CN105657016A - Online energy consumption monitoring method for important energy consumption unit - Google Patents

Online energy consumption monitoring method for important energy consumption unit Download PDF

Info

Publication number
CN105657016A
CN105657016A CN201511034615.7A CN201511034615A CN105657016A CN 105657016 A CN105657016 A CN 105657016A CN 201511034615 A CN201511034615 A CN 201511034615A CN 105657016 A CN105657016 A CN 105657016A
Authority
CN
China
Prior art keywords
energy consumption
data
client
platform
monitoring method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511034615.7A
Other languages
Chinese (zh)
Inventor
杜长河
马文杰
辜晓川
赵小鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Gaoxiao Information Industry Corp Ltd
Original Assignee
Qingdao Gaoxiao Information Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Gaoxiao Information Industry Corp Ltd filed Critical Qingdao Gaoxiao Information Industry Corp Ltd
Priority to CN201511034615.7A priority Critical patent/CN105657016A/en
Publication of CN105657016A publication Critical patent/CN105657016A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Selective Calling Equipment (AREA)

Abstract

The invention discloses to an online energy consumption monitoring method for an important energy consumption unit. The online energy consumption monitoring method comprises onsite collection, online energy consumption monitoring enterprise end device and data reporting, wherein an energy consumption monitoring end device is used for collecting the energy consumption of the unit and transmitting the collected data to an enterprise data collection and report server through a multiprotocol data collection gateway, and meanwhile, system security isolation is realized in the multiprotocol data collection gateway and the server through an isolation air gap; the server carries out HTTPS encryption through an operating system firewall and transmits the data to a national platform and a provincial platform; the online energy consumption monitoring method disclosed by the invention is used for solving the network isolation of a data collection system from a management system and a control system, and guaranteeing the security of the collected data of the system; and an intelligent device integrating a communication interface server, an industrial control computer and industrial control software supports a plurality of collection protocols on an enterprise site.

Description

A kind of emphasis energy unit energy consumption on-line monitoring method
Technical field
The present invention relates to a kind of energy consumption on-line monitoring system end equipment, belong to enterprise energy consumption detection technique field.
Background technology
At present, energy consumption on-line monitoring enterprises end equipment on the market is all that data acquisition gateway separates deployment with reporting machine now, and this case achieves data acquisition gateway and reports machine to be monolithically integrated into integration apparatus, completes the integral fusion gathering with reporting.
Summary of the invention
It is an object of the invention to for the deficiencies in the prior art, it is proposed to a kind of emphasis energy unit energy consumption on-line monitoring method.
For realizing the purpose of the present invention, the present invention is achieved by the following technical solutions:
A kind of emphasis energy unit energy consumption on-line monitoring method, report including collection in worksite, energy consumption on-line monitoring enterprises end equipment and data, the energy consumption collection of unit is carried out by energy consumption monitoring end equipment, the data of collection to business data collection and are reported in server by multi-protocol data acquisition gateway transmission, in multi-protocol data acquisition gateway and server, carries out security of system isolation by isolation gap simultaneously; Server is operated by system fire wall to carry out HTTPS encryption and is uploaded to country's platform and economizes in platform.
Described energy consumption on-line monitoring enterprises end equipment is undertaken by following steps operation:
S1: registration operates with nullifying;
S2: energy consumption monitoring end equipment downloads basic data from application software system;
S3: energy unit configurations data are uploaded;
S4: gather data and upload.
Data access transmission platform and the data of energy consumption monitoring end equipment send software and adopt reliable queue transmission machine-processed with Receipt Validation.
Energy consumption on-line monitoring enterprises end is applied as client, and application platform is as service end, and service end is generally adopted request-reply pattern by client.
Request-reply process is initiated by client, and service end response forms, and first client sends request command to service end; Then service end receives response after request command, namely sets up and client application interface channel; Secondly service end performs the request operation of client, and execution result is returned to client; Client receives the service response of service end again, if client does not obtain service end response within the prescribed time-limit, then enters the timeout treatment stage;Finally dismantled interface channel, this request-reply end of operation by service end or client; Client does not receive response after sending a request command at the appointed time, then should be judged as time-out; After time-out, client retransmits request command, does not receive response client yet and should judge that communication is unavailable after retransmitting stipulated number, sign off.
Gather data and upload the data access transmission platform that by the timing of energy consumption monitoring end equipment, the data on the same day of collection are uploaded to country's platform and this province back end; Every day, data uploaded data batch as one, and country's platform returns a successful feedback message after being properly received this lot data with the provincial node of ownership, if time-out does not also receive feedback or feedback is failure, then retransmitting, successfully feeding back until receiving; If retransmit 3 times also unsuccessful, then this lot data is still preserved in queue, next time uploads data and again retransmits, until success.
The advantage of emphasis energy unit energy consumption on-line monitoring method of the present invention is: solve data collecting system and management system, the Network Isolation controlling system, it is ensured that the safety of system acquisition data; Integrate the smart machine of communication interface server, industrial computer, industrial control software, support the on-the-spot multiple acquisition protocols of enterprise.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the data report flow figure of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments. Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of protection of the invention.
Embodiment:
As it is shown in figure 1, the interactive operation of energy consumption on-line monitoring enterprises end equipment and system platform mainly has energy consumption monitoring end facility registration and nullifies operation; Energy consumption monitoring end equipment downloads basic data from application software system; Energy unit configurations data are uploaded; Collection data are uploaded.
Data Transport Protocol adopts HTTPS, it is ensured that it is safe and reliable that data are transmitted under internet environment. Data access transmission platform and the data of energy consumption monitoring end equipment send software and adopt reliable queue transmission machine-processed with Receipt Validation, it is ensured that data are reliably sent to country's platform and belong to provincial node.
Except data access transmission platform, also there is complementary interactive maintenance operation in energy consumption monitoring end equipment with energy consumption monitoring end device management platform (resource management system) of provincial node and application system.
Application layer adopts two kinds of data interaction forms of JSON and XML, and is all based on HTTPS agreement, and which kind of data form data interaction adopts refer to application protocol explanation.
Energy consumption on-line monitoring enterprises end is applied generally as client, and application platform is as service end, and service end is generally adopted request-reply pattern by client.
Request-reply process is initiated by client, and service end response forms, and first client sends request command to service end;Then service end receives response after request command, namely sets up and client application interface channel; Secondly service end performs the request operation of client, and execution result is returned to client; Client receives the service response of service end again, if client does not obtain service end response within the prescribed time-limit, then enters the timeout treatment stage; Finally dismantled interface channel, this request-reply end of operation by service end or client.
Client does not receive response after sending a request command at the appointed time, then should be judged as time-out; After time-out, client retransmits request command, does not receive response client yet and should judge that communication is unavailable after retransmitting stipulated number, sign off; Time-out time is self-defined according to the application task content of communication; Time-out sending times must reaching property require self-defined according to the task of communication, is commonly defined as 3 times; Energy consumption monitoring end this batch data of equipment transmission time-out is retransmitted the request command after unsuccessfully and should be left in data transmit queue, retransmits, until data are uploaded successfully, to ensure that data are reliably uploaded when lower secondary data transmits again.
Facility registration is after energy consumption monitoring end equipment completes physics deployment, access network and start shooting, energy consumption monitoring end equipment needs read ownship information and be registered to energy consumption monitoring end device management platform, resource management system is that energy consumption monitoring end equipment is allocated a device ID, and apply for an effective CA certificate for it simultaneously, downloadable authentication also configures; Facility registration is triggered by energy consumption monitoring end deployed with devices workmen, and energy consumption monitoring end facility management client is automatically obtained.
It is when not in use by a target energy consumption monitoring end equipment that equipment is nullified, and system maintenance management person's logging device management platform of provincial node selects this equipment, carries out nullifying operation; Now this equipment and this user no longer bind, and equipment does not then have the ability uploading data.
It is after the success of energy consumption monitoring end facility registration that basic data is downloaded, application system initial configuration can be carried out, configuration energy unit Back ground Information, and data access configuration information, at this time, it may be necessary to download the normal data codings such as such as administrative division, industry, energy kind, production process from provincial node application system.
It is after energy consumption monitoring end equipment completes energy unit initial configuration that energy unit configurations data are uploaded, it is necessary to some Back ground Informations of energy unit are uploaded country's platform application system; This operation is accessed workmen by energy consumption monitoring end equipment, or is triggered by energy unit energy consumption monitoring end plant maintenance personnel.
Gathering that data upload is energy consumption monitoring end equipment timing data access transmission platform that the data on the same day of collection are uploaded to country's platform and this province back end; Every day, data uploaded data batch as one, and country's platform returns a successful feedback message after being properly received this lot data with the provincial node of ownership, if time-out does not also receive feedback or feedback is failure, then retransmitting, successfully feeding back until receiving; If retransmit 3 times also unsuccessful, then this lot data is still preserved in queue, next time uploads data and again retransmits, until success.
Energy consumption monitoring end equipment realize data access, security isolation, data process and upload, operation management four partial function; Many mainboards, and extensible architecture; Each mainboard CPU, double-core 1.4GHz and more than; 2GB and above internal memory, 800MHz and frequencies above; 500GB and stored above, supports double; two hard disk SATA interface RAID1 data hot-backup function;Isolation: independent double; two main frames " 2+1 " (external processing unit, inside and outside processing unit+isolation safe data exchange unit), non-IP physical isolation; It is not less than 128 �� 64 lattice type LCD display screens, for host work state.
Data-interface is at least 2 tunnels (expansible) data access serial ports (RS232/RS485) respectively; At least 2 tunnels (expansible) data access Ethernet (100Mbps) interface; At least 2 circuit-switched data send Ethernet (100Mbps) interface; Expansible WiFi wireless data access function; Expansible 3G wireless data upload function; 2 road USB (2.0 and more than) interface; 1 tunnel USB interface; 1 road Console interface.
Power supply scope AC220V �� 10%, 50Hz (meets GB12325,220V individual event admissible deviation of supply volt-age area requirement), and two-way Redundant backup power supply inputs, and ensemble average energy consumption is less than 450W; Two-way Redundant backup power supply should support that trouble power online insertion and removal is changed, Renewal process must not influential system properly functioning; There is power failure sound and light of alarm.
Mounting structure meets all-in-one machine structure design, modular construction dynamic cutting or extension; The casing structure design conformance with standard added mounting means basic size of 19 inches of racks; Structural design should ensure that redundant copies of data hard disk, Redundant backup power supply, when being not switched on equipment cabinets, can carry out on-the-spot hot plug easily and change.
Certainly, described above is not limitation of the present invention, and the present invention is also not limited to the example above; those skilled in the art; in the essential scope of the present invention, change, remodeling, interpolation or the replacement made, all should belong to protection scope of the present invention.

Claims (6)

1. emphasis energy unit energy consumption on-line monitoring method, it is characterized in that: include collection in worksite, energy consumption on-line monitoring enterprises end equipment and data and report, the energy consumption collection of unit is carried out by energy consumption monitoring end equipment, the data of collection to business data collection and are reported in server by multi-protocol data acquisition gateway transmission, in multi-protocol data acquisition gateway and server, carries out security of system isolation by isolation gap simultaneously; Server is operated by system fire wall to carry out HTTPS encryption and is uploaded to country's platform and economizes in platform.
2. emphasis energy unit energy consumption on-line monitoring method according to claim 1, it is characterised in that: described energy consumption on-line monitoring enterprises end equipment is undertaken by following steps operation:
S1: registration operates with nullifying;
S2: energy consumption monitoring end equipment downloads basic data from application software system;
S3: energy unit configurations data are uploaded;
S4: gather data and upload.
3. emphasis energy unit energy consumption on-line monitoring method according to claim 1, it is characterised in that: data access transmission platform and the data of energy consumption monitoring end equipment send software and adopt reliable queue transmission machine-processed with Receipt Validation.
4. emphasis energy unit energy consumption on-line monitoring method according to claim 1, it is characterised in that: the application of energy consumption on-line monitoring enterprises end is as client, and application platform is as service end, and service end is generally adopted request-reply pattern by client.
5. emphasis energy unit energy consumption on-line monitoring method according to claim 4, it is characterised in that: request-reply mode process is initiated by client, and service end response forms, and first client sends request command to service end; Then service end receives response after request command, namely sets up and client application interface channel;Secondly service end performs the request operation of client, and execution result is returned to client; Client receives the service response of service end again, if client does not obtain service end response within the prescribed time-limit, then enters the timeout treatment stage; Finally dismantled interface channel, this request-reply end of operation by service end or client; Client does not receive response after sending a request command at the appointed time, then should be judged as time-out; After time-out, client retransmits request command, does not receive response client yet and should judge that communication is unavailable after retransmitting stipulated number, sign off.
6. emphasis energy unit energy consumption on-line monitoring method according to claim 1 and 2, it is characterised in that: gather data and upload the data access transmission platform that by the timing of energy consumption monitoring end equipment, the data on the same day of collection are uploaded to country's platform and this province back end; Every day, data uploaded data batch as one, and country's platform returns a successful feedback message after being properly received this lot data with the provincial node of ownership, if time-out does not also receive feedback or feedback is failure, then retransmitting, successfully feeding back until receiving; If retransmit 3 times also unsuccessful, then this lot data is still preserved in queue, next time uploads data and again retransmits, until success.
CN201511034615.7A 2015-12-30 2015-12-30 Online energy consumption monitoring method for important energy consumption unit Pending CN105657016A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511034615.7A CN105657016A (en) 2015-12-30 2015-12-30 Online energy consumption monitoring method for important energy consumption unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511034615.7A CN105657016A (en) 2015-12-30 2015-12-30 Online energy consumption monitoring method for important energy consumption unit

Publications (1)

Publication Number Publication Date
CN105657016A true CN105657016A (en) 2016-06-08

Family

ID=56491473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511034615.7A Pending CN105657016A (en) 2015-12-30 2015-12-30 Online energy consumption monitoring method for important energy consumption unit

Country Status (1)

Country Link
CN (1) CN105657016A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106685986A (en) * 2017-01-18 2017-05-17 北京蓝色星语科技有限公司 Method and system for processing hazardous article detection data
CN107276987A (en) * 2017-05-17 2017-10-20 厦门奥普拓自控科技有限公司 A kind of the special line physical isolation industrial data means of communication and system
CN109256862A (en) * 2018-10-23 2019-01-22 重庆重开电气有限公司 Electrical Safety service system based on energy saving and efficiency increasing
CN111586041A (en) * 2020-05-07 2020-08-25 英赛克科技(北京)有限公司 Industrial unidirectional isolation network gate system and data transmission method
WO2022160698A1 (en) * 2021-01-27 2022-08-04 深圳供电局有限公司 Communication method, system, and apparatus for metering automation system, and computer device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050138432A1 (en) * 1997-02-12 2005-06-23 Ransom Douglas S. System and method for routing power management via XML firewall
CN102185883A (en) * 2011-03-09 2011-09-14 江苏润龙合同能源管理有限公司 Energy-management-contract-based energy consumption remote acquisition system and acquisition control method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050138432A1 (en) * 1997-02-12 2005-06-23 Ransom Douglas S. System and method for routing power management via XML firewall
CN102185883A (en) * 2011-03-09 2011-09-14 江苏润龙合同能源管理有限公司 Energy-management-contract-based energy consumption remote acquisition system and acquisition control method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
百度文库用户: ""重点用能单位能耗在线监测系统能耗监测端设备功能规范"", 《URL:HTTPS://WENKU.BAIDU.COM/VIEW/6C7BFF806EDB6F1AFF001FDE.HTML?FROM=SEARCH》 *
高圣溥,高志宏: ""热电厂能耗在线监测系统的应用研究"", 《价值工程》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106685986A (en) * 2017-01-18 2017-05-17 北京蓝色星语科技有限公司 Method and system for processing hazardous article detection data
CN106685986B (en) * 2017-01-18 2019-07-02 北京蓝色星语科技有限公司 A kind of hazardous material detection data processing method and processing system
CN107276987A (en) * 2017-05-17 2017-10-20 厦门奥普拓自控科技有限公司 A kind of the special line physical isolation industrial data means of communication and system
CN109256862A (en) * 2018-10-23 2019-01-22 重庆重开电气有限公司 Electrical Safety service system based on energy saving and efficiency increasing
CN109256862B (en) * 2018-10-23 2023-01-31 重庆重开电气有限公司 Power utilization safety service system based on energy conservation and efficiency improvement
CN111586041A (en) * 2020-05-07 2020-08-25 英赛克科技(北京)有限公司 Industrial unidirectional isolation network gate system and data transmission method
WO2022160698A1 (en) * 2021-01-27 2022-08-04 深圳供电局有限公司 Communication method, system, and apparatus for metering automation system, and computer device

Similar Documents

Publication Publication Date Title
CN105657016A (en) Online energy consumption monitoring method for important energy consumption unit
CN103858106B (en) remote cable access point reset
CN103166933B (en) A kind of data security switching system and method
CN103780432B (en) Parking lot O&M method, Carriageway controlling machine, server, mobile terminal and system
CN103726881B (en) Safety of coal mines hidden danger signal acquiring processing system and method
CN107547589A (en) A kind of data acquisition treatment method and device
CN104091219A (en) Intelligent door lock hotel unified management system and realizing method thereof
CN103561032B (en) The method of Modbus device network communication under ICP/IP protocol
CN104580148A (en) Method for simple data interaction between electric power region I and electric power III by using reserve 1bit data of forward direction isolating device
CN104009544A (en) Photovoltaic power generation remote control and communication system and method
CN107204666A (en) The remote sensing information joint debugging method of transformer station four and system based on mobile message technology
CN103383559A (en) Flow computers having wireless communication protocol interfaces and related methods
JP2015534753A (en) Data packet transfer and delivery system and method
CN108408362A (en) A kind of intelligent transportation monitoring system and monitoring method for conveyer belt
CN104468703A (en) Communication method and system for distributed small power source and upper computer
CN203896047U (en) Electric power protection system
CN105743695A (en) Monitoring method and system based on IEC 104 protocol
CN104102213B (en) A kind of tele-control system for material separation device and method
CN202094936U (en) Fire alarm image-text system
CN101364905B (en) Wired network monitoring system
CN110501944A (en) Production of hydrocarbons intelligent monitor system and method based on NB-IoT
CN102541006A (en) Collecting method for long-distance working conditions
CN203786880U (en) Intelligent wireless fire-fighting network system bases on ZigBee
CN207867293U (en) A kind of intelligent transportation monitoring system for conveyer belt
CN205847321U (en) A kind of information transmitting terminal based on Linux system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160608

RJ01 Rejection of invention patent application after publication