CN105591906A - Path switching device and path switching method - Google Patents

Path switching device and path switching method Download PDF

Info

Publication number
CN105591906A
CN105591906A CN201510390100.4A CN201510390100A CN105591906A CN 105591906 A CN105591906 A CN 105591906A CN 201510390100 A CN201510390100 A CN 201510390100A CN 105591906 A CN105591906 A CN 105591906A
Authority
CN
China
Prior art keywords
equipment
gear
switch unit
checkout equipment
checkout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510390100.4A
Other languages
Chinese (zh)
Other versions
CN105591906B (en
Inventor
车渝
陈向涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou H3C Technologies Co Ltd
Original Assignee
Hangzhou H3C Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou H3C Technologies Co Ltd filed Critical Hangzhou H3C Technologies Co Ltd
Priority to CN201510390100.4A priority Critical patent/CN105591906B/en
Publication of CN105591906A publication Critical patent/CN105591906A/en
Application granted granted Critical
Publication of CN105591906B publication Critical patent/CN105591906B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Small-Scale Networks (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a path switching device and a path switching method. According to the path switching device and the path switching method, gear switching of first and second switching units can be controlled according to states of first detection equipment and second detection equipment, so as to support high reliability of deployment of the detection equipment through main-standby switching between the first detection equipment and the second detection equipment. In addition, the states of the first detection equipment and the second detection equipment can be identified through acquiring power supply signals of the first detection equipment and the second detection equipment without relying on first network equipment and second network equipment, thus the first detection equipment and the second detection equipment can be not perceived by the first network equipment and the second network equipment, thereby preventing the highly reliable deployment of the detection equipment from being contrary to features of unperceptive and transparent access of the detection equipment.

Description

Path switching device and path switching method
Technical field
The present invention relates to a kind of path switching device and a kind of path switching method.
Background technology
Between the network equipment, can dispose checkout equipment. By the active and standby switching mode of checkout equipment, canImprove the reliability that checkout equipment is disposed.
But if checkout equipment is adopted to the mode of active and standby switching, checkout equipment need to be by the network equipmentPerception, that is, the high reliability of checkout equipment deployed with devices need to depend on the network equipment. This is for havingSome checkout equipment of unaware and transparent access characteristic, for example IPS (InstrusionPreventionSystem, intrusion prevention system) and/or ACG (ApplicationControlGateway, application controlsGateway) etc., obviously run counter to its characteristic.
Summary of the invention
In one embodiment, a kind of path switching device comprises:
The first switch unit, have by the first gear of first network equipment and the first checkout equipment conducting,And by the second gear of first network equipment and the second checkout equipment conducting;
The second switch unit, have by the third gear of second network equipment and the first checkout equipment conducting,And by the fourth speed position of second network equipment and the second checkout equipment conducting;
Logical block, detects by gathering the power supply signal of the first checkout equipment and the second checkout equipmentThe state of one checkout equipment and the second checkout equipment, and according to testing result control the first switch unit andTwo switch units switch gear, make to form guiding path between first network equipment and second network equipment.
Alternatively, logical block gathers the by the USB interface of the first checkout equipment and the second checkout equipmentThe power supply signal of one checkout equipment and the second checkout equipment.
Alternatively, when the state of the first checkout equipment is while being normal, logical block control the first switch unitSwitch to the first gear, and control the second switch unit and switch to third gear; When the first checkout equipment andWhen the state that only has the second checkout equipment in the second checkout equipment is normal, logical block control first is switchedUnit switches to the second gear, and controls the second switch unit and switch to fourth speed position.
Alternatively, the first switch unit further has first network equipment and the first checkout equipment andThe 5th gear that two checkout equipments all disconnect, the second switch unit further have by second network equipment withThe 6th gear that the first checkout equipment and the second checkout equipment all disconnect, and, the 5th gear and the 6th gradePosition conducting.
Alternatively, when the state of the first checkout equipment and the second checkout equipment is when abnormal, logical blockControl the first switch unit and switch to the 5th gear, and control the second switch unit switches to the 6th gear.
In one embodiment, this path