CN105626041A - 随钻当量密度测量方法及装置 - Google Patents
随钻当量密度测量方法及装置 Download PDFInfo
- Publication number
- CN105626041A CN105626041A CN201610217226.6A CN201610217226A CN105626041A CN 105626041 A CN105626041 A CN 105626041A CN 201610217226 A CN201610217226 A CN 201610217226A CN 105626041 A CN105626041 A CN 105626041A
- Authority
- CN
- China
- Prior art keywords
- drilling
- density
- depth
- drill string
- measuring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/04—Measuring depth or liquid level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Mechanical Engineering (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610217226.6A CN105626041A (zh) | 2014-05-29 | 2016-04-08 | 随钻当量密度测量方法及装置 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410233859.7A CN103982174B (zh) | 2014-05-29 | 2014-05-29 | 随钻当量密度测量方法及装置 |
CN201610217226.6A CN105626041A (zh) | 2014-05-29 | 2016-04-08 | 随钻当量密度测量方法及装置 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410233859.7A Division CN103982174B (zh) | 2014-05-29 | 2014-05-29 | 随钻当量密度测量方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105626041A true CN105626041A (zh) | 2016-06-01 |
CN105626041A8 CN105626041A8 (zh) | 2018-04-06 |
Family
ID=56041332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610217226.6A Pending CN105626041A (zh) | 2014-05-29 | 2016-04-08 | 随钻当量密度测量方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105626041A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11236602B2 (en) * | 2019-11-12 | 2022-02-01 | Saudi Arabian Oil Company | Automated real-time transport ratio calculation |
CN114775611A (zh) * | 2022-04-24 | 2022-07-22 | 贵州强胜基础工程技术有限公司 | 建筑桩基础底部沉渣处理及补强施工方法 |
US11655690B2 (en) | 2021-08-20 | 2023-05-23 | Saudi Arabian Oil Company | Borehole cleaning monitoring and advisory system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040211595A1 (en) * | 2003-04-25 | 2004-10-28 | Pinckard Mitchell D. | System and method for automatic drilling to maintain equivalent circulating density at a preferred value |
US20050284659A1 (en) * | 2004-06-28 | 2005-12-29 | Hall David R | Closed-loop drilling system using a high-speed communications network |
CN102094632A (zh) * | 2009-12-14 | 2011-06-15 | 西安威尔罗根能源科技有限公司 | 一种泥浆压力密度测井仪 |
US20130049983A1 (en) * | 2011-08-26 | 2013-02-28 | John Rasmus | Method for calibrating a hydraulic model |
CN202850970U (zh) * | 2012-08-29 | 2013-04-03 | 中国海洋石油总公司 | 一种深水表层钻井井下环空压力自动控制系统 |
CN103388471A (zh) * | 2013-08-05 | 2013-11-13 | 吴佳平 | 一种钻孔校检仪及其工作方法 |
CN103982174A (zh) * | 2014-05-29 | 2014-08-13 | 中国石油集团钻井工程技术研究院 | 随钻当量密度测量方法及装置 |
-
2016
- 2016-04-08 CN CN201610217226.6A patent/CN105626041A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040211595A1 (en) * | 2003-04-25 | 2004-10-28 | Pinckard Mitchell D. | System and method for automatic drilling to maintain equivalent circulating density at a preferred value |
US20050284659A1 (en) * | 2004-06-28 | 2005-12-29 | Hall David R | Closed-loop drilling system using a high-speed communications network |
CN102094632A (zh) * | 2009-12-14 | 2011-06-15 | 西安威尔罗根能源科技有限公司 | 一种泥浆压力密度测井仪 |
US20130049983A1 (en) * | 2011-08-26 | 2013-02-28 | John Rasmus | Method for calibrating a hydraulic model |
CN202850970U (zh) * | 2012-08-29 | 2013-04-03 | 中国海洋石油总公司 | 一种深水表层钻井井下环空压力自动控制系统 |
CN103388471A (zh) * | 2013-08-05 | 2013-11-13 | 吴佳平 | 一种钻孔校检仪及其工作方法 |
CN103982174A (zh) * | 2014-05-29 | 2014-08-13 | 中国石油集团钻井工程技术研究院 | 随钻当量密度测量方法及装置 |
Non-Patent Citations (1)
Title |
---|
刘伟等: "井下振动测量、分析原理研究", 《石油钻采工艺》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11236602B2 (en) * | 2019-11-12 | 2022-02-01 | Saudi Arabian Oil Company | Automated real-time transport ratio calculation |
US11655690B2 (en) | 2021-08-20 | 2023-05-23 | Saudi Arabian Oil Company | Borehole cleaning monitoring and advisory system |
CN114775611A (zh) * | 2022-04-24 | 2022-07-22 | 贵州强胜基础工程技术有限公司 | 建筑桩基础底部沉渣处理及补强施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105626041A8 (zh) | 2018-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10539001B2 (en) | Automated drilling optimization | |
CA2910186C (en) | Method and apparatus for determining wellbore position | |
EP2929141B1 (en) | Weighting function for inclination and azimuth computation | |
US10982526B2 (en) | Estimation of maximum load amplitudes in drilling systems independent of sensor position | |
CN103982174B (zh) | 随钻当量密度测量方法及装置 | |
US11378506B2 (en) | Methods and systems for monitoring drilling fluid rheological characteristics | |
CN102892970A (zh) | 钻井方法和系统 | |
CN104989370B (zh) | 一种滑动导向钻井闭环控制系统及其控制方法 | |
NO20170446A1 (en) | Methods and apparatus for monitoring wellbore turtuosity | |
RU2613688C1 (ru) | Автоматическая оценка скважинного исследования | |
US11111770B2 (en) | Automated steering using operating constraints | |
CN105626041A (zh) | 随钻当量密度测量方法及装置 | |
US20230193740A1 (en) | Estimation of maximum load amplitudes in drilling systems using multiple independent measurements | |
CN105840176A (zh) | 随钻当量密度测量方法及装置 | |
US11608735B2 (en) | Drill bit position measurement | |
Bashir et al. | Overview on directional drilling wells | |
US11573139B2 (en) | Estimation of downhole torque based on directional measurements | |
US10267145B2 (en) | Increasing borehole wall permeability to facilitate fluid sampling | |
Kurz | Relief Well Profile Analysis and Evaluation of a Passive Seismic Method for Relief Well Placement in the Shallow Wisting Discovery | |
Beique et al. | Drilling unique wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CI02 | Correction of invention patent application |
Correction item: Application Date|Original application data Correct: 2014.05.29|201410233859.7 2014.05.29 False: 2016.04.08|N/A Number: 22 Page: The title page Volume: 32 Correction item: Application Date|Original application data Correction item: Application Date|Original application data Correct: 2014.05.29|201410233859.7 2014.05.29 False: 2016.04.08|N/A Number: 22 Volume: 32 Volume: 32 |
|
CI02 | Correction of invention patent application | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160601 |
|
RJ01 | Rejection of invention patent application after publication |