CN105644592A - Generation method, query method and device of wiring diagram of single equipment according to railway signal system - Google Patents

Generation method, query method and device of wiring diagram of single equipment according to railway signal system Download PDF

Info

Publication number
CN105644592A
CN105644592A CN201510457040.3A CN201510457040A CN105644592A CN 105644592 A CN105644592 A CN 105644592A CN 201510457040 A CN201510457040 A CN 201510457040A CN 105644592 A CN105644592 A CN 105644592A
Authority
CN
China
Prior art keywords
equipment
destination object
cable
affiliated partner
diagram
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510457040.3A
Other languages
Chinese (zh)
Other versions
CN105644592B (en
Inventor
尚庆生
祁杰生
吕兴寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Sunland Graphics Technology Co Ltd
Original Assignee
Lanzhou Sunland Graphics Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Sunland Graphics Technology Co Ltd filed Critical Lanzhou Sunland Graphics Technology Co Ltd
Priority to CN201510457040.3A priority Critical patent/CN105644592B/en
Publication of CN105644592A publication Critical patent/CN105644592A/en
Application granted granted Critical
Publication of CN105644592B publication Critical patent/CN105644592B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to the technical field of management of engineering drawings, in particular to a generation method, query method and device of a wiring diagram of single equipment according to a railway signal system. The generation method of the wiring diagram of the single equipment according to the railway signal system comprises the following steps of determining an associated object associated with a target object in a construction drawing or an as-built drawing of equipment in the railway signal system, and establishing associated relation between the target object and the associated object; using the target object as a core, generating the layout of the associated object according to the associated relation, and generating a full path wiring schematic diagram of the corresponding equipment. According to the generation method, query method and device of the wiring diagram of the single equipment according to the railway signal system, disclosed by the invention, the problems that the equipment is inconvenient to emergently dispose and drawings are inconvenient to manage and refer to in the railway signal system can be solved.

Description

Railway signal system sets up for connecing distribution drawing generating method, querying method and device
Technical field
The present invention relates to engineering drawing management technique field, set up for connecing distribution drawing generating method, querying method and device in particular to railway signal system.
Background technology
Railway signal system is the holonomic system being made up of the main equipments such as various types of signal display device, track circuit, changing points device and affiliated facility thereof. Railway signal system is the nerve centre of railway operation and control, is responsible for the scheduling of driving transport, commands and the transmission and execution, the monitor task that automatically control instruction, to ensure traffic safety, to improve railway operation efficiency.
The design of the railway signal system of China has strict design rule, has to comply with the design standard that state-owned railroads head office (the former Ministry of Railways) issues simultaneously. Signalling arrangement design drawing reflect in signaling system comprehensively the installation site of various types of signal equipment and connect, distribution relation, railway operation telecommunication and signaling branch equipment regular maintenance and troubleshooting must use the as-constructed drawing archives that Railway Design and construction department provide to carry out technical management. Compared with other engineering drawing, railway signal system mechanical drawing has following several outstanding feature, and one is the little convenience in order to construct and operation maintenance manages of breadth, is all almost the extended type of A3 breadth or A3 breadth; Two is that graphic element is intensive, lengthy and tedious, and the graphic element on a drawing is even tens thousand of up to thousands of; Three is that drawing quantity is many, and a common station is together with interval drawing quantity, generally all more than three, 400; Four is in close relations between each drawing, signalling arrangement from position, cable pathway, middle connect distribution chamber, to device drives, all of distribution relation that connects is all be reflected in dispersedly in different drawings. Therefore, when device fails emergency disposal or regular maintenance, the management of signal drawing, have access to and analyze, cause high effort for consuming time.
In recent years, market also occurs in that some general engineering technique softwares, generally all the management of drawing category is got up, carry out consulting or edit-modify according to designation of drawing. These systems are mostly according to the design of product data management system thought, it is possible to by relational database management system, but can only realize engineering drawing and store by the classification of whole drawing and relevant documentation information thereof.
The complexity of railway signal system drawing figure, is that complexity and the reliability requirement of signaling system makes so, and signal drawing figure, from system perspective and construct angle design of expression principle and target, is hung ten thousand and can not be leaked one. After rail yard opens operation, this drawing figure is taken as again equipment files and consigns to railway operation administration section, as the foundation that everyday devices administers and maintains. The distribution positional information that connects of one equipment is distributed in multiple even whole design drawinies. One device fails or in General Maintenance, (signalling arrangement Machine Room) to outdoor cable trace and connects wiring condition at various nodes indoor, professional and technical personnel is needed to analyze, search, follow the tracks of and repeatedly compare from multiple design drawings, interpreting blueprints efficiency is very low, is highly detrimental to Classification Management and the maintenance of equipment. Particularly during device fails, have a strong impact on fault and dispose speed, cause Train delay, delay. Along with railway operating kilometrage be continuously increased, train running speed is increasingly faster and the fast development of high-speed railway, railway operation management being proposed and grows with each passing hour and requirements at the higher level that speed is all entered, big unification and scattered way to manage based on the original construction drawing of signaling system or as-built drawing are difficult to meet the operation maintenance needs of modern signalling systems.
Existing general engineering technique software carries out drawing retrieval, retrieval mode inefficiency only by the keyword of filename or filename, it is impossible to meet real work needs.
Summary of the invention
It is an object of the invention to provide and a kind of generate complete trails new, individual equipment according to railway signal system equipment construction or as-built drawing and connect distribution principle map generalization method, querying method and device, to improve, the management of railway signal system mechanical drawing is lengthy and tedious, consult time-consuming, bothersome, ineffective to accident handling problem.
First aspect, embodiments provide a kind of new railway signal system and set up for connecing distribution drawing generating method, including determining the affiliated partner being associated with destination object in railway signal system equipment construction or as-built drawing, and set up the incidence relation of described destination object and described affiliated partner; With described destination object for core, affiliated partner described in described incidence relation layout, through restructuring, conversion, generate corresponding, new equipment complete trails and connect distribution schematic diagram.
Second aspect, the embodiment of the present invention additionally provides the querying method of this railway signal system equipment details, including: receive the instruction information of the inquiry destination object that user sends; Searching and show that the equipment complete trails with described instruction information matches connects distribution schematic diagram to user, wherein said equipment complete trails connects distribution schematic diagram and includes described destination object, and has the affiliated partner of incidence relation with described destination object.
The third aspect, the embodiment of the present invention additionally provides a kind of according to railway signal system equipment construction figure or as-built drawing, generate new complete trails and connect the device of distribution schematic diagram, including: incidence relation sets up module, for determining the affiliated partner being associated with destination object in railway signal system equipment design drawing, and set up the incidence relation of described destination object and described affiliated partner; Equipment drawing generation module, is used for described destination object for core, affiliated partner described in described incidence relation layout, generates corresponding, new equipment complete trails and connect distribution principle schematic diagram.
Fourth aspect, the embodiment of the present invention additionally provides the inquiry unit of a kind of railway signal system equipment drawing, including: receiver module, for receiving the instruction information of the inquiry destination object that user sends; Searching display module, for searching and showing the equipment drawing with described instruction information matches to user, wherein said equipment drawing includes described destination object, and has the affiliated partner of incidence relation with described destination object.
The railway signal system of the embodiment of the present invention sets up for connecing distribution drawing generating method, querying method and device, control principle according to equipment and control flow, with destination object (such as cable, semaphore, track section and point machine etc.) for core, from railway signal system equipment construction or as-built drawing, determine, with destination object, there is the affiliated partner of incidence relation, and destination object and corresponding affiliated partner are reorganized and reconfiguration according to set incidence relation, generate new equipment complete trails and connect distribution schematic diagram, thus being originally contained in complexity, whole positions of a destination object in dispersion but be closely related ten several or tens of drawings and link information thereof are independent and intactly show, and then significantly improve the work efficiency of user's interpreting blueprints and accident analysis, it addition, user can pass through to click semantic object extraction to the complete equipment drawing relevant to destination object, such that it is able to improve user to consult effectiveness of retrieval.
Accompanying drawing explanation
Fig. 1 illustrates the flow chart of railway signal system equipment map generalization method in the embodiment of the present invention;
Fig. 2 illustrates certain station two-wire track circuit and cable pathway figure in the embodiment of the present invention;
Fig. 3 illustrates the cable topology figure of certain station 12# cable in the embodiment of the present invention;
Fig. 4 illustrates certain station 1I assembled arrangement table Local map in the embodiment of the present invention;
Fig. 5 illustrates the outdoor noseplate distribution table Local map in certain station in the embodiment of the present invention;
Fig. 6 illustrates that in the embodiment of the present invention, certain 1I outdoor, station noseplate connects wiring diagram;
Fig. 7 illustrates the Local map of certain station outside cable wiring diagram in the embodiment of the present invention;
Fig. 8 illustrates certain station 1I wire-bound links figure in the embodiment of the present invention;
Fig. 9 illustrates that in the embodiment of the present invention, certain station 1I outside cable connects wiring diagram;
Figure 10-Figure 12 illustrates certain station 1I combined side wiring diagram in the embodiment of the present invention;
Figure 13-Figure 14 illustrates certain station 1DG track circuit figure in the embodiment of the present invention;
Figure 15-Figure 16 illustrates certain station entry/exit station signal lights lighting circuit figure in the embodiment of the present invention;
Figure 17 illustrates certain station switch control circuit figure in the embodiment of the present invention;
Figure 18 illustrates No. 1 switch control circuit figure in certain station in the embodiment of the present invention;
Figure 19 illustrates certain station semaphore X main filament warning circuit figure in the embodiment of the present invention;
Figure 20 illustrates certain station S1LQG block section circuit diagram in the embodiment of the present invention;
Figure 21 illustrates that in the embodiment of the present invention, query facility connects the flow chart of wiring graph;
Figure 22 illustrates that in the embodiment of the present invention, user clicks the flow chart of query facility figure.
Detailed description of the invention
Below in conjunction with accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described. Based on embodiments of the invention, the every other embodiment that those skilled in the art obtain under the premise not making creative work, broadly fall into the scope of protection of the invention.
Railway signal system for the embodiment of the present invention sets up for connecing distribution map generalization method in the specific implementation, and main process step includes as shown in Figure 1:
Step S11: determine the affiliated partner being associated with destination object in railway signal system equipment construction figure or as-built drawing, and set up the incidence relation of destination object and affiliated partner.
In this step, with destination object for core, from railway signal system equipment construction figure or as-built drawing, determine the design drawing relevant to destination object, search from the design drawing determined and determine the affiliated partner being associated with destination object; And according to destination object layout in each design drawing, set up the incidence relation of destination object and affiliated partner.
Step S12: with destination object for core, according to incidence relation restructuring and conversion affiliated partner, generates equipment complete trails new accordingly and connects distribution schematic diagram.
When generating equipment complete trails and connecing distribution schematic diagram, by the destination object found out from each construction drawing and affiliated partner, carry out reconfiguring and reconfiguration, and the parameter that sets a property, thus generating corresponding equipment complete trails to connect distribution schematic diagram.
In the embodiment of the present invention, the equipment complete trails of generation connects distribution schematic diagram and includes the equipment site plan of band signal equipment figure attribute information, wire-bound links figure and cable topology figure; After generating equipment site plan, wire-bound links figure and cable topology figure, also equipment site plan, wire-bound links figure and cable topology figure for generating arrange trigger condition, when receiving the triggering instruction meeting trigger condition, according to triggering instruction presentation device site plan, wire-bound links figure, cable topology figure and equipment cable wiring diagram, the cable map clicking presentation device site plan, wire-bound links figure, cable topology figure and equipment by user thus can be realized.
The railway signal system equipment map generalization method of the embodiment of the present invention in the specific implementation, have employed and railway signal system equipment construction figure or the as-built drawing of DWG graphics file format carried out restructuring conversion and obtain new, the equipment complete trails remaining DWG form connects the mode of distribution schematic diagram, and the new figure of generation can include following one or more according to the actual needs: the wall scroll outside cable topological diagram of mounting cable chamber, single target equipment is (such as semaphore, track section, point machine) meet distribution link figure, single target equipment is (such as semaphore, track section, point machine) outside cable wiring diagram, the outside cable wiring diagram of cable chamber, single target equipment is (such as interior semaphore of standing, stand inner orbit section, point machine) outdoor noseplate wiring diagram, single target equipment is (such as interior semaphore of standing, stand inner orbit section, point machine) the combined bay location drawing, single system is (such as Wayside signal, interval orbit section) the interval composite rack location drawing, single target equipment is (such as interior semaphore of standing, stand inner orbit section, point machine) combined bay side wiring diagram, the lamp circuit figure of semaphore, the main filament warning circuit figure of semaphore in standing, the track circuit figure of track section, the control circuit figure of track switch and block section circuit diagram.
Above-mentioned cable topology figure, is used for representing that single cable pathway and this cable are connected to which cable junction box, chamber equipment (such as point machine, track circuit, semaphore), the situation of cable and cable connection device belonging to reflected signal equipment.
Above-mentioned single target equipment meet distribution link figure, during for representing that the equipment such as point machine, track section and semaphore arrive indoor wiring outdoor, have passed through which cable terminal box, cable junction box, lightning protection cabinet, combined bay/composite rack, and be connected to which terminal.
The outside cable wiring diagram of above-mentioned target device, for representing that single target equipment have passed through which cable box of outside cable and connects wiring condition in cable box.
Above-mentioned cable chamber outside cable wiring diagram, connects wiring condition for what represent a certain outside cable chamber.
Above-mentioned outdoor noseplate connects wiring diagram, for representing that target device connects distribution relation at outdoor noseplate or lightning protection cabinet.
The said equipment combined bay location drawing, for representing the target device position at combined bay.
Combinations thereof side wiring diagram, for representing the target device combined side wiring condition at combined bay.
Above-mentioned track circuit figure, for representing the track circuit of target track section and connecing wiring condition.
Above-mentioned signal lighting circuit figure, for representing the lamp circuit of echo signal machine and connecing wiring condition.
Above-mentioned switch control circuit figure, for representing the railway switch control circuit of target track switch and connecing wiring condition.
Semaphore main filament warning circuit figure in above-mentioned station, for representing the main filament warning circuit of semaphore in a certain station and connecing wiring condition.
Above-mentioned block section circuit diagram, for representing the block section circuit of target interval track section and connecing wiring condition.
Below with reference to specific embodiment, the method generating various kinds of equipment figure is described in detail.
(1) the wall scroll outside cable topological diagram of cable chamber is mounted
Wall scroll outside cable topological diagram is to win each equipment (specifically can include point machine/track section/semaphore) of connection under 4/7 cable junction box and Direction box that every cable connects from the two-wire track cable pathway figure at certain station (interval) respectively, and these Direction boxs and signalling arrangement graphical symbol are all the graph blocks with attribute.
Illustrate for the cable topology map generalization of certain station 12# cable below:
1. the drawing required for generating the cable topology of 12# cable: certain stand the two-wire track circuit in signalling arrangement construction drawing or as-built drawing and cable pathway figure.
2. from two-wire track circuit and cable pathway figure, find the distribution of 12# cable, in accompanying drawing 2 shown in black thick dashed line, win out together with its chamber connected by black thick dashed line, including X3, XI, XII and X4 (semaphore title) in figure.
3. by 4/7 cable junction box and signal box, the chamber of track, track switch chamber be placed on different three horizontal line; Replace 4/7 cable junction box and device end box with the graph block with attribute and fill in each attribute; Indicate cable number.
The cable topology figure completed, as shown in Figure 3.
(2) single target equipment meet distribution link figure
The wire-bound links figure of single target equipment be the outside cable wiring diagram (or interval trunk cable wiring diagram) from Target Station (or interval) is followed the tracks of respectively and 4/7 cable junction box that cutting individual equipment (such as point machine/track section/semaphore) connects with other equipment (such as point machine/track section/semaphore) chamber until signal box, these Direction boxs and signalling arrangement chamber are all the graph blocks with attribute.
Illustrate for the wire-bound links map generalization process at No. 1 track switch in certain station 1 grade (1I) below:
1. the drawing required for generating the wire-bound links figure of single target equipment is: the assembled arrangement table in certain signaling at stations equipment construction figure or as-built drawing, outdoor noseplate distribution table and outside cable wiring diagram;
2. finding the block position of 1I to be 3 layers of 3 row 1 frame at assembled arrangement table is 31-3, (as Fig. 4 gets the bid the position of annulus);
3. in outdoor noseplate distribution table, 1F5-01-1 to 5 position, outdoor noseplate position of 1I is found according to the block position 31-3 of 1I, such as Fig. 5, corresponding combination is connect distribution terminal (31-305-1,31-305-2,31-305-3,31-305-4,31-305-5) and fills in the segment representing combined bay position, outdoor noseplate position is placed in the segment representing lightning protection cabinet; By corresponding position it can be seen that 1I is five-wire system track switch, therefore 1I out draws five distributions afterwards to device end box graph block from combined bay;
4. outside cable wiring diagram finds the distribution of 1I, as it is shown in fig. 7,1I track switch have passed through 1 (I) HZ24, D-1HZ24, D-3HZ24, is linked to lightning protection cabinet 1F5, generates splice case graph block respectively, and mark terminal number;
5. as shown in Figure 7,1I track switch is connected on 1# cable, uses the graph block with attribute to make cable number and indicates, indicates the cable number of the wire-bound links of be 1I;
The 1I wire-bound links figure completed is as shown in Figure 8.
(3) the outside cable wiring diagram of single target equipment
Canyon outer cable connects other equipment (point machine/track section/semaphore) that wiring diagram is tracking cutting individual equipment (point machine/track section/semaphore) connect respectively from the outside cable wiring diagram (or interval trunk cable wiring diagram) at certain station (interval) 4/7 cable junction box and connection until signal box.
Connect wiring diagram with certain station 1 grade of (1I) outside cable of No. 1 track switch below to be generated as example and illustrate:
1. generating drawing needed for canyon outer cable connects wiring diagram is: the outside cable wiring diagram in certain station signalling arrangement construction drawing or as-built drawing;
2. in outside cable wiring diagram, find 1I place chamber (as shown in Figure 7);
3. all devices that also cutting is connected, all chambers from signal box to distalmost end are followed the tracks of with 1I place chamber;
4. delete the numerical digit outside with terminal chamber, for the terminal number in chamber plus solid terminal, and the connecting line between terminal and terminal can be interrupted at each terminal place;
5. the chamber line style of current done device name with equipment place is widened.
6. cable map, it can be seen that 1I track switch is connected on 1# cable, indicates that the outside cable of be 1I connects the cable number of distribution outdoor;
The 1I outside cable completed connects wiring diagram as shown in Figure 9.
(4) the outdoor noseplate wiring diagram of single target equipment
It is look into outdoor noseplate distribution table from the outdoor noseplate position the outside cable wiring diagram at certain station that outdoor noseplate connects wiring diagram, data row corresponding on the noseplate distribution table of cutting outdoor.
Connect wiring diagram with certain outdoor noseplate of No. 11 grade of the track switch (1I) in station below to be generated as example and illustrate:
1. generating drawing needed for the outer noseplate of canyon connects wiring diagram is: the outdoor noseplate wiring diagram in certain station signalling arrangement construction drawing or as-built drawing;
2. in the outdoor noseplate wiring diagram in certain station, find outdoor 1F5-01-1 to 5 position, the noseplate position (as shown in Figure 5) of 1I;
3. cutting is relevant to 1I all data and form, and 1F-5 is replicated in above the data and form that institute's cutting gets off;
The 1I outdoor noseplate completed connects wiring diagram as shown in Figure 6.
(5) the combined bay location drawing of single target equipment
The equipment combined bay location drawing is the combined bay that the terminals of a unit block connecing wiring diagram according to the outdoor noseplate in certain station comes judgment device place, and then finds the correspondence position of equipment from corresponding combined bay.
It is generated as example with certain station 1 grade of (1I) combined bay location drawing of No. 1 track switch below to illustrate:
1. needed for the equipment combined bay location drawing, drawing is: the assembled arrangement table in certain signaling at stations equipment construction figure or as-built drawing;
2. the block position finding 1I in certain station assembled arrangement table is 33 layers of 31-3 of row 1 frame;
3. cutting 3 row all data and form;
The 1I combined bay location drawing completed is as shown in Figure 4;
(6) the combined bay side wiring diagram of single target equipment
Combined side wiring diagram is the wiring diagram winning each equipment from certain station (interval) combined side wiring diagram respectively.
It is generated as example with certain station track switch 1I combined side wiring diagram below to illustrate:
1. needed for generating equipment combined side wiring diagram, drawing is: the assembled arrangement table in certain signaling at stations equipment construction figure or as-built drawing, certain (interval) combined side wiring diagram of standing;
2. in certain station assembled arrangement table, block position 31-2,31-3 and 31-4 relevant to 1 is found;
3. in certain station combined side wiring diagram, find 31-2,31-3 and 31-4 according to block position 31-2,31-3 and the 31-4 relevant to track switch 1, this form and data cutting are got off;
The 1I combined side wiring diagram completed is such as shown in accompanying drawing 10-Figure 12.
(7) the track circuit figure of track section
Track circuit figure wins in the 25 weeks track circuit figure (certain 97 type 25Hz phase-sensitive track circuits figure that stand, but track circuit is not limited only to this standard) from the signalling arrangement figure of certain station and the circuit diagram of relevant device in the outside cable wiring diagram in certain station (or interval) respectively.
It is generated as example with certain station 1DG track circuit figure below to illustrate:
1. needed for generating track circuit figure, drawing is: 25 weeks track circuit figure (as shown in Figure 13) in certain station signalling arrangement design drawing or as-built drawing;
2. at 25 weeks, track circuit figure finds the data relevant to 1DG, line flag of going forward side by side;
The 1DG track circuit figure completed is as shown in Figure 14.
(8) the lamp circuit figure of semaphore
Signal lighting circuit figure is the entry/exit station from the signalling arrangement figure of certain station or each semaphore circuit diagram of winning of shunting signal lamp circuit figure, and Wayside signal lighting circuit figure is the circuit diagram of the corresponding semaphore part of extraction from certain station block section circuit diagram.
It is generated as example with certain station D1 signal lighting circuit figure below to illustrate:
1. needed for generating signal lighting circuit figure, drawing is: certain stand the entry/exit station in signalling arrangement construction drawing or as-built drawing or shunting signal lamp circuit figure (as shown in Figure 15);
2. certain station shunting signal lamp circuit figure find D1 to go forward side by side line flag;
The D1 signal lighting circuit figure completed is as shown in Figure 16.
(9) the control circuit figure of track switch
Switch control circuit figure is the control circuit figure of each point machine won in the switch control circuit figure from certain station signalling arrangement construction drawing or as-built drawing.
It is generated as example with No. 1 switch control circuit figure in certain station below to illustrate:
1. needed for generating switch control circuit figure, drawing is: the switch control circuit figure (as shown in Figure 17) in certain station signalling arrangement construction drawing or as-built drawing;
2. certain station switch control circuit figure find No. 1 that a line of track switch to go forward side by side line flag;
No. 1 switch control circuit figure completed is as shown in Figure 18.
(10) the main filament warning circuit figure of semaphore in standing
Semaphore main filament warning circuit figure be each semaphore of winning signal alarm for burnout of a main filament circuit diagram in certain station, station connect distribution information and circuit diagram.
It is generated as example with certain station semaphore X main filament warning circuit figure below to illustrate:
1. needed for generating semaphore main filament warning circuit figure, drawing is: signal alarm for burnout of a main filament circuit diagram in the station in certain station signalling arrangement construction drawing or as-built drawing;
2. in certain station, station, signal alarm for burnout of a main filament circuit diagram find X to go forward side by side line flag;
The semaphore X main filament warning circuit figure completed is as shown in Figure 19.
(11) block section circuit diagram is each interval orbit circuit information and circuit diagram won in the block section circuit diagram from the signalling arrangement figure of certain station.
It is generated as example with certain station S1LQG block section circuit diagram below to illustrate:
1. needed for generating block section circuit diagram, drawing is: the block section circuit diagram in certain station signalling arrangement construction drawing or as-built drawing;
2. block section circuit diagram full detail of certain being stood extracts;
The S1LQG block section circuit diagram completed is as shown in Figure 20.
It is an object of the invention to allow the technical staff of railway signal operating administration and manager can check the wiring condition that connects of various equipment conveniently and efficiently, improve the efficiency of management and failture evacuation. Implementation process with station (or marshalling yard, to send out a field) for unit, first collect completely, Signal construction figure or as-built drawing accurately, process as stated above obtain equipment site plan, wire-bound links figure, cable topology figure, outside cable connects wiring diagram, outdoor noseplate connects wiring diagram, the equipment combined bay location drawing, combined side wiring diagram, track circuit figure, signal lighting circuit figure, switch control circuit figure, semaphore main filament warning circuit figure, block section circuit diagram.
Above-mentioned graphic file is closely related with equipment, and each equipment is relevant to multiple figure again, correct in order to ensure the logical relation between graphic file, has formulated strict file designation rule, such as wire-bound links figure called after name of station _ JXLL_ implementor name; Outside cable figure called after name of station _ SWDL_ implementor name etc.
Restructuring based on above-mentioned railway signal system equipment construction figure or as-built drawing converts and the method for generation, proposes a kind of equipment drawing based on this New Graphics and use and management method in the embodiment of the present invention. By click equipment graph block, can transferring relevant all kinds of graphic files, device parameter and photo in kind, recall precision is significantly high.
Pass through the art of this patent, it is possible to change that traditional signalling arrangement map file is had access to, the distribution relation that connects of equipment is searched and failure analysis methods, is remarkably improved the efficiency of signalling arrangement map file information management and malfunction elimination, ensures railway operation safety and percent of punctuality completely.
The embodiment of the present invention generates new equipment complete trails based on signalling arrangement construction drawing or as-built drawing connect distribution schematic diagram through restructuring conversion, check the flow process of this figure as shown in Figure 21, this flow process is from signalling arrangement site plan, automatically other figure relative is had access to by mouse point taking equipment graph block, the figure that support point takes has three kinds, respectively: signalling arrangement site plan, signalling arrangement meet distribution link figure, cable topology figure. User clicks graphic operation flow process as shown in Figure 22.
The operating process of signalling arrangement site plan is as follows:
Showing arbitrary Railways Stations (field) and uplink and downlink Block signaling equipment site plan thereof, user can click semaphore, track switch, track section 3 class segment, and management system selects automatic decision figure block type according to user, responds.
1. select semaphore or Wayside signal, directly display the wire-bound links figure of semaphore;
2. selecting station inner orbit section, display receives, sends shortcut menu, after user selects to determine, and display track section receiving terminal or transmitting terminal wire-bound links figure;
3. selecting track switch, display comprises point machine extension set title and the implicit expression track section title associated with track switch, after user's selection is determined, and the wire-bound links figure of display track switch or implicit expression track section.
Wire-bound links graphic operation flow process is as follows:
In wire-bound links figure, user can click splice case, termination box, combined bay, lightning protection cabinet and cable number 5 class graph block, and management system selects automatic decision graph block type according to user and ejects shortcut menu, after user selects, shows respective graphical.
1. the wire-bound links figure of semaphore may select in station display lamp circuit figure, outside cable wiring diagram, main filament warning circuit figure, the outdoor outside cable wiring diagram of splice case, lightning protection cabinet outdoor noseplate wiring diagram, place combined bay assembled arrangement figure, combined side wiring diagram, photo in kind;
2. optional display point machine control circuit figure, outdoor the outside cable wiring diagram of splice case, lightning protection cabinet outdoor noseplate wiring diagram, place combined bay assembled arrangement figure, combined side wiring diagram in the wire-bound links figure of track switch;
3. optional display track circuit figure, outdoor the outside cable wiring diagram of splice case, lightning protection cabinet outdoor noseplate wiring diagram, place combined bay assembled arrangement figure, combined side wiring diagram in the wire-bound links figure of station inner orbit section;
4. optional display signal lighting circuit figure, the outdoor outside cable wiring diagram of splice case, the place combined bay location drawing, combined side wiring diagram, photo in kind in the wire-bound links figure of Wayside signal;
5. optional display block section circuit diagram, outdoor the outside cable wiring diagram of splice case, the place combined bay location drawing, combined side wiring diagram in the wire-bound links figure of interval orbit section.
6. select the cable graph block in equipment wire-bound links figure, show the cable topology figure of this numbering cable.
Cable topology graphic operation flow process is as follows:
In the topological diagram of single cable, user can printing device graph block, display corresponding device wire-bound links figure.
Railway signal figure is that (version is from r14 up till now up-to-date 2014 at AutoCAD, and may proceed to upgrading backward) design under graphics software environment, result of design is the graphic file of DWG form, below for DWG formatted file, describe embodiments of the present invention in detail, described embodiment is only used for explaining the present invention, is not intended to limit the specific embodiment of the present invention.
The interactive operation of figure of the present invention is realized by the graph block of DWG file, and the browse operation process of graphic based is as shown in Figure 22. The figure that can respond mouse-click operation is Railways Stations (field) and uplink and downlink Block signaling equipment site plan, wire-bound links figure and cable topology figure, these 3 kinds of figures devise some graph blocks, by reading device type and the title that block's attribute may determine that user selects, thus responding.
It is proven, the present invention will be distributed over the equipment in signalling arrangement detail design or as-built drawing and connects distribution relation and undertaken decomposing, recombinating and reconfiguration by equipment, make arbitrary equipment outdoor to the indoor cable at place, the chamber of process, place comprehensive/combined bay position, the terminal that uses on each node be very clear, drastically increases the speed of interpreting blueprints. The inquiry mode of the graphic based block adopted, operates directly perceived, convenient, friendly, and technical staff and manager are very easy to grasp, it is simple to promote. Utilize the present invention to develop railway signal drawing intelligent guidance system, drastically increase the efficiency of railway signal management and troubleshooting.
Distribution principle map generalization method is connect based on above-mentioned railway signal system equipment singulation complete trails, the embodiment of the present invention additionally provides a kind of railway signal system equipment map generalization device, including: incidence relation sets up module, for determining the affiliated partner being associated with destination object in railway signal system equipment design drawing, and set up the incidence relation of described destination object and described affiliated partner; Equipment drawing generation module, is used for described destination object for core, affiliated partner described in described incidence relation layout, generates corresponding equipment complete trails and connect distribution schematic diagram.
The figure of above-mentioned generation includes the described signal equipment site plan with graphic attribute, described meet distribution link figure and described cable topology figure, point selection operation for above-mentioned figure, the generation device of figure also includes: trigger condition arranges module, for equipment site plan included in the described figure for generating, wire-bound links figure and cable topology figure arranges trigger condition, with when receiving the triggering instruction meeting described trigger condition, the instruction described signalling arrangement site plan of displaying is triggered according to described, described wire-bound links figure and described cable topology figure.
The querying method of corresponding above-mentioned railway signal system figure, the embodiment of the present invention additionally provides a kind of railway signal system and sets up the standby inquiry unit connecing wiring diagram, this device includes: receiver module, for receiving the instruction information of the inquiry destination object that user sends; Searching display module, for searching and showing the equipment drawing with described instruction information matches to user, wherein said equipment drawing includes described destination object, and has the affiliated partner of incidence relation with described destination object.
The device that the embodiment of the present invention provides, its technique effect realizing principle and generation is identical with preceding method embodiment, for being briefly described, the not mentioned part of device embodiment part, it is referred to corresponding contents in preceding method embodiment.
Above; being only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any those familiar with the art is in the technical scope that the invention discloses; change can be readily occurred in or replace, all should be encompassed within protection scope of the present invention. Therefore, protection scope of the present invention should be as the criterion with scope of the claims.

Claims (10)

1. railway signal system sets up for connecing distribution drawing generating method, it is characterised in that including:
The construction or as-built drawing of railway signal system equipment are determined the affiliated partner being associated with destination object, and sets up the incidence relation of described destination object and described affiliated partner;
With described destination object for core, affiliated partner described in described incidence relation layout, generate a kind of complete trails new, for individual equipment and connect distribution schematic diagram.
2. method according to claim 1, it is characterised in that determine the affiliated partner being associated with destination object in described railway signal system equipment construction or as-built drawing, and set up the incidence relation of described destination object and described affiliated partner, including:
From the construction of described railway signal system equipment or as-built drawing, determine that relevant to described destination object, complete trails for generating described equipment connects the design drawing of distribution schematic diagram;
The all described construction determined or as-built drawing are searched the affiliated partner associated with described destination object;
According to destination object each construction or as-built drawing in layout, set up the incidence relation of described destination object and described affiliated partner.
3. method according to claim 2, it is characterised in that with described destination object for core, affiliated partner described in described incidence relation layout, generate a kind of complete trails new, for individual equipment and connect distribution schematic diagram, including:
And/or win out from labelling the construction or as-built drawing at respective place by the described affiliated partner found out;
With described destination object for core, labelling and/or the described affiliated partner winning out are reconfigured according to described incidence relation and convert, and the parameter that sets a property, the complete trails to generate relevant device connects distribution schematic diagram.
4. method according to claim 1, it is characterized in that, set up standby complete trails described in generating to connect distribution schematic diagram and include: the equipment site plan of band signal equipment graphic attribute, connect distribution link figure and cable topology figure and cabling diagram, wherein, described signalling arrangement includes: track switch, semaphore, track circuit and cable; The method also includes:
For described equipment site plan, described in meet distribution link figure and described cable topology figure trigger condition be set, with when receive meet described trigger condition triggering instruction time, according to described trigger instruction show described equipment site plan, described in connect distribution link figure, described cable topology figure and described cabling diagram.
5. the method according to any one of Claims 1-4, it is characterized in that, set up standby complete trails described in generating to connect distribution schematic diagram and include the one or more of new figure after restructuring or conversion: the wall scroll outside cable topological diagram of mounting cable chamber, single target equipment meet distribution link figure, the outside cable wiring diagram of single target equipment, the outside cable wiring diagram of cable chamber, the outdoor noseplate wiring diagram of single target equipment, the combined bay location drawing of single target equipment, the interval composite rack location drawing of single system, the combined bay side wiring diagram of single target equipment, the lamp circuit figure of semaphore, the main filament warning circuit figure of semaphore in standing, the track circuit figure of track section, the control circuit figure of track switch and block section circuit diagram.
6. railway signal system sets up for connecing wiring diagram querying method, it is characterised in that including:
Receive the instruction information of the inquiry destination object that user sends;
Searching and show that the complete trails of the equipment with described instruction information matches connects distribution schematic diagram to user, wherein said equipment complete trails connects distribution schematic diagram and includes described destination object, and has the affiliated partner of incidence relation with described destination object.
7. method according to claim 6, it is characterised in that search and show the equipment drawing with described instruction information matches to user, including:
When the described instruction information received be for query facility site plan, connect distribution link figure and/or cable topology figure triggering instruction time, according to described trigger instruction show corresponding equipment site plan, connect distribution link figure, cable topology figure and cabling diagram.
8. railway signal system sets up the standby wiring diagram that connects and generates device, it is characterised in that including:
Incidence relation sets up module, for determining the affiliated partner being associated with destination object in railway signal system equipment design drawing, and sets up the incidence relation of described destination object and described affiliated partner;
Set up standby complete trails and connect distribution schematic diagram generation module, be used for described destination object for core, affiliated partner described in described incidence relation layout, generate corresponding figure.
9. device according to claim 8, it is characterized in that, described device also includes: trigger condition arranges module, for equipment site plan included in the described equipment drawing for generating, meet distribution link figure and cable topology figure trigger condition is set, with when receive meet described trigger condition triggering instruction time, according to described trigger instruction show described equipment site plan, described in connect distribution link figure and described cable topology figure and cabling diagram.
10. railway signal system sets up for connecing wiring diagram inquiry unit, it is characterised in that including:
Receiver module, for receiving the instruction information of the inquiry destination object that user sends;
Searching display module, for searching and showing that the equipment complete trails with described instruction information matches connects distribution schematic diagram to user, wherein said equipment drawing includes described destination object, and has the affiliated partner of incidence relation with described destination object.
CN201510457040.3A 2015-07-29 2015-07-29 Railway signal system single device connects distribution drawing generating method, querying method and device Active CN105644592B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510457040.3A CN105644592B (en) 2015-07-29 2015-07-29 Railway signal system single device connects distribution drawing generating method, querying method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510457040.3A CN105644592B (en) 2015-07-29 2015-07-29 Railway signal system single device connects distribution drawing generating method, querying method and device

Publications (2)

Publication Number Publication Date
CN105644592A true CN105644592A (en) 2016-06-08
CN105644592B CN105644592B (en) 2017-08-11

Family

ID=56481663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510457040.3A Active CN105644592B (en) 2015-07-29 2015-07-29 Railway signal system single device connects distribution drawing generating method, querying method and device

Country Status (1)

Country Link
CN (1) CN105644592B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107767441A (en) * 2017-09-20 2018-03-06 国家电网公司 Three-dimensional display management method and system
CN108090938A (en) * 2016-11-22 2018-05-29 北京国双科技有限公司 A kind of method for exhibiting data and device
CN108563763A (en) * 2018-04-17 2018-09-21 兰州深蓝图形技术有限公司 Railway signals equipment graphic display method, device and mobile terminal
CN108872733A (en) * 2018-04-17 2018-11-23 中铁电气化(武汉)设计研究院有限公司 A kind of non-insulated track circuit adjustment table determines method and device
CN110481595A (en) * 2019-07-19 2019-11-22 黑龙江瑞兴科技股份有限公司 A method of for carrying out malfunction monitoring to track circuit section
CN110781138A (en) * 2019-10-31 2020-02-11 海南蓄能发电有限公司 Electronic drawing management system and method
CN112214947A (en) * 2020-09-03 2021-01-12 卡斯柯信号(郑州)有限公司 Turnout circuit action time sequence display method
CN112307692A (en) * 2020-10-30 2021-02-02 北京全路通信信号研究设计院集团有限公司 Station interlocking annunciator circuit drawing generation method and device
CN112966460A (en) * 2021-04-09 2021-06-15 中铁第一勘察设计院集团有限公司 Digitization method of railway signal engineering wiring terminal wiring
CN113704521A (en) * 2021-10-28 2021-11-26 北京全路通信信号研究设计院集团有限公司 Electronic drawing generation method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006040617A1 (en) * 2004-10-12 2006-04-20 Ford Otomativ Sanayi Anonim Sirketi A method and apparatus for monitoring fuel injection
JP4090852B2 (en) * 2002-11-21 2008-05-28 財団法人鉄道総合技術研究所 Train travel information detection device by GPS positioning and train travel information detection method
JP5307098B2 (en) * 2010-09-17 2013-10-02 株式会社メイエレック Railway signal CAD system simulator, computer program therefor, computer-readable recording medium recording the program, and railway signal CAD system simulation method
CN103569160A (en) * 2012-07-30 2014-02-12 北京西南交大盛阳科技有限公司 Railway signal alarm method based on dynamic logical electronic graph paper
CN103778589A (en) * 2014-02-25 2014-05-07 北京全路通信信号研究设计院有限公司 Monitoring method and system of railway signal system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4090852B2 (en) * 2002-11-21 2008-05-28 財団法人鉄道総合技術研究所 Train travel information detection device by GPS positioning and train travel information detection method
WO2006040617A1 (en) * 2004-10-12 2006-04-20 Ford Otomativ Sanayi Anonim Sirketi A method and apparatus for monitoring fuel injection
JP5307098B2 (en) * 2010-09-17 2013-10-02 株式会社メイエレック Railway signal CAD system simulator, computer program therefor, computer-readable recording medium recording the program, and railway signal CAD system simulation method
CN103569160A (en) * 2012-07-30 2014-02-12 北京西南交大盛阳科技有限公司 Railway signal alarm method based on dynamic logical electronic graph paper
CN103778589A (en) * 2014-02-25 2014-05-07 北京全路通信信号研究设计院有限公司 Monitoring method and system of railway signal system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李德坤: "车站信号设备管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108090938A (en) * 2016-11-22 2018-05-29 北京国双科技有限公司 A kind of method for exhibiting data and device
CN107767441A (en) * 2017-09-20 2018-03-06 国家电网公司 Three-dimensional display management method and system
CN108563763A (en) * 2018-04-17 2018-09-21 兰州深蓝图形技术有限公司 Railway signals equipment graphic display method, device and mobile terminal
CN108872733A (en) * 2018-04-17 2018-11-23 中铁电气化(武汉)设计研究院有限公司 A kind of non-insulated track circuit adjustment table determines method and device
CN110481595A (en) * 2019-07-19 2019-11-22 黑龙江瑞兴科技股份有限公司 A method of for carrying out malfunction monitoring to track circuit section
CN110781138A (en) * 2019-10-31 2020-02-11 海南蓄能发电有限公司 Electronic drawing management system and method
CN112214947A (en) * 2020-09-03 2021-01-12 卡斯柯信号(郑州)有限公司 Turnout circuit action time sequence display method
CN112307692A (en) * 2020-10-30 2021-02-02 北京全路通信信号研究设计院集团有限公司 Station interlocking annunciator circuit drawing generation method and device
CN112307692B (en) * 2020-10-30 2023-10-03 北京全路通信信号研究设计院集团有限公司 Station interlocking annunciator circuit drawing generation method and device
CN112966460A (en) * 2021-04-09 2021-06-15 中铁第一勘察设计院集团有限公司 Digitization method of railway signal engineering wiring terminal wiring
CN112966460B (en) * 2021-04-09 2024-06-07 中铁第一勘察设计院集团有限公司 Digital method for wiring of wiring terminal of railway signal engineering
CN113704521A (en) * 2021-10-28 2021-11-26 北京全路通信信号研究设计院集团有限公司 Electronic drawing generation method and system

Also Published As

Publication number Publication date
CN105644592B (en) 2017-08-11

Similar Documents

Publication Publication Date Title
CN105644592B (en) Railway signal system single device connects distribution drawing generating method, querying method and device
CN202856733U (en) Optical cable management system ocms
CN100463822C (en) Computer interlock system
CN105591691B (en) A kind of fault point positioning method of the communications optical cable based on GIS
CN104780000B (en) A kind of method of fibre core fault fast positioning
CN106446431B (en) The electrical secondary system method for visualizing of extra-high voltage direct-current transmission control protection equipment
CN104753178A (en) Power grid fault handling system
CN110442755B (en) Topological graph display method based on network connection between nuclear power plant DCS (distributed control System) platforms
CN103576650A (en) Operation security monitoring and managing system for airport ground equipment
CN102710443A (en) Method and system for impact analysis of power communication relay protection business
CN105429803B (en) Quadratic Imaginary loop fault localization method based on fault zone Difference formula reasoning
CN102832715A (en) Virtual terminal, real fiber/optical cable integrative design method in design of intelligent substation
CN204348052U (en) Low voltage electric network power information acquisition system
CN104504770A (en) Intelligent patrol system for communication device
CN110474431A (en) A kind of power system visualization platform monitoring management method and system
CN104637265A (en) Dispatch-automated multilevel integration intelligent watching alarming system
CN106779508A (en) Secondary system of intelligent substation safety measure analogue simulation and O&M control platform
CN103888286A (en) Information communication machine room device and line resource management system
CN101227327B (en) Method for concentrating network managing system and uploading lower level alarm information
CN103607048B (en) An electric power network device fault diagnosis method and a system
CN109067602A (en) Electric power adapted electric industry business method for diagnosing faults and Related product based on communication monitoring
CN206178083U (en) Power distribution network fault positioning system
CN107231187A (en) A kind of transmission cable fault judgment method, device and terminal
CN107025329A (en) The empty loop automatic connection method of intelligent substation
CN109728580A (en) Reliability estimation method under power distribution network maintenance mode based on depth forward-backward search method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant