CN105653862B - Load point power supply distance calculation method and device - Google Patents

Load point power supply distance calculation method and device Download PDF

Info

Publication number
CN105653862B
CN105653862B CN201511025529.XA CN201511025529A CN105653862B CN 105653862 B CN105653862 B CN 105653862B CN 201511025529 A CN201511025529 A CN 201511025529A CN 105653862 B CN105653862 B CN 105653862B
Authority
CN
China
Prior art keywords
load point
power supply
topological path
distance
transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511025529.XA
Other languages
Chinese (zh)
Other versions
CN105653862A (en
Inventor
邱吉福
周荣臻
秦金义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201511025529.XA priority Critical patent/CN105653862B/en
Publication of CN105653862A publication Critical patent/CN105653862A/en
Application granted granted Critical
Publication of CN105653862B publication Critical patent/CN105653862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Abstract

A kind of load point power supply distance calculation method and device, wherein the described method includes: obtaining platform area graph data, platform area includes transformer and multiple load points;Topological path of the acquisition transformer to each load point respectively;Respectively according to the power supply distance of each topological path calculating transformer to the corresponding load point of the topological path.Due to obtain respectively transformer to each load point topological path, and according to the power supply distance of each topological path calculating transformer to the corresponding load point of the topological path, it is calculated to realize the power supply distance of each load point in power grid, provides quantization reference frame for power supply quality of the transformer to load point.It is calculated relative to the automation for manually to the measuring and calculating of power supply distance, realizing the power supply distance of each load point convenient for the graph data according to power grid by way of topological path.

Description

Load point power supply distance calculation method and device
Technical field
The present invention relates to electrical network fields, and in particular to a kind of load point power supply distance calculation method and device.
Background technique
With the development of economy, substation quantity, number of, lines are continuously increased, and power grid is increasingly complicated, are changed also more Frequently.Currently, to solve frequent schematic diagram replacement problem, scheduling is big frequently with collaborative computer system and automation algorithm Screen power transmission network schematic diagram automatically generates.When generating schematic diagram, it usually needs to the electricity box for exceeding standard unit area radius of electricity supply (load point) is identified, in order to which power supply enterprise is transformed power grid.
In the prior art, for the management of low-voltage platform area, lack advanced technological means and accurately obtain low-voltage and supply more than the planned quota electricity Radius;Power supply enterprise generally obtains client's low voltage range according to voltage monitoring point, or according to customers dial service hotline Reflection low-voltage learns low voltage range, then carries out selective electric network reconstruction.Existing technical solution, more passively, lag In customer demand.
Usually influencing transformer is mainly power supply distance of the transformer to the electricity box to the factor of electricity box power supply quality, works as confession When electrical distance is excessive, power supply quality variation is generally resulted in, therefore, how to calculate the power supply beyond transformer to electricity box in power grid Radius becomes urgent problem to be solved.
Summary of the invention
The technical problem to be solved in the present invention is that effectively calculating in power grid transformer to the power supply distance of load point.
For this purpose, according in a first aspect, the embodiment of the present invention discloses a kind of load point power supply distance calculation method, comprising:
Platform area graph data is obtained, described area includes transformer and multiple load points;The transformer is obtained respectively to arrive The topological path of each load point;The transformer is calculated to the corresponding load point of the topological path according to each topological path respectively Power supply distance.
Further, the topological path of each load point includes: the line bar node that the topological path passes through;It obtains and is located at institute State the distance between adjacent line bar on the topological path;It is described that the transformer is calculated to the topology according to each topological path respectively The power supply distance of the corresponding load point in path includes: to sum to the distance between adjacent line bar on the topological path described in, To obtain the power supply distance of the corresponding load point of the described topological path.
Further, further includes: obtain the radius of electricity supply of the transformer;Institute is calculated according to each topological path respectively described After stating transformer to the power supply distance of the corresponding load point of the topological path, further includes: judge each load point respectively Whether power supply distance is more than the radius of electricity supply;If the power supply distance of load point is more than the radius of electricity supply, at described The load point is identified in area's graph data.
Further, if the power supply distance of load point is more than the radius of electricity supply, the load is presented with visual means Point.
According to second aspect, the embodiment of the present invention discloses a kind of load point power supply distance computing device, comprising:
Graph data acquiring unit, for obtaining platform area graph data, described area includes transformer and multiple load points; Topological path acquiring unit, the topological path for obtaining the transformer respectively to each load point;
It is corresponding to the topological path to calculate the transformer according to each topological path for respectively for power supply distance computing unit Load point power supply distance.
Further, line bar distance acquiring unit, for obtain be located on the described topological path between adjacent line bar away from From;The power supply distance computing unit includes: summation subelement, between adjacent line bar on the topological path described in Distance summation, to obtain the power supply distance of the corresponding load point of the topological path.
Further, further includes: radius of electricity supply acquiring unit, for obtaining the radius of electricity supply of the transformer;Judging unit, For judging whether the power supply distance of each load point is more than the radius of electricity supply respectively;Unit is identified, if being used for load The power supply distance of point is more than the radius of electricity supply, then identifies the load point in described area's graph data.
Further, further includes: visualization, if the power supply distance for load point is more than the radius of electricity supply, The load point is presented with visual means.
Technical solution of the present invention has the advantages that
Load point power supply distance calculation method provided in an embodiment of the present invention and device, due to obtaining transformer respectively to respectively The topological path of load point, and according to the power supply of each topological path calculating transformer to the corresponding load point of the topological path away from From, so that the power supply distance for realizing each load point in power grid calculates, it is transformer to the power supply quality amount of providing of load point Change reference frame.Relative to manually to the measuring and calculating of power supply distance, it is convenient for the figure number according to power grid by way of topological path Factually the automation of the power supply distance of existing each load point calculates.
As a preferred technical solution, by judging whether the power supply distance of each load point is more than radius of electricity supply, if negative The power supply distance of lotus point is more than radius of electricity supply, identifies the load point in the area Ze Tai graph data, consequently facilitating quickly, it is easy Ground locking is more than the load point of radius of electricity supply, provides foundation to be included in the load point of electric network reconstruction range.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of load point power supply distance calculation method flow chart in the embodiment of the present invention;
Fig. 2 is a kind of graphical examples figure in standard unit area of power grid in the embodiment of the present invention;
Fig. 3 is a kind of load point power supply distance computing device schematic diagram in the embodiment of the present invention.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
As long as in addition, the non-structure each other of technical characteristic involved in invention described below different embodiments It can be combined with each other at conflict.
Effectively to calculate transformer in power grid to the power supply distance of load point, the present embodiment discloses a kind of load point and supplies Electrical distance calculation method, referring to FIG. 1, being the load point power supply distance calculation method flow chart, the load point power supply distance meter Calculation method includes the following steps:
Step S100 obtains platform area graph data, wherein platform area includes transformer and multiple load points (electricity box).It please join Fig. 2 is examined, is the graphical examples in a certain standard unit area in power grid, this area includes transformer 1 and multiple load points 2, preferred In embodiment, platform area figure can further include multiple line bar nodes 3 (in figure shown in circle), and be arranged in adjacent lines Cable run between bar node 3, between line bar node 3 and transformer 1 or load point 2.
Step S200, respectively obtain transformer to each load point topological path.In the present embodiment, in platform area figure, With regard to topologies, the topological path of each load point is searched for automatically, and each topological path is transformer 1 to corresponding load point 2 The supply path being powered by cable run.
Step S300, respectively according to the power supply of each topological path calculating transformer to the corresponding load point of the topological path away from From.After step S200 acquires topological path, by each topological path, it can calculate separately to obtain the confession of corresponding load point Electrical distance.
In a preferred embodiment, the topological path of each load point includes: the line bar node that the topological path passes through.It is obtaining It is available to be located at the distance between adjacent line bar on the topological path after taking the topological path of load point, it specifically, can be pre- The distance between adjacent line bar is first stored, after obtaining topological path, is directly extracted from system positioned at phase on the topological path The distance between adjacent line bar.When executing step S300, sum to the distance between adjacent line bar on the topological path is located at, with Obtain the power supply distance of the corresponding load point of the topological path.
In order to realize convenient for quick, easily locking is more than that the load point of radius of electricity supply is also wrapped in a preferred embodiment It includes:
Step S400 obtains the radius of electricity supply of transformer.Alleged radius of electricity supply is that transformer 1 is transmitted by cable run When supply voltage, load point is enabled to receive the power supply distance of its normal power supply voltage.Certainly, in other embodiments, Radius of electricity supply can be suitably increased or reduced according to test needs.In a particular embodiment, radius of electricity supply can pass through I/O Equipment input obtains, and can also be pre-stored in system.It should be noted that being not intended to limit step S200 and step in the present embodiment Execution sequencing between rapid S400.
After executing step S300, further includes:
Step S500 judges whether the power supply distance of each load point is more than radius of electricity supply respectively.
If the power supply distance of load point is more than radius of electricity supply, S600 is thened follow the steps,
Step S600 identifies the load point in platform area graph data, specifically, can make a check mark to the load point Position can also add corresponding explanation in its attribute.
In a preferred embodiment, if the power supply distance of load point is more than radius of electricity supply, S700 is thened follow the steps,
The load point is presented with visual means in step S700.It specifically, referring to fig. 2, can be on platform area figure with not The load point is marked with color, it is of course also possible to show the load point on platform area figure by way of text or symbol.
It should be noted that step S700 can be executed after step S600 in the present embodiment, it can also be with either-or It executes.
The present embodiment also discloses a kind of load point power supply distance computing device, referring to FIG. 3, the load point power supply distance Computing device includes: graph data acquiring unit 100, topological path acquiring unit 200 and power supply distance computing unit 300, In:
For graph data acquiring unit 100 for obtaining platform area graph data, platform area includes transformer and multiple load points;It opens up Flutter topological path of the path acquiring unit 200 for obtaining transformer respectively to each load point;Power supply distance computing unit 300 is used In respectively according to the power supply distance of each topological path calculating transformer to the corresponding load point of the topological path.
In a preferred embodiment, load point power supply distance computing device further include: line bar distance acquiring unit is used for It obtains and is located at the distance between adjacent line bar on the topological path;Power supply distance computing unit 300 includes: summation subelement, is used It sums in positioned at the distance between adjacent line bar on the topological path, to obtain the power supply of the corresponding load point of the topological path Distance.
In a preferred embodiment, load point power supply distance computing device further include: radius of electricity supply acquiring unit is used for Obtain the radius of electricity supply of transformer;Judging unit, for judging whether the power supply distance of each load point is more than radius of electricity supply respectively; Unit is identified, if the power supply distance for load point is more than radius of electricity supply, identifies the load in the area Ze Tai graph data Point.
In a preferred embodiment, the load point power supply distance computing device further include: visualization, if for negative The power supply distance of lotus point is more than radius of electricity supply, then the load point is presented with visual means.
Load point power supply distance calculation method disclosed by the embodiments of the present invention and device, due to obtaining transformer respectively to respectively The topological path of load point, and according to the power supply of each topological path calculating transformer to the corresponding load point of the topological path away from From, so that the power supply distance for realizing each load point in power grid calculates, it is transformer to the power supply quality amount of providing of load point Change reference frame.Relative to manually to the measuring and calculating of power supply distance, it is convenient for the figure number according to power grid by way of topological path Factually the automation of the power supply distance of existing each load point calculates.
In a preferred embodiment, by judging whether the power supply distance of each load point is more than radius of electricity supply, if load The power supply distance of point is more than radius of electricity supply, the load point is identified in the area Ze Tai graph data, consequently facilitating quickly, easily Locking is more than the load point of radius of electricity supply, provides foundation to be included in the load point of electric network reconstruction range.
It should be understood by those skilled in the art that, the embodiment of the present invention can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the present invention Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the present invention, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The present invention be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Obviously, the above embodiments are merely examples for clarifying the description, and does not limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And it is extended from this it is obvious variation or It changes still within the protection scope of the invention.

Claims (6)

1. a kind of load point power supply distance calculation method, which comprises the steps of:
Platform area graph data is obtained, described area includes transformer and multiple load points, and the load point is electricity box;
Obtain respectively the transformer to each load point topological path;
Respectively according to each topological path calculate the transformer to the corresponding load point of the topological path power supply distance;
Obtain the radius of electricity supply of the transformer;
It is described respectively according to each topological path calculate the transformer to the corresponding load point of the topological path power supply distance Later, further includes:
Whether the power supply distance for judging each load point respectively is more than the radius of electricity supply;
If the power supply distance of load point is more than the radius of electricity supply, the load is identified in described area's graph data Point.
2. load point power supply distance calculation method as described in claim 1, which is characterized in that the topological road of each load point Diameter includes: the line bar node that the topological path passes through;
It obtains and is located at the distance between adjacent line bar on the described topological path;
It is described respectively according to each topological path calculate the transformer to the corresponding load point of the topological path power supply distance packet Include: to the distance between adjacent line bar summation on the described topological path is located at, to obtain, the described topological path is corresponding to be born The power supply distance of lotus point.
3. load point power supply distance calculation method as described in claim 1, which is characterized in that if the power supply distance of load point More than the radius of electricity supply, then the load point is presented with visual means.
4. a kind of load point power supply distance computing device characterized by comprising
Graph data acquiring unit, for obtaining platform area graph data, described area includes transformer and multiple load points, described Load point is electricity box;
Topological path acquiring unit, the topological path for obtaining the transformer respectively to each load point;
It is corresponding negative to the topological path to calculate the transformer according to each topological path for respectively for power supply distance computing unit The power supply distance of lotus point;
Radius of electricity supply acquiring unit, for obtaining the radius of electricity supply of the transformer;
Judging unit, for judging whether the power supply distance of each load point is more than the radius of electricity supply respectively;
Unit is identified, if the power supply distance for load point is more than the radius of electricity supply, in described area's graph data Identify the load point.
5. load point power supply distance computing device as claimed in claim 4, which is characterized in that
Line bar distance acquiring unit is located at the distance between adjacent line bar on the described topological path for obtaining;
The power supply distance computing unit includes:
Sum subelement, for being located at the distance between adjacent line bar summation on the described topological path, with obtain it is described should The power supply distance of the corresponding load point of topological path.
6. load point power supply distance computing device as claimed in claim 4, which is characterized in that further include:
Visualization, if the power supply distance for load point is more than the radius of electricity supply, being presented with visual means should Load point.
CN201511025529.XA 2015-12-30 2015-12-30 Load point power supply distance calculation method and device Active CN105653862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511025529.XA CN105653862B (en) 2015-12-30 2015-12-30 Load point power supply distance calculation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511025529.XA CN105653862B (en) 2015-12-30 2015-12-30 Load point power supply distance calculation method and device

