CN105634017B CN201410711981.0A CN201410711981A CN105634017B CN 105634017 B CN105634017 B CN 105634017B CN 201410711981 A CN201410711981 A CN 201410711981A CN 105634017 B CN105634017 B CN 105634017B
Authority
CN
China
Prior art keywords
power
wind
wind turbine
instruction
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410711981.0A
Other languages
Chinese (zh)
Other versions
CN105634017A (en
Inventor
高翔
胡凯凯
郭锐
张家友
白臣
夏相春
李克成
张海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Zhuzhou Institute Co Ltd
Original Assignee
CSR Zhuzou Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSR Zhuzou Institute Co Ltd filed Critical CSR Zhuzou Institute Co Ltd
Priority to CN201410711981.0A priority Critical patent/CN105634017B/en
Publication of CN105634017A publication Critical patent/CN105634017A/en
Application granted granted Critical
Publication of CN105634017B publication Critical patent/CN105634017B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Wind Motors (AREA)

Abstract

A kind of Poewr control method based on wind power plant Energy Management System, the process of wherein active power controller are:(1) wind power plant gross output and the difference of target power instruction are calculated;(2) it is more than wind field rated power as target power instructs, is that rated power is distributed per Fans;(3) if target power instruction is more than present output power, not power distribution;(4) if target power instruction is less than output power, the real-time output power that control ratio is multiplied by current wind turbine distributes fan;The process of Reactive Power Control is:(1) maximum lagging reactive power and maximum capacitive reactive power are calculated;(2) reactive command and maximum idle ratio x are calculated, and calculates reactive power ability;(3) ratio X is multiplied by wind turbine reactive power ability value, fan is distributed as instruction.The present invention has many advantages, such as that principle is simple, versatility is good, effectively can carry out steady, maximization to power of fan output and controls.

