CN105603849A - Pervious concrete precast component for road - Google Patents

Pervious concrete precast component for road Download PDF

Info

Publication number
CN105603849A
CN105603849A CN201510961223.9A CN201510961223A CN105603849A CN 105603849 A CN105603849 A CN 105603849A CN 201510961223 A CN201510961223 A CN 201510961223A CN 105603849 A CN105603849 A CN 105603849A
Authority
CN
China
Prior art keywords
pervious concrete
road
prefabricated components
pervious
road according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510961223.9A
Other languages
Chinese (zh)
Inventor
庞正扬
薛俊
席亚杰
黄国春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Kodak Building Materials Limited-Liability Co
Original Assignee
Nantong Kodak Building Materials Limited-Liability Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Kodak Building Materials Limited-Liability Co filed Critical Nantong Kodak Building Materials Limited-Liability Co
Priority to CN201510961223.9A priority Critical patent/CN105603849A/en
Publication of CN105603849A publication Critical patent/CN105603849A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

The application discloses a pervious concrete precast component for road. The pervious concrete precast component for road comprises a pervious concrete slab; the periphery of the pervious concrete slab is provided with a concrete layer; steel bars are pre-embedded in the pervious concrete slab; and parts of the steel bars extend out of the pervious concrete slab and the concrete layer. The pervious concrete precast component for road can effectively solve the municipal surface gathered water, ease the burden of municipal drainage system; and the modular design can resolve the problem traffic congestion of caused by slow road repair.

Description

Road pervious concrete prefabricated components
Technical field
The disclosure relates generally to building field, relates in particular to a kind of road pervious concrete prefabricatedMember.
Background technology
Road surface, traditional cities is water-tight structure, and rainwater is shown to get rid of by road, and discharge capacity is limited,In the time running into heavy rain or heavy rain, rainwater easily collects on road surface, concentrate in a large number motor vehicle and fromOn runway, cause road surface ponding on a large scale.
Hardstand has several respects to the main harm of urban environment: the one, while raining, intercept completelyRainwater directly infiltrates through ground, has increased the weight of the burden of drainage pipeline, makes city once meeting rainfall simultaneouslyCompletely ponding, and when fine day, ground is very dried again, stirs up a cloud of dust; The 2nd, a large amount of reflections,Storage is stayed and is then discharged solar radiant heat, has greatly increased urban heat land effect, makes amenityDegree reduces greatly; The 3rd, after snowfall, easily freeze and skid, bring multiple inconvenience to people's tripEven dangerous, meanwhile, also cannot utilize precipitation to supplement urban groundwater. The 4th, directly affect cityCity's vegetation health, further increases the weight of arid, the water shortage status in city, forms the life of vicious circleState environment.
In existing pervious concrete, due to fine aggregate, workability and the mobility such as admixture sand notPoor, inside concrete space skewness, causes the pressure resistance of existing pervious concreteDegree and rupture strength can not meet the requirement on road surface, the therefore water penetration of pervious concrete and anti-foldingThe relation of compression strength becomes existing main direction of studying in industry, how to configure and meetsThe pervious concrete of road surface pressure-proof and snap-resistent intensity also becomes a difficult problem urgently to be resolved hurrily.
In sum, existing not yet have a kind of high strength permeable road concrete prefabricated components again.
Summary of the invention
In view of road surface in prior art is water-tight structure, rainwater is shown to get rid of by road, earial drainage energyThe defect that power is limited or deficiency, expect to provide a kind of road pervious concrete prefabricated components.
Provide a kind of road pervious concrete prefabricated components on the one hand, comprising: pervious concretePlate, described pervious concrete plate surrounding is furnished with concrete layer, pre-buried in described pervious concrete plateHave bar construction, described bar construction part is stretched out described pervious concrete plate and described concreteLayer.
Road in the present invention can effectively solve urban pavement with pervious concrete prefabricated componentsPonding, alleviates sewerage system burden; And be modularized design, can solve current roadTrimming speed is slow, thus the traffic blocking problem causing.
Brief description of the drawings
By read do with reference to the following drawings non-limiting example is done retouch in detailState, it is more obvious that the application's other features, objects and advantages will become:
Fig. 1-3 are pervious concrete prefabricated components structural representation for road in the present invention;
Detailed description of the invention
Below in conjunction with drawings and Examples, the application is described in further detail. Be appreciated that, specific embodiment described herein is only for explaining related invention, but not to thisBright restriction. It also should be noted that, for convenience of description, in accompanying drawing, only show withInvent relevant part.
It should be noted that, in the situation that not conflicting, the embodiment in the application and embodimentIn feature can mutually combine. Describe below with reference to the accompanying drawings and in conjunction with the embodiments this in detailApplication.
Please refer to Fig. 1 to Fig. 3, the invention provides a kind of road pervious concrete prefabricated components,It is characterized in that, comprising: pervious concrete plate 1, described pervious concrete plate surrounding is furnished with mixedSolidifying soil layer 3, is embedded with bar construction 2 in described pervious concrete plate, described bar construction 2Part is stretched out described pervious concrete plate 1 and described concrete layer 3.
Road in the present invention can effectively solve city on the one hand with pervious concrete prefabricated componentsCity's surface gathered water, alleviates sewerage system burden; On the other hand, the road in the present invention is usedConcrete prefabricated element is modularized design, can solve current road trimming speed slow, therebyThe traffic blocking problem causing.
Optionally, described pervious concrete plate is regular shape.
Optionally, described pervious concrete is rectangle. In the present invention, providing a kind of road usesPervious concrete prefabricated components, carry out modular making by pervious concrete, on the one hand in realityMore convenient in the work progress on border, and convenient to the trimming of road, alleviation trafficPressure; On the other hand above-mentioned prefabricated components are made to regular shape, more constructability; SeparatelyOutward, because compression strength and the rupture strength of pervious concrete plate are lower, road surface is easily damaged,Increase in the surrounding of pervious concrete plate the concrete layer that common high-strength concrete is made, strengthenedThe compression strength of prefabricated components and rupture strength.
Optionally, described concrete layer material is common high-strength concrete. In the present invention, body isPervious concrete plate, surrounding is distributed with common high-strength concrete layer, realizes between modulesSeparate, and easy to use in actual use.
Optionally, described pervious concrete is by cement, coarse aggregate rubble, water, high efficiency water reducing agentComposition, its mass ratio is: cement: coarse aggregate rubble: water: high efficiency water reducing agent is 20~25:81~85:4.2~4.8:0.5~0.8. Pervious concrete in the present invention is by cement, rubble, waterWith high efficiency water reducing agent composition, do not add the fine aggregates such as sand, in the concrete prefabricated element of making, depositIn even continuous space, thereby can reach permeable effect.
Optionally, described cement: coarse aggregate rubble: water: high efficiency water reducing agent mass ratio is 20~23:82~84:4.5:0.6~0.7. The also tool of pervious concrete prefabricated components that in the present invention, material is madeHave good compression strength and rupture strength, its test is as follows.
Optionally, described pervious concrete also comprises blend composition flyash. In the present invention by makingCarry out the preparation of pervious concrete prefabricated components with coarse aggregate rubble and blend composition flyash, makePrefabricated components afterwards have good water penetration.
It is below the test to the pervious concrete of the road in the present invention prefabricated components;
Experiment one: pressure test:
Pervious concrete piece, C30 concrete block, pervious concrete prefabricated components are carried out to pressureTest, experiment in triplicate, is got average. Test specimen should try in time from take out in maintenance placeTest, test specimen surface and upper and lower bearing plate face are wiped clean. Test specimen is placed in to pressure testing machineOn lower platen or backing plate, the center of test specimen should be aimed at testing machine lower platen center, starts testMachine, in the time that top board and test specimen or billet approach, adjusts ball seat, makes contact balanced. In examinationTest continuous uniform ground loading in process, in the time that the approaching destruction of test specimen starts to be sharply out of shape, stop adjustingWhole testing machine throttle, until destroy, then records failing load.
Concrete cubic compressive strength should be calculated as follows:
fcc=F/A;
In formula: fcc: concrete test specimen compression strength (MPa); F: test specimen failing load (N); A: examinationPart bearing area (㎡).
Show according to experimental result, these pervious concrete prefabricated components have higher pressure resistanceDegree.
Experiment two: permeability rate test
Carry out water permeabillity test, to assess the water permeable ability of prefabricated components.
Test specimen is carried out under standard conditions to maintenance, take out test specimen, close with plasticine before testGap between envelope test specimen and permeable instrument adds water in permeable instrument, shows from test specimen from water riseFace 120mm/150mm/200mm plays beginning timing, until 0mm, record takesBetween.
Coefficient of permeability: V=H/ Δ T;
In formula, V is coefficient of permeability, the mm/s of unit; H is water level falling head, the mm of unit;Δ T is highly near 0 required time, the s of unit.
120mm 150mm 200mm
Concrete sample 15.1 19.5 26.7
Show according to experiment structure, this pervious concrete can be effectively permeable.
Show according to experiment above, the pervious concrete prefabricated components that provide in the present invention havePreferably water penetration, can effectively solve the ponding of urban pavement, and link sewerage system is negativeLoad; With certain compression strength, ensure that road surface has higher compression strength permeable time;And the road in the present invention is modularized design with pervious concrete prefabricated components, be easy to changeThe road component damaging, has improved the speed that road is rested and reorganized greatly.
More than describing is only the application's preferred embodiment and saying institute's application technology principleBright. It will be appreciated by those skilled in the art that invention scope related in the application, do not limitThe technical scheme forming in the particular combinations of above-mentioned technical characterictic, also should be encompassed in and not depart from simultaneouslyIn the situation of described inventive concept, be combined by above-mentioned technical characterictic or its equivalent featureAnd other technical scheme forming. For example, in above-mentioned feature and the application disclosed (but being not limited to)The technical characterictic with similar functions is replaced mutually and the technical scheme that forms.

Claims (7)

1. road pervious concrete prefabricated components, is characterized in that, comprising: permeable mixedConcrete board, described pervious concrete plate surrounding is furnished with concrete layer, in described pervious concrete plateBe embedded with bar construction, described bar construction part is stretched out described pervious concrete plate and described mixedSolidifying soil layer.
2. road according to claim 1 pervious concrete prefabricated components, its feature existsIn, described pervious concrete plate is regular shape.
3. road according to claim 2 pervious concrete prefabricated components, its feature existsIn, described pervious concrete plate is rectangle.
4. road according to claim 1 pervious concrete prefabricated components, its feature existsIn, described concrete layer material is common high-strength concrete.
5. road according to claim 1 pervious concrete prefabricated components, its feature existsIn, described pervious concrete is made up of cement, coarse aggregate rubble, water, high efficiency water reducing agent, itsMass ratio is: cement: coarse aggregate rubble: water: high efficiency water reducing agent is 20~25:81~85:4.2~4.8:0.5~0.8。
6. road according to claim 3 pervious concrete prefabricated components, its feature existsIn, described cement: coarse aggregate rubble: water: high efficiency water reducing agent mass ratio is 20~23:82~84:4.5:0.6~0.7。
7. road according to claim 3 pervious concrete prefabricated components, its feature existsIn, described pervious concrete also comprises blend composition flyash.
CN201510961223.9A 2015-12-18 2015-12-18 Pervious concrete precast component for road Pending CN105603849A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510961223.9A CN105603849A (en) 2015-12-18 2015-12-18 Pervious concrete precast component for road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510961223.9A CN105603849A (en) 2015-12-18 2015-12-18 Pervious concrete precast component for road

Publications (1)

Publication Number Publication Date
CN105603849A true CN105603849A (en) 2016-05-25

Family

ID=55984160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510961223.9A Pending CN105603849A (en) 2015-12-18 2015-12-18 Pervious concrete precast component for road

Country Status (1)

Country Link
CN (1) CN105603849A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759789A (en) * 2016-12-26 2017-05-31 江苏中路工程技术研究院有限公司 A kind of road gully structure suitable for sponge city
CN109608133A (en) * 2018-12-24 2019-04-12 南京工程学院 A kind of high-performance permeable concrete and preparation method thereof
CN114182716A (en) * 2021-10-28 2022-03-15 河北工程大学 Method for manufacturing U-shaped precast sheet pile of anti-liquefaction reinforced permeable concrete for existing building

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2732807Y (en) * 2003-04-24 2005-10-12 同济大学 Water-permeable concrete pavement brick
CN1749202A (en) * 2005-08-04 2006-03-22 上海交通大学 Method for preparing flyash water permeating road surface concrete
CN1749201A (en) * 2005-08-04 2006-03-22 上海交通大学 Flyash water permeating road surface concrete
CN101182172A (en) * 2007-11-28 2008-05-21 盛虹集团有限公司 High-strength high-water-permeability concrete and preparation method thereof
CN101831904A (en) * 2010-05-06 2010-09-15 南京工业大学 Permeable concrete pile
WO2010110906A1 (en) * 2009-03-25 2010-09-30 Make It Right Foundation Reinforced pervious concrete
CN102079105A (en) * 2010-11-11 2011-06-01 华南理工大学 Preparation method of ecological embankment type porous concrete special for plant growing
CN203701257U (en) * 2014-02-14 2014-07-09 江苏建筑职业技术学院 Water-permeable concrete well lid
CN103981783A (en) * 2014-04-29 2014-08-13 中国建筑股份有限公司 Stone texture imitating permeable concrete prefabricated brick and preparation method thereof
CN104446076A (en) * 2014-11-04 2015-03-25 江苏建筑职业技术学院 Permeable reinforced concrete

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2732807Y (en) * 2003-04-24 2005-10-12 同济大学 Water-permeable concrete pavement brick
CN1749202A (en) * 2005-08-04 2006-03-22 上海交通大学 Method for preparing flyash water permeating road surface concrete
CN1749201A (en) * 2005-08-04 2006-03-22 上海交通大学 Flyash water permeating road surface concrete
CN101182172A (en) * 2007-11-28 2008-05-21 盛虹集团有限公司 High-strength high-water-permeability concrete and preparation method thereof
WO2010110906A1 (en) * 2009-03-25 2010-09-30 Make It Right Foundation Reinforced pervious concrete
CN101831904A (en) * 2010-05-06 2010-09-15 南京工业大学 Permeable concrete pile
CN102079105A (en) * 2010-11-11 2011-06-01 华南理工大学 Preparation method of ecological embankment type porous concrete special for plant growing
CN203701257U (en) * 2014-02-14 2014-07-09 江苏建筑职业技术学院 Water-permeable concrete well lid
CN103981783A (en) * 2014-04-29 2014-08-13 中国建筑股份有限公司 Stone texture imitating permeable concrete prefabricated brick and preparation method thereof
CN104446076A (en) * 2014-11-04 2015-03-25 江苏建筑职业技术学院 Permeable reinforced concrete

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759789A (en) * 2016-12-26 2017-05-31 江苏中路工程技术研究院有限公司 A kind of road gully structure suitable for sponge city
CN106759789B (en) * 2016-12-26 2019-04-05 江苏中路工程技术研究院有限公司 A kind of road gully structure suitable for sponge city
CN109608133A (en) * 2018-12-24 2019-04-12 南京工程学院 A kind of high-performance permeable concrete and preparation method thereof
CN114182716A (en) * 2021-10-28 2022-03-15 河北工程大学 Method for manufacturing U-shaped precast sheet pile of anti-liquefaction reinforced permeable concrete for existing building

Similar Documents

Publication Publication Date Title
Kia et al. Clogging in permeable concrete: A review
Singh et al. A review of sustainable pervious concrete systems: Emphasis on clogging, material characterization, and environmental aspects
Obla Pervious concrete—An overview
CN101293763B (en) Water permeable concrete and pavement construction method
CN100422442C (en) Rainwater-collecting pervious concrete pavement system
Tong Clogging effects of portland cement pervious concrete
Gupta Monitoring in situ performance of pervious concrete in British Columbia—A pilot study
CN103553471B (en) Method for manufacturing water permeable brick from waste concrete, and pavement method of water permeable brick
CN105603849A (en) Pervious concrete precast component for road
CN207362616U (en) Permeable brick paving structure
CN108774931B (en) Roadbed construction process suitable for salty soil region
KR102191037B1 (en) System and method for water spray using porous base-layer block
Eathakoti et al. An innovative no-fines concrete pavement model
Kováč et al. Pervious concrete as a sustainable solution for pavements in urban areas
JP2008008125A (en) Method for making permeable pavement material and permeable molded/machined product
Busari et al. Pervious pavements for storm water control
Suozzo et al. Long-term field monitoring and evaluation of maintenance practices for pervious concrete pavement in Vermont
CN208395598U (en) It is a kind of for improving the concrete precast block of easy ponding region
Arhin et al. Optimal mix designs for pervious concrete for an urban area
Lucke et al. Addressing the demands of the new German permeable pavement design guidelines and the hydraulic behaviour of a new paving design
CN107288007A (en) A kind of asphalt paving structure with safeguard measure
CN207193694U (en) A kind of asphalt paving structure with safeguard measure
CN207347874U (en) A kind of ponding flow guide system on road surface and square
CN106758652B (en) A kind of high intensity pervious concrete road
Kevern et al. Temperature response in a pervious concrete system designed for stormwater treatment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160525

RJ01 Rejection of invention patent application after publication