CN105634975B - A kind of load share method of short wave communication network - Google Patents

A kind of load share method of short wave communication network Download PDF

Info

Publication number
CN105634975B
CN105634975B CN201610051253.0A CN201610051253A CN105634975B CN 105634975 B CN105634975 B CN 105634975B CN 201610051253 A CN201610051253 A CN 201610051253A CN 105634975 B CN105634975 B CN 105634975B
Authority
CN
China
Prior art keywords
upstream
equipment
regional
upstream device
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610051253.0A
Other languages
Chinese (zh)
Other versions
CN105634975A (en
Inventor
付国宾
王骁勇
余奇
郑浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PEOPLE'S LIBERATION ARMY DEFENSE INFORMATION SCHOOL
Original Assignee
PEOPLE'S LIBERATION ARMY DEFENSE INFORMATION SCHOOL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PEOPLE'S LIBERATION ARMY DEFENSE INFORMATION SCHOOL filed Critical PEOPLE'S LIBERATION ARMY DEFENSE INFORMATION SCHOOL
Priority to CN201610051253.0A priority Critical patent/CN105634975B/en
Publication of CN105634975A publication Critical patent/CN105634975A/en
Application granted granted Critical
Publication of CN105634975B publication Critical patent/CN105634975B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/10Flow control; Congestion control
    • H04L47/12Avoiding congestion; Recovering from congestion
    • H04L47/125Avoiding congestion; Recovering from congestion by balancing the load, e.g. traffic engineering
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The present invention is applicable to short wave communication network technical field, the load share method of a kind of short wave communication network is provided, including: when service conversation initiated by needs, upstream equipment selects concrete upstream device according to load-balancing algorithm, after the regional agency controller in the shortwave service controller in the first load sharing territory and the second load sharing territory is selected, caller device is initiated a session request to called equipment by short wave communication network and sets up session connection.In the present invention, shortwave service controller and regional agency controller use full load to share mode, and any appliance breaks down does not affects Network operation;When completing a service conversation; each equipment in load sharing territory all can provide complete control function; and the equipment specifically participating in sharing session is determined when session setup by load-balancing algorithm by upstream equipment; and control service relation keeps constant before conversation end; the load of the most each equipment is essentially identical, improves network utilisation efficiency.

