CN105631610A - Instruction management system - Google Patents

Instruction management system Download PDF

Info

Publication number
CN105631610A
CN105631610A CN201610089023.3A CN201610089023A CN105631610A CN 105631610 A CN105631610 A CN 105631610A CN 201610089023 A CN201610089023 A CN 201610089023A CN 105631610 A CN105631610 A CN 105631610A
Authority
CN
China
Prior art keywords
information
client
task
server
instructions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610089023.3A
Other languages
Chinese (zh)
Inventor
郝宏志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610089023.3A priority Critical patent/CN105631610A/en
Publication of CN105631610A publication Critical patent/CN105631610A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management

Abstract

The invention discloses an instruction management system, and the system comprises a server and at least two clients, wherein the first client enables the work information and time requirement information to be transmitted to a server. The server receives the work information and time requirement information from the first client, and transmits the work information and time requirement information to the second client corresponding to the work information according to the work information. The second client receives the work information and time requirement information forwarded by the server, and returns reply information to the sever according to the work information and time requirement information. The server receives the reply information from the second client, and transmits the reply information to the first client according to the reply information.

Description

A kind of instruction management system
Technical field
The present invention relates to a kind of instruction management system.
Background technology
At present, the management method that company management is commonly used is that lower receiver is taked continuous print " control " measure by the publisher by instruction or request. Namely remind (understanding), inspection (going action), verify (whether completing), ensure the effectiveness of management. But, when management issue many to a certain extent time, the time cost of control is too high, cause manager in fact cannot pay at all enough energy go process. Therefore the efficiency of management of this method is low.
Summary of the invention
The present invention is to solve that the problems referred to above provide a kind of instruction management system, including server and at least two client, job information and time requirement information are sent to described server by the first client in described at least two client; Described server receives the described job information from described first client and described time requirement information, according to described job information, described job information and described time requirement information is sent second client corresponding with described job information to described at least two client; Described second client receives described job information and the described time requirement information that described server forwards, and returns return information extremely described server according to described job information and described time requirement information; Described server receives the described return information from described second client, and sends described return information to described first client according to described return information.
Above-mentioned instruction management system, described job information includes task information, described task information includes task title, task definition, problem originator, the task undertaker, and described time requirement information includes: the first turnaround time and the first deadline; Described task information and described time requirement information, according to the task undertaker in described task information, are sent second client corresponding with the described task undertaker to described at least two client by described server.
Above-mentioned instruction management system, described job information includes work and asks information for instructions, the described work information of asking for instructions includes asking title for instructions, asks content for instructions, asks presenter for instructions, asks the undertaker for instructions, and described time requirement information includes: the second turnaround time and the second deadline; Described server is asked for instructions according to described work and is asked the undertaker for instructions in information, described work asks for instructions information and described time requirement information sends to described at least two client asks, with described, the second client that the undertaker is corresponding for instructions.
Above-mentioned instruction management system, described job information includes work help information, described work help information include seeking help title, content of seeking help, the presenter that seeks help, seek help the undertaker, described time requirement information includes: the 3rd turnaround time and the 3rd deadline; Described work help information and described time requirement information, according to the undertaker that seeks help in described work help information, are sent second client corresponding with the described undertaker that seeks help to described at least two client by described server.
Above-mentioned instruction management system, described return information includes: extension decision information and extension cause information.
Above-mentioned instruction management system, described return information includes: refusal accepts information and Reason For Denial information.
Above-mentioned instruction management system, described client revises described job information and/or described return information according to the preset rules being stored in described server, and amended described job information and/or described return information are sent to described server, described amended job information and/or described amended return information, according to described amended job information and/or described return information, are sent second client corresponding with described amended job information and/or described amended return information to described at least two client by described server.
Above-mentioned instruction management system, the content of described job information and/or described return information is word and/or voice and/or video.
Above-mentioned instruction management system, described server prestores personal information send described personal information to the client corresponding with described personal information in described at least two client.
By the instruction management system in the present invention, when in the face of a large amount of management issue, it is not necessary to management personnel are artificially tracked monitoring, improve the efficiency of management.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of instruction management system in one embodiment of the invention;
Fig. 2 is the schematic diagram of instruction management system in one embodiment of the invention.
Wherein, accompanying drawing labelling:
1: server 2: client
8: task list 9: ask list for instructions
10: list 11 of seeking help: task
12: work asks 13 for instructions: work is sought help
14: task essential information 15: the first replys suggestion
16: ask essential information 17: the second for instructions and reply suggestion
18: essential information of seeking help 19: the three replys suggestion
20: application for adjournment 21: extension reason
22: refusal acceptance 23: Reason For Denial
Detailed description of the invention
