CN105598898A CN201610042717.1A CN201610042717A CN105598898A CN 105598898 A CN105598898 A CN 105598898A CN 201610042717 A CN201610042717 A CN 201610042717A CN 105598898 A CN105598898 A CN 105598898A
Authority
CN
China
Prior art keywords
wire
mounting block
tail
chute
threading hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610042717.1A
Other languages
Chinese (zh)
Inventor
顾艳勇
董庆
赵俊平
宋洪波
梁建国
李莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Binzhou Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Guo Wang Binzhou City Shandong Province Bincheng District Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guo Wang Binzhou City Shandong Province Bincheng District Electric Co filed Critical Guo Wang Binzhou City Shandong Province Bincheng District Electric Co
Priority to CN201610042717.1A priority Critical patent/CN105598898A/en
Publication of CN105598898A publication Critical patent/CN105598898A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING, OR HOLDING
    • B25B25/00Implements for fastening, connecting or tensioning of wire or strip
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/20Side-supporting means therefor, e.g. using guy ropes or struts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention belongs to the technical field of electric power circuit construction devices, and particularly relates to a stay wire tail wire manufacturing tool and a use method thereof. The stay wire tail wire manufacturing tool comprises a tail wire winding device body. The tail wire winding device body comprises a winding part and a holding part. A set of threading holes are formed in the middle of the winding part. A ball installing block is installed on the front side of the winding part. A ball is installed on the ball installing block. The stay wire tail wire manufacturing tool has the advantages that it can be ensured that an iron wire is closely and uniformly wound, and no gaps exist.

Description

一种拉线尾线制作工具及其使用方法A kind of tool for making tail wire and using method thereof

技术领域 technical field

本发明属于电力线路施工设备技术领域,具体地涉及一种拉线尾线制作工具及其使用方法。 The invention belongs to the technical field of power line construction equipment, and in particular relates to a guy wire tail making tool and a using method thereof.

背景技术 Background technique

电能由发电厂输送到负荷中心或用户终端的距离较远,通常需要架设输电线路进行输送。在输电线路施工时,高低压供电线路使用砼杆来架设,在固定安装电力砼杆时,将砼杆竖立到地面后,为了保证砼杆的稳固及受力平衡,需要采用拉线将砼杆辅助固定。 Electric energy is transmitted from power plants to load centers or user terminals over a long distance, and transmission lines usually need to be erected for transmission. During the construction of transmission lines, the high and low voltage power supply lines are erected with concrete poles. When the electric concrete poles are fixedly installed, after the concrete poles are erected to the ground, in order to ensure the stability and force balance of the concrete poles, it is necessary to use pull wires to support the concrete poles. fixed.

安装拉线时,拉线一端首先通过UT线夹弯曲对折后形成双股拉线,然后用铁丝将双股拉线搭接部分进行绑扎,这种过程称为“打拉线”。现有打拉线的方式是使用老虎钳、扳手、大锤等多种手提工具交替作业,以将镀锌的铁丝缠绕绑扎在双股拉线上。在缠绕过程中,《电气装置安装工程35kv及以下架空电力线路施工及验收规范》(GB50173-92)对于铁丝要求为:缠绕紧密均匀无缝隙、无硬弯、整齐美观,且不能伤及铁丝的镀锌层。目前,进行拉线的尾线缠绕时,经常出现缠绕的铁丝有缝隙、不均匀紧密的问题。这便是现有技术的不足之处。 When installing the guy wire, one end of the guy wire is first bent and folded in half by the UT clamp to form a double-strand guy wire, and then the overlapping part of the double-strand guy wire is bound with iron wire. This process is called "tying the guy wire". The existing mode of playing backguy is to use multiple portable tools such as vise, wrench, sledgehammer to work alternately, so that the galvanized iron wire is wound and tied on the double backguy. During the winding process, the "Code for Construction and Acceptance of 35kV and Below Overhead Power Lines for Electrical Installation Engineering" (GB50173-92) requires the iron wire to be tight and uniform without gaps, no hard bends, neat and beautiful, and cannot damage the wire. Galvanized layer. At present, when the tail wire of the pull wire is wound, the problems of gaps and uneven tightness of the wound iron wire often occur. Here it is the weak point of prior art.