Description

A kind of load share method of short wave communication network
Technical field
The invention belongs to short wave communication network technical field, particularly relate to the load sharing side of a kind of short wave communication network Method.
Background technology
In current short wave communication network, when initiating business reply between on-site terminal and command terminal, region Agent controller and shortwave service controller are all fixing, and the controller service that so will result in is busy, Time often result in network blockage phenomenon, some controllers are the most idle, waste resource.If controlled Device breaks down, if being switched to other controllers not in time, is then likely to occur service disconnection.
Summary of the invention
In view of the above problems, it is an object of the invention to provide the load share method of a kind of short wave communication network, Aim to solve the problem that the technical problem that existing short wave communication network relevant device load sharing is uneven.
The present invention adopts the following technical scheme that
Described short wave communication network includes on-site terminal, command terminal and some Regional Control Centers and some districts Territory Acting Center, each Regional Control Center all includes that a shortwave service controller and regional complex management are flat Platform, each regional agency center includes a regional agency controller, regional agency NMS and peace Full shielding system, is provided with civilian access node, described finger between described on-site terminal and Regional Control Center Wave and between terminal and regional agency center, be provided with open access node, the shortwave industry of regional control centre Business controller constitutes the first load sharing territory, and the regional agency controller of regional Acting Center constitutes second Load sharing territory, the load share method of described short wave communication network includes:
When service conversation initiated by needs, upstream equipment selects concrete upstream device according to load-balancing algorithm, When the regional agency in the shortwave service controller in the first load sharing territory and the second load sharing territory controls After device is selected, caller device is initiated a session request to called equipment by short wave communication network and sets up session connection, The path of this session connection keeps constant before conversation end;Wherein, command terminal is called when on-site terminal Time, described on-site terminal is caller device, and command terminal is called equipment, described shortwave service controller phase Being upstream device for civilian access node, civilian access node is upstream equipment, and described regional agency controls Device is upstream device relative to shortwave service controller, and described shortwave service controller is upstream equipment;Work as finger When waving terminal call on-site terminal, described command terminal is caller device, and described on-site terminal is called equipment, Described open access node is upstream equipment relative to described regional agency controller, and described regional agency controls Device is upstream device, and described regional agency controller is upstream equipment relative to described shortwave service controller, Described shortwave service controller is upstream device.
The invention has the beneficial effects as follows: in the present invention, in short wave communication network, the switch control device of core net is (i.e. Described shortwave service controller and regional agency controller) use full load to share mode, arbitrary exchange controls The fault of equipment does not affect Network and runs;When completing a service conversation, every in load sharing territory Individual switch control device all can provide complete control function, and specifically participates in current sessions in load sharing territory The equipment of work, is determined when session setup by upstream equipment load-balancing algorithm, and control service relation exists Keeping constant before conversation end, the load of the most each switch control device is essentially identical, improves network utilisation Efficiency.
Accompanying drawing explanation
Fig. 1 is the system construction drawing of short wave communication network;
Fig. 2 is the flow chart of the load share method of short wave communication network;
Fig. 3 is that upstream equipment selects the flow chart of concrete upstream device step according to load-balancing algorithm.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and reality Execute example, the present invention is further elaborated.Only should be appreciated that specific embodiment described herein Only in order to explain the present invention, it is not intended to limit the present invention.
In order to technical solutions according to the invention are described, illustrate below by specific embodiment.
Fig. 1 shows the system structure of the short wave communication network that the embodiment of the present invention provides, including on-site terminal 11, Command terminal 12 and some Regional Control Centers 13 and some regional agency centers 14, it is illustrated that in have three Regional Control Center and three regional agency centers, each Regional Control Center 13 all includes a shortwave business Controller 131 and regional complex management platform 132, each regional agency center 14 includes a regional agency Controller 141, regional agency NMS 142 and security isolation system 143, described on-site terminal Civilian access node 15, described command terminal 12 and region generation it is provided with between 11 and Regional Control Center 13 Open access node 16 it is provided with, the shortwave service controller of regional control centre between reason center 14 Constituting the first load sharing territory, the regional agency controller of regional Acting Center constitutes the second load sharing Territory.
It should be noted that said structure only lists the some necessary structure of short wave communication network, but can not Deny that short wave communication network can also include other structures, such as emergency information service platform, civilian net the Internet Close and the data memory node etc. of user storage data.In the present embodiment short wave communication network, the three of civilian network side Individual shortwave service controller constitutes a load sharing territory, with each emergency information service platform, the interconnection of civilian net Node traffic controller in gateway and civilian access node realizes entirely interconnecting connection, it is provided that accesses and exchanges control Uniform business.Three regional agency controllers of commander side constitute a load sharing territory, save with each open access Access service controller in point realizes entirely interconnecting connection, it is provided that access and exchange control service.Bearing of both sides Lotus shares territory provides mutually control service.
Based on above-mentioned short wave communication network system, Fig. 2 shows the flow process of load share method, with reference to Fig. 1 and Fig. 2, the load share method that the present embodiment provides comprises the steps:
Step S101, when service conversation initiated by needs, upstream equipment selects concrete according to load-balancing algorithm Upstream device.
Shortwave emergency communication net has high requirement to reliability, in existing network, and different shortwave business Controller and regional agency controller are all independent, and same on-site terminal initiates session service with command terminal Time, it is all selected fixing shortwave service controller and regional agency controller, this can cause controller load Uneven, and if after certain controller on session path breaks down, it is likely that occur that conversation is existing As, this is fatal to the reliability of short wave communication network.For the equipment in this this step, in load sharing territory Functional equivalent, each equipment all can provide complete control function, and the fault of any appliance does not affect network industry Business runs.When needs initiation business is replied, setting of the concrete participation current sessions work in load sharing territory Standby, upstream equipment load-balancing algorithm determine when session setup, so can be by reasonable distribution Business Stream Amount, it is to avoid network blockage.
Upstream equipment described here and upstream device are for the calling of different directions, and the concrete equipment of indication is different. When on-site terminal calling command terminal, described on-site terminal is caller device, and command terminal is called equipment, Described shortwave service controller is upstream device relative to civilian access node, and civilian access node is that upstream sets Standby, described regional agency controller is upstream device relative to shortwave service controller, described shortwave business control Device processed is upstream equipment;When command terminal calling on-site terminal, described command terminal is caller device, institute Stating on-site terminal is called equipment, and described open access node is upstream relative to described regional agency controller Equipment, described regional agency controller is upstream device, and described regional agency controller is relative to described shortwave Service controller is upstream equipment, and described shortwave service controller is upstream device.
Step S102, when in the shortwave service controller in the first load sharing territory and the second load sharing territory Regional agency controller selected after, caller device is initiated a session request to called equipment by short wave communication network And set up session connection, the path of this session connection keeps constant before conversation end.
After shortwave service controller and regional agency controller are selected, the session path of short wave communication network determines that , caller device initiates a session request to called equipment and sets up session connection, and this session connection Path keeps constant before conversation end.
For above-mentioned steps S101, with reference to shown in Fig. 3, described upstream equipment selects according to load-balancing algorithm Concrete upstream device step, specifically includes:
Step S201, upstream equipment use endless form to select downstream according to the enabled node list of self record Equipment.
Enabled node list downstream is preserved in each upstream equipment this locality, such as needs when on-site terminal During calling command terminal, civilian access node preserves the enabled node list of shortwave Service control downstream, Described shortwave service controller preserves the enabled node list of regional agency controller downstream.Work as commander During terminal call on-site terminal, what described open access node preserved regional agency controller downstream can With node listing, the enabled node of shortwave service controller downstream preserved by described regional agency controller List.Then upstream equipment is for each conversation request, selects upstream device according to enabled node list circulation. As it is shown in figure 1, on-site terminal have issued three callings, shortwave industry to the command terminal opened under access node Business controller have selected different regional agency controllers for three times.Certainly for civilian Node Controller, it is possible to Different shortwave service controllers is selected with each session repeating query.
Step S202, upstream equipment send conversation message to selected upstream device, and start for described choosing The fault detect intervalometer of fixed upstream device.
After selecting upstream device according to enabled node list, the upstream device also detecting this selected is actual Available, concrete, need startup separator to detect intervalometer.
If step S203 upstream equipment receives selected downstream before described fault detect timer expiry and sets The standby response message returned, then stop described fault detect intervalometer, completes this upstream device and selects.
During fault detect intervalometer timing, if receiving the response message that selected upstream device returns, then Illustrate that the upstream device of current selection can be used, then stop described fault detect intervalometer, complete this downstream and set Alternative.
Step S204, otherwise, assert that the current upstream device selected occurs abnormal, now by this upstream device Frequency of abnormity add up 1;
If step S205 now frequency of abnormity is more than predetermined threshold value, then assert the current upstream device selected not Available, temporarily this upstream device is deleted from enabled node list, and startup separator recovers intervalometer, In the described fault recovery intervalometer time-out moment every time, send status poll to all disabled upstream devices and disappear Breath, if receive the response message that upstream device therein returns, then will return to the downstream of response message Equipment adds in enabled node list.
If fault detect timer expiry, after i.e. timing time arrives, do not receive selected upstream device yet and return Response message, then the current upstream device selected is likely to occur exception, and this is set the exception of upstream device Number of times adds up 1, if frequency of abnormity is more than predetermined threshold value, then assert that the current upstream device selected is unavailable, So need this upstream device to delete from enabled node list, show the most unavailable, it is to avoid next time is again Select this upstream device.Startup separator recovers intervalometer simultaneously, and this intervalometer is cycle timer, time length ratio Common heart time is long, continues timing after every end cycle, and each time-out sends state immediately and looks into Ask message to all disabled upstream devices.If receiving what certain or several upstream device returned During response message, then the upstream device returning response message is added in enabled node list, after participation Load sharing select.So when temporarily or permanently property fault occurs in the equipment in somewhere, its in system His peer device can automatically be taken over it and control function, to ensure that whole system still is able to run well, and in event Barrier point can reactivate this equipment after recovering and participate in load sharing.
As preferably, also include after described step S205:
Step S206, after cumulative frequency of abnormity still less than or during equal to described predetermined threshold value, upstream equipment is pressed Next upstream device is selected according to enabled node list.
If accumulative frequency does not arrives predetermined threshold value, although illustrate that upstream device does not returns response message, but the most not Must be that upstream device breaks down, it is also possible to be that upstream device transience mistake occurs, or downstream sets Standby momentary traffic is busy, or temporary network blocking etc., now upstream equipment selects according to enabled node list Select next upstream device.If frequency of abnormity exceedes predetermined threshold value, illustrate probably to occur equipment fault, Then need from enabled node list, delete this upstream device, show the most unavailable.
It addition, after regional agency controller and shortwave service controller break down, be notified that maintainer is examined Repair, after maintenance completes, regional agency controller and shortwave service controller break down start time, all to Corresponding upstream equipment sends startup notifying message, after upstream equipment receives startup notifying message, if on The enabled node list of trip equipment does not exist the equipment sending startup notifying message, then this equipment is added to In enabled node list.
Generally, after regional agency controller and shortwave service controller are selected, current business session Path be constant, but be likely to occur described regional agency controller or shortwave service controller occur therefore The problem of barrier, now occurs that the upstream equipment of story equipment selects next equipment according to enabled node list repeating query And startup separator detection intervalometer, until the response message having a upstream device to return, then session is cut Shift to return the upstream device of response message.And temporarily will appear from the upstream device of fault from available section point range Table is deleted, and startup separator recovers intervalometer, in the described fault recovery intervalometer time-out moment every time, to All disabled upstream devices send STATUS ENQUIRY message, if receiving what upstream device therein returned During response message, then the upstream device returning response message is added in enabled node list.Accordingly even when Wherein regional agency controller or shortwave service controller break down, and also can be switched to next equipment in time, Ensure conversation stability.
Storing for data, the present invention uses Distributed Data Store Model, each regional agency center also to wrap Including a data memory node, each Regional Control Center the most also includes a data memory node, all The data memory node at regional agency center constitutes the distributed data-storage system of commander side, and all regions are controlled The data memory node at center processed constitutes the distributed data-storage system of civilian network side, any one data storage joint Point failure or damage do not affect the operation of whole data-storage system, can be recovered by a memory node The data of whole distributed data-storage system.Liang Ge distributed data-storage system working mechanism is identical, only It is that storage data content is different with data volume.
Regional Control Center and regional agency achieve important webmaster number centrally through Distributed Data Store Model According to share, backup and switching for network management system provide data supporting.Equally, noted by customer location Sharing of the data such as volume, provides data supporting for service availability framework based on load sharing.
It addition, the comprehensive management platform in Regional Control Center and the regional agency network pipe at regional agency center Reason system all uses main two standby host systems, it is achieved the high availability of network management system.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all at this Any amendment, equivalent and the improvement etc. made within bright spirit and principle, should be included in the present invention Protection domain within.

