CN105651224B - 坝后设弃渣场的土石坝坝体实时监测系统 - Google Patents
坝后设弃渣场的土石坝坝体实时监测系统 Download PDFInfo
- Publication number
- CN105651224B CN105651224B CN201610165365.9A CN201610165365A CN105651224B CN 105651224 B CN105651224 B CN 105651224B CN 201610165365 A CN201610165365 A CN 201610165365A CN 105651224 B CN105651224 B CN 105651224B
- Authority
- CN
- China
- Prior art keywords
- earth
- dam
- dam body
- rockfill
- rockfill dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
- G01B21/02—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring length, width, or thickness
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
- G01B21/32—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610165365.9A CN105651224B (zh) | 2016-03-22 | 2016-03-22 | 坝后设弃渣场的土石坝坝体实时监测系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610165365.9A CN105651224B (zh) | 2016-03-22 | 2016-03-22 | 坝后设弃渣场的土石坝坝体实时监测系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105651224A CN105651224A (zh) | 2016-06-08 |
CN105651224B true CN105651224B (zh) | 2018-07-03 |
Family
ID=56495311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610165365.9A Active CN105651224B (zh) | 2016-03-22 | 2016-03-22 | 坝后设弃渣场的土石坝坝体实时监测系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105651224B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107165770B (zh) * | 2017-05-22 | 2020-01-07 | 武汉大学 | 一种抽水蓄能电站机组启动暂态监测与安全评估系统及方法 |
CN109440811A (zh) * | 2018-09-21 | 2019-03-08 | 深圳市源远水利设计有限公司 | 一种沟谷型弃渣场干砌石挡渣墙和排水明渠排水处理工艺 |
CN113447415A (zh) * | 2021-05-25 | 2021-09-28 | 水利部交通运输部国家能源局南京水利科学研究院 | 一种土石坝坝内渗水监测系统及其使用方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011066124A1 (en) * | 2009-11-24 | 2011-06-03 | Corning Incorporated | Mass based methods and systems for estimating soot load |
WO2012118390A1 (en) * | 2011-02-28 | 2012-09-07 | Critical Materials, Lda. | Structural health management system and method based on combined physical and simulated data |
CN203270476U (zh) * | 2013-06-17 | 2013-11-06 | 黑龙江工程学院 | 立交桥沥青路面结构实时监测系统 |
CN103604386A (zh) * | 2013-12-03 | 2014-02-26 | 中安消技术有限公司 | 一种墙体形状变化检测方法、系统及其建筑物 |
CN103743441A (zh) * | 2014-01-20 | 2014-04-23 | 马鞍山南山开发公司 | 一种边坡安全的多元耦合在线监测系统及方法 |
CN103900743A (zh) * | 2014-04-08 | 2014-07-02 | 天津思博科科技发展有限公司 | 一种基于应力感应技术的地下管道安全监测装置 |
-
2016
- 2016-03-22 CN CN201610165365.9A patent/CN105651224B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011066124A1 (en) * | 2009-11-24 | 2011-06-03 | Corning Incorporated | Mass based methods and systems for estimating soot load |
WO2012118390A1 (en) * | 2011-02-28 | 2012-09-07 | Critical Materials, Lda. | Structural health management system and method based on combined physical and simulated data |
CN203270476U (zh) * | 2013-06-17 | 2013-11-06 | 黑龙江工程学院 | 立交桥沥青路面结构实时监测系统 |
CN103604386A (zh) * | 2013-12-03 | 2014-02-26 | 中安消技术有限公司 | 一种墙体形状变化检测方法、系统及其建筑物 |
CN103743441A (zh) * | 2014-01-20 | 2014-04-23 | 马鞍山南山开发公司 | 一种边坡安全的多元耦合在线监测系统及方法 |
CN103900743A (zh) * | 2014-04-08 | 2014-07-02 | 天津思博科科技发展有限公司 | 一种基于应力感应技术的地下管道安全监测装置 |
Also Published As
Publication number | Publication date |
---|---|
CN105651224A (zh) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105841661B (zh) | 一种桥梁动态健康实时监测装置 | |
CN105807685B (zh) | 一种智能监测型幕墙系统 | |
CN105673079B (zh) | 一种路桥隧道监控预警装置 | |
CN105783856B (zh) | 可实时预测自身寿命的建筑物坡屋面梁 | |
Karim et al. | Impact of climate change on floodplain inundation and hydrological connectivity between wetlands and rivers in a tropical river catchment | |
CN105651224B (zh) | 坝后设弃渣场的土石坝坝体实时监测系统 | |
CN105756082B (zh) | 可实时监测的生态挡土墙 | |
CN105787820B (zh) | 具有实时监测功能的轻钢龙骨隔墙结构 | |
CN113505499B (zh) | 基于bim和大数据分析的水利工程建筑全生命周期管理系统 | |
CN105843140A (zh) | 一种用于石油开采的地下管道监测系统 | |
CN105133667A (zh) | 一种降雨条件下土质边坡安全性态的时空动态评价方法 | |
CN105825009A (zh) | 一种基于建筑信息模型的桥梁竖向变形性能预警方法 | |
JP7174204B2 (ja) | 遠隔状態監視システム及び監視方法 | |
CN105841662B (zh) | 可实时监测的污水处理系统 | |
CN105841985B (zh) | 一种智能监测型输电电路高塔结构 | |
CN105841663B (zh) | 一种可实时预测自身寿命的智能水电站 | |
CN105841738B (zh) | 水道、河道两侧边坡实时监测防护系统 | |
CN105868842A (zh) | 一种可实时预测自身寿命的智能变电站 | |
CN105716659A (zh) | 电力杆塔户外防损预警系统 | |
CN105628104B (zh) | 可自动化监测自身疲劳寿命的火电站 | |
CN106525192A (zh) | 一种实时河流断面测量装置和方法 | |
CN115439018A (zh) | 一种大范围输变电设施地质灾害监测方法和系统 | |
CN105783821B (zh) | 复杂地质条件下的联合围堰健康预测系统 | |
CN107356631A (zh) | 保温效果自动监测方法及装置 | |
CN110806174A (zh) | 泄洪闸门动态可视化监测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Tan Jinzhong Inventor after: Tang Guoyi Inventor after: Xu Chenghua Inventor after: Yan Gang Inventor after: Wang Weiguo Inventor after: Wang Zhenxiang Inventor after: Liu Gang Inventor before: Wei Xingfei |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180518 Address after: 210000 105, Jia Dong Cun, Yuhuatai oil District, Nanjing, Jiangsu. Applicant after: Nanjing Jiangsu Geological Engineering Investigation Institute Address before: No. 32, Zhenhai District, Zhejiang Province, Zhenhai District, Drum Tower East Road, Ningbo, Zhejiang Applicant before: Wei Xingfei |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |