CN105649896B - 风电机组智能监控运行控制系统及其控制方法 - Google Patents
风电机组智能监控运行控制系统及其控制方法 Download PDFInfo
- Publication number
- CN105649896B CN105649896B CN201610027629.4A CN201610027629A CN105649896B CN 105649896 B CN105649896 B CN 105649896B CN 201610027629 A CN201610027629 A CN 201610027629A CN 105649896 B CN105649896 B CN 105649896B
- Authority
- CN
- China
- Prior art keywords
- module
- wind
- difference
- information
- resources
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Wind Motors (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610027629.4A CN105649896B (zh) | 2016-01-07 | 2016-01-07 | 风电机组智能监控运行控制系统及其控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610027629.4A CN105649896B (zh) | 2016-01-07 | 2016-01-07 | 风电机组智能监控运行控制系统及其控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105649896A CN105649896A (zh) | 2016-06-08 |
CN105649896B true CN105649896B (zh) | 2018-07-10 |
Family
ID=56487493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610027629.4A Expired - Fee Related CN105649896B (zh) | 2016-01-07 | 2016-01-07 | 风电机组智能监控运行控制系统及其控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105649896B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763944B (zh) * | 2019-01-28 | 2021-03-12 | 中国海洋大学 | 一种海上风机叶片故障非接触式监测系统及监测方法 |
CN114458549A (zh) * | 2022-03-11 | 2022-05-10 | 浙江工业大学 | 双馈异步风机塔筒全生命周期状态监测系统 |
CN114352478B (zh) * | 2022-03-16 | 2022-05-31 | 中国华能集团清洁能源技术研究院有限公司 | 海上风电机组控制系统及控制方法 |
CN116125956A (zh) * | 2023-03-01 | 2023-05-16 | 淄博博睿机电科技有限公司 | 一种基于数据分析的永磁同步风机控制器测试系统 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2405492B (en) * | 2003-08-30 | 2008-01-02 | Distant Control Ltd | Method and apparatus for remote control of power plants |
KR20130026107A (ko) * | 2011-09-05 | 2013-03-13 | 삼성중공업 주식회사 | 풍력 발전 시스템 및 그 제어 방법 |
CN103306893B (zh) * | 2012-03-09 | 2015-11-18 | 北京光耀能源技术股份有限公司 | 一种风力发电机故障预警及报警方法 |
CN103742358B (zh) * | 2013-12-24 | 2016-06-15 | 青海能高新能源有限公司 | 一种复合式风力发电机组状态监控系统 |
CN104863798A (zh) * | 2014-02-25 | 2015-08-26 | 常州铠甲智能科技有限公司 | 基于分布式存储的风电机组状态监测系统及其监测方法 |
-
2016
- 2016-01-07 CN CN201610027629.4A patent/CN105649896B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105649896A (zh) | 2016-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106774276B (zh) | 风电场自动发电控制系统测试平台 | |
CN105649896B (zh) | 风电机组智能监控运行控制系统及其控制方法 | |
US8912674B2 (en) | System and method of selecting wind turbine generators in a wind park for change of output power | |
US8860237B2 (en) | System and method of selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve | |
US9018787B2 (en) | System and method of wind turbine control using a torque setpoint | |
CN101806282B (zh) | 基于最佳风能利用的低额定风速风力发电控制系统 | |
CN103104416B (zh) | 风力发电系统 | |
WO2017201503A1 (en) | System and method for balancing reactive power loading between renewable energy power systems | |
CN105549423B (zh) | 风电机组偏航系统与变桨系统精细化实时仿真平台和方法 | |
CN103020462A (zh) | 计及复杂尾流效应模型的风电场概率输出功率计算方法 | |
CN103742357A (zh) | 一种风力发电机组风轮非对称载荷控制方法 | |
CN109274121A (zh) | 一种风电场控制参数优化方法及系统 | |
CN106762453B (zh) | 具有发电量预测及跟踪控制的风力发电智能网及控制方法 | |
CN110778454B (zh) | 一种风电机组协调控制方法和系统 | |
CN108988381A (zh) | 风力发电机组低电压穿越控制方法、装置及系统 | |
Berg | Wind energy conversion | |
CN112039051A (zh) | 一种含双馈风力发电机接入变电站母线负荷的实时建模方法 | |
CN110210170A (zh) | 一种大规模风电机群等值小信号模型建模方法 | |
Lu et al. | Integration of large scale wind energy with electrical power systems in China | |
Farret et al. | Active yaw control with sensorless wind speed and direction measurements for horizontal axis wind turbines | |
Najd et al. | Pitch angle control using neural network in wind turbines | |
Oudah et al. | Wind turbines control: Features and trends | |
CN113946608B (zh) | 一种基于在线rbf神经网络的风力发电机组运行状态监测方法 | |
CN108879767A (zh) | 风力发电机组高电压穿越控制方法、装置及系统 | |
Li et al. | NNPID-based stator voltage oriented vector control for DFIG based wind turbine systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Kong Yigang Inventor after: Qu Xiaogang Inventor after: Zhang Guochen Inventor after: Chang Zhengyan Inventor after: Yang Mingliang Inventor after: Xu Gening Inventor after: Fan Xiaoning Inventor after: Sun Chaoli Inventor before: Kong Yigang Inventor before: Zhang Guochen Inventor before: Qu Xiaogang Inventor before: Chang Zhengyan Inventor before: Yang Mingliang Inventor before: Xu Gening Inventor before: Fan Xiaoning Inventor before: Sun Chaoli |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180710 Termination date: 20190107 |
|
CF01 | Termination of patent right due to non-payment of annual fee |