Fig. 1 is the schematic diagram of instruction management system in one embodiment of the invention. Refer to Fig. 1, in the present embodiment, instruction management system 100, including server 1 and at least two client 2, job information and time requirement information are sent to server 1 by the first client at least two client 2; Server 1 receives the job information from the first client and time requirement information, according to job information, job information and time requirement information is sent second client corresponding with job information at least two client 2; Second client receives job information and the time requirement information that server forwards, and returns return information to server 1 according to job information and time requirement information; Server 1 receives the return information from the second client, and sends return information to the first client according to return information.
Selecting as one, in the application one embodiment, job information includes task information, and task information includes task title, task definition, problem originator, the task undertaker. Time requirement information includes: the first turnaround time and the first deadline; Task information and time requirement information, according to the task undertaker in task information, are sent second client corresponding with the task undertaker at least two client 2 by server 1.
Selecting as one, in the application one embodiment, job information includes work and asks information for instructions, and the work information of asking for instructions includes asking title for instructions, asks content for instructions, asks presenter for instructions, asks the undertaker for instructions. Time requirement information includes: the second turnaround time and the second deadline; Server 1 is asked for instructions according to work and is asked the undertaker for instructions in information, work is asked for instructions information and time requirement information sends second client corresponding with asking the undertaker for instructions at least two client 2.
Selecting as one, in the application one embodiment, job information includes work help information, work help information include seeking help title, content of seeking help, the presenter that seeks help, seek help the undertaker. Time requirement information includes: the 3rd turnaround time and the 3rd deadline; Work help information and time requirement information, according to the undertaker that seeks help in work help information, are sent second client corresponding with the undertaker that seeks help at least two client 2 by server 1.
Selecting as one, in the application one embodiment, return information includes: extension decision information and extension cause information.
Selecting as one, in the application one embodiment, return information includes: refusal accepts information and Reason For Denial information.
Select as one, in the application one embodiment, client 2 is according to the preset rules modification information and/or the return information that are stored in server 1, and amended job information and/or return information are sent to server 1, amended job information and/or amended return information, according to amended job information and/or return information, are sent second client corresponding with amended job information and/or amended return information at least two client 2 by server 1.
Selecting as one, in the application one embodiment, the content of job information and/or return information is word and/or voice and/or video.
Select as one, in the application one embodiment, the task and/or the first deadline that are later than the first Preset Time the first turnaround time are later than the task of the second Preset Time and/or are later than the work of the 3rd Preset Time the second turnaround time and ask for instructions and/or the second deadline was later than the work of the 4th Preset Time and asks for instructions and/or the 3rd work being later than the 5th Preset Time turnaround time is sought help and/or the 3rd deadline was later than the work of the 6th Preset Time and seeks help generation penalty note by server 1, and bill is sent at least two client 2, second client corresponding with job information and/or return information.
Selecting as one, in the application one embodiment, server 1 prestores personal information send personal information to the client corresponding with personal information at least two client 2.
Fig. 2 is that in one embodiment of the invention, the schematic diagram of instruction management system refer to Fig. 2, for instance A is as the task person of assigning. The first client is logged in by PC or mobile equipment, the essential information of the first client display A, A enters task list 8 afterwards, and in task list 8, newly-built title is " asking you to carry out the market demand research work of new product as early as possible ", is numbered the task 11 of 171. In task information, appointed task receiver is B. This task is sent to server 1 by A by the first client subsequently, and this task 11, according to task receiver, is sent the second client to B place by server 1. B logs in the second client by PC or mobile equipment, and the essential information of the second client display B, by seeing this task 11 in the task list 8 in the second client. What be wherein together dealt into the second client along with task also has the task essential information 14 pre-established by A, includes task title, task definition, problem originator, the task undertaker, turnaround time and deadline including mission bit stream.
If turnaround time and deadline are set as in JIUYUE, 2015 respectively 2 days and 14 days by A in task essential information 14, if B did not reply this instruction in JIUYUE before 2 days, then penalty note produces it to be produced penalty note (point penalty or fine); If not completing task in JIUYUE before 14 days, also it can be produced penalty note. Penalty note can certainly be directly produced without prompting. If penalty note generates, point penalty or fine automatically can be collected to them under one's name by instruction management system on backstage, and by examination department, it performed punishment.
B is as the task undertaker afterwards, after entering this task 11, fills in back suggestion 15 in task essential information 14. And this reply suggestion 15 is back to server 1, this reply suggestion 15 is back to the person of the assigning A of task 11 by server 1. Then B can reply refusal information 22 in replying suggestion 15 and/or postpone information 20. Such as, A requires that turnaround time is on August 14th, 2015, and the deadline is August 31. B fill in " refusal receives an assignment " replying in suggestion 15 on 14th, and to fill in Reason For Denial in Reason For Denial 23 be " time is too short, it is impossible to finish on schedule ". A agrees to this reply suggestion, does not then produce penalty note after seeing the reply suggestion 15 that B refusal receives an assignment. August 31, is the deadline. B return information 15 before this fill in " task-delay application " and fill in after " each retail trader not yet provide enough market demand information " A sees the reply suggestion of B task-delay application in extension reason 21, agree to this reply suggestion, then do not produce penalty note.
Work is asked for instructions identical with task with the workflow sought help that works, here do not repeating. But owing to, in real work, task is usually and is sent to subordinate by higher level, work is asked for instructions to be usually and is sent by subordinate's superior, and work is sought help and is usually between peer and sends out mutually. Therefore, this instruction management system can also pass through resignation system, and the user of different stage is set different authorities. Such as when task sends, sender can change any information about this task, and task recipient can only edit wherein partial information. Work is when asking transmission for instructions, be could alter that any information asked for instructions by the person of asking for instructions, and the person of asking for instructions can only change wherein partial information etc.
By the instruction management system in the present invention, when in the face of a large amount of management issue, it is not necessary to management personnel are artificially tracked monitoring, improve the efficiency of management.

Claims (9)

1. an instruction management system, including server and at least two client, it is characterised in that
Job information and time requirement information are sent to described server by the first client in described at least two client;
Described server receives the described job information from described first client and described time requirement information, according to described job information, described job information and described time requirement information is sent second client corresponding with described job information to described at least two client;
Described second client receives described job information and the described time requirement information that described server forwards, and returns return information extremely described server according to described job information and described time requirement information;
Described server receives the described return information from described second client, and sends described return information to described first client according to described return information.
2. instruction management system as claimed in claim 1, it is characterized in that, described job information includes task information, described task information includes task title, task definition, problem originator, the task undertaker, and described time requirement information includes: the first turnaround time and the first deadline;
Described task information and described time requirement information, according to the task undertaker in described task information, are sent second client corresponding with the described task undertaker to described at least two client by described server.
3. instruction management system as claimed in claim 1, it is characterized in that, described job information includes work and asks information for instructions, the described work information of asking for instructions includes asking title for instructions, asks content for instructions, asks presenter for instructions, asks the undertaker for instructions, and described time requirement information includes: the second turnaround time and the second deadline;
Described server is asked for instructions according to described work and is asked the undertaker for instructions in information, described work asks for instructions information and described time requirement information sends to described at least two client asks, with described, the second client that the undertaker is corresponding for instructions.
4. instruction management system as claimed in claim 1, it is characterized in that, described job information includes work help information, described work help information include seeking help title, content of seeking help, the presenter that seeks help, seek help the undertaker, described time requirement information includes: the 3rd turnaround time and the 3rd deadline;
Described work help information and described time requirement information, according to the undertaker that seeks help in described work help information, are sent second client corresponding with the described undertaker that seeks help to described at least two client by described server.
5. instruction management system as claimed in claim 1, it is characterised in that described return information includes: extension decision information and extension cause information.
6. instruction management system as claimed in claim 1, it is characterised in that described return information includes: refusal accepts information and Reason For Denial information.
7. instruction management system as claimed in claim 1, it is characterized in that, described client revises described job information and/or described return information according to the preset rules being stored in described server, and amended described job information and/or described return information are sent to described server, described server is according to described amended job information and/or described return information, described amended job information and/or described amended return information are sent to described at least two client, second client corresponding with described amended job information and/or described amended return information.
8. instruction management system as claimed in claim 1, it is characterised in that the content of described job information and/or described return information is word and/or voice and/or video.
9. instruction management system as claimed in claim 1, it is characterised in that described server prestores personal information, and described personal information is sent the client corresponding with described personal information to described at least two client.
CN201610089023.3A 2016-02-17 2016-02-17 Instruction management system Pending CN105631610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610089023.3A CN105631610A (en) 2016-02-17 2016-02-17 Instruction management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610089023.3A CN105631610A (en) 2016-02-17 2016-02-17 Instruction management system

Publications (1)

Publication Number Publication Date
CN105631610A true CN105631610A (en) 2016-06-01

Family

ID=56046515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610089023.3A Pending CN105631610A (en) 2016-02-17 2016-02-17 Instruction management system

Country Status (1)

Country Link
CN (1) CN105631610A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102821143A (en) * 2012-07-23 2012-12-12 中国联合网络通信集团有限公司 Cooperating method, equipment and system of terminal
US8984521B2 (en) * 2010-02-18 2015-03-17 International Business Machines Corporation Computer system performance by applying rate limits to control block tenancy
CN104468802A (en) * 2014-12-11 2015-03-25 上海元趣信息技术有限公司 Intelligent early education system, client side and data processing method
CN104580284A (en) * 2013-10-14 2015-04-29 方正宽带网络服务股份有限公司 Service assignment device and service assignment method
CN104778545A (en) * 2015-04-08 2015-07-15 深圳市科陆电子科技股份有限公司 Work task management system based on mobile equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8984521B2 (en) * 2010-02-18 2015-03-17 International Business Machines Corporation Computer system performance by applying rate limits to control block tenancy
CN102821143A (en) * 2012-07-23 2012-12-12 中国联合网络通信集团有限公司 Cooperating method, equipment and system of terminal
CN104580284A (en) * 2013-10-14 2015-04-29 方正宽带网络服务股份有限公司 Service assignment device and service assignment method
CN104468802A (en) * 2014-12-11 2015-03-25 上海元趣信息技术有限公司 Intelligent early education system, client side and data processing method
CN104778545A (en) * 2015-04-08 2015-07-15 深圳市科陆电子科技股份有限公司 Work task management system based on mobile equipment

Similar Documents

Publication Publication Date Title
Abdul-Rahman et al. Implementation of risk management in malaysian construction industry: case studies
Bertelsen et al. Managing the three aspects of production in construction
CN109858724B (en) Intelligent dispatching method and device based on data analysis and computer equipment
DE112013001964T5 (en) Management of the security of the message exchange
CN104050540A (en) Method and system for team cooperation task management
CN111709707A (en) Management and control system and method applied to project delivery construction site
CN106529823A (en) Management and control system
CN107194674A (en) A kind of intelligent distribution scheduling system based on item business rule
CN109636183A (en) A kind of multiplexing kind recruitment coordinated management method and system based on big data
Damian The study of requirements engineering in global software development: as challenging as important
CN110910089A (en) Intelligent community work order processing method and device, server and system
Hekneby et al. Orchestrated learning: creating a company-specific production system (XPS)
CN106651154A (en) Daily precontrol method for infrastructure risk
CN105631610A (en) Instruction management system
Britt et al. Lessons learned from the make ready process in a hospital project
Kundu et al. IT support service: identification and categorisation of wastes
CN107862512A (en) A kind of task processing method, terminal and computer-readable recording medium
Hekneby et al. The financial implications of XPS: an organizational learning perspective
Riazi et al. The use of supply chain management to overcome low labour productivity issues in the Tenth Malaysia Plan public sector projects
Gupta et al. Ground water quality monitoring using wireless sensors and machine learning
Linna et al. Harmonizing emergency management knowledge representation
Germain Use of collaboration software to improve nuclear power plant outage management
Taleb et al. Managing communication between architects and clients during design phase
Sly et al. Improving the efficiency of large manufacturing assembly plants
Goit Minimization of wastage using lean technology in construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160601

RJ01 Rejection of invention patent application after publication