CN105643459A - Ceramic tile grinding head mounting structure - Google Patents

Ceramic tile grinding head mounting structure Download PDF

Info

Publication number
CN105643459A
CN105643459A CN201511032225.6A CN201511032225A CN105643459A CN 105643459 A CN105643459 A CN 105643459A CN 201511032225 A CN201511032225 A CN 201511032225A CN 105643459 A CN105643459 A CN 105643459A
Authority
CN
China
Prior art keywords
bistrique
fixed code
grinding head
interconnecting piece
ceramic tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511032225.6A
Other languages
Chinese (zh)
Other versions
CN105643459B (en
Inventor
肖世文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heyuan Xinlu New Materials Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201511032225.6A priority Critical patent/CN105643459B/en
Publication of CN105643459A publication Critical patent/CN105643459A/en
Application granted granted Critical
Publication of CN105643459B publication Critical patent/CN105643459B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B24GRINDING; POLISHING
    • B24BMACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
    • B24B45/00Means for securing grinding wheels on rotary arbors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)
  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The invention discloses a ceramic tile grinding head mounting structure. The ceramic tile grinding head mounting structure comprises a mounting frame, a grinding head connecting part connected with the bottom surface of the mounting frame, and a fixed code component with an operation part arranged beside the grinding head connecting part; the mounting frame is provided with a hooking part capable of being hooked with the fixed code component; a fastening part is arranged on the grinding head connecting part; and the fixed code component is synchronously connected with the hooking part and the fastening part to connect the mounting frame with the grinding head connecting part. The mounting frame and the grinding head connecting part are connected through the fixed code component; as the operation part of the fixed code component is arranged beside the mounting frame, when the grinding head connecting part is replaced, people can perform mounting and disassembly operations for the grinding head connecting part beside the mounting frame. The grinding head connecting part is convenient to be replaced; an operation gap has no need to be formed in the mounting frame; the height of a grinding machine using the ceramic tile grinding head mounting structure is decreased; and the manufacturing cost of the grinding machine is reduced. The ceramic tile grinding head mounting structure is used for the grinding machine.

Description

A kind of ceramic tile bistrique installs structure
Technical field
The present invention relates to a kind of ceramic tile bistrique and structure is installed.
Background technology
After ceramic tile is produced, it is necessary to carry out its appearance being ground or polishing with shredder. Bistrique comprises bistrique interconnecting piece and bistrique body, and owing to the quality of pottery is relatively hard, bistrique body is worn totally very soon. On existing bistrique interconnecting piece and shredder, erecting frame is all use bolt as interconnecting piece, and install all from top to bottom, therefore the operating portion of described bolt is above erecting frame, but owing to there being the existence of motor to cause the space of top of erecting frame less so that change bistrique very inconvenient. And in order to facilitate the mounting or dismounting of bistrique, between erecting frame and motor, needing to be provided with bigger operating clearance, this just makes the height of shredder to increase, and causes volume to become big and manufacturing cost rising.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of ceramic tile bistrique being convenient to change to install structure.
The present invention solves the solution of its technical problem:
A kind of ceramic tile bistrique installs structure, comprise the bistrique interconnecting piece that erecting frame is connected with the bottom surface of erecting frame, the bottom surface of bistrique interconnecting piece is provided with bistrique body, also comprise fixed code assembly, described fixed code assembly is provided with operating portion, described operating portion is arranged on the side of bistrique interconnecting piece, erecting frame is provided with and can hook the connecting portion connect with fixed code assembly, bistrique interconnecting piece is provided with fastening part, and described fixed code assembly is connected with connecting portion and fastening part simultaneously thus makes erecting frame and bistrique interconnecting piece link together.
As the further improvement of such scheme, described erecting frame is provided with threaded hole, the outside screw that described connecting portion is provided with described threaded hole is connected.
As the further improvement of such scheme, described bistrique interconnecting piece is provided with the accommodation groove that can hold connecting portion, and the fit-up gap of described accommodation groove and connecting portion is less than 1mm.
As the further improvement of such scheme, fixed code assembly comprises fixed code, fixed code assembly also comprises the Lock Part that can be fixed on bistrique interconnecting piece by fixed code, and described Lock Part is connected with bistrique interconnecting piece, and Lock Part is provided with described operating portion.
The invention has the beneficial effects as follows: erecting frame and bistrique interconnecting piece are linked together by fixed code assembly, owing to the operating portion of fixed code assembly is located at the side of erecting frame.Therefore, when changing bistrique interconnecting piece, people can carry out the installation of bistrique interconnecting piece, the operation of dismounting from the side of erecting frame. So not only being convenient for changing bistrique interconnecting piece, also without the need to setting operation gap on erecting frame again, so not only order uses the height of the shredder of the present invention to diminish, and also can reduce its manufacturing cost. The present invention is used for shredder.
Accompanying drawing explanation
In order to the technical scheme being illustrated more clearly in the embodiment of the present invention, below the accompanying drawing used required in embodiment being described is briefly described. Obviously, described accompanying drawing is a part of embodiment of the present invention, instead of whole embodiment, and the technician of this area is under the prerequisite not paying creative work, it is also possible to obtain other designs and accompanying drawing according to these accompanying drawings.
Fig. 1 is the connection structural representation of the embodiment of the present invention;
Fig. 2 is the elevational schematic view of embodiment of the present invention erecting frame;
Fig. 3 is the schematic top plan view of embodiment of the present invention bistrique interconnecting piece.
Embodiment
Below with reference to embodiment and accompanying drawing, the technique effect of the design of the present invention, concrete structure and generation is clearly and completely described, fully to understand object, the characteristic sum effect of the present invention. Obviously; described embodiment is a part of embodiment of the present invention, instead of whole embodiment, based on embodiments of the invention; other embodiments that the technician of this area obtains under the prerequisite not paying creative work, all belong to the scope of protection of the invention. In addition, all connections/connection relation mentioned in literary composition, not singly refers to that component directly connects, and refers to and according to concrete performance, can connect auxiliary part by adding or reduce, and forms more excellent connection structure. Each technology feature in the invention, can combination of interactions under the prerequisite of not conflicting conflict.
Referring to figs. 1 through Fig. 3, this is one embodiment of the present of invention, specifically:
A kind of ceramic tile bistrique installs structure, comprise the bistrique interconnecting piece 2 that erecting frame 1 is connected with the bottom surface of erecting frame 1, the bottom surface of bistrique interconnecting piece 2 is provided with bistrique body, also comprise fixed code assembly, described fixed code assembly is provided with operating portion, described operating portion is arranged on the side of bistrique interconnecting piece 2, erecting frame 1 is provided with and can hook the connecting portion 11 connect with fixed code assembly, bistrique interconnecting piece 2 is provided with fastening part 12, and described fixed code assembly is connected with connecting portion 11 and fastening part 12 simultaneously thus makes erecting frame 1 and bistrique interconnecting piece 2 link together. Therefore when changing bistrique, people can carry out the installation of bistrique, the operation of dismounting from the side of erecting frame. So not only being convenient for changing bistrique interconnecting piece, also without the need to setting operation gap on erecting frame again, so not only order uses the height of the shredder of the present invention to diminish, and also can reduce its manufacturing cost.
For the ease of processing and installation, described erecting frame 1 is provided with threaded hole, and described connecting portion 11 is provided with and the outside screw that described threaded hole is connected.
In order to allow bistrique interconnecting piece 2 can not there is bigger gap because of holding between groove 21 and connecting portion 11 in the process of work, cause occurring between bistrique interconnecting piece 2 and erecting frame to rotate mutually, described bistrique interconnecting piece 2 is provided with the accommodation groove 21 that can hold connecting portion 11, and the fit-up gap of described accommodation groove 21 and connecting portion 11 is less than 1mm.
For ease of mounting or dismounting, fixed code assembly comprises fixed code 3, and fixed code assembly also comprises the Lock Part that can be fixed on bistrique interconnecting piece 2 by fixed code 3, and described Lock Part 31 is connected with bistrique interconnecting piece 2, and Lock Part 31 is provided with described operating portion.
Above the better embodiment of the present invention is carried out concrete explanation, but the invention is not limited to described embodiment, those of ordinary skill in the art also can make all equivalent modifications or replacement under the prerequisite not running counter to spirit of the present invention, and these equivalent modification or replacement are all included in the application's claim limited range.

Claims (4)

1. a ceramic tile bistrique installs structure, comprise erecting frame (1), the bistrique interconnecting piece (2) being connected with the bottom surface of erecting frame (1), the bottom surface of bistrique interconnecting piece (2) is provided with bistrique body, it is characterized in that: also comprise fixed code assembly, described fixed code assembly is provided with operating portion, described operating portion is arranged on the side of bistrique interconnecting piece (2), erecting frame (1) is provided with and can hook the connecting portion (11) connect with fixed code assembly, bistrique interconnecting piece (2) is provided with fastening part (12), described fixed code assembly is connected with connecting portion (11) and fastening part (12) simultaneously thus makes erecting frame (1) and bistrique interconnecting piece (2) link together.
2. a kind of ceramic tile bistrique according to claim 1 installs structure, it is characterised in that: described erecting frame (1) is provided with threaded hole, and described connecting portion (11) is provided with and the outside screw that described threaded hole is connected.
3. a kind of ceramic tile bistrique according to claim 2 installs structure, it is characterized in that: described bistrique interconnecting piece (2) is provided with the accommodation groove (21) that can hold connecting portion (11), the fit-up gap of described accommodation groove (21) and connecting portion (11) is less than 1mm.
4. a kind of ceramic tile bistrique according to claims 1 to 3 any one installs structure, it is characterized in that: fixed code assembly comprises fixed code (3), fixed code assembly also comprises the Lock Part that can be fixed on bistrique interconnecting piece (2) by fixed code (3), described Lock Part (31) is connected with bistrique interconnecting piece (2), and Lock Part (31) is provided with described operating portion.
CN201511032225.6A 2015-12-30 2015-12-30 A kind of ceramic tile bistrique mounting structure Active CN105643459B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511032225.6A CN105643459B (en) 2015-12-30 2015-12-30 A kind of ceramic tile bistrique mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511032225.6A CN105643459B (en) 2015-12-30 2015-12-30 A kind of ceramic tile bistrique mounting structure