发明内容 Contents of the invention

本发明是为了解决上述技术问题,而提供一种可确保铁丝缠绕紧密均匀、无缝隙的拉线尾线制作工具及其使用方法。 The present invention aims to solve the above-mentioned technical problems, and provides a guy wire tail making tool and a using method thereof which can ensure that iron wires are wound tightly and evenly without gaps.

本发明的技术方案是:一种拉线尾线制作工具,包括尾线缠绕器本体,所述尾线缠绕器本体包括缠绕部和把持部,所述缠绕部的中部设有一组穿线孔,所述缠绕部的前侧安装有滚珠安装块,所述滚珠安装块上安装有滚珠。 The technical solution of the present invention is: a pulling wire tail production tool, including a tail winder body, the tail winder body includes a winding part and a holding part, a group of threading holes are arranged in the middle of the winding part, the A ball mounting block is mounted on the front side of the winding part, and balls are mounted on the ball mounting block.

本发明的技术方案还包括:所述滚珠安装块包括位于穿线孔上方的上安装块和位于穿线孔下方的下安装块,所述上安装块和下安装块的结构相同且互相平行。将滚珠安装块平行设置在穿线孔的上下两侧,能够对缠绕的铁丝滚压均匀,可提高对缠绕铁丝的修整效果。 The technical solution of the present invention also includes: the ball mounting block includes an upper mounting block located above the threading hole and a lower mounting block located below the threading hole, the upper mounting block and the lower mounting block have the same structure and are parallel to each other. The ball mounting block is arranged in parallel on the upper and lower sides of the threading hole, so that the winding iron wire can be rolled evenly, and the trimming effect of the winding iron wire can be improved.

本发明的技术方案还包括:所述滚珠安装块的边角处采用圆弧过渡结构。采用圆弧过渡结构可避免安装块在滚压过程中对铁丝的镀锌层造成伤害。 The technical solution of the present invention also includes: a circular arc transition structure is adopted at the corners of the ball mounting block. The use of a circular arc transition structure can prevent the installation block from causing damage to the galvanized layer of the iron wire during the rolling process.

本发明的技术方案还包括:所述滚珠安装块的边缘处外设有保护层,所述保护层由橡胶、毛毡或布带制成。在安装块的边缘处设置保护层,能够避免在滚压时损坏铁丝,提高拉线尾线质量。 The technical solution of the present invention also includes: a protective layer is provided outside the edge of the ball mounting block, and the protective layer is made of rubber, felt or cloth tape. A protective layer is provided on the edge of the mounting block, which can avoid damage to the iron wire during rolling and improve the quality of the tail wire of the pull wire.

本发明的技术方案还包括:所述缠绕部的后侧安装有滑槽,所述滑槽内安装有可沿滑槽左右移动的支撑杆。能够方便悬挂铁丝,并可根据使用要求进行位置调整,使用方便。 The technical solution of the present invention also includes: a sliding slot is installed on the rear side of the winding part, and a support rod that can move left and right along the sliding slot is installed in the sliding slot. The iron wire can be hung conveniently, and the position can be adjusted according to the use requirements, which is convenient to use.

本发明的技术方案还包括:所述支撑杆上安装有滚轮。对铁丝起到导向修整作用,避免对铁丝镀锌层的损坏。 The technical solution of the present invention also includes: rollers are installed on the support rod. It plays a role of guiding and trimming the iron wire to avoid damage to the galvanized layer of the iron wire.

本发明的技术方案还包括:所述滑槽包括位于穿线孔上方的上滑槽和位于穿线孔下方的下滑槽,所述上滑槽和下滑槽互相平行。在穿线孔的上下两侧均设置滑槽,能够方便使用且可提高缠绕质量。 The technical solution of the present invention further includes: the chute includes an upper chute located above the threading hole and a lower chute located below the threading hole, the upper chute and the lower chute are parallel to each other. Slide grooves are arranged on the upper and lower sides of the threading hole, which can be used conveniently and can improve the winding quality.

本发明的技术方案还包括:所述穿线孔的孔径大小沿中心线向两侧依次递减,所述穿线孔内设置有橡胶垫。设置一组孔径大小不一的穿线孔,可方便缠绕不同粗细的铁丝,使用范围广,并且,在穿线孔内设置橡胶垫,可对铁丝起到防护作用,避免直接摩擦磨损镀锌层。 The technical solution of the present invention further includes: the aperture size of the threading hole decreases successively along the center line to both sides, and a rubber pad is arranged in the threading hole. Set a group of threading holes with different diameters, which can easily wind iron wires of different thicknesses, and has a wide range of applications. Moreover, rubber pads are set in the threading holes, which can protect the iron wires and avoid direct friction and abrasion of the galvanized layer.

本发明的技术方案还包括:所述尾线缠绕器本体由绝缘材料制成,所述把持部位置处设置有防滑层。性能可靠且使用方便。 The technical solution of the present invention also includes: the main body of the tail wire winder is made of insulating material, and an anti-slip layer is provided at the position of the gripping part. Reliable performance and ease of use.

本发明还提供了一种拉线尾线制作工具的使用方法,主要包括以下步骤: The present invention also provides a method for using the wire tail production tool, which mainly includes the following steps:

步骤一,将待缠绕的镀锌铁丝挂在支撑杆上,沿滑槽推动支撑杆至大小合适的穿线孔位置处; Step 1. Hang the galvanized iron wire to be wound on the support rod, and push the support rod along the chute to the position of the threading hole with a suitable size;

步骤二,将镀锌铁丝从穿线孔中穿出放于拉线搭接位置处,将缠绕部上安装有滚珠安装块的一侧与拉线接触; Step 2: Pass the galvanized iron wire through the threading hole and place it at the overlapping position of the cable, and contact the side of the winding part where the ball mounting block is installed with the cable;

步骤三,双手握住把持部顺时针或者逆时针转动把持部,镀锌铁丝被缠绕在拉线搭接位置处,同时滚珠对缠绕的镀锌铁丝进行平复修正。 Step 3, hold the grip part with both hands and turn it clockwise or counterclockwise, the galvanized iron wire is wound at the overlapping position of the stay wire, and at the same time, the ball corrects the wound galvanized iron wire.

使用滑槽和支撑杆能够将待缠绕的镀锌铁丝移动至合适位置,方便后续的缠绕;同时,设置一组孔径大小不同的穿线孔,能够方便缠绕不同粗细的铁丝,适用范围广;并且,设置滚珠,既能够减小与铁丝之间的摩擦力,降低对铁丝的损害,又能够实现边缠绕边滚压修整,确保缠绕紧密均匀无缝隙。 The galvanized iron wire to be wound can be moved to a suitable position by using the chute and the support rod to facilitate the subsequent winding; at the same time, a set of threading holes with different diameters can be set to facilitate the winding of iron wires of different thicknesses, which has a wide range of applications; and, setting The ball can not only reduce the friction between the iron wire and the damage to the iron wire, but also realize rolling and trimming while winding to ensure tight and uniform winding without gaps.

本发明的有益效果是:通过在缠绕部上安装滚珠,当进行铁丝缠绕时,使工具与铁丝之间由传统的直接滑动摩擦变为间接的滚动摩擦,可降低由于摩擦对铁丝镀锌层的损害,进而可避免由于铁丝镀锌层损害造成的腐蚀断裂问题;同时,设置滚珠还可实现边缠绕边滚压修整,确保铁丝缠绕紧密均匀无缝隙。 The beneficial effects of the present invention are: by installing balls on the winding part, when winding the iron wire, the traditional direct sliding friction between the tool and the iron wire becomes indirect rolling friction, which can reduce the impact on the galvanized layer of the iron wire due to friction. damage, thereby avoiding the problem of corrosion and fracture caused by damage to the galvanized layer of the iron wire; at the same time, the setting of balls can also realize rolling and trimming while winding, ensuring that the iron wire is tightly wound and uniform without gaps.

附图说明 Description of drawings

图1是本发明的主视示意图。 Fig. 1 is a schematic front view of the present invention.

图2是本发明的后视示意图。 Figure 2 is a schematic rear view of the present invention.

图3是本发明的剖视主视图。 Fig. 3 is a sectional front view of the present invention.

图中,1、尾线缠绕器本体,2、把持部,3、滚珠安装块,4、滚珠,5、穿线孔,6、缠绕部,7、滑槽,8、支撑杆,9、橡胶垫。 In the figure, 1. The body of the tail wire winder, 2. The grip part, 3. The ball mounting block, 4. The ball, 5. The threading hole, 6. The winding part, 7. The chute, 8. The support rod, 9. The rubber pad .

具体实施方式 detailed description

下面结合附图对本发明的技术方案进行详细描述。 The technical scheme of the present invention will be described in detail below in conjunction with the accompanying drawings.

本发明的一种拉线尾线制作工具,可对拉线的搭接部分进行绑扎,并能确保缠绕的镀锌铁丝紧密均匀无缝隙。 The tool for making the tails of the guy wires of the invention can bind the overlapped parts of the guy wires, and can ensure that the wound galvanized iron wires are tight and even without gaps.

如图1至图3所示,本发明的拉线尾线制作工具包括尾线缠绕器本体1,该尾线缠绕器本体1由绝缘材料制成,如压缩木、塑料等,其包括缠绕部6和把持部2,在把持部上设置防滑层,如防滑花纹,可以增大把持力,使用时省力、方便。 As shown in Figures 1 to 3, the guy wire tail making tool of the present invention includes a tail wire winder body 1, which is made of insulating material, such as compressed wood, plastic, etc., and includes a winding part 6 And the grip part 2, an anti-slip layer, such as an anti-skid pattern, can be set on the grip part, which can increase the grip force, and save effort and convenience during use.

缠绕部6的中部设有一组穿线孔5,具体地,穿线孔5的孔径大小不一且穿线孔5的孔径大小沿中心线向两侧依次递减,设置一组孔径大小不一的穿线孔,可方便缠绕不同粗细的铁丝,使用范围广。在穿线孔5内设置有橡胶垫9,可对铁丝起到防护作用,避免直接摩擦磨损镀锌层。 The middle part of the winding part 6 is provided with a set of threading holes 5. Specifically, the threading holes 5 have different aperture sizes and the aperture sizes of the threading holes 5 decrease successively along the center line to both sides, and a group of threading holes with different aperture sizes are set. It is convenient to wind iron wires of different thicknesses and has a wide range of applications. A rubber pad 9 is arranged in the threading hole 5, which can protect the iron wire and avoid direct friction and abrasion of the galvanized layer.

在缠绕部6的前侧(也就是使用时与拉线直接接触的一侧)安装有滚珠安装块3,该滚珠安装块3上安装有滚珠4。设置滚珠和安装块的好处在于:当进行铁丝缠绕时,可使工具与铁丝之间由传统的直接滑动摩擦变为间接的滚动摩擦,降低由于摩擦对铁丝镀锌层的损害,进而避免由于铁丝镀锌层损害造成的腐蚀断裂问题;同时,设置滚珠还可实现边缠绕边滚压修整,确保铁丝缠绕紧密均匀无缝隙。 A ball mounting block 3 is mounted on the front side of the winding portion 6 (that is, the side that is in direct contact with the stay wire during use), and a ball 4 is mounted on the ball mounting block 3 . The advantage of setting the ball and the mounting block is that when the wire is wound, the traditional direct sliding friction between the tool and the wire can be changed into an indirect rolling friction, which reduces the damage to the galvanized layer of the wire due to friction, thereby avoiding the damage caused by the wire The problem of corrosion and fracture caused by damage to the galvanized layer; at the same time, the setting of balls can also realize rolling and trimming while winding to ensure that the iron wire is tightly wound and uniform without gaps.

为了提高滚压修整的效果,滚珠安装块3包括位于穿线孔5上方的上安装块和位于穿线孔5下方的下安装块,并且,上安装块和下安装块的结构相同且互相平行,能够对缠绕的铁丝滚压均匀,可提高对缠绕铁丝的修整效果。 In order to improve the effect of rolling trimming, the ball mounting block 3 includes an upper mounting block positioned above the threading hole 5 and a lower mounting block positioned below the threading hole 5, and the upper mounting block and the lower mounting block have the same structure and are parallel to each other, which can Rolling the wound iron wire evenly can improve the trimming effect of the wound iron wire.

为了避免对铁丝的镀锌层造成损坏,将滚珠安装块3的边角处设计成采用圆弧过渡结构,并且,在滚珠安装块3的边缘处外设置由橡胶、毛毡或布带制成保护层,能够避免在滚压时损坏铁丝,提高拉线尾线质量。 In order to avoid damage to the galvanized layer of the iron wire, the corners of the ball mounting block 3 are designed to adopt a circular arc transition structure, and the outer edge of the ball mounting block 3 is provided with a protection made of rubber, felt or cloth tape. Layers can avoid damage to the iron wire during rolling and improve the quality of the wire tail.

在缠绕部6的后侧安装有滑槽7,滑槽7内安装有可沿滑槽左右移动的支撑杆8,其能够方便悬挂铁丝,并可根据使用要求进行位置调整,使用方便。 A chute 7 is installed on the rear side of the winding part 6, and a support rod 8 that can move left and right along the chute is installed in the chute 7, which can easily hang iron wires, and can be adjusted according to the use requirements, and is easy to use.

为了方便使用,在支撑杆8上安装有滚轮,滑槽7设计成包括位于穿线孔5上方的上滑槽和位于穿线孔5下方的下滑槽,并且,上滑槽和下滑槽互相平行。 For ease of use, rollers are installed on the support bar 8, and the chute 7 is designed to include an upper chute above the threading hole 5 and a lower chute positioned below the threading hole 5, and the upper chute and the lower chute are parallel to each other.

本发明的拉线尾线制作工具的使用方法,主要包括以下步骤: The using method of the backguy tail production tool of the present invention mainly comprises the following steps:

步骤一,将待缠绕的镀锌铁丝挂在支撑杆8上,沿滑槽7推动支撑杆8至大小合适的穿线孔5位置处; Step 1, hang the galvanized iron wire to be wound on the support rod 8, and push the support rod 8 along the chute 7 to the position of the threading hole 5 with a suitable size;

步骤二,将镀锌铁丝从穿线孔5中穿出放于拉线搭接位置处,将缠绕部6上安装有滚珠安装块3的一侧与拉线接触; Step 2, pass the galvanized iron wire through the threading hole 5 and place it at the overlapping position of the guy wire, and contact the side of the winding part 6 where the ball mounting block 3 is installed with the guy wire;

步骤三,双手握住把持部2顺时针或者逆时针转动把持部2,镀锌铁丝被缠绕在拉线搭接位置处,同时滚珠4对缠绕的镀锌铁丝进行平复修正。 Step 3, hold the grip part 2 with both hands and turn the grip part 2 clockwise or counterclockwise, the galvanized iron wire is wound at the overlapping position of the stay wire, and at the same time, the ball 4 is used to restore and correct the wound galvanized iron wire.

使用滑槽和支撑杆能够将待缠绕的镀锌铁丝移动至合适位置,方便后续的缠绕;同时,设置一组孔径大小不同的穿线孔,能够方便缠绕不同粗细的铁丝,适用范围广;并且,设置滚珠,既能够减小与铁丝之间的摩擦力,降低对铁丝的损害,又能够实现边缠绕边滚压修整,确保缠绕紧密均匀无缝隙。 The galvanized iron wire to be wound can be moved to a suitable position by using the chute and the support rod to facilitate the subsequent winding; at the same time, a set of threading holes with different diameters can be set to facilitate the winding of iron wires of different thicknesses, which has a wide range of applications; and, setting The ball can not only reduce the friction between the iron wire and the damage to the iron wire, but also realize rolling and trimming while winding to ensure tight and uniform winding without gaps.

虽然以上描述了本发明的具体实施方式,但是本领域的技术人员应当理解,这些仅是举例说明,本发明的保护范围是由所附权利要求书限定。本领域的技术人员在不背离本发明的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本发明的保护范围。 Although the specific embodiments of the present invention have been described above, those skilled in the art should understand that these are only examples, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.

Claims (10)

1.一种拉线尾线制作工具,包括尾线缠绕器本体(1),其特征在于:所述尾线缠绕器本体(1)包括缠绕部(6)和把持部(2),所述缠绕部(6)的中部设有一组穿线孔(5),所述缠绕部(6)的前侧安装有滚珠安装块(3),所述滚珠安装块(3)上安装有滚珠(4)。 1. A pulling wire tail making tool, comprising a tail winder body (1), characterized in that: the tail winder body (1) includes a winding part (6) and a holding part (2), the winding A set of threading holes (5) is provided in the middle of the part (6), and a ball mounting block (3) is installed on the front side of the winding part (6), and a ball (4) is mounted on the ball mounting block (3). 2.如权利要求1所述的一种拉线尾线制作工具,其特征在于:所述滚珠安装块(3)包括位于穿线孔(5)上方的上安装块和位于穿线孔(5)下方的下安装块,所述上安装块和下安装块的结构相同且互相平行。 2. A cable tail production tool according to claim 1, characterized in that: the ball mounting block (3) includes an upper mounting block located above the threading hole (5) and an upper mounting block located below the threading hole (5). The lower mounting block, the upper mounting block and the lower mounting block have the same structure and are parallel to each other. 3.如权利要求1所述的一种拉线尾线制作工具,其特征在于:所述滚珠安装块(3)的边角处采用圆弧过渡结构。 3. The tool for making guy wire tails according to claim 1, characterized in that: the corners of the ball mounting block (3) adopt a circular arc transition structure. 4.如权利要求3所述的一种拉线尾线制作工具,其特征在于:所述滚珠安装块(3)的边缘处外设有保护层,所述保护层由橡胶、毛毡或布带制成。 4. The tool for making cable tails according to claim 3, characterized in that: the edge of the ball mounting block (3) is provided with a protective layer, and the protective layer is made of rubber, felt or cloth tape become. 5.如权利要求1至4任一所述的一种拉线尾线制作工具,其特征在于:所述缠绕部(6)的后侧安装有滑槽(7),所述滑槽(7)内安装有可沿滑槽左右移动的支撑杆(8)。 5. A guy wire tail production tool according to any one of claims 1 to 4, characterized in that: a chute (7) is installed on the rear side of the winding part (6), and the chute (7) A support rod (8) that can move left and right along the chute is installed inside. 6.如权利要求5所述的一种拉线尾线制作工具,其特征在于:所述支撑杆(8)上安装有滚轮。 6 . The tool for making guy wire tails according to claim 5 , characterized in that: rollers are installed on the support rod ( 8 ). 7 . 7.如权利要求5所述的一种拉线尾线制作工具,其特征在于:所述滑槽(7)包括位于穿线孔(5)上方的上滑槽和位于穿线孔(5)下方的下滑槽,所述上滑槽和下滑槽互相平行。 7. A guy wire tail making tool according to claim 5, characterized in that: the chute (7) includes an upper chute located above the threading hole (5) and a sliding chute located below the threading hole (5) The upper chute and the lower chute are parallel to each other. 8.如权利要求5所述的一种拉线尾线制作工具,其特征在于:所述穿线孔(5)的孔径大小沿中心线向两侧依次递减,所述穿线孔(5)内设置有橡胶垫(9)。 8. The tool for making a cable tail according to claim 5, characterized in that: the diameter of the threading hole (5) decreases sequentially along the center line to both sides, and the threading hole (5) is provided with Rubber pads (9). 9.如权利要求1所述的一种拉线尾线制作工具,其特征在于:所述尾线缠绕器本体(1)由绝缘材料制成,所述把持部(2)位置处设置有防滑层。 9. A guy wire tail making tool according to claim 1, characterized in that: the tail wire winder body (1) is made of insulating material, and an anti-slip layer is provided at the position of the gripping part (2) . 10.一种使用上述任一权利要求的拉线尾线制作工具进行拉线尾线的方法,主要包括以下步骤: 10. A method of using the wire tail making tool according to any one of the above claims to make a wire tail, mainly comprising the following steps: 步骤一,将待缠绕的镀锌铁丝挂在支撑杆(8)上,沿滑槽(7)推动支撑杆(8)至大小合适的穿线孔(5)位置处; Step 1. Hang the galvanized iron wire to be wound on the support rod (8), and push the support rod (8) along the chute (7) to the position of the threading hole (5) of appropriate size; 步骤二,将镀锌铁丝从穿线孔(5)中穿出放于拉线搭接位置处,将缠绕部(6)上安装有滚珠安装块(3)的一侧与拉线接触; Step 2, pass the galvanized iron wire through the threading hole (5) and place it at the overlapping position of the cable, and contact the side of the winding part (6) where the ball mounting block (3) is installed with the cable; 步骤三,双手握住把持部(2)顺时针或者逆时针转动把持部(2),镀锌铁丝被缠绕在拉线搭接位置处,同时滚珠对缠绕的镀锌铁丝进行平复修正。 Step 3, hold the grip part (2) with both hands and turn the grip part (2) clockwise or counterclockwise, the galvanized iron wire is wound at the overlapping position of the cable, and at the same time, the ball corrects the wound galvanized iron wire.
CN201610042717.1A 2016-01-22 2016-01-22 Stay wire tail wire manufacturing tool and use method thereof Pending CN105598898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610042717.1A CN105598898A (en) 2016-01-22 2016-01-22 Stay wire tail wire manufacturing tool and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610042717.1A CN105598898A (en) 2016-01-22 2016-01-22 Stay wire tail wire manufacturing tool and use method thereof

Publications (1)

Publication Number Publication Date
CN105598898A true CN105598898A (en) 2016-05-25

Family

ID=55979507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610042717.1A Pending CN105598898A (en) 2016-01-22 2016-01-22 Stay wire tail wire manufacturing tool and use method thereof

Country Status (1)

Country Link
CN (1) CN105598898A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107322521A (en) * 2017-08-02 2017-11-07 南京信息职业技术学院 Automatic stringing machine for pressure-resistant framework
CN107443292A (en) * 2017-08-02 2017-12-08 南京信息职业技术学院 A pressure-resistant frame automatic rope threading machine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201383646Y (en) * 2009-04-16 2010-01-13 河南省电力公司信阳供电公司 A new type of power cable wire winder
JP2011036992A (en) * 2009-08-14 2011-02-24 Michiyoshi Tsushi Wire uniting tool
JP3176565U (en) * 2012-02-06 2012-06-28 東神電気株式会社 Thimble
CN202324778U (en) * 2011-11-15 2012-07-11 枣强县电力局 Pull wire binding device
CN202550368U (en) * 2012-03-09 2012-11-21 灵寿县供电局 pull line tool
CN103352599A (en) * 2013-06-17 2013-10-16 国家电网公司 Stay wire binding tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201383646Y (en) * 2009-04-16 2010-01-13 河南省电力公司信阳供电公司 A new type of power cable wire winder
JP2011036992A (en) * 2009-08-14 2011-02-24 Michiyoshi Tsushi Wire uniting tool
CN202324778U (en) * 2011-11-15 2012-07-11 枣强县电力局 Pull wire binding device
JP3176565U (en) * 2012-02-06 2012-06-28 東神電気株式会社 Thimble
CN202550368U (en) * 2012-03-09 2012-11-21 灵寿县供电局 pull line tool
CN103352599A (en) * 2013-06-17 2013-10-16 国家电网公司 Stay wire binding tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107322521A (en) * 2017-08-02 2017-11-07 南京信息职业技术学院 Automatic stringing machine for pressure-resistant framework
CN107443292A (en) * 2017-08-02 2017-12-08 南京信息职业技术学院 A pressure-resistant frame automatic rope threading machine

Similar Documents

Publication Publication Date Title
CN203522074U (en) Bundling fixing device for tail wire and main wire of stay wire of power transmission line poles
CN105350815A (en) Special tool for binding tail wires of stay wires of power transmission line tower
CN105598898A (en) Stay wire tail wire manufacturing tool and use method thereof
CN104022477B (en) Binding device for overhead lead and stay wire
CN205159935U (en) Quick accurate tensioner bullwheel acts as go -between
CN203983909U (en) Strapping device for aerial condutor and bracing wire
CN103352599B (en) Beat stay wire tool box
CN102677942A (en) Bracing wire special tool
CN209924458U (en) A kind of steel bar binding and fixing device for bridge construction
CN203547213U (en) Fixing device for stay wire binding
CN203617621U (en) Wire crossover-laying device
CN205855649U (en) Bracing wire filament winder
CN203475922U (en) Electric pole wiring manufacturing tool
CN204190267U (en) A kind of stay wire making tool
CN205153674U (en) Transmission line shaft tower tail wire ligature specialized tool that acts as go -between
CN208119477U (en) Grounding wire pole bundled device
CN201999330U (en) A structure-improved binding belt
CN219116798U (en) A wire rack for electromagnetic wire
CN205166803U (en) Turn -buckle laborsaving and that fixed tail wire is convenient rotates
CN207273143U (en) Strain clamp installation tool
CN204369316U (en) A kind of coiling clip for cable disk card line
CN205790454U (en) Portable anchor support Special grounding wire
CN202076101U (en) Low voltage foil wound insulation coil
CN204174997U (en) Drawing wire binding tool
CN204809756U (en) Electrician's wire barrow

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Qiu Bin

Inventor after: Hu Xiaoming

Inventor after: Yu Yang

Inventor after: Lu Xiaoyan

Inventor before: Gu Yanyong

Inventor before: Dong Qing

Inventor before: Zhao Junping

Inventor before: Song Hongbo

Inventor before: Liang Jianguo

Inventor before: Li Ying

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160929

Address after: 256600 Bohai Road, Shandong, No. five, No. 663, Binzhou

Applicant after: BINZHOU CITY POWER SUPPLY COMPANY, STATE GRID SHANDONG ELECTRIC POWER COMPANY

Address before: 256600, No. 5, 663 Bohai Road, Bincheng District, Shandong, Binzhou

Applicant before: Guo Wang Binzhou City, Shandong Province Bincheng District electric company

RJ01 Rejection of invention patent application after publication

Application publication date: 20160525

RJ01 Rejection of invention patent application after publication