Description

A kind of Poewr control method based on wind power plant Energy Management System
Technical field
Present invention relates generally to wind generator system fields, refer in particular to a kind of power based on wind power plant Energy Management System Control method.
Background technology
The wind-resources in China concentrate on northern territory (northeast, North China, northwest) substantially, and wind speed variation is fast, and power of fan is defeated Go out unstable, be susceptible to the situation that power output is widely varied, it is larger for the control difficulty of power, it is difficult to ensure control Rate, precision and accuracy rate so that the power output of wind power plant impacts power grid larger, is also susceptible to because of excessive work( Rate control causes wind turbine to report an error shutdown.
In order to solve problem above, it needs to be improved the Poewr control method of existing wind turbine Energy Management System. At present, traditional mode is required to calculate the active ability or reactive power of wind power generating set, the wind proposed if any practitioner Power generator active power, the control method of reactive power distribution, process are:(1) wind turbine data are acquired;(2) wind field is calculated Real-time active power, reactive power, wind speed, calculate the maximum power value that can be distributed per Fans;(3) with target instruction target word power It is compared, wind turbine, which is artificially divided into, need to shut down wind turbine, need to subtract power Fan, need to increase the types such as power Fan;(4) pass through calculating It obtains the accurate power control value of every Fans, and is assigned to wind turbine.
It is shown according to field research and feedback data, above-mentioned traditional approach mainly has following deficiency:
1st, the variation of wind turbine wind speed frequently results in the variation of power of fan fan-out capability comparatively fast, and power control is difficult, is susceptible to The phenomenon that being exported beyond target power, and be difficult to realize in the control range of target power, it is maximized to control wind turbine output Power.
2nd, it is excessively complicated since it is desired that active power ability, reactive power ability to every Fans carry out complex calculation Algorithm operation control software reaction can be caused slow, power of fan control slows.
Invention content
The technical problem to be solved in the present invention is that:For technical problem of the existing technology, the present invention provides one Kind of principle is simple, versatility is good, it is steady that effectively power of fan output can be carried out, maximize control based on wind-powered electricity generation field energy Buret manages the Poewr control method of system.
In order to solve the above technical problems, the present invention uses following technical scheme:
A kind of Poewr control method based on wind power plant Energy Management System, including:Active power controller and reactive power Control;
The process of the active power controller is:(1) power control target power instruction is obtained, wind power plant is calculated and always exports Power and the difference of target power instruction;(2) it is more than wind field rated power as target power instructs, then is every Fans allocation Determine power, complete distribution;(3) if target power instruction is more than present output power, then not power distribution, wind turbine freedom of leaving Power generation;(4) if target power instruction is less than output power, target power instruction and the ratio of output power is calculated, obtains one A control ratio;Then, control ratio obtained above is multiplied by the real-time output power of current wind turbine, distributes to wind Machine completes power control;
The process of the Reactive Power Control is:(1) according to the real-time active output power and wind turbine of current wind power plant Intrinsic power factor calculates its maximum lagging reactive power and maximum capacitive reactive power;(2) reactive command is calculated The idle ratio x with maximum, and reactive power ability is calculated according to the real-time active power of every Fans;(3) ratio X is multiplied by Wind turbine reactive power ability value distributes fan as instruction.
As a further improvement on the present invention:According to wind turbine real-time running state, wind turbine is divided into several classes:
I class wind turbines:Special state wind turbine, overtemperature or artificial non-serving pattern lower limit work(;
II class wind turbines:Output power is less than or equal to minimum definite value;
Group III wind turbine:Output power is less than active power set-point;
IV class wind turbines:Output power is approximately equal to active power set-point;
Wherein, minimum definite value is wind turbine minimum acceptable active power limit value, and setting value is less than this value wind turbine Can report an error shutdown;Active power set-point is the power command value distributed for separate unit wind turbine;Wind field output power allows upper Lower limiting value is:When there is super generating or few heat condition, super generating or few hair amount and the percent value of command power.
As a further improvement on the present invention:The detailed process of the active power controller is:
Step 1:After control instruction is obtained, first step processing is carried out to control instruction, is determined whether to according to wind field spy Different situation arranges instruction actual value;
Step 2:Judge control instruction value, such as larger than wind field rated generation capacity, be that rated power is distributed per Fans, Complete distribution;If current active output is less than control instruction, then do not control;If output power is more than the lower limit allowed, and Less than the upper limit of permission, then do not adjust;
Step 3:Obtain the separate unit wind turbine mean power set-point obtained according to control instruction value and wind turbine power generation number of units;
Step 4:If all Group III wind turbines of wind turbine at this time, do not adjust;
Step 5:If the first sub-distribution, calculate control instruction and account for the current ratio always exported, then II, Group III wind turbine are pressed This ratio is reduced, and completes distribution;
Step 6:If control instruction is distributed for non-first time, the predistribution of control instruction, I class wind turbines are carried out:Without Control, makes it freely generate electricity;II class wind turbines:Active power is given as minimum definite value;Group III wind turbine:Active power is given as Real output;IV class wind turbines:Active power, which gives, to be remained unchanged;
Step 7:The secondary distribution of control instruction, and to pre-allocating remaining instruction, in two kinds of situation, if it is more than zero, Then it is averagely allocated to II classes, Group III and IV class wind turbines;If less than zero, continue the part of super generating from II, III, IV class wind It is proportionally reduced in the instruction of the secondary distribution of machine, until the instruction of secondary distribution and the amount of predistribution remaining command are in algorithm In the threshold range of permission, distribution is completed;
Step 9:Additional spilling revision directive in configuration is averagely allocated to II, III, IV class wind turbine.
As a further improvement on the present invention:The power factor is calculated by following formula:
As a further improvement on the present invention:The detailed process of the Reactive Power Control is:
Step 1: starting, long-range reactive command Q is obtained;
Step 2: the maximum power factor of wind turbine acquiescence passes through current wind field total active-power P in real time for 0.95 at this timetot Total reactive power upper limit value Q of real-time wind field can be obtainedtot
Step 3: it calculates
Step 4: as X is more than or equal to 1, the reactive power upper limit is calculated according to its real-time effective power meter per Fans at this time Value temporarily terminates as apportioning cost, waits for startup next time;If X is less than 1, the reactive power of wind turbine output is limited;
Step 5: as X is less than 1, X is multiplied by the reactive power power capability of current every controllable wind turbine, obtained value is i.e. The reactive command value being assigned to for every Fans.
Compared with prior art, the advantage of the invention is that:
1st, the Poewr control method based on wind power plant Energy Management System of the invention, passes through the real-time of wind power generating set Proportionate relationship between active power and active command is used as the benchmark for distributing active power instruction, avoids the need for passing through reality When wind speed calculate the complex calculation of current active ability, so as to ignore wind speed quickly variation cause to calculate it is functional Error between power and actual numerical value, so as to accurately calculate the active power instruction that every Fans needs are assigned to.
2nd, the Poewr control method based on wind power plant Energy Management System of the invention, reactive power can be consolidated by wind turbine Mathematics management between some power factors and active power is accurately calculated, so as to ensure that the control of reactive power essence Exactness and active output is not interfered with.
3rd, the Poewr control method based on wind power plant Energy Management System of the invention, greatly improves wind field energy pipe Reason system ensures the steady and high efficiency of wind field power control, improves wind power generating set and exist for the efficiency of power control The maximum utilization rate of work(state is limited, versatility and applicability are good.
Description of the drawings
Fig. 1 is the flow diagram that active power controller is carried out in the present invention.
Fig. 2 is the flow diagram that Reactive Power Control is carried out in the present invention.
Specific embodiment
The present invention is described in further details below with reference to Figure of description and specific embodiment.
A kind of Poewr control method based on wind power plant Energy Management System of the present invention, including active power controller and nothing Work(power control:
The process of the active power controller is:(1) power control target power instruction is obtained, wind power plant is calculated and always exports Power and the difference of target power instruction;(2) it is more than wind field rated power as target power instructs, then is every Fans allocation Determine power, complete distribution.(3) if target power instruction is more than present output power, then not power distribution, wind turbine freedom of leaving Power generation.(4) if target power instruction is less than output power, target power instruction and the ratio of output power is calculated, obtains one A control ratio;Then, control ratio obtained above is multiplied by the real-time output power of current wind turbine, distributes to wind Machine completes power control.
The process of the Reactive Power Control is:(1) according to the real-time active output power and wind turbine of current wind power plant Intrinsic power factor calculates its maximum lagging reactive power and maximum capacitive reactive power.(2) reactive command is calculated The idle ratio X with maximum, and reactive power ability is calculated according to the real-time active power of every Fans.(3) ratio X is multiplied by Wind turbine reactive power ability value distributes fan as instruction.
From the foregoing, it will be observed that after method using the present invention, active power does not need to compute repeatedly the wind field active power upper limit, directly Connect by current point on the basis of active power in real time, according to the ratio of active command and real-time active power, amplification in proportion or The active command of separate unit wind turbine is reduced, can ensure that its active command received per Fans is active in current wind turbine automatically Within the scope of power capability.And reactive power calculates its ability value according to wind turbine current active power, further according to nonfunctional Power and the ratio relation of instruction instruct to distribute, and are not in cause to influence having for wind turbine because reactive power instruction distribution is excessively high Work(power output.The method of the present invention has certain versatility, the various initial values actually controlled, maximum value, minimum value, guarantor Shield value can all need adjustment in real time according to the use of user, reduce a large amount of human resources.
In specific application, can wind turbine be divided by several classes according to wind turbine real-time running state:
I class wind turbines:Special state wind turbine, overtemperature or artificial non-serving pattern lower limit work(;
II class wind turbines:Output power is less than or equal to minimum definite value;
Group III wind turbine:Output power is less than active power set-point;
IV class wind turbines:Output power is approximately equal to active power set-point.
Wherein, minimum definite value is wind turbine minimum acceptable active power limit value, and setting value is less than this value wind turbine Can report an error shutdown.Active power set-point is the power command value distributed for separate unit wind turbine.During air-blower control, wind field Output power allow upper lower limit value be:When there is super generating or few heat condition, super generating or the percentage of few hair amount and command power Ratio, this value adjust requirement and wind field actual conditions that can change manually according to net.
As shown in Figure 1, in concrete application example, the detailed process of active power controller is:
Step 1:After control instruction is obtained, first step processing is carried out to control instruction, is determined whether to according to wind field spy Different situation arranges instruction actual value.
Step 2:Judge control instruction value, such as larger than wind field rated generation capacity, be that rated power is distributed per Fans, Complete distribution;If current active output is less than control instruction, then do not control;If output power is more than the lower limit allowed, and Less than the upper limit of permission, then do not adjust;
Step 3:Obtain the separate unit wind turbine mean power set-point obtained according to control instruction value and wind turbine power generation number of units.
Step 4:If all Group III wind turbines of wind turbine at this time, do not adjust;
Step 5:If the first sub-distribution, calculate control instruction and account for the current ratio always exported, then II, Group III wind turbine are pressed This ratio is reduced, and completes distribution;
Step 6:If control instruction is distributed for non-first time, the predistribution of control instruction, I class wind turbines are carried out:Without Control, makes it freely generate electricity, but the part that its output power is dispatched as a whole;II class wind turbines:Active power is given as most Lower bound definite value;Group III wind turbine:Active power is given as real output;IV class wind turbines:Active power, which gives, to be remained unchanged.
Step 7:The secondary distribution of control instruction, and to pre-allocating remaining instruction, in two kinds of situation, if it is more than zero, Then it is averagely allocated to II classes, Group III and IV class wind turbines;If less than zero, represent and also have super generating, need to continue the portion of super generating Divide and proportionally reduced from the instruction of the secondary distribution of II, III, IV class wind turbine, until instruction and the predistribution of secondary distribution are surplus The amount of remaining instruction is in the threshold range of algorithm permission, completes distribution.
Step 9:Additional spilling revision directive in configuration is averagely allocated to II, III, IV class wind turbine.
In the present embodiment, to be PLC control system be set by reactive power according to active power situation, power factor It calculates to judge that current wind turbine needs to send out reactive power amount.Wherein, it is as follows to calculate method for power factor:
It is possible thereby to release reactive power and be:
In view of the active power power generation situation of current wind turbine, while also to consider wind turbine rated reactive power and idle work( The limitation of rate is adjustable lower limiting value.Again because real power control and idle control are run, therefore the control of reactive power is not simultaneously It can influence the control of active power.So the calculating of reactive power is to carry out operation on the basis of the real-time active power of wind turbine 's.As shown in Fig. 2, detailed process is as follows:
Step 1: starting, long-range reactive command Q is obtained;
Step 2: the maximum power factor of wind turbine acquiescence passes through current wind field total active-power P in real time for 0.95 at this timetot Total reactive power upper limit value Q of real-time wind field can be obtainedtot
Step 3:
Step 4: as X is more than or equal to 1, illustrate under present case, the idle output of wind field is to be unable to reach instruction certainly Numerical value, reactive power upper limit value is calculated as apportioning cost according to its real-time effective power meter per Fans at this time, is temporarily terminated, Wait for startup next time.If X is less than 1, illustrate to need to limit the reactive power that wind turbine exports.
Step 5: as X is less than 1, then X is multiplied by the reactive power power capability of current every controllable wind turbine, obtained value The reactive command value being as assigned to per Fans.Distribution terminates.
In conclusion the method for the present invention is suitable for wind-power electricity generation and control technology on wind electricity generation unit and wind-force hair Motor group remote control field can specifically be formed as the power control module of wind power plant Energy Management System.Power control mould Block sends wind-driven generator machine real-time running data, wind power plant statistical data, wind power plant and the wind turbine power generation machine control of wind power plant Data processed receive the power dispatching control command from grid dispatching center to grid dispatching center, according to real-time wind-force The operating status of generating set on the basis of wind power generating set normal operation is ensured, calculates simultaneously distribution power control instruction, Steadily, active power, the reactive power to power grid of wind power generating set output grid requirements are maximumlly controlled, realizes wind field It is unattended, it ensure that the maximization of wind turbine utilization rate and wind turbine low-loss operation for a long time.By using the present invention's Control method greatly improves the efficiency of active power of wind power field control, the model that wind power plant is enable to allow in power instruction Interior output power as far as possible is enclosed, the economic interests of wind power plant owner is ensure that, also enables the operation of the safe efficient rate of wind turbine.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment, All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention should be regarded as the protection of the present invention Range.

Claims (4)

1. a kind of Poewr control method based on wind power plant Energy Management System, which is characterized in that including:Active power controller and Reactive Power Control;
The process of the active power controller is:(1) power control target power instruction is obtained, calculates wind power plant gross output With the difference of target power instruction;(2) it is more than wind field rated power as target power instructs, then is that every Fans distribute specified work( Rate completes distribution;(3) it is more than present output power as target power instructs, then power is not distributed, and wind turbine of leaving freely is sent out Electricity;(4) if target power instruction is less than output power, target power instruction and the ratio of output power is calculated, obtains one Control ratio;Then, control ratio obtained above is multiplied by the real-time output power of current wind turbine, distributes fan, Complete power control;
The process of the Reactive Power Control is:(1) it is intrinsic according to the real-time active output power and wind turbine of current wind power plant Power factor, calculate its maximum lagging reactive power and maximum capacitive reactive power;(2) calculate reactive command with most Big idle ratio x, and reactive power ability is calculated according to the real-time active power of every Fans;(3) ratio X is multiplied by wind turbine Reactive power ability value distributes fan as instruction;
According to wind turbine real-time running state, wind turbine is divided into several classes:
I class wind turbines:Special state wind turbine, overtemperature or artificial non-serving pattern lower limit work(;
II class wind turbines:Output power is less than or equal to minimum definite value;
Group III wind turbine:Output power is less than active power set-point;
IV class wind turbines:Output power is approximately equal to active power set-point;
Wherein, minimum definite value is wind turbine minimum acceptable active power limit value, and setting value can be reported less than this value wind turbine Mistake is shut down;Active power set-point is the power command value distributed for separate unit wind turbine;The bound that wind field output power allows It is worth and is:When there is super generating or few heat condition, super generating or few hair amount and the percent value of command power.
2. the Poewr control method according to claim 1 based on wind power plant Energy Management System, which is characterized in that described The detailed process of active power controller is:
Step 1:After control instruction is obtained, first step processing is carried out to control instruction, is determined whether to according to the special feelings of wind field Condition arranges instruction actual value;
Step 2:Judge control instruction value, such as larger than wind field rated generation capacity, be that rated power is distributed per Fans, complete Distribution;If current active output is less than control instruction, then do not control;If output power is more than the lower limit allowed, and is less than The upper limit of permission, then do not adjust;
Step 3:Obtain the separate unit wind turbine mean power set-point obtained according to control instruction value and wind turbine power generation number of units;
Step 4:If all Group III wind turbines of wind turbine at this time, do not adjust;
Step 5:It if the first sub-distribution, calculates control instruction and accounts for the current ratio always exported, then II, Group III wind turbine are compared by this Example is reduced, and completes distribution;
Step 6:If control instruction is distributed for non-first time, the predistribution of control instruction, I class wind turbines are carried out:Without control System, makes it freely generate electricity;II class wind turbines:Active power is given as minimum definite value;Group III wind turbine:Active power is given as reality Border output power;IV class wind turbines:Active power, which gives, to be remained unchanged;
Step 7:The secondary distribution of control instruction, with to pre-allocating remaining instruction, in two kinds of situation, if it is more than zero, inciting somebody to action It is averagely allocated to II classes, Group III and IV class wind turbines;If less than zero, continue the part of super generating from II, III, IV class wind turbine It is proportionally reduced in the instruction of secondary distribution, until the instruction of secondary distribution and the amount of predistribution remaining command are in algorithm and allow Threshold range in, complete distribution;
Step 9:Additional spilling revision directive in configuration is averagely allocated to II, III, IV class wind turbine.
3. the Poewr control method according to claim 1 or 2 based on wind power plant Energy Management System, which is characterized in that The power factor is calculated by following formula:
4. the Poewr control method according to claim 1 or 2 based on wind power plant Energy Management System, which is characterized in that The detailed process of the Reactive Power Control is:
Step 1: starting, long-range reactive command Q is obtained;
Step 2: the maximum power factor of wind turbine acquiescence passes through current wind field total active-power P in real time for 0.95 at this timetotIt can be with Obtain total reactive power upper limit value Q of real-time wind fieldtot
Step 3:
Step 4: as X is more than or equal to 1, reactive power upper limit value is calculated according to its real-time effective power meter per Fans at this time and is made For apportioning cost, temporarily terminate, wait for startup next time;If X is less than 1, the reactive power of wind turbine output is limited;
Step 5: as X is less than 1, X is multiplied by the reactive power power capability of current every controllable wind turbine, obtained value is as every The reactive command value that Fans are assigned to.
CN201410711981.0A 2014-11-28 2014-11-28 A kind of Poewr control method based on wind power plant Energy Management System Active CN105634017B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410711981.0A CN105634017B (en) 2014-11-28 2014-11-28 A kind of Poewr control method based on wind power plant Energy Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410711981.0A CN105634017B (en) 2014-11-28 2014-11-28 A kind of Poewr control method based on wind power plant Energy Management System

Publications (2)

Publication Number Publication Date
CN105634017A CN105634017A (en) 2016-06-01
CN105634017B true CN105634017B (en) 2018-06-22

Family

ID=56048683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410711981.0A Active CN105634017B (en) 2014-11-28 2014-11-28 A kind of Poewr control method based on wind power plant Energy Management System

Country Status (1)

Country Link
CN (1) CN105634017B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110783952B (en) * 2019-10-30 2021-10-22 中国华能集团有限公司 Wind power plant energy management system and method
CN110932334B (en) * 2019-11-13 2021-05-07 国电南瑞南京控制系统有限公司 Wind power plant power control method with constraint multi-objective optimization
CN113193601B (en) * 2021-05-06 2023-02-28 道莅智远科技(青岛)有限公司 Wind power plant energy management system and method based on industrial PLC

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013699A (en) * 2010-10-25 2011-04-13 电子科技大学 Method for distributing active power of wind power station
CN102856931A (en) * 2012-06-15 2013-01-02 中国电力科学研究院 Wind power plant active power dynamic grouping control method
CN103606966A (en) * 2013-11-18 2014-02-26 沈阳华创风能有限公司 Control method for distribution of active power and reactive power of wind power generator
CN104184171A (en) * 2014-08-13 2014-12-03 上海电机学院 Wind power plant layer active power control system and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8121618B2 (en) * 2009-10-28 2012-02-21 Digimarc Corporation Intuitive computing methods and systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013699A (en) * 2010-10-25 2011-04-13 电子科技大学 Method for distributing active power of wind power station
CN102856931A (en) * 2012-06-15 2013-01-02 中国电力科学研究院 Wind power plant active power dynamic grouping control method
CN103606966A (en) * 2013-11-18 2014-02-26 沈阳华创风能有限公司 Control method for distribution of active power and reactive power of wind power generator
CN104184171A (en) * 2014-08-13 2014-12-03 上海电机学院 Wind power plant layer active power control system and method

Also Published As

Publication number Publication date
CN105634017A (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN107276127B (en) Consider the wind electricity digestion optimization method of the multi-area Interconnected Power System of interconnection electricity transaction plan
US8046110B2 (en) Control of active power reserve in a wind-farm
CN104917204B (en) A kind of active power of wind power field optimal control method
CN102820676B (en) Electricity-limiting control method for wind farm
CN106953363B (en) Power grid spinning reserve Optimal Configuration Method under a kind of wind power plant limit power operating states
CN105743133A (en) Active power control method for wind power plant participated power grid frequency modulation
CN104124714B (en) A kind of grid-connected Poewr control method of distributed power source, Apparatus and system
CN108193653A (en) A kind of plant without storage's Automatic Optimal system
CN105634017B (en) A kind of Poewr control method based on wind power plant Energy Management System
CN104037805B (en) A kind of photovoltaic plant taking into account power system security constraints can power generation margin distribution method
CN102518560B (en) Method for regulating active power of wind power field
CN108933443B (en) Wind power plant power coordination control method and system
CN103701134A (en) Grid-connected wind power plant point voltage control method based on MCR (Magnetic Control Reactor) and capacitance mixed compensation
CN106602613A (en) Provincial and local two-level dispatching section coordination and control method
CN106773644B (en) A kind of AGC control systems and its method changed based on the heat supply amount of drawing gas
CN104868471A (en) Static security aid decision making method for provincial power grid
Liu et al. Optimal short-term load dispatch strategy in wind farm
CN107346889B (en) Load reduction optimization model construction method considering primary and secondary frequency modulation and minimum frequency deviation
CN104182808B (en) A kind of new energy station generation schedule formulating method rationed the power supply based on equal proportion
CN115864541A (en) Capacity optimization configuration method and device for multi-pumped storage power station
CN106026178B (en) A kind of more distributed generation resources self-discipline electricity-generating control methods in region and device
CN104794576B (en) Unit has distribution of work coordination approach in a kind of wind power plant
CN106684931A (en) Active control method and system of new-energy power plant
CN108448655A (en) A kind of passive power grid wide area electricity-generating control method and system
CN108108888A (en) The active command cooperative control method and device of wind-power electricity generation and photovoltaic generation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant