CN105649221A - 现场组装式复合保温合成墙板用连接装置 - Google Patents
现场组装式复合保温合成墙板用连接装置 Download PDFInfo
- Publication number
- CN105649221A CN105649221A CN201610152462.4A CN201610152462A CN105649221A CN 105649221 A CN105649221 A CN 105649221A CN 201610152462 A CN201610152462 A CN 201610152462A CN 105649221 A CN105649221 A CN 105649221A
- Authority
- CN
- China
- Prior art keywords
- connecting device
- screw rod
- wallboard
- assembly type
- field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
Abstract
本发明涉及组装式墙板连接技术领域,具体的说是一种现场组装式复合保温合成墙板用连接装置。目前建筑领域预制面板间的连接多采用凹凸槽或用螺栓固定连接板。凹凸槽在预制面板时增加难度。同时在两板间形成不规则缝隙。而螺栓连接板在拧紧螺栓时费时费力,还易使板材平整度降低。本发明由连接装置A和连接装置B组成,二个连接装置与预制板内的钢架连接固定,连接装置A上设有连接螺杆,连接螺杆为水平T型;连接装置B上设有竖直T型开口,竖直T型开口调节螺杆的伸出侧的两边设有二道斜支撑。
Description
技术领域
本发明涉及组装式墙板连接技术领域,具体的说是一种现场组装式复合保温合成墙板用连接装置。
背景技术
目前建筑领域预制面板间的连接多采用凹凸槽或用螺栓固定连接板。凹凸槽在预制面板时增加难度。同时在两板间形成不规则缝隙。而螺栓连接板在拧紧螺栓时费时费力,还易使板材平整度降低,并且还在外面露出面板,增加装修费用。因此研发一种省时、省力、定位准确又隐身于面板间的连接机构具有十分广阔的前景。
发明内容
本发明的目的是提供一种现场组装式复合保温合成墙板用连接装置,可以快速、高效、限位准确的实现连接。
本发明的技术方案如下:由连接装置A和连接装置B组成,二个连接装置与预制板内的钢架连接固定,连接装置A上设有连接螺杆,连接螺杆为水平T型;连接装置B上设有竖直T型开口,连接装置B上连接螺杆伸出侧的两边设有二道斜支撑。
进一步,所述的二道斜支撑自上而下渐变厚。
本发明的优点是设计构思巧妙,安装时无需手动拧紧螺栓,完全依靠墙板的自重准确定位,可以快速、高效、限位准确的实现连接,连接后板材平整度高。
附图说明
图1为本发明的结构示意图;
图2为连接装置B结构示意图;
图3为连接装置A上的连接螺杆结构示意图。
图中:1.连接装置B、2.连接螺杆。
具体实施方式
从图1可知,本发明由连接装置A和连接装置B组成,二个连接装置与预制板内的钢架连接固定,连接装置A上设有连接螺杆,连接螺杆为水平T型;连接装置B上设有竖直T型开口,连接装置B上连接螺杆伸出侧的两边设有二道斜支撑。
进一步,所述的二道斜支撑自上而下渐变厚。
本发明安装时,用起吊装置将装有连接装置A的预制板吊起,使调节螺杆入到连接装置B上的竖直T型开口中;然后利用预制板的自重使调节螺杆沿二道斜支撑下滑,实现定位。
显然,本发明的上述实施例仅仅是为清楚地说明本发明所作的举例,而并非是对本发明的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无法对所有的实施方式予以穷举。凡是属于本发明的技术方案所引伸出的显而易见的变化或变动仍处于本发明的保护范围之列。
Claims (2)
1.一种现场组装式复合保温合成墙板用连接装置,其特征在于由连接装置A和连接装置B组成,二个连接装置与预制板内的钢架连接固定,连接装置A上设有连接螺杆,连接螺杆为水平T型;连接装置B上设有竖直T型开口,连接装置B上连接螺杆伸出侧的两边设有二道斜支撑。
2.如权利要求1所述的一种现场组装式复合保温合成墙板用连接装置,其特征在于所述的二道斜支撑自上而下渐变厚。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610152462.4A CN105649221A (zh) | 2016-03-17 | 2016-03-17 | 现场组装式复合保温合成墙板用连接装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610152462.4A CN105649221A (zh) | 2016-03-17 | 2016-03-17 | 现场组装式复合保温合成墙板用连接装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105649221A true CN105649221A (zh) | 2016-06-08 |
Family
ID=56493965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610152462.4A Pending CN105649221A (zh) | 2016-03-17 | 2016-03-17 | 现场组装式复合保温合成墙板用连接装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105649221A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2276182A (en) * | 1993-03-18 | 1994-09-21 | David Charles Dyer | Sealing of struts against panels |
US6199328B1 (en) * | 1998-12-11 | 2001-03-13 | Owens Corning Fiberglas Technology, Inc. | Clamp assembly for attaching panels to substrate |
JP2002357095A (ja) * | 2001-06-01 | 2002-12-13 | Sumitomo Metal Ind Ltd | 部材間継手装置 |
JP2007056554A (ja) * | 2005-08-25 | 2007-03-08 | Sumitomo Metal Ind Ltd | 部材間継手 |
CN205557851U (zh) * | 2016-03-17 | 2016-09-07 | 侯鹏 | 现场组装式复合保温合成墙板用连接装置 |
-
2016
- 2016-03-17 CN CN201610152462.4A patent/CN105649221A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2276182A (en) * | 1993-03-18 | 1994-09-21 | David Charles Dyer | Sealing of struts against panels |
US6199328B1 (en) * | 1998-12-11 | 2001-03-13 | Owens Corning Fiberglas Technology, Inc. | Clamp assembly for attaching panels to substrate |
JP2002357095A (ja) * | 2001-06-01 | 2002-12-13 | Sumitomo Metal Ind Ltd | 部材間継手装置 |
JP2007056554A (ja) * | 2005-08-25 | 2007-03-08 | Sumitomo Metal Ind Ltd | 部材間継手 |
CN205557851U (zh) * | 2016-03-17 | 2016-09-07 | 侯鹏 | 现场组装式复合保温合成墙板用连接装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203924349U (zh) | 一种预制墙板与叠合梁快速安装连接结构 | |
CN202530571U (zh) | 便于拆装的箱式房屋 | |
CN103628710B (zh) | 一种便携可卸式箱式中压变频室 | |
CN204167849U (zh) | 电缆沟及其盖板 | |
CN105019670A (zh) | 预制混凝土墙板位置调整装置 | |
CN103953201A (zh) | 空间网架反吊装装置 | |
CN205557851U (zh) | 现场组装式复合保温合成墙板用连接装置 | |
CN105649221A (zh) | 现场组装式复合保温合成墙板用连接装置 | |
CN204781660U (zh) | 搭扣式光伏组件屋面结构 | |
CN204715639U (zh) | 一种压型钢板屋面板 | |
CN204820511U (zh) | 新型蜂窝架空活动地板 | |
CN208884787U (zh) | 一种可调节式幕墙安装结构 | |
CN202809942U (zh) | 一种屋脊构造 | |
CN203569833U (zh) | 一种新型建筑外装饰保温一体化板干挂系统 | |
CN202674539U (zh) | 一种海洋平台桥架通用垂直变径调高设备 | |
CN201785960U (zh) | 安装在屋顶的组件 | |
CN104295103A (zh) | 一种预制外墙板安装方法 | |
CN205100571U (zh) | 一种预制整体卫生间快速安装就位装置 | |
CN204738496U (zh) | 一种地热散热集成板 | |
CN204531330U (zh) | 一种不锈钢复合板支架 | |
CN204781462U (zh) | 一种抗裂墙体固定组合件 | |
CN203769306U (zh) | 密肋楼盖浇注模具加工设备 | |
CN203939249U (zh) | 墙板吊架结构 | |
CN210713392U (zh) | 一种可滑动的陶土板幕墙连接件 | |
CN204059613U (zh) | 一种竖墙板与楼隔板连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160614 Address after: Nine Hebei Zhangjiakou hi tech Zone, 075000 blocks west street, mansion building 303 Applicant after: Hou Peng Address before: Nine Hebei Zhangjiakou hi tech Zone, 075000 blocks west street, mansion building 303 Applicant before: ZHANGJIAKOU CONSTRUCTION GROUP GUANGJIAN NEW BUILDING ENERGY SAVING MATERIAL CO., LTD. |
|
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160608 |
|
WD01 | Invention patent application deemed withdrawn after publication |