Publications (2)

Publication Number Publication Date
CN105643459A true CN105643459A (en) 2016-06-08
CN105643459B CN105643459B (en) 2018-04-10

Family

ID=56490230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511032225.6A Active CN105643459B (en) 2015-12-30 2015-12-30 A kind of ceramic tile bistrique mounting structure

Country Status (1)

Country Link
CN (1) CN105643459B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4998384A (en) * 1989-09-01 1991-03-12 Norton Company Grinding wheel mounting means
CN2294134Y (en) * 1997-09-18 1998-10-14 李立 Adjusting device for grinding wheel having two kinds of grinding particles
CN2846647Y (en) * 2005-12-14 2006-12-13 潘勇生 Lock button
CN201989021U (en) * 2010-12-28 2011-09-28 盘起工业(大连)有限公司 Fixture for processing square-profile cylindrical pin positioning female die
CN204450125U (en) * 2015-01-22 2015-07-08 宁波明润机械制造有限公司 The two rib grinding attachment of a kind of short cylindrical inner ring

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4998384A (en) * 1989-09-01 1991-03-12 Norton Company Grinding wheel mounting means
CN2294134Y (en) * 1997-09-18 1998-10-14 李立 Adjusting device for grinding wheel having two kinds of grinding particles
CN2846647Y (en) * 2005-12-14 2006-12-13 潘勇生 Lock button
CN201989021U (en) * 2010-12-28 2011-09-28 盘起工业(大连)有限公司 Fixture for processing square-profile cylindrical pin positioning female die
CN204450125U (en) * 2015-01-22 2015-07-08 宁波明润机械制造有限公司 The two rib grinding attachment of a kind of short cylindrical inner ring

Also Published As

Publication number Publication date
CN105643459B (en) 2018-04-10

Similar Documents

Publication Publication Date Title
CN203097306U (en) Assembled type building wallboard installation tool
CN204804127U (en) Novel stone material curtain mounting structure of combination pendant
CN204177127U (en) Master control borad mounting box and refrigerator
CN105643459A (en) Ceramic tile grinding head mounting structure
CN213062711U (en) Aluminum alloy outer wall decorative plate structure
CN204828200U (en) Quick hoist and mount lock
CN205413610U (en) Sieve fixing device
CN201389747Y (en) Workbench adjusting mechanism of bull-nose electric discharge machine
CN209140830U (en) A kind of electric hammer electric pick skeleton dustproof cover being easily installed
CN103236756B (en) For the motor flange dish fixed jig of tipper
CN204560046U (en) A kind of for the fixture to pcb board installing electronic elements
CN205021431U (en) Novel emery wheel
CN205877598U (en) Connection structure between medical instrument enclosure component
CN204052147U (en) A kind of round sieve interior shield of shaking
CN205153432U (en) Novel marble installation pendant
CN209011410U (en) A kind of aluminium section for installation of ceiling
CN204148884U (en) The clamp base of replaceable insert
CN205154918U (en) A bearing frame for enclosing word machine
CN204197060U (en) A kind of floor assembly meeting multiple seat mounting structure
CN204213151U (en) For the bolt of irregular, negative and positive boss structure is installed
CN205315420U (en) A connection structure that is used for outer protection shield of handrail and handrail riser
CN208910164U (en) Shoe washing machine
CN201745390U (en) Improved intermediate/rear axle housing structure
CN105782074A (en) Dust removing fan for road milling machine
CN202157654U (en) Connecting plate for indoor door pocket jamb

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190731

Address after: 517373 Block B-05-19-1 of Shenzhen Baoan (Longchuan) Industrial Transfer Park, Dengyun Town, Longchuan County, Heyuan City, Guangdong Province

Patentee after: Heyuan Xinlu New Materials Co.,Ltd.

Address before: 528000 Ladder 402, No. 2 Beihu Road, Luocun Street, Nanhai District, Foshan City, Guangdong Province

Patentee before: Xiao Shiwen

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A structure for installing ceramic tile grinding heads

Effective date of registration: 20231204

Granted publication date: 20180410

Pledgee: Bank of China Limited by Share Ltd. Heyuan branch

Pledgor: Heyuan Xinlu New Materials Co.,Ltd.

Registration number: Y2023980069227

PE01 Entry into force of the registration of the contract for pledge of patent right