CN105605308B - Municipal blow-off line laying construction method - Google Patents
Municipal blow-off line laying construction method Download PDFInfo
- Publication number
- CN105605308B CN105605308B CN201510559943.2A CN201510559943A CN105605308B CN 105605308 B CN105605308 B CN 105605308B CN 201510559943 A CN201510559943 A CN 201510559943A CN 105605308 B CN105605308 B CN 105605308B
- Authority
- CN
- China
- Prior art keywords
- concrete
- briquetting
- cushion block
- piece
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Sewage (AREA)
- Foundations (AREA)
Abstract
Municipal blow-off line laying construction method, laid by the way of zonal cooling construction, prefabricated in advance lower concrete cushion block and top concrete briquetting are employed in each section of process of deployment;Each section of process of deployment is:Poured on ground at the construction field (site), prefabricated polylith lower concrete cushion block and polylith top concrete briquetting;Digging groove, form foundation trench;Foundation trench supporting construction is installed;Pre- polylith lower concrete cushion block, one or more pipe and polylith top concrete briquetting are successively placed in foundation trench, the both ends of every pipe are made to be respectively supported in the semi-circular recesses of one piece of lower concrete cushion block, and be pressed in respectively in the semi-circular recesses of one piece of top concrete briquetting, and polyethylene expansion joint plate is placed between the combining structure of adjacent two groups of lower concrete cushion blocks and top concrete briquetting;Pipe external wrapping concrete is poured into foundation trench;Backfill groove.This construction method simplifies process, shortens the construction period, accelerates efficiency of construction.
Description
Technical field
The invention belongs to sewage conduct technical field of construction, more particularly to a kind of municipal blow-off line laying construction method.
Background technology
At present, municipal blow-off line is generally laid by the way of zonal cooling construction, and each section using following
Construction technological process:
S1, digging groove, form foundation trench;
S2, installation foundation trench supporting construction, generally use steel plate box supporting, the purpose is to:On the one hand it is the peace for ensureing foundation trench
Entirely, the security of operation in workmen's subsequent pit is on the other hand improved;
S3, to the bottom of foundation trench ttom of pipe concrete is poured, one of polyethylene expansion joint plate, stretched polyethylene are set every 6 meters
Contracting seam plate is fixed by specialized structure, and the ttom of pipe concrete to pouring is by manually carrying out leveling;
After the tentatively solidification of S4, the ttom of pipe concrete after pouring, the time generally tentatively solidified is 4-8 hours, by rising
Hang equipment one or more pipe is placed on the ttom of pipe concrete after solidification, and pipe is fixed on by ttom of pipe by iron wire and mixed
On solidifying soil, when can so avoid follow-up concreting, pipe floats;
S5, the linearity for adjusting pipe, can use wedge-shaped concrete block or larger stone;
S6, pipe shaft, tube top concrete are poured, the surrounding up and down of pipe is wrapped by concrete;
S7, backfill groove, so far complete the construction of one section of sewage conduct.
In above-mentioned construction technological process, when carrying out the artificial equating of the 3rd work step, the blow-off line of the 4th work step of progress
When fixed and when carrying out the pipe straightening of the 5th work step, it is required to workmen and enters progress in groove, workmen is in ditch
Time in groove is longer, on the one hand causes construction period longer, and another aspect operation is dangerous big, and it is hidden to there is more safety
Suffer from, such as, when the both sides not support template of groove or when supporting is not in place, it there is the hidden danger of groove landslide.In addition, it is necessary to
Carry out concrete twice to pour, the hardening time of provided pipe base concrete is wanted in centre, so, causes that the engineering time is longer, apply
Work efficiency rate is low.
The content of the invention
The present invention for solve known technology present in technical problem provide a kind of simplified process, shortening the construction period,
Be used in turn rate, raising working security and the guarantee for accelerating efficiency of construction, reduction material cost, raising foundation trench supporting construction are applied
The municipal blow-off line laying construction method of working medium amount.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:
Municipal blow-off line laying construction method, the construction method are laid by the way of zonal cooling construction, its
It is characterised by:Prefabricated in advance lower concrete cushion block and and lower concrete are employed in each section of process of deployment
Top concrete briquetting that cushion block is engaged, in the upper surface medium position and top concrete briquetting of lower concrete cushion block
The medium position of lower surface is respectively equipped with the semi-circular recesses to match with the external diameter of sewage conduct to be laid, and two halves circle is recessed
Groove can be spliced into a full circle positioning through hole;Each section of process of deployment comprises the following steps successively:
Poured on S1, ground at the construction field (site), prefabricated polylith lower concrete cushion block and polylith top concrete briquetting;
S2, digging groove, form foundation trench;
S3, installation foundation trench supporting construction;
S4, by lifting appliance and human assistance by prefabricated polylith lower concrete cushion block, one or more pipe
And prefabricated polylith top concrete briquetting is successively placed in foundation trench, one piece of top concrete briquetting and one piece of bottom coagulation
Native cushion block forms combining structure up and down, the both ends of every pipe is respectively supported at the semicircle recessed of one piece of lower concrete cushion block
In groove, and it is pressed in respectively in the semi-circular recesses of one piece of top concrete briquetting;And in two groups of adjacent lower concretes
Polyethylene expansion joint plate is directly placed between the combining structure of cushion block and top concrete briquetting;
S5, pipe external wrapping concrete, the top surface of concreting to top concrete briquetting are poured into foundation trench;
S6, backfill groove, so far complete the laying of one section of sewage conduct.
The technical scheme that the present invention can also take is:
The caliber of used pipe is D, and the length of every pipe is 6 meters, the height of every piece of lower concrete cushion block and every
The height of block top concrete briquetting takes δ, then δ=D/2+300mm, the width of every piece of lower concrete cushion block and every piece of top
The width of concrete blocks takes L1, then L1=D+600mm, the length and every piece of top concrete of every piece of lower concrete cushion block
The length of briquetting takes L2, then L2 >=1m.
The top concrete briquetting at every pipe both ends and the prefabricated dosage of lower concrete cushion block are every with corresponding in S5
The proportionate relationship of the amount of pouring of the concrete of root pipe is 33:67.
The present invention has the advantages and positive effects of:
1st, each section of construction shorten to six procedures by existing seven procedure, and concrete is poured by subtracting twice
It is few to arrive once, so, the preliminary setting time of centre is eliminated, ensure that construction is carried out continuously, so as to improve efficiency of construction
With shorten the construction time, improve 60% or so through preresearch estimates efficiency, the duration reduces 60% or so.
2nd, using the combining structure of cushion block and briquetting, amount of concrete 33% is to pour on the ground corresponding to every pipe
Build, be prefabricated, so improving security and efficiency simultaneously, security improves 33% or so, on the ground with the efficiency comparison of underground
Improve 50% or so.
3rd, using this construction method, it is not necessary to carry out in foundation trench artificial levelling and pipe is fixed with iron wire, this
Sample, activity duration of the people in foundation trench is drastically reduce the area, improve the security of construction and ensure that personal safety.
4th, pipe need not be fixed with iron wire in this construction technology, so reduces the dosage of material, reduce
Material cost.
5th, foundation trench generally use steel plate box supporting, using existing construction method, every piece of steel plate box at least needs 2 day time
It can down have enough to meet the need, and use this construction method, every piece of steel plate box only needs 1 day time down to have enough to meet the need, circulation material utilization rate
50% is improved, benefit accordingly improves.
6th, place polyethylene expansion joint plate needs specially to be fixed in existing construction method, and uses this construction party
Method, polyethylene expansion joint plate are directly sandwiched between adjacent cushion block and the combining structure of briquetting, so, avoid the need for setting specially
The fixed structure of door, this improves efficiency and the security of operation.
Brief description of the drawings
Fig. 1 is the construction flow chart of the present invention;
Fig. 2 is the attachment structure schematic diagram between pipe in the step working procedure of this construction method the 4th.
In figure:1st, lower concrete cushion block;2nd, top concrete briquetting;3rd, foundation trench;4th, foundation trench supporting construction;5th, pipe;
6th, polyethylene expansion joint plate;7th, concrete.
Embodiment
In order to further understand the content, features and effects of the present invention, hereby enumerating following examples, and coordinate accompanying drawing
Describe in detail as follows:
Fig. 1 and 2, municipal blow-off line laying construction method are referred to, the construction method uses the side of zonal cooling construction
Formula is laid, and is the characteristics of the construction method:Bottom coagulation prefabricated in advance is employed in each section of process of deployment
Native cushion block 1 and the top concrete briquetting 2 being engaged with lower concrete cushion block.In the middle part of the upper surface of lower concrete cushion block
The medium position of position and the lower surface of top concrete briquetting is respectively equipped with to match with the external diameter of sewage conduct to be laid
Semi-circular recesses, two halves circular groove can be spliced into a full circle positioning through hole.Each section of process of deployment successively include with
Lower step:
Poured on S1, ground at the construction field (site), prefabricated polylith lower concrete cushion block and polylith top concrete briquetting.
The quantity of lower concrete cushion block and top concrete briquetting will be matched with follow-up using the quantity of pipe.Specifically, every
The both ends of pipe correspond to one piece of lower concrete cushion block and one piece of top concrete briquetting respectively.
S2, digging groove, foundation trench 3 is formed, with specific reference to existing form of construction work.
S3, installation foundation trench supporting construction 4, referring specifically to existing form of construction work.
S4, by lifting appliance and human assistance by prefabricated polylith lower concrete cushion block, one or more pipe 5
And prefabricated polylith top concrete briquetting is successively placed in foundation trench, one piece of top concrete briquetting and one piece of bottom coagulation
Native cushion block forms combining structure up and down, the both ends of every pipe is respectively supported at the semicircle recessed of one piece of lower concrete cushion block
In groove, and it is pressed in respectively in the semi-circular recesses of one piece of top concrete briquetting;And in two groups of adjacent lower concretes
Polyethylene expansion joint plate 6 is directly placed between the combining structure of cushion block and top concrete briquetting.Usual polyethylene expansion joint plate
It is made up of the polyethylene expansion joint plate positioned at top half and the polyethylene expansion joint plate positioned at the latter half, wherein positioned at upper half
Partial polyethylene expansion joint plate is clamped by two adjacent top concrete briquettings, the polyethylene expansion joint plate positioned at the latter half
By two adjacent lower concrete block grips.Above-mentioned lower concrete cushion block, pipe, top concrete briquetting and stretched polyethylene
Contracting seam plate Specific construction process be:Lifting appliance is first passed through to wait to spread according to the section by prefabricated polylith lower concrete cushion block
If the length of sewage conduct and the length of single cell of selection be placed on the bottom surface of foundation trench, polylith lower concrete is in base
When riding position in groove bottom will ensure follow-up down tube, both ends one piece of lower concrete cushion block of each correspondence of every pipe, and
Adjust the elevation and linearity of polylith lower concrete cushion block;Then more pipes are supported on by bottom by lifting appliance one by one
In half plate arc groove in concrete pad, it is attached between pipe using spigot-and-socket;To be more finally by lifting appliance
Block top concrete briquetting is placed on multiple lower concrete cushion blocks in foundation trench one by one, and two so in every pipe
End is equipped with the combining structure of one group of top concrete briquetting and lower concrete cushion block;Meanwhile mixed in the bottom of a pipe
After solidifying native cushion block installs, it is necessary to the polyethylene positioned at the latter half before the lower concrete cushion block of installation adjacent pipe
Before expansion joint plate is attached to corresponding to a pipe on the side of lower concrete cushion block;Positioned at the polyethylene expansion joint of top half
Plate installs the installation referring to the above-mentioned polyethylene expansion joint plate positioned at the latter half, will not be repeated here.
S5, pipe external wrapping concrete 7, the top surface of concreting to top concrete briquetting are poured into foundation trench;
S6, backfill groove, so far complete the laying of one section of sewage conduct.
Using above-mentioned applying method, the parameter of used pipe and the parameter of lower concrete cushion block and top concrete pressure
The parameter of block is preferably as follows relation, uses the caliber of pipe as D, and the length of every pipe is 6 meters, every piece of lower concrete pad
The height of block and the height of every piece of top concrete briquetting take δ, then δ=D/2+300mm, the width of every piece of lower concrete cushion block
Degree and the width of every piece of top concrete briquetting take L1, then L1=D+600mm, the length of every piece of lower concrete cushion block and every
The length of block top concrete briquetting takes L2, then L2 >=1m.
Using above-mentioned construction method, the top concrete briquetting at every pipe both ends and the prefabricated use of lower concrete cushion block
The proportionate relationship of the amount of pouring of concrete of the amount with corresponding to every pipe in S5 is preferably 33:67.
Claims (3)
1. municipal blow-off line laying construction method, the construction method is laid by the way of zonal cooling construction, and it is special
Sign is:Employed in each section of process of deployment lower concrete cushion block prefabricated in advance and with lower concrete pad
The top concrete briquetting that block is engaged, under the upper surface medium position and top concrete briquetting of lower concrete cushion block
The medium position of end face is respectively equipped with the semi-circular recesses to match with the external diameter of sewage conduct to be laid, two halves circular groove
A full circle positioning through hole can be spliced into;Each section of process of deployment comprises the following steps successively:
Poured on S1, ground at the construction field (site), prefabricated polylith lower concrete cushion block and polylith top concrete briquetting;
S2, digging groove, form foundation trench;
S3, installation foundation trench supporting construction;
S4, by lifting appliance and human assistance by prefabricated polylith lower concrete cushion block, one or more pipe and pre-
The polylith top concrete briquetting made is successively placed in foundation trench, one piece of top concrete briquetting and one piece of lower concrete pad
Block forms combining structure up and down, the both ends of every pipe is respectively supported at the semi-circular recesses of one piece of lower concrete cushion block
It is interior, and be pressed in respectively in the semi-circular recesses of one piece of top concrete briquetting;And in two groups of adjacent lower concrete pads
Polyethylene expansion joint plate is directly placed between the combining structure of block and top concrete briquetting;
S5, pipe external wrapping concrete, the top surface of concreting to top concrete briquetting are poured into foundation trench;
S6, backfill groove, so far complete the laying of one section of sewage conduct.
2. municipal blow-off line laying construction method according to claim 1, it is characterised in that:The caliber of used pipe
For D, the length of every pipe is 6 meters, and the height of every piece of lower concrete cushion block and the height of every piece of top concrete briquetting are equal
δ being taken, then δ=D/2+300mm, the width of every piece of lower concrete cushion block and the width of every piece of top concrete briquetting take L1,
Then L1=D+600mm, the length of every piece of lower concrete cushion block and the length of every piece of top concrete briquetting take L2, then L2 >=
1m。
3. municipal blow-off line laying construction method according to claim 1, it is characterised in that:The top at every pipe both ends
The amount of pouring of concrete of the prefabricated dosage of portion's concrete blocks and lower concrete cushion block with corresponding to every pipe in S5
Proportionate relationship is 33:67.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510559943.2A CN105605308B (en) | 2015-09-06 | 2015-09-06 | Municipal blow-off line laying construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510559943.2A CN105605308B (en) | 2015-09-06 | 2015-09-06 | Municipal blow-off line laying construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105605308A CN105605308A (en) | 2016-05-25 |
CN105605308B true CN105605308B (en) | 2017-12-29 |
Family
ID=55985485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510559943.2A Active CN105605308B (en) | 2015-09-06 | 2015-09-06 | Municipal blow-off line laying construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105605308B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107882152A (en) * | 2017-12-04 | 2018-04-06 | 瑞安市东南市政工程建设有限公司 | A kind of municipal blow-off pipe laying and construction method |
CN109281379B (en) * | 2018-11-10 | 2020-11-24 | 温州市龙湾大地绿化有限公司 | Municipal sewage pipeline laying construction method |
CN109898548A (en) * | 2019-02-14 | 2019-06-18 | 济南城建集团有限公司 | Exempt from the assembling module and construction method of compacting in a kind of municipal pipeline basis |
CN110594488B (en) * | 2019-08-14 | 2021-02-09 | 中国电建集团华东勘测设计研究院有限公司 | Underground pipeline groove supporting and monitoring integrated structure and construction method |
CN113324097A (en) * | 2021-04-20 | 2021-08-31 | 中国水利水电第九工程局有限公司 | Deep groove excavation construction process |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19849142A1 (en) * | 1998-10-24 | 2000-04-27 | Sander Karl Heinz Gmbh & Co Kg | Sub-surface concrete water pipe supported at ends in concrete muffs simplifying manufacture and installation, muffs being made of two halves bolted together |
CN1712643A (en) * | 2004-06-14 | 2005-12-28 | 胡彦彬 | Foundation construction of precast concrete pipes |
CN102155585B (en) * | 2011-04-12 | 2012-08-15 | 中国十九冶集团有限公司 | Method for laying mine slurry pipeline in long and narrow section |
KR101180451B1 (en) * | 2012-02-15 | 2012-09-06 | 박건호 | A connecting block for pipe and constructing method using it |
KR101262964B1 (en) * | 2012-09-11 | 2013-05-09 | 주식회사 건축사사무소도아 | Braket for supporting water and waste pipe of apartment house |
-
2015
- 2015-09-06 CN CN201510559943.2A patent/CN105605308B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105605308A (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105605308B (en) | Municipal blow-off line laying construction method | |
CN104594348B (en) | Enlarged footing bellows anchor pole and construction method thereof | |
CN103981898B (en) | A kind of inverse underground engineering construction method done of overall open cut node | |
CN107059903A (en) | Bottom plate plugging dewatering well construction method is worn in foundation ditch | |
CN103628885A (en) | Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel | |
CN108532649A (en) | A kind of compressive static load test method of bored concrete pile | |
CN102587663A (en) | Concrete construction process of steel tube columns of super-high-rise building | |
CN110004991B (en) | Underground structure anti-floating system based on convex wing foot plate and construction method | |
CN107587884A (en) | Tunnel double-lining concrete vault backfills grouting device | |
CN110700237A (en) | Construction method of diaphragm wall for preventing concrete from flowing around | |
CN107794942A (en) | Riverbed comprehensive pipe gallery structure and its construction method are worn under one kind | |
CN207297034U (en) | Tunnel double-lining concrete vault backfills grouting device | |
CN209369832U (en) | Steel pipe behind fill concrete structure in a kind of tunnel | |
CN110206071A (en) | A kind of diaphram wall seam reinforcement means and device | |
CN107542086B (en) | Anchor cable construction method for filling slope | |
CN107268675A (en) | The laying method and structure of a kind of many storehouse underground pipe galleries of combined type | |
CN106917358B (en) | A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system | |
CN110552378A (en) | Underground space roof subsides post-cast strip and seals structure in advance | |
CN206513380U (en) | A kind of tunnel double-lining vault with rubber seal reserves Grouting Pipe | |
CN106193279B (en) | Time building method of main structure wall prestressed structure and main structure wall | |
CN208717918U (en) | The enclosure structure of foundation pit of subway station of high-voltage line or overpass is worn under a kind of | |
CN105673933A (en) | Waterproof sealing device for post-through-wall pipeline and construction method | |
CN207974149U (en) | Pre-buried skeleton strength core masonry cable duct | |
CN205975592U (en) | Subway goes out to wear a waterline support structure under lambda line shield method | |
CN109505629A (en) | Steel pipe behind fill concrete structure and construction method in a kind of tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 300384 the Binhai New Area of Tianjin Huayuan Industrial Zone Rong Yuan Road No. 2 4-2101 Patentee after: China Construction Municipal Construction Group Co., Ltd. Address before: 300384 Tianjin City Huayuan Industrial Zone Binhai Rong Yuan Road No. 2 4-2101 Patentee before: Sinohydro Tianjin Engineering Co.,Ltd. |
|
CP03 | Change of name, title or address |