Claims (7)

1. the load share method of a short wave communication network, it is characterised in that described short wave communication network includes existing Field terminal, command terminal and some Regional Control Centers and some regional agency centers, each Region control Center all includes a shortwave service controller and regional complex management platform, and each regional agency center includes One regional agency controller, regional agency NMS and security isolation system, described on-site terminal And it is provided with civilian access node between Regional Control Center, between described command terminal and regional agency center Being provided with open access node, the shortwave service controller of regional control centre constitutes the first load sharing Territory, the regional agency controller of regional Acting Center constitutes the second load sharing territory, and described method includes:
When service conversation initiated by needs, upstream equipment selects concrete upstream device according to load-balancing algorithm, When the regional agency in the shortwave service controller in the first load sharing territory and the second load sharing territory controls After device is selected, caller device is initiated a session request to called equipment by short wave communication network and sets up session connection, The path of this session connection keeps constant before conversation end;Wherein, command terminal is called when on-site terminal Time, described on-site terminal is caller device, and command terminal is called equipment, described shortwave service controller phase Being upstream device for civilian access node, civilian access node is upstream equipment, and described regional agency controls Device is upstream device relative to shortwave service controller, and described shortwave service controller is upstream equipment;Work as finger When waving terminal call on-site terminal, described command terminal is caller device, and described on-site terminal is called equipment, Described open access node is upstream equipment relative to described regional agency controller, and described regional agency controls Device is upstream device, and described regional agency controller is upstream equipment relative to described shortwave service controller, Described shortwave service controller is upstream device.
2. method as claimed in claim 1, it is characterised in that described upstream equipment is according to load-balancing algorithm Select concrete upstream device step, specifically include:
Upstream equipment uses endless form to select upstream device according to the enabled node list of self record;
Upstream equipment sends conversation message to selected upstream device, and starts and set for described selected downstream Standby fault detect intervalometer;
If upstream equipment receives the sound that selected upstream device returns before described fault detect timer expiry Answer message, then stop described fault detect intervalometer, complete this upstream device and select;
Otherwise, assert that the current upstream device selected occurs abnormal, now by the frequency of abnormity of this upstream device Cumulative 1, if now frequency of abnormity is more than predetermined threshold value, then assert that the current upstream device selected is unavailable, Temporarily this upstream device is deleted from enabled node list, and startup separator recovers intervalometer, in described event Barrier recovers the intervalometer time-out moment every time, sends STATUS ENQUIRY message to all disabled upstream devices, as When fruit receives the response message that upstream device therein returns, then the upstream device returning response message is added It is added in enabled node list.
3. method as claimed in claim 2, it is characterised in that described upstream equipment is according to load-balancing algorithm Select concrete upstream device step, also include:
After cumulative frequency of abnormity still less than or during equal to described predetermined threshold value, upstream equipment is according to enabled node List selects next upstream device.
4. method as claimed in claim 3, it is characterised in that described upstream equipment is according to load-balancing algorithm Select concrete upstream device step, also include:
After regional agency controller and shortwave service controller are started shooting, all send to corresponding upstream equipment Startup notifying message, after upstream equipment receives startup notifying message, if the available section point range of upstream equipment Table does not exist the equipment sending startup notifying message, then this equipment is added in enabled node list.
5. method as described in any one of claim 1-4, it is characterised in that described upstream equipment is according to load Equalization algorithm selects concrete upstream device step, also includes:
When shortwave service controller or regional agency controller break down, its upstream equipment is according to available section Point list repeating query selects next equipment startup separator detection intervalometer, until there being a upstream device to return Response message, then switches to return the upstream device of response message by session;
The upstream device that temporarily will appear from fault is deleted from enabled node list, and startup separator recovers timing Device, in the described fault recovery intervalometer time-out moment every time, sends state to all disabled upstream devices Query messages, if receive the response message that upstream device therein returns, then by return response message Upstream device add in enabled node list.
6. method as described in any one of claim 1-4, it is characterised in that each regional agency center is also wrapped Including a data memory node, each Regional Control Center the most also includes a data memory node, all The data memory node at regional agency center constitutes the distributed data-storage system of commander side, and all regions are controlled The data memory node at center processed constitutes the distributed data-storage system of civilian network side, any one data storage joint Point failure or damage do not affect the operation of whole data-storage system, can be recovered by a memory node The data of whole distributed data-storage system.
7. method as claimed in claim 6, it is characterised in that described regional complex management platform and region generation Reason NMS all uses main two standby host systems.
CN201610051253.0A 2016-01-26 2016-01-26 A kind of load share method of short wave communication network Active CN105634975B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610051253.0A CN105634975B (en) 2016-01-26 2016-01-26 A kind of load share method of short wave communication network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610051253.0A CN105634975B (en) 2016-01-26 2016-01-26 A kind of load share method of short wave communication network

Publications (2)

Publication Number Publication Date
CN105634975A CN105634975A (en) 2016-06-01
CN105634975B true CN105634975B (en) 2016-12-14

Family

ID=56049492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610051253.0A Active CN105634975B (en) 2016-01-26 2016-01-26 A kind of load share method of short wave communication network

Country Status (1)

Country Link
CN (1) CN105634975B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115002114B (en) * 2022-05-27 2024-03-19 北京百度网讯科技有限公司 Node processing method, device, electronic equipment, storage medium and server

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100589137C (en) * 2008-10-06 2010-02-10 南京厚华通信设备有限责任公司 Large scale civil defence alarm multi-stage control system
WO2015151217A1 (en) * 2014-03-31 2015-10-08 富士通株式会社 Management system and management method
CN103997793B (en) * 2014-06-06 2017-08-22 中国电子科技集团公司第二十八研究所 Short wave network data cut-in method based on business statistics characteristic in data communication

Also Published As

Publication number Publication date
CN105634975A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
US8438307B2 (en) Method and device of load-sharing in IRF stack
CN103888277B (en) A kind of gateway disaster-tolerant backup method, device and system
CN100388218C (en) Method for realizing backup between servers
CN102257848B (en) Main and secondary apparatuses conversion method betwenn communication equipment, communication equipment and system, and request equipment of system and service
CN104113428B (en) A kind of equipment management device and method
CN107078925B (en) Heartbeat period setting method and terminal
CN103368712A (en) Switchover method and device for main equipment and standby equipment
WO2014029308A1 (en) Resource allocation method and device
WO2012174893A1 (en) Dual-center disaster recovery-based switching method and device in iptv system
CN103825777A (en) DMZ server switching method and device
CN105071968A (en) Method and device for repairing hidden failures of service plane and control plane of communication device
CN102265556B (en) Conversion method between an main communicational equipment and a spare communicational equipment, the communicational equipments and a service request equipment
CN109391691A (en) The restoration methods and relevant apparatus that NAS is serviced under a kind of single node failure
CN103607293A (en) Flow protection method and equipment thereof
CN112367182B (en) Configuration method and device of disaster recovery main and standby equipment
CN104486128A (en) System and method for realizing redundant heartbeat between nodes of double-controller
US20150312362A1 (en) Method and apparatus for sending delivery notification of network application-related product
CN105634975B (en) A kind of load share method of short wave communication network
CN111953808A (en) Data transmission switching method of dual-machine dual-active architecture and architecture construction system
US6590961B1 (en) Call protect systems with handoff redundancy
US7609683B2 (en) Communication system, connection management server apparatus, and recording medium on which program is recorded
CN106534758A (en) Conference backup method and conference backup device
CN109347679A (en) Dual master control plate hot standby switch method, apparatus, access gateway and safety network system
CN111858193A (en) Method and system for realizing server pool service
CN114301763A (en) Distributed cluster fault processing method and system, electronic device and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant