Change module, for according to described change indication information, changing duplex use-pattern in described flexible duplex subframe.
12. 1 kinds of base stations, it is characterised in that, comprising: the subframe scheduling device of frequency division duplex system as claimed in claim 11.
The subframe scheduling method of 13. 1 kinds of frequency division duplex systems, it is characterised in that, comprising:
Receive the change indication information of the flexible duplex subframe from base station;
According to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern.
14. subframe scheduling methods as claimed in claim 13, it is characterized in that, according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern step comprise:
According to described flexible duplex subframe change indication information determine meet requirement part descending sub frame as can by flexible dispatching flexible duplex subframe;
The direction of the part descending sub frame of the described satisfied requirement determined is configured to sub-frame of uplink;
Abandon a subframe of the part descending sub frame previous moment of described satisfied requirement.
15. subframe scheduling methods as claimed in claim 13, it is characterized in that, according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern step comprise:
According to described flexible duplex subframe change indication information determine meet requirement part sub-frame of uplink as can by flexible dispatching flexible duplex subframe;
The direction of the part sub-frame of uplink of the described satisfied requirement determined is configured to descending sub frame;
Abandon a subframe in a moment after the part sub-frame of uplink of described satisfied requirement.
16. subframe scheduling methods as claimed in claim 13, it is characterised in that, described subframe scheduling method also comprises:
Report to described base station and whether it is supported in sub-frame of uplink and carries out downlink reception or two frequencies of the up-downgoing in default frequency range receive simultaneously; And
Whether it is supported in descending sub frame and carries out upper row transmission or two frequencies of the up-downgoing in default frequency range send simultaneously.
The subframe scheduling device of 17. 1 kinds of frequency division duplex systems, it is characterised in that, comprising:
Receiver module, for receiving the change indication information of duplex subframe flexibly;
Determine change module, for according to described flexible duplex subframe change indication information determine can by flexible dispatching flexible duplex subframe and described flexible duplex subframe on change duplex use-pattern.
18. 1 kinds of terminals, it is characterised in that, comprising: the subframe scheduling device of frequency division duplex system as claimed in claim 17.
CN201410740627.0A 2014-12-05 2014-12-05 Frequency division duplex system subframe scheduling method and apparatus, base station, and terminal Pending CN105657850A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410740627.0A CN105657850A (en) 2014-12-05 2014-12-05 Frequency division duplex system subframe scheduling method and apparatus, base station, and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410740627.0A CN105657850A (en) 2014-12-05 2014-12-05 Frequency division duplex system subframe scheduling method and apparatus, base station, and terminal

Publications (1)

Publication Number Publication Date
CN105657850A true CN105657850A (en) 2016-06-08

Family

ID=56481248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410740627.0A Pending CN105657850A (en) 2014-12-05 2014-12-05 Frequency division duplex system subframe scheduling method and apparatus, base station, and terminal

Country Status (1)

Country Link
CN (1) CN105657850A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018228417A1 (en) * 2017-06-16 2018-12-20 华为技术有限公司 Method for determining transmission directions and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102624490A (en) * 2012-03-27 2012-08-01 华为技术有限公司 Method, device and system for information transmission and subscriber equipment
CN102917328A (en) * 2011-08-02 2013-02-06 华为技术有限公司 Specific subframe based indication method, related device and system
WO2013162325A1 (en) * 2012-04-27 2013-10-31 Park Kyoung Su Cleaner for window of outer wall of high-rise building
CN104010373A (en) * 2014-06-09 2014-08-27 宇龙计算机通信科技(深圳)有限公司 Carrier configuration method, configuration system and base station for mobile communication

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102917328A (en) * 2011-08-02 2013-02-06 华为技术有限公司 Specific subframe based indication method, related device and system
CN102624490A (en) * 2012-03-27 2012-08-01 华为技术有限公司 Method, device and system for information transmission and subscriber equipment
WO2013162325A1 (en) * 2012-04-27 2013-10-31 Park Kyoung Su Cleaner for window of outer wall of high-rise building
CN104010373A (en) * 2014-06-09 2014-08-27 宇龙计算机通信科技(深圳)有限公司 Carrier configuration method, configuration system and base station for mobile communication

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018228417A1 (en) * 2017-06-16 2018-12-20 华为技术有限公司 Method for determining transmission directions and device
US11412393B2 (en) 2017-06-16 2022-08-09 Huawei Technologies Co., Ltd. Method and device for determining transmission direction

Similar Documents

Publication Publication Date Title
CN102595600B (en) Semi-static scheduling method, user equipment and network device
KR102137116B1 (en) Method for reporting channel state information in wireless communication system and apparatus therefor
CN103002578B (en) Realize the method for D2D data transmission, Apparatus and system in cellular networks
CN101754380B (en) Resource control method, system, base and terminal in carrier polymerization system
CN112789818B (en) Method and apparatus for performing HARQ in NR V2X system
GB2429605B (en) Apparatus and method for communicating signalling information
CN102045862A (en) Carrier aggregation realizing method, device and system
CN102468950A (en) Information transmission method, terminal, base station and communication system
CN103002579B (en) Control information transmission method, base station and user equipment
CN104125610A (en) Data transmitting method and device in D2D communication
CN102215577B (en) The resource allocation methods of backhaul link uplink control channel and system
CN103069899A (en) Configuring an uplink and downlink splitting pattern for device-to-device communication under a cellular network
CN103796312A (en) Method, system and equipment for machine type communication in LTE-A
CN102594438A (en) Data transmission method, device and system
CN102387598A (en) Method for scheduling physical downlink control channel (PDCCH)
CN102148672A (en) Methods, systems and equipment for transmitting response feedback transmission configuration information and response feedback
CN103825687A (en) Device-to-device-communication signaling transmission method for cellular network
CN102065545A (en) Methods for notifying and determining locations of resources and system and equipment
CN110249675A (en) Communication means, the network equipment and terminal
CN103906251A (en) HARQ-ACK feedback method in D2D mode in LTE network
CN101309522B (en) Uplink reply message feedback method and mobile terminal
CN101932111A (en) Method and system for resource scheduling between enhanced base stations
US20170222862A1 (en) Method of reducing impact of d2d in-band interference on cellular transmission
CN104579591A (en) Feedback resource distribution method and system for TDD (Time Division Duplexing) downlink multi-subframe scheduling
CN102017754B (en) Resource allocation in two domains

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160608