Publications (2)

Publication Number Publication Date
CN105653862A CN105653862A (en) 2016-06-08
CN105653862B true CN105653862B (en) 2019-05-24

Family

ID=56490785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511025529.XA Active CN105653862B (en) 2015-12-30 2015-12-30 Load point power supply distance calculation method and device

Country Status (1)

Country Link
CN (1) CN105653862B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529758B (en) * 2016-09-13 2022-09-20 国网山东省电力公司青岛供电公司 Method and device for judging rationality of power supply area of distribution transformer
CN111415107B (en) * 2020-04-30 2023-05-09 南方电网数字电网研究院有限公司 Power distribution network area image generation method, device, computer equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102053835A (en) * 2010-12-30 2011-05-11 广东电网公司江门供电局 Method for displaying power supply range of power distribution line
CN102437578A (en) * 2011-10-14 2012-05-02 中国电力科学研究院 Power supply mode selection method of area without electricity supply based on load distance and load characteristic
CN104573853A (en) * 2014-12-19 2015-04-29 华南理工大学 Systematic solution for voltage quality evaluation and optimization of low-voltage transformer area distribution networks

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009012648A1 (en) * 2009-03-11 2010-09-16 Siemens Aktiengesellschaft Device, especially power quality meter and power quality device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102053835A (en) * 2010-12-30 2011-05-11 广东电网公司江门供电局 Method for displaying power supply range of power distribution line
CN102437578A (en) * 2011-10-14 2012-05-02 中国电力科学研究院 Power supply mode selection method of area without electricity supply based on load distance and load characteristic
CN104573853A (en) * 2014-12-19 2015-04-29 华南理工大学 Systematic solution for voltage quality evaluation and optimization of low-voltage transformer area distribution networks

Also Published As

Publication number Publication date
CN105653862A (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN105474523B (en) System, method and apparatus and the visible computer readable medium reconfigured for distribution network
JP5833530B2 (en) EMS power outage management apparatus and method
EP2930634A2 (en) System and method for automated substation design and configuration
JP6331465B2 (en) Transformer connection phase determination device, transformer connection phase determination method, and transformer connection phase determination program
US20140156094A1 (en) Sigma algebraic approximants as a diagnostic tool in power networks
CN105119282A (en) On-line calculation system and method for theoretical line loss of power grid
CN105653862B (en) Load point power supply distance calculation method and device
CN108921420B (en) Method and system for generating production plan by power plant station equipment
CN112308736B (en) Information processing method and device for complex environments of areas
KR101988670B1 (en) Device for state estimation of power distribution system
CN111984925A (en) Circuit abnormity positioning method based on loop impedance, storage medium and computing equipment
CN111695238A (en) System and method for visualizing transient simulation data of power system
CN115509255A (en) Substation patrol unmanned aerial vehicle airline risk management and control method, device, equipment and storage medium
CN116073340A (en) Relay protection constant value list generation method and device under source-load interaction scene
CN104700318A (en) Method for identifying weak link of power distribution network based on equipment power flow topology
CN110909991A (en) Rapid estimation device and method for optical cable fiber core remote intelligent scheduling service
JP2014204663A (en) Systems and methods for identifying weak buses in electrical power system
Altman A practical comprehensive approach to PMU placement for full observability
CN104463461A (en) Distribution line load density analysis method, device and system
CN107703352A (en) A kind of power consumption monitoring method and system based on Openpower platforms
CN105656029A (en) Method and device for determining load points outside power supply radius of low-voltage power supply region
CN109336199A (en) Sewage treatment method for real-time monitoring and system
CN109946562A (en) A kind of electrical power distribution network fault location method and system
US9129141B2 (en) Method for modeling a repair in an electric grid
CN103400336A (en) Economy evaluation method based on network availability and extensibility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant