CN105634790B - Amending method, network management system and the equipment of managed object - Google Patents
Amending method, network management system and the equipment of managed object Download PDFInfo
- Publication number
- CN105634790B CN105634790B CN201410714503.5A CN201410714503A CN105634790B CN 105634790 B CN105634790 B CN 105634790B CN 201410714503 A CN201410714503 A CN 201410714503A CN 105634790 B CN105634790 B CN 105634790B
- Authority
- CN
- China
- Prior art keywords
- equipment
- target device
- attribute value
- managed object
- network management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Computer And Data Communications (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The embodiment of the present invention provides amending method, network management system and the equipment of a kind of managed object, this method comprises: the first property value of managed object on target device is revised as the second attribute value according to preset modification task by network management system;Wherein, the modification task includes holding relationship between mark, second attribute value and the preset target device and the first equipment of the target device;The network management system holds relationship according to, and the first equipment of Xiang Suoshu sends the first notification message for carrying second attribute value;Wherein, first notification message is used to indicate first equipment and the attribute value of the managed object for the target device held is revised as second attribute value.Method provided in an embodiment of the present invention saves a large amount of modification time, improves modification efficiency, to reduce the influence to business in equipment is held.
Description
Technical field
The present embodiments relate to the communication technology more particularly to a kind of amending method of managed object, network management system and
Equipment.
Background technique
With the development of science and technology, many fields all produce complicated large scale system, it include a large amount of inhomogeneities in the system
The equipment (or being known as network element from logic level) of type.Based on the form that current information security faces, more and more system administrations
Person needs managed object relevant to information security in periodic modification equipment, for example, in equipment all kinds of account numbers password (data
Password, password of operating system account number of equipment of library account number etc.).By taking managed object is the account number cipher in equipment as an example,
Traditional password amending method is all the maintenance that password is carried out by manual operations, more in number of devices, and between equipment mutually
There are in the complication system of dependence, this method workload is huge, and operating process complexity cause it is error-prone.
Therefore, the prior art introduces Account Administration function in some network management systems, on all devices managed it
The password of account number modify, specifically: network management system according to the equipment (i.e. target device) of the password to be modified of selection and
The account number of password to be modified in the equipment, setting code modifies task in network management system, and is appointed according to the modification of the password of setting
The order line of Modify password is sent to target device by business, so that target device executes the order line, to be automatically performed target
The password modification of account number is corresponded in equipment.But when the account (account of the account of certain equipment and target device
Information includes account number, account number cipher, device IP etc.) between there are when dependence, i.e., when certain equipment are held or using upper
When stating the account (these equipment referred to as hold equipment) on target device, when modifying the account number cipher on target device,
The password configuration item for the correspondence account number for also needing manual amendment to hold in equipment.That is, the password set in network management system
Modification task can only modify the account number cipher on target device automatically.
But when for equipment room dependence complexity in large-scale system and system, manual amendment holds in equipment
Password configuration item spend time it is longer, it is larger to the service impact held in equipment.
Summary of the invention
The embodiment of the present invention provides amending method, network management system and the equipment of a kind of managed object, existing to solve
In technology when the equipment room dependence complexity in system, manual amendment holds the time of the cost of the password configuration item in equipment
Longer, larger to the service impact held in equipment technical problem.
In a first aspect, the embodiment of the present invention provides a kind of amending method of managed object, comprising:
The first property value of managed object on target device is revised as according to preset modification task by network management system
Two attribute values;Wherein, the modification task includes the mark of the target device, second attribute value and preset described
Hold relationship between target device and the first equipment;
The network management system holds relationship according to, and the first equipment of Xiang Suoshu, which is sent, carries the of second attribute value
One notification message;Wherein, first notification message is used to indicate first equipment for the target device held
The attribute value of managed object is revised as second attribute value.
With reference to first aspect, in the first possible embodiment of first aspect, the relationship of holding includes described
Hold relationship between first equipment and the managed object of the target device, alternatively, the device type of first equipment
Hold relationship between the device type of the target device.
With reference to first aspect or the first possible embodiment of first aspect, second in first aspect are possible
In embodiment, the network management system repairs the first property value of the managed object of target device according to preset modification task
It is changed to before the second attribute value, the method also includes:
The network management system, which is held relationship according to and sent to first equipment, carries the of second attribute value
Two notification messages;Wherein, the second notification message is used to notify the target device in predetermined time to first equipment
The attribute value of the managed object of the target device is modified when arrival.
With reference to first aspect any one of to second of possible embodiment of first aspect, the of first aspect
In three kinds of possible embodiments, the network management system is according to preset modification task by the of the managed object of target device
One attribute value is revised as before the second attribute value, the method also includes:
The network management system detect the network management system management all measurement equipments to be checked whether with the target device it
Between exist it is described hold relationship, obtain testing result;
The network management system will exist with the target device holds the related Devices to test as the first equipment.
Second aspect, the present invention provide a kind of amending method of managed object, comprising:
First equipment receives network management system according to hold relationship transmission the between target device and first equipment
One notification message;Wherein, first notification message carries the second attribute value of the managed object of the target device, described
First notification message is used to indicate first equipment and repairs the attribute value of the managed object for the target device held
It is changed to second attribute value;
The attribute value of the managed object for the target device held is revised as the second attribute by first equipment
Value.
In conjunction with second aspect, in the first possible embodiment of second aspect, the relationship of holding includes described
Hold relationship between first equipment and the managed object of the target device, alternatively, the device type of first equipment
Hold relationship between the device type of the target device.
In conjunction with the possible embodiment of the first of second aspect or second aspect, second in second aspect is possible
In embodiment, first equipment receives network management system and holds relationship hair according between target device and first equipment
Before the first notification message sent, the method also includes:
First equipment receives carrying second attribute value that the network management system holds relationship transmission according to
Second notification message;Wherein, the second notification message is used to notify the target device default to first equipment
Moment modifies the attribute value of the managed object of the target device when reaching;
First equipment executes preset customization operations according to the second notification message.
The third aspect, the embodiment of the present invention provide a kind of network management system, comprising:
Processing module, for being modified the first property value of managed object on target device according to preset modification task
For the second attribute value;Wherein, the modification task includes the mark of the target device, second attribute value and preset
Hold relationship between the target device and the first equipment;
Sending module, for holding relationship according to, the first equipment of Xiang Suoshu, which is sent, carries second attribute value
First notification message;Wherein, first notification message is used to indicate the target device that first equipment will be held
The attribute value of managed object be revised as second attribute value.
In conjunction with the third aspect, in the first possible embodiment of the third aspect, the relationship of holding includes described
Hold relationship between first equipment and the managed object of the target device, alternatively, the device type of first equipment
Hold relationship between the device type of the target device.
In conjunction with the possible embodiment of the first of the third aspect or the third aspect, second in the third aspect is possible
In embodiment, the sending module is also used to the quilt of target device in the processing module according to preset modification task
Management object first property value be revised as before the second attribute value, according to it is described hold relationship to first equipment transmission take
Second notification message with second attribute value;Wherein, the second notification message is used to notify institute to first equipment
State the attribute value that target device modifies the managed object of the target device when predetermined time reaches.
In conjunction with any one of second of possible embodiment of the third aspect to the third aspect, the of the third aspect
In three kinds of possible embodiments, the processing module, be also used to according to preset modification task by target device by pipe
The first property value of reason object is revised as before the second attribute value, and all measurement equipments to be checked for detecting the network management system management are
It is no to hold relationship in the presence of described between the target device, testing result is obtained, and will exist with the target device and hold
The Devices to test of relationship is as the first equipment.
Fourth aspect, the embodiment of the present invention provide a kind of modification equipment of managed object, comprising:
Receiving module is sent for receiving network management system according to the relationship of holding between target device and first equipment
The first notification message;Wherein, first notification message carries the second attribute value of the managed object of the target device,
First notification message is used to indicate the attribute of the managed object for the target device that the modification equipment will be held
Value is revised as second attribute value;
Processing module, for the attribute value of the managed object for the target device held to be revised as the second attribute
Value.
In conjunction with fourth aspect, in the first possible embodiment of fourth aspect, the relationship of holding includes described
Hold relationship between modification equipment and the managed object of the target device, alternatively, the device type of the modification equipment
Hold relationship between the device type of the target device.
In conjunction with the possible embodiment of the first of fourth aspect or fourth aspect, second in fourth aspect is possible
In embodiment, the receiving module is also used to receive the network management system and holds described in the carrying of relationship transmission according to
The second notification message of second attribute value;Wherein, the second notification message is used to notify the target to the modification equipment
Equipment modifies the attribute value of the managed object of the target device when predetermined time reaches;
The processing module is also used to execute preset customization operations according to the second notification message.
Amending method, network management system and the equipment of managed object provided by the invention, by network management system according to default
Modification task the first property value of managed object on target device is revised as the second attribute value after, according to preset mesh
Relationship of holding between marking device and the first equipment sends the first notification message for carrying the second attribute value to the first equipment, with touching
The attribute value for sending out the managed object for the target device that the first equipment is held it is revised as the second attribute by first property value
Value.Method provided in an embodiment of the present invention modifies the managed object for the target device that it is held by the first equipment automatically
Attribute value, avoid the attribute for manually modifying the managed object of all target devices held and held in equipment
Value, saves a large amount of modification time, improves modification efficiency, to reduce the influence to business in equipment is held.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair
Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the flow diagram of the amending method embodiment one of managed object provided by the invention;
Fig. 2 is the flow diagram of the amending method embodiment two of managed object provided by the invention;
Fig. 3 is the flow diagram of the amending method embodiment three of managed object provided by the invention;
Fig. 4 is the flow diagram of the amending method example IV of managed object provided by the invention;
Fig. 5 is the flow diagram of the amending method embodiment five of managed object provided by the invention;
Fig. 6 is the structural schematic diagram of network management system embodiment provided by the invention;
Fig. 7 is the structural schematic diagram of the modification apparatus embodiments of managed object provided by the invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
The present embodiments relate to network management system, can be Network Management System (Network Management
System, hereinafter referred to as NMS), or and Element management system (Network Management System, hereinafter referred to as
EMS).The network management system can be individual server, can be the multiple servers with incidence relation, which uses
Multiple managed devices in management business system.It should be noted that the managed device can be database server, may be used also
To be business device, the embodiment of the present invention is to this and with no restrictions.That is, the present embodiments relate to target device and
First equipment can be database server, can also be business device, can also be host.
In addition, the present embodiments relate to managed object, can be the close of the account number of the database on managed device
Code can also be the password of the account number of the operating system on managed device, can also be in equipment relevant to information security one
A little objects, as long as the managed object can be held by other managed devices or use.Such as: the database of equipment A
Account held by equipment B, i.e. equipment B can use the database of held account logging device A, account
Information may include the account number of the database of equipment A, the corresponding password of account, the IP of equipment A, Service name of database etc.,
Equipment B can be referred to as and hold equipment.
Fig. 1 is the flow diagram of the amending method embodiment one of managed object provided by the invention.As described in Figure 1,
This method comprises:
S101: network management system modifies the first property value of managed object on target device according to preset modification task
For the second attribute value;Wherein, the modification task includes the mark of the target device, second attribute value and preset
Hold relationship between the target device and the first equipment.
Specifically, the managed object attribute value modification that preset modification task can be human configuration in network management system is appointed
Business can also be the managed object attribute value modification task that network management system loads automatically.It can wrap in the preset modification task
It includes and holds relationship between mark, the second attribute value and preset target device and the first equipment of target device.For example, dimension
Shield personnel can select the target device of account number cipher to be modified, by account on the mark of the target device, target device
(new password is the second attribute value of account password to new password, and old password is just the first attribute of account password
Value) and target device and the first equipment between hold relationship configure in network management system.It should be noted that referred to herein
Target device and the first equipment between hold relationship, can be the password quilt of some account number and account on target device
First equipment is held or is used, and the password of some account number and account for can also be this type equipment of target device is by
One equipment is held or is used, some account number and account password that can also be the equipment of this type of target device are by first
The equipment of this type of equipment is held or is used.Optionally, the first equipment, which can exist for one with target device, holds pass
The equipment of system can exist for multiple and target device and hold related equipment, which is referred to as holding equipment.
S102: network management system holds relationship according to, and the first equipment of Xiang Suoshu, which is sent, carries second attribute value
First notification message;Wherein, first notification message is used to indicate the target device that first equipment will be held
The attribute value of managed object be revised as second attribute value.
Specifically, when network management system execute above-mentioned modification task after, i.e., on target device the attribute value of managed object by
First property value is revised as after the second attribute value, and network management system determines that the first equipment is set with target according to above-mentioned relationship of holding
Related equipment is held for existing, therefore, network management system sends the first notification message to the first equipment.First equipment is receiving
After first notification message, determine that the attribute value of above-mentioned managed object is modified by target device, i.e., first
The attribute value of the managed object for the target device held in equipment has occurred that variation, and therefore, the first equipment is according to this
The second attribute value carried in first notification message, the attribute value of the managed object for the target device that it is held are changed to
Second attribute value, to complete the automatic modification of the attribute value for the managed object held in the first equipment.
For example, it is assumed that having managed two equipment of A and B under network management system, and equipment B holds the account of the database on equipment A
Number information.Task is modified according to preset password when network management system to be modified the account number cipher of the database on equipment A,
Network management system is notified that equipment B, the Old Password release of the account number of the database for the equipment A that it is held, by the close of account
Code is revised as new password.Also, it is optional, it, can be with restarting equipment in order to keep new password formally effective.Certainly, equipment B is being incited somebody to action
After the account number cipher of the database of the equipment A held is revised as new password, some cleaning works can also be done.
What needs to be explained here is that network management system modifies to the account number cipher of the database of equipment A, modification is real
The password on border, because being that there is unified standard interface between network management system and the database of equipment A;But for equipment B
On the account number cipher of the database of equipment A held, since equipment B is by the account number cipher of the database of the equipment A held
The position of storage is that network management system is unknown, therefore can not modify equipment by way of the setting and modifying task in network management system
The password of the account number of the database of the equipment A held on B, therefore, network management system are close in the account number of the database of modification equipment A
After code, the first notification message is sent to equipment B, so that the account number for the database that held equipment A is modified in equipment B triggering is close
Code, avoids manual intervention, to save modification time, improves the attribute value for holding the managed object held in equipment
Modification efficiency, reduce the influence to the business held in equipment.
The amending method of managed object provided by the invention, by network management system according to preset modification task by target
The first property value of managed object is revised as after the second attribute value in equipment, according to preset target device and the first equipment
Between relationship of holding the first notification message for carrying the second attribute value is sent to the first equipment, to trigger the first equipment for its institute
The attribute value of the managed object for the target device held is revised as the second attribute value by first property value.The embodiment of the present invention mentions
The method of confession is modified the attribute value of the managed object for the target device that it is held automatically by the first equipment, avoids people
The attribute value of all managed objects for holding the target device held in equipment of work manual modification, saves a large amount of modification
Time improves modification efficiency, to reduce the influence to business in equipment is held.
Further, on the basis of above-mentioned embodiment illustrated in fig. 1, above-mentioned relationship of holding can be the first equipment and target
Hold relationship between the managed object of equipment, can also be the device type of the first equipment and the device type of target device
Between hold relationship.
Optionally, when relationship of holding between the first equipment and the managed object of target device when holding relationship, net
Guard system is the transmission of orientation when sending the first notification message, i.e. the first notification message is transmitted directly to hold by network management system
First equipment of the managed object of target device.
Optionally, when relationship of holding holds pass between the device type of the first equipment and the device type of target device
When being, it is assumed that the device type of target device is Class1, and the device type of the first equipment is type 2, and equipment is held in type 2
There is the managed object of equipment in Class1.Therefore, when network management system determines being managed pair for some target device in Class1
When the attribute value of elephant is modified, then network management system can the first equipment with equipment all under notification type 2, under certain type 2
Also the first notification message of network management system transmission is just had received.
Fig. 2 is the flow diagram of the amending method embodiment two of managed object provided by the invention.In above-mentioned implementation
On the basis of example, what is involved is network management systems before the attribute value of the managed object of modification target device for the present embodiment, mentions
It is preceding that the carrying of second attribute value is sent to the first equipment in second notification message, so that the first equipment disappears according to second notice
Breath executes corresponding customization operations, further decreases the modification of managed object attribute value caused by the business in the first equipment
It influences.Further, before above-mentioned S101, this method further include:
S201: network management system, which is held relationship according to and sent to first equipment, carries the of second attribute value
Two notification messages;Wherein, the second notification message is used to notify the target device in predetermined time to first equipment
The attribute value of the managed object of the target device is modified when arrival.
Specifically, network management system modification target device managed object attribute value before, according to preset modification
Relationship of holding between target device and the first equipment in task is led to the second of the first equipment transmission the second attribute value of carrying
Message is known, so that the first equipment knows that target device will modify the managed object on target device when predetermined time reaches
Attribute value.Therefore the first equipment executes corresponding customization operations after receiving second notification message.
Optionally, which can be by the target device that the first equipment holds the second attribute value as itself
The spare attribute value of managed object, when the first equipment once find using first property value can not access target equipment it is corresponding
When business, the first equipment enables the second attribute value in time, avoids the first equipment and is in the state that can not be accessed for a long time, thus
Reduce modification influence caused by the business in the first equipment of the attribute value of managed object.
Optionally, which can also be for after the first equipment receives second notification message, and the first equipment can be with
It is switched in the service that other target devices provide for the first equipment in time, the category of the managed object to current target device
Property value modification after the completion of, the first equipment is switched to again again in service provided by the target device, is set so as to avoid first
It is in the state for attempting to access for long-time due to currently modifying the target device of managed object attribute value because that can not access,
The problem of consumption access resource, the first equipment is switched in time in the service of other target devices offer, therefore is reduced
The modification of the attribute value of managed object is influenced caused by the business in the first equipment.For example, equipment B holds equipment A's
The account number cipher of database, and equipment A and equipment C are respectively that equipment B provides the service of text retrieval, therefore, when network management system
Before the account number cipher of the database of system modification equipment A, second notification message is sent to equipment B, equipment B is switched to
In the service that equipment C is provided, continue text retrieval, after the completion of the modification of the account number cipher of the database of equipment A, network management system
System notice equipment B is back switched in the text retrieval service of equipment A offer, so that the document retrieval business of equipment B is not
It will receive the influence of the account number cipher modification of equipment A.
Method provided in an embodiment of the present invention, by network management system modification target device managed object attribute value
Before, the carrying of the second attribute value is sent to the first equipment in second notification message in advance so that the first equipment according to this
Two notification messages execute corresponding customization operations, further decrease the modification of managed object attribute value on target device to first
It is influenced caused by business in equipment.
Fig. 3 is the flow diagram of the amending method embodiment three of managed object provided by the invention.In above-mentioned implementation
On the basis of example, what is involved is network management systems before the attribute value of the managed object of modification target device for the present embodiment, really
Fixed and target device, which exists, holds related first equipment, so that the first notification message to be sent to the specific mistake of the first equipment
Journey.Further, as shown in figure 3, before above-mentioned S101, this method further include:
S301: network management system detect the network management system management all measurement equipments to be checked whether with the target device it
Between exist it is described hold relationship, obtain testing result.
Specifically, whether all measurement equipments to be checked of network management system detection network management system management exist between target device
It is described to hold relationship, it can be network management system to all Devices to test and send detection instruction, execute detection by these Devices to test
After instruction, the testing result known is sent to network management system;It can also be that network management system logs in each Devices to test and goes to detect,
To directly know the testing result.The testing result can exist between Devices to test and target device holds relationship, or
The relationship of holding is not present before person, Devices to test and target device.Also, the testing result can be multiple.
S302: network management system will exist with the target device holds the related Devices to test as the first equipment.
Specifically, after network management system determines the first equipment, optionally, when relationship of holding is the first equipment and target device
Managed object between when holding relationship, network management system can modification target device managed object attribute value it
Afterwards, what is directly oriented sends the first notification message to first equipment;Optionally, when the equipment class that relationship of holding is the first equipment
Between type and the device type of target device when holding relationship, network management system can determine the first equipment institute according to the first equipment
The device type of category, all devices after the attribute value of the managed object of modification target device, under the device type
Send the first notification message.
Fig. 4 is the flow diagram of the amending method example IV of managed object provided by the invention.As described in Figure 4,
This method comprises:
S401: the first equipment receives network management system and is sent according to the relationship of holding between target device and first equipment
The first notification message;Wherein, first notification message carries the second attribute value of the managed object of the target device,
First notification message is used to indicate first equipment for the attribute of the managed object for the target device held
Value is revised as second attribute value.
(managed object can be with specifically, when user needs to modify the attribute value of the managed object of target device
For the password of some account number in equipment), corresponding modification task can be configured in network management system, network management system can also be automatic
The corresponding modification task of load.It may include mark, the second attribute value and the preset mesh of target device in the modification task
Hold relationship between marking device and the first equipment.For example, maintenance personnel can select the target device of account number cipher to be modified,
By the new password of account on the mark of the target device, target device, (new password is the second category of account password
Property value, old password is just the first property value of account password) and target device and the first equipment between hold relationship
Configuration is in network management system.It, can be with it should be noted that hold relationship between target device mentioned here and the first equipment
That the password of some account number and account is held or used by the first equipment on target device, can also be target device this
Some account number of one type equipment and the password of account are held or are used by the first equipment, can also for target device this
Some account number of the equipment of type and account password are held or are used by the equipment of first equipment this type.Optionally,
First equipment, which can exist for one with target device, holds related equipment, can exist for multiple and target device and hold pass
The equipment of system, first equipment are referred to as holding equipment.
After network management system executes above-mentioned modification task, i.e., the attribute value of managed object is by the first attribute on target device
Value is revised as after the second attribute value, and network management system determines that the first equipment is to exist to hold with target device according to above-mentioned relationship of holding
Related equipment, therefore, network management system send the first notification message to the first equipment.
The attribute value of the managed object for the target device held is revised as the second attribute by the S402: the first equipment
Value.
Specifically, the first equipment after receiving first notification message, determines target device by above-mentioned by pipe
Reason object's property value is modified, i.e. the attribute value of the managed object for the target device held in the first equipment is
Changed, therefore, the first equipment is according to the second attribute value carried in first notification message, the target that it is held
The attribute value of the managed object of equipment is changed to the second attribute value, to complete the managed object held in the first equipment
Attribute value automatic modification.It specifically may refer to the account number of the database on the modification equipment A lifted in above-described embodiment one
The example of password, details are not described herein.
The amending method of managed object provided by the invention receives network management system according to target device by the first equipment
Hold the first notification message of relationship transmission between the first equipment, and is modified according to the first notification message and to be held automatically
The attribute value of managed object avoids and manually modifies being managed pair for all target devices held and held in equipment
The attribute value of elephant saves a large amount of modification time, improves modification efficiency, to reduce to the shadow for holding business in equipment
It rings.
Further, on the basis of above-mentioned embodiment illustrated in fig. 4, above-mentioned relationship of holding can be the first equipment and target
Hold relationship between the managed object of equipment, can also be the device type of the first equipment and the device type of target device
Between hold relationship.
Optionally, when relationship of holding between the first equipment and the managed object of target device when holding relationship, net
Guard system is the transmission of orientation when sending the first notification message, i.e. the first notification message can be transmitted directly to by network management system
Hold the first equipment of the managed object of target device.
Optionally, when relationship of holding holds pass between the device type of the first equipment and the device type of target device
When being, it is assumed that the device type of target device is Class1, and the device type of the first equipment is type 2, and equipment is held in type 2
There is the managed object of equipment in Class1.Therefore, when network management system determines being managed pair for some target device in Class1
When the attribute value of elephant is modified, then network management system can the first equipment with equipment all under notification type 2, under certain type 2
Also the first notification message of network management system transmission is just had received
Fig. 5 is the flow diagram of the amending method embodiment five of managed object provided by the invention.In above-mentioned implementation
On the basis of example, what is involved is the first equipment to receive network management system according to holding between target device and the first equipment for the present embodiment
Before the first notification message for having relationship to send, the second notification message for the second attribute value of carrying that network management system is sent is received,
To execute corresponding customization operations according to the second notification message, the modification of managed object attribute value is further decreased to the
It is influenced caused by business in one equipment.Further, before above-mentioned S401, this method further include:
S501: the first equipment receives carrying second attribute value that the network management system holds relationship transmission according to
Second notification message;Wherein, the second notification message is used to notify the target device default to first equipment
Moment modifies the attribute value of the managed object of the target device when reaching.
Specifically, network management system modification target device managed object attribute value before, according to preset modification
Relationship of holding between target device and the first equipment in task is led to the second of the first equipment transmission the second attribute value of carrying
Message is known, so that the first equipment knows that target device will modify the managed object on target device when predetermined time reaches
Attribute value.
S502: the first equipment executes preset customization operations according to the second notification message.
Optionally, which can be by the target device that the first equipment holds the second attribute value as itself
The spare attribute value of managed object, when the first equipment once find using first property value can not access target equipment it is corresponding
When business, the first equipment enables the second attribute value in time, avoids the first equipment and is in the state that can not be accessed for a long time, thus
Reduce modification influence caused by the business in the first equipment of the attribute value of managed object.
Optionally, which can also be for after the first equipment receives second notification message, and the first equipment can be with
It is switched in the service that other target devices provide for the first equipment in time, the category of the managed object to current target device
Property value modification after the completion of, the first equipment is switched to again again in service provided by the target device, is set so as to avoid first
Standby shape due to can not access the target device for the attribute value for currently modifying managed object for a long time in trial access
The problem of state, consumption access resource, the first equipment is switched in time in the service of other target devices offer, therefore is dropped
The modification of the low attribute value of managed object is influenced caused by the business in the first equipment.For example, equipment B holds equipment A
Database account number cipher, and equipment A and equipment C are respectively that equipment B provides the service of text retrieval, therefore, work as network management
Before the account number cipher of the database of system modification equipment A, second notification message is sent to equipment B, equipment B is switched
In the service provided to equipment C, continue text retrieval, after the completion of the modification of the account number cipher of the database of equipment A, network management
System notice equipment B is back switched in the text retrieval service of equipment A offer, so that the document retrieval business of equipment B
The influence of the account number cipher modification of equipment A is not will receive.
Method provided in an embodiment of the present invention receives network management system according to target device and the first equipment by the first equipment
Between the first notification message for holding relationship transmission before, receive the second attribute value of carrying that network management system is sent second is logical
Know message, to execute corresponding customization operations according to the second notification message, further decreases and be managed on target device pair
As the modification of attribute value is influenced caused by the business in the first equipment
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above-mentioned each method embodiment can lead to
The relevant hardware of program instruction is crossed to complete.Program above-mentioned can be stored in a computer readable storage medium.The journey
When being executed, execution includes the steps that above-mentioned each method embodiment to sequence;And storage medium above-mentioned include: ROM, RAM, magnetic disk or
The various media that can store program code such as person's CD.
Fig. 6 is the structural schematic diagram of network management system embodiment provided by the invention.As shown in fig. 6, the network management system includes:
Processing module 11 and sending module 12.
Wherein, processing module 11, for being belonged to according to preset modification task by first of managed object on target device
Property value is revised as the second attribute value;Wherein, the modification task include the mark of the target device, second attribute value with
And hold relationship between the preset target device and the first equipment;Sending module 12, for holding relationship according to,
The first notification message for carrying second attribute value is sent to first equipment;Wherein, first notification message is used for
Indicate that the attribute value of the managed object for the target device held is revised as second attribute by first equipment
Value.
Network management system provided in an embodiment of the present invention can execute above method embodiment, realization principle and technology effect
Seemingly, details are not described herein for fruit.
Further, above-mentioned relationship of holding includes between first equipment and the managed object of the target device
Hold relationship, alternatively, holding relationship between the device type of first equipment and the device type of the target device.
Optionally, above-mentioned sending module 12 is also used to target in the processing module 11 according to preset modification task
The first property value of the managed object of equipment is revised as before the second attribute value, is held relationship according to described and is set to described first
Preparation send the second notification message for carrying second attribute value;Wherein, the second notification message to described first for setting
The attribute value of the standby managed object for notifying the target device to modify the target device when predetermined time reaches.
Optionally, above-mentioned processing module 11 is also used in being managed target device pair according to preset modification task
The first property value of elephant is revised as before the second attribute value, detect the network management system management all measurement equipments to be checked whether with
Hold relationship described in existing between the target device, obtains testing result, and will exist with the target device and hold relationship
The Devices to test as the first equipment.
Network management system provided in an embodiment of the present invention can execute above method embodiment, realization principle and technology effect
Seemingly, details are not described herein for fruit.
Fig. 7 is the structural schematic diagram of the modification apparatus embodiments of managed object provided by the invention.As described in Figure 7, should
Modifying equipment includes: receiving module 21 and processing module 22.
Wherein, receiving module 21, for receiving network management system according to holding between target device and first equipment
The first notification message that relationship is sent;Wherein, first notification message carries the of the managed object of the target device
Two attribute values, first notification message are used to indicate being managed pair for the target device that will be held of modification equipment
The attribute value of elephant is revised as second attribute value;Processing module 22, for being managed the target device held
Object's property value is revised as the second attribute value.
The modification equipment of managed object provided in an embodiment of the present invention can execute above method embodiment, realize
Principle is similar with technical effect, and details are not described herein.
Further, above-mentioned relationship of holding includes between modification equipment and the managed object of the target device
Hold relationship, alternatively, holding relationship between the device type of the modification equipment and the device type of the target device.
Optionally, above-mentioned receiving module 21 is also used to receive the network management system and holds taking for relationship transmission according to
Second notification message with second attribute value;Wherein, the second notification message is used to notify institute to the modification equipment
State the attribute value that target device modifies the managed object of the target device when predetermined time reaches;Above-mentioned processing module
22, it is also used to execute preset customization operations according to the second notification message.
The modification equipment of managed object provided in an embodiment of the present invention can execute above method embodiment, realize
Principle is similar with technical effect, and details are not described herein.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (16)
1. a kind of amending method of managed object characterized by comprising
The first property value of managed object on target device is revised as the second category according to preset modification task by network management system
Property value;Wherein, the modification task includes mark, second attribute value and the preset target of the target device
Hold relationship between equipment and the first equipment;
The network management system holds relationship according to, and the first of the first equipment of Xiang Suoshu transmission carrying second attribute value is logical
Know message;Wherein, first notification message is used to indicate first equipment for the target device held by pipe
Reason object's property value is revised as second attribute value.
2. the method according to claim 1, wherein the relationship of holding includes first equipment and the mesh
Hold relationship between the managed object of marking device, alternatively, the device type of first equipment and the target device
Hold relationship between device type.
3. method according to claim 1 or 2, which is characterized in that the network management system will according to preset modification task
The first property value of the managed object of target device is revised as before the second attribute value, the method also includes:
It is logical that the network management system holds relationship sends carrying second attribute value to first equipment second according to
Know message;Wherein, the second notification message is used to notify the target device to reach in predetermined time to first equipment
The attribute value of the managed object of target device described in Shi Xiugai.
4. method according to claim 1 or 2, which is characterized in that the network management system will according to preset modification task
The first property value of the managed object of target device is revised as before the second attribute value, the method also includes:
Whether all measurement equipments to be checked that the network management system detects the network management system management are deposited between the target device
Hold relationship described, obtains testing result;
The network management system will exist with the target device holds the related measurement equipment to be checked as the first equipment.
5. according to the method described in claim 3, it is characterized in that, the network management system is according to preset modification task by target
The first property value of the managed object of equipment is revised as before the second attribute value, the method also includes:
Whether all measurement equipments to be checked that the network management system detects the network management system management are deposited between the target device
Hold relationship described, obtains testing result;
The network management system will exist with the target device holds the related measurement equipment to be checked as the first equipment.
6. a kind of amending method of managed object characterized by comprising
First equipment receives network management system and holds the first logical of relationship transmission according between target device and first equipment
Know message;Wherein, first notification message carries the second attribute value of the managed object of the target device, and described first
Notification message is used to indicate first equipment and is revised as the attribute value of the managed object for the target device held
Second attribute value;
The attribute value of the managed object for the target device held is revised as the second attribute value by first equipment.
7. according to the method described in claim 6, it is characterized in that, the relationship of holding includes first equipment and the mesh
Hold relationship between the managed object of marking device, alternatively, the device type of first equipment and the target device
Hold relationship between device type.
8. method according to claim 6 or 7, which is characterized in that first equipment receives network management system according to target
Before the first notification message for holding relationship transmission between equipment and first equipment, the method also includes:
First equipment receives that the network management system holds carrying second attribute value of relationship transmission according to
Two notification messages;Wherein, the second notification message is used to notify the target device in predetermined time to first equipment
The attribute value of the managed object of the target device is modified when arrival;
First equipment executes preset customization operations according to the second notification message.
9. a kind of network management system characterized by comprising
Processing module, for the first property value of managed object on target device to be revised as according to preset modification task
Two attribute values;Wherein, the modification task includes the mark of the target device, second attribute value and preset described
Hold relationship between target device and the first equipment;
Sending module, for holding relationship according to, the first equipment of Xiang Suoshu, which is sent, carries the first of second attribute value
Notification message;Wherein, first notification message is used to indicate first equipment for the quilt for the target device held
Management object's property value is revised as second attribute value.
10. network management system according to claim 9, which is characterized in that it is described hold relationship include first equipment with
Hold relationship between the managed object of the target device, alternatively, the device type of first equipment and the target
Hold relationship between the device type of equipment.
11. network management system according to claim 9 or 10, which is characterized in that the sending module is also used at the place
Reason module according to preset modification task by the first property value of the managed object of target device be revised as the second attribute value it
Before, hold second notification message of the relationship to first equipment transmission carrying, second attribute value according to described;Wherein, institute
Second notification message is stated for notifying the target device to modify the target when predetermined time reaches to first equipment
The attribute value of the managed object of equipment.
12. network management system according to claim 9 or 10, which is characterized in that the processing module is also used to according to pre-
If modification task the first property value of the managed object of target device is revised as the second attribute value before, detect the net
All measurement equipments to be checked of guard system management hold relationship described in whether existing between the target device, obtain detection knot
Fruit, and will exist with the target device and hold the related measurement equipment to be checked as the first equipment.
13. network management system according to claim 11, which is characterized in that the processing module is also used to according to default
Modification task the first property value of the managed object of target device is revised as the second attribute value before, detect the network management
All measurement equipments to be checked of system administration hold relationship described in whether existing between the target device, obtain testing result,
And will exist with the target device and hold the related measurement equipment to be checked as the first equipment.
14. a kind of modification equipment of managed object characterized by comprising
Receiving module holds the first logical of relationship transmission according between target device and the first equipment for receiving network management system
Know message;Wherein, first notification message carries the second attribute value of the managed object of the target device, and described first
The attribute value that notification message is used to indicate the managed object for the target device that the modification equipment will be held is revised as
Second attribute value;
Processing module, for the attribute value of the managed object for the target device held to be revised as the second attribute value.
15. modification equipment according to claim 14, which is characterized in that it is described hold relationship include the modification equipment with
Hold relationship between the managed object of the target device, alternatively, the device type and the target of the modification equipment
Hold relationship between the device type of equipment.
16. modification equipment according to claim 14 or 15, which is characterized in that the receiving module is also used to receive institute
State the second notification message that network management system holds carrying second attribute value of relationship transmission according to;Wherein, described
Two notification messages are used to notify the target device to modify the target device when predetermined time reaches to the modification equipment
Managed object attribute value;
The processing module is also used to execute preset customization operations according to the second notification message.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410714503.5A CN105634790B (en) | 2014-11-28 | 2014-11-28 | Amending method, network management system and the equipment of managed object |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410714503.5A CN105634790B (en) | 2014-11-28 | 2014-11-28 | Amending method, network management system and the equipment of managed object |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105634790A CN105634790A (en) | 2016-06-01 |
CN105634790B true CN105634790B (en) | 2019-04-12 |
Family
ID=56049328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410714503.5A Active CN105634790B (en) | 2014-11-28 | 2014-11-28 | Amending method, network management system and the equipment of managed object |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105634790B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111327418B (en) * | 2020-01-21 | 2022-03-01 | 烽火通信科技股份有限公司 | G.hn-based domain name and password updating method and system |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101677414A (en) * | 2008-09-18 | 2010-03-24 | 华为技术有限公司 | Method, system and device for leading user side terminal to obtain password |
CA2680977C (en) * | 2008-10-06 | 2018-08-07 | Accenture Global Services Gmbh | Tariff management configuration automation |
CN103516529A (en) * | 2012-06-20 | 2014-01-15 | 中兴通讯股份有限公司 | Management method, device and system of configuration files |
CN103686668B (en) * | 2012-09-20 | 2017-12-05 | 中兴通讯股份有限公司 | Data-updating method, system and equipment |
CN103229453A (en) * | 2012-12-28 | 2013-07-31 | 华为技术有限公司 | Authentication method, device and system |
-
2014
- 2014-11-28 CN CN201410714503.5A patent/CN105634790B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105634790A (en) | 2016-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021017279A1 (en) | Cluster security management method and apparatus based on kubernetes and network domain, and storage medium | |
CN104392175B (en) | Cloud application attack processing method, apparatus and system in a kind of cloud computing system | |
US20170244626A1 (en) | Device and settings management platform | |
CN110493080B (en) | Block link point monitoring method and device, electronic equipment and storage medium | |
CN102937930B (en) | Application program monitoring system and method | |
WO2016160523A1 (en) | Conditional declarative policies | |
CN109039733A (en) | A kind of alarm method, system and electronic equipment and storage medium | |
CN106201468B (en) | A kind of processing method of screenshotss, device and electronic equipment | |
US9245147B1 (en) | State machine reference monitor for information system security | |
CN107534570A (en) | Virtualize network function monitoring | |
CN103812699A (en) | Monitoring management system based on cloud computing | |
US9397906B2 (en) | Scalable framework for monitoring and managing network devices | |
US20240039984A1 (en) | Rule-based action triggering in a provider network | |
US20240007488A1 (en) | Supervisory control and data acquisition | |
US20170351560A1 (en) | Software failure impact and selection system | |
JP5460630B2 (en) | Network system and management server | |
CN104243232A (en) | Virtual network fault detection and location method | |
US10122602B1 (en) | Distributed system infrastructure testing | |
CN102752146A (en) | Cluster topological graph generation method and server | |
CN103973484A (en) | Operation and maintenance management system based on network topological structure | |
CN111082998A (en) | Architecture system of operation and maintenance monitoring campus convergence layer | |
CN105634790B (en) | Amending method, network management system and the equipment of managed object | |
CN103810419A (en) | Application uninstall preventing method and equipment | |
US20150370675A1 (en) | Methods, systems, and computer readable media for utilizing abstracted user-defined data to conduct network protocol testing | |
US10819604B2 (en) | Change to availability mapping |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200219 Address after: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Patentee after: HUAWEI TECHNOLOGIES Co.,Ltd. Address before: 210012 Ande Gate No. 94, Yuhuatai District, Jiangsu, Nanjing Patentee before: Huawei Technologies Co.,Ltd. |
|
TR01 | Transfer of patent right |