CN105649218A - Pipe connecting clamp and concrete beam slab supporting device comprising same - Google Patents

Pipe connecting clamp and concrete beam slab supporting device comprising same Download PDF

Info

Publication number
CN105649218A
CN105649218A CN201511033863.XA CN201511033863A CN105649218A CN 105649218 A CN105649218 A CN 105649218A CN 201511033863 A CN201511033863 A CN 201511033863A CN 105649218 A CN105649218 A CN 105649218A
Authority
CN
China
Prior art keywords
lag
buckling plate
pipe fitting
support bar
buckling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511033863.XA
Other languages
Chinese (zh)
Other versions
CN105649218B (en
Inventor
杨晓东
程毅
甄创城
刘欢
陈鹏智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Guangzhou
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Guangzhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd, China Construction Fifth Engineering Bureau Co Ltd Guangzhou filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201511033863.XA priority Critical patent/CN105649218B/en
Publication of CN105649218A publication Critical patent/CN105649218A/en
Application granted granted Critical
Publication of CN105649218B publication Critical patent/CN105649218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements

Abstract

The invention discloses a pipe connecting clamp which comprises a body, first buckling plates, second buckling plates and locking pieces. The body is provided with a first U-shaped groove which is formed vertically. The two outer side walls of the body are each transversely provided with a second U-shaped groove. Each first buckling plate is vertically provided with a third U-shaped groove. Each second buckling plate is transversely provided with a fourth U-shaped groove. One end of each first buckling plate and one end of each second buckling plate are rotatably connected to the body. The two ends of the first U-shaped groove are each provided with one first buckling plate. The second buckling plates are arranged on the outer side walls of the body. The invention further discloses a concrete beam slab supporting device comprising the pipe connecting clamp. By the adoption of the pipe connecting clamp, a plurality of pipes in different directions can be connected at the same time, and the integrality and firmness are better; and in addition, installation is convenient, and the cost is lower.

Description

Pipe fitting jockey and comprise the beams of concrete plate supporting device of this fixture
Technical field
The present invention relates to a kind of jockey, particularly relate to a kind of pipe fitting jockey and the beams of concrete plate supporting device comprising this fixture.
Background technology
At building field, generally require multiple tubing element, be attached in a plurality of directions, as when setting up support arrangement, it is necessary to many cross one another pipe fittings are linked together, and require significantly high for the globality connected and fastness, otherwise can affect the safety of a support arrangement. Two pipe fittings generally can only be attached by traditional fixture, and can only be attached in the same direction, if the pipe fitting of multiple directions is attached, multiple fixture is then needed to realize, the globality of this connection is not good, fastness is also bad, and the utilization of multiple fixture makes installation more complicated, and cost also can increase. Therefore, a kind of multiple tubing element on different directions can being attached and pipe fitting jockey that fastness is good is needed at present badly.
Summary of the invention
It is an object of the invention to provide a kind of the pipe fitting of multiple directions can be attached, the easy for installation and pipe fitting jockey that is connected firmly, it is a further object of the present invention to provide a kind of beams of concrete plate supporting device comprising this fixture.
For achieving the above object, the present invention adopts the following technical scheme that
A kind of pipe fitting jockey, including body, the first buckling plate, the second buckling plate and locking member; Described body has a first vertically arranged U-lag, and two lateral walls of described body are respectively horizontally arranged with one second U-lag, and described first U-lag and the second U-lag are all used for holding pipe fitting or bar; The quantity of described first buckling plate and the second buckling plate is 2, and described first buckling plate is vertically provided with one the 3rd U-lag, and described second buckling plate is horizontally arranged with one the 4th U-lag; One end of described first buckling plate is rotatably coupled on body, and the other end is fixed on body by described locking member; One end of described second buckling plate is rotatably coupled on body, and the other end is fixed on body by described locking member;Described 2 the first buckling plates are separately positioned on the two ends of the first U-lag, and this first buckling plate can be matched for clamping tightly pipe fitting or bar with the first U-lag; Described second buckling plate is arranged on the lateral wall of body, for being matched for clamping tightly pipe fitting or bar with the second U-lag.
Preferably, described 2 the second U-lags are symmetricly set on the lateral wall of body.
Preferably, hinge or bolt between one end and the body of described first buckling plate, can be adopted to realize being rotatably connected, hinge or bolt between one end and the body of described second buckling plate, can be adopted to realize being rotatably connected.
Preferably, described locking member is screw bolt and nut.
Present invention also offers a kind of beams of concrete plate supporting device comprising above-mentioned pipe fitting jockey, including pipe fitting jockey and support bar, described pipe fitting jockey is located on support bar, and described first U-lag and the first buckling plate coordinate clamps support bar.
Preferably, described beams of concrete plate supporting device also includes head rod and the second connecting rod; The quantity of described pipe fitting jockey is 4, and the quantity of described support bar is 4, and described 4 support bars are vertically arranged the matrix of composition one 2 �� 2; One end of described head rod is coordinated by the second buckling plate on support bar and the second U-lag clamps, and its other end is coordinated by the second buckling plate on laterally adjacent support bar and the second U-lag to be clamped; One end of described second connecting rod is fixed on support bar, and its other end is fixed on longitudinally adjacent support bar, and described second connecting rod is positioned at the lower section of head rod; The top of described support bar is provided with a jacking, and the added crossbeam that is provided with of described head rod, described crossbeam and jacking are used for carrying concrete beam plate.
Preferably, between adjacent two jackings, erection has cross bar.
Preferably, described second connecting rod is fixed on support bar by fixation clamp and screw.
The beneficial effects of the present invention is: compared with prior art, the pipe fitting jockey of the present invention, the lateral wall of body has also been offered the second U-lag of transverse direction, and also rotating on lateral wall it is connected to the second buckling plate, being matched for clamping tightly pipe fitting by U-lag and buckling plate, it is possible to achieve linked together by the multiple tubing element on different directions, globality and fastness that this kind connects are better, install simpler, lower in cost. It addition, the invention also discloses the beams of concrete plate supporting device comprising this fixture, compared with traditional beams of concrete plate supporting device, this support arrangement is easy for installation, good integrity, safety height.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of pipe fitting jockey embodiment of the present invention;
Fig. 2 is the schematic diagram of beams of concrete plate supporting device embodiment of the present invention.
Wherein, 1, pipe fitting jockey; 10, body; 11, the first buckling plate; 12, the second buckling plate; 13, locking member; 14, the first U-lag; 15, the second U-lag; 16, the 3rd U-lag; 17, the 4th U-lag; 2, support bar; 3, head rod; 4, the second connecting rod; 5, jacking; 6, crossbeam; 7, cross bar; 8, concrete beam plate.
Detailed description of the invention
Embodiment one
Below, in conjunction with accompanying drawing and detailed description of the invention, the present invention is described further:
As it is shown in figure 1, a kind of pipe fitting jockey 1, including body the 10, first buckling plate the 11, second buckling plate 12 and locking member 13; Body 10 has a first vertically arranged U-lag 14, each on two lateral walls of body 10 lateral symmetry is provided with one second U-lag 15;Described first U-lag 14 and the second U-lag 15 are all used for holding pipe fitting or bar; The quantity of the first buckling plate 11 and the second buckling plate 12 is 2, and described first buckling plate 11 is vertically provided with one the 3rd U-lag 16, and described second buckling plate 12 is horizontally arranged with one the 4th U-lag 17; One end of first buckling plate 11 is rotatably coupled on body 10, and the other end is fixed on body 10 by described locking member 13; One end of second buckling plate 12 is rotatably coupled on body 10, and the other end is fixed on body 10 by described locking member 13; Preferably employ hinge between one end and the body 10 of described first buckling plate 11 or bolt realizes being rotatably connected, preferably employing hinge between one end and the body 10 of described second buckling plate 12 or bolt realizes being rotatably connected, described locking member 13 preferably employs screw bolt and nut; Described 2 the first buckling plates 11 are separately positioned on the two ends of the first U-lag 14, and this first buckling plate 11 can be matched for clamping tightly pipe fitting or bar with the first U-lag 14; Second buckling plate 12 is arranged on the lateral wall of body 10, and this second buckling plate 12 is for being matched for clamping tightly pipe fitting or bar with the second U-lag 15.
As in figure 2 it is shown, a kind of beams of concrete plate supporting device, including above-mentioned pipe fitting jockey 1, support bar 2, head rod 3 and the second connecting rod 4; Wherein, the quantity of pipe fitting jockey 1 is 4, and the quantity of support bar 2 is 4, and described 4 support bars 2 are vertically arranged the matrix of composition one 2 �� 2; Pipe fitting jockey 1 is located on support bar 2, and its first U-lag 14 and the first buckling plate 11 clamp support bar 2; One end of head rod 3 is coordinated with the second U-lag 15 by the second buckling plate 12 on support bar 2 clamps, and its other end is coordinated with the second U-lag 15 by the second buckling plate 12 on laterally adjacent support bar 2 to be clamped; One end of second connecting rod 4 is fixed on support bar 2, and its other end is fixed on longitudinally adjacent support bar 2, and this second connecting rod 4 can be fixed on support bar 2 by fixation clamp and screw, and this second connecting rod 4 is positioned at the lower section of head rod 3; The top of support bar 2 is provided with a jacking 5, and between adjacent two jackings 5, erection has cross bar 7; The added crossbeam 6 that is provided with of head rod 3, described crossbeam 6 and jacking 5 are used for carrying concrete beam plate 8.
It will be apparent to those skilled in the art that can technical scheme as described above and design, make other various corresponding changes and deformation, and all these change and deformation all should belong within the protection domain of the claims in the present invention.

Claims (8)

1. a pipe fitting jockey, it is characterised in that include body, the first buckling plate, the second buckling plate and locking member; Described body has a first vertically arranged U-lag, and two lateral walls of described body are respectively horizontally arranged with one second U-lag, and described first U-lag and the second U-lag are all used for holding pipe fitting or bar; The quantity of described first buckling plate and the second buckling plate is 2, and described first buckling plate is vertically provided with one the 3rd U-lag, and described second buckling plate is horizontally arranged with one the 4th U-lag; One end of described first buckling plate is rotatably coupled on body, and the other end is fixed on body by described locking member; One end of described second buckling plate is rotatably coupled on body, and the other end is fixed on body by described locking member; Described 2 the first buckling plates are separately positioned on the two ends of the first U-lag, and this first buckling plate can be matched for clamping tightly pipe fitting or bar with the first U-lag;Described second buckling plate is arranged on the lateral wall of body, for being matched for clamping tightly pipe fitting or bar with the second U-lag.
2. pipe fitting jockey as claimed in claim 1, it is characterised in that described 2 the second U-lags are symmetricly set on the lateral wall of body.
3. pipe fitting jockey as claimed in claim 1, it is characterized in that, hinge or bolt can be adopted between one end and the body of described first buckling plate to realize being rotatably connected, hinge or bolt between one end and the body of described second buckling plate, can be adopted to realize being rotatably connected.
4. pipe fitting jockey as claimed in claim 1, it is characterised in that described locking member is screw bolt and nut.
5. the beams of concrete plate supporting device comprising pipe fitting jockey described in any one of claim 1-4, it is characterized in that, including pipe fitting jockey and support bar, described pipe fitting jockey is located on support bar, and described first U-lag and the first buckling plate coordinate clamps support bar.
6. beams of concrete plate supporting device as claimed in claim 5, it is characterised in that also include head rod and the second connecting rod; The quantity of described pipe fitting jockey is 4, and the quantity of described support bar is 4, and described 4 support bars are vertically arranged the matrix of composition one 2 �� 2; One end of described head rod is coordinated by the second buckling plate on support bar and the second U-lag clamps, and its other end is coordinated by the second buckling plate on laterally adjacent support bar and the second U-lag to be clamped; One end of described second connecting rod is fixed on support bar, and its other end is fixed on longitudinally adjacent support bar, and described second connecting rod is positioned at the lower section of head rod; The top of described support bar is provided with a jacking, and the added crossbeam that is provided with of described head rod, described crossbeam and jacking are used for carrying concrete beam plate.
7. beams of concrete plate supporting device as claimed in claim 6, it is characterised in that between adjacent two jackings, erection has cross bar.
8. beams of concrete plate supporting device as claimed in claim 6, it is characterised in that described second connecting rod is fixed on support bar by fixation clamp and screw.
CN201511033863.XA 2015-12-31 2015-12-31 Pipe fitting jockey and beams of concrete plate supporting device comprising the fixture Active CN105649218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511033863.XA CN105649218B (en) 2015-12-31 2015-12-31 Pipe fitting jockey and beams of concrete plate supporting device comprising the fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511033863.XA CN105649218B (en) 2015-12-31 2015-12-31 Pipe fitting jockey and beams of concrete plate supporting device comprising the fixture

Publications (2)

Publication Number Publication Date
CN105649218A true CN105649218A (en) 2016-06-08
CN105649218B CN105649218B (en) 2019-02-01

Family

ID=56491274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511033863.XA Active CN105649218B (en) 2015-12-31 2015-12-31 Pipe fitting jockey and beams of concrete plate supporting device comprising the fixture

Country Status (1)

Country Link
CN (1) CN105649218B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1031576A (en) * 1987-08-26 1989-03-08 快速龙门起重架租赁有限公司 The improvement of scaffolding
JP2001107472A (en) * 1999-10-08 2001-04-17 Sumitomo Metal Ind Ltd Pipe joint for structure
CN201459932U (en) * 2009-04-13 2010-05-12 上海亚泽太阳能金属屋面工程有限公司 Roofing round tube purline adjustable connecting device
CN203145196U (en) * 2013-04-10 2013-08-21 姚传海 Rod piece connecting device applied to complex building space structural system
CN104074350A (en) * 2014-06-11 2014-10-01 安徽长青电子机械(集团)有限公司 Wall connecting type scaffold connecting element
CN204510775U (en) * 2015-02-13 2015-07-29 深圳市中升建科科技发展有限公司 Construction of High-rise elevating safety protecting screen

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1031576A (en) * 1987-08-26 1989-03-08 快速龙门起重架租赁有限公司 The improvement of scaffolding
JP2001107472A (en) * 1999-10-08 2001-04-17 Sumitomo Metal Ind Ltd Pipe joint for structure
CN201459932U (en) * 2009-04-13 2010-05-12 上海亚泽太阳能金属屋面工程有限公司 Roofing round tube purline adjustable connecting device
CN203145196U (en) * 2013-04-10 2013-08-21 姚传海 Rod piece connecting device applied to complex building space structural system
CN104074350A (en) * 2014-06-11 2014-10-01 安徽长青电子机械(集团)有限公司 Wall connecting type scaffold connecting element
CN204510775U (en) * 2015-02-13 2015-07-29 深圳市中升建科科技发展有限公司 Construction of High-rise elevating safety protecting screen

Also Published As

Publication number Publication date
CN105649218B (en) 2019-02-01

Similar Documents

Publication Publication Date Title
CN204372344U (en) Furred ceiling combined pillar
CN202391435U (en) Vertical buried type water stop clamp of inverted arch
CN204401808U (en) Bolt-ball net frame assembly structure
CN204626962U (en) A kind of clamp frame of column template
CN210179067U (en) Pipeline installation fixing clamp
CN104671071A (en) Concrete formwork hoisting method and connecting clamp used in concrete formwork hoisting method
CN204983185U (en) Expansion joint keeping cover structure for wall face and top face
CN104777577A (en) Optical cable down leading iron pipe fixing bracket
CN203707716U (en) Multilayer laying support for aluminum alloy cable in shaft well
CN210404603U (en) Cable support convenient to adjust
CN105649218A (en) Pipe connecting clamp and concrete beam slab supporting device comprising same
CN204254033U (en) A kind of marine water pipe hanger structure
CN203860787U (en) Novel connection support foot
CN108116302B (en) Multilayer pipeline transportation support with arbitrary shape and transportation method thereof
CN203685790U (en) Twisted-shaped connector of anti-seismic support
CN204692772U (en) A kind of combination type supporting device for petroleum pipeline
CN209925777U (en) Pipeline support for municipal construction
CN105987230A (en) Pipe clamp cross arm
CN201699365U (en) Holding rod mounting structure component of EPON access box
CN204751889U (en) Jockey is used in concrete form hoist and mount
CN204152040U (en) A kind of stone curtain wall external corner edge list structure
CN207687490U (en) A kind of T-type supporting rack
CN204717658U (en) A kind of boiler H type fin economizer erecting by overhang
CN204986023U (en) Pipeline fix the support frame for building
CN204266664U (en) A kind of adjustable anchor ear

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 410000 Changsha Yuhua District, Hunan Zhongyi Road, No. 158

Applicant after: China Construction Fifth Engineering Division Co., Ltd.

Applicant after: CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION CORP., LTD. GUANGZHOU BRANCH

Address before: 510000 Guangdong city of Guangzhou province Haizhuqu District Xingang Road No. 1088 Zhongzhou Trade Center 13 floor

Applicant before: CHINA CONSTRUCTION FIFTH ENGINEERING DIVISION CORP., LTD. GUANGZHOU BRANCH

Applicant before: China Construction Fifth Engineering Division Co., Ltd.

GR01 Patent grant
GR01 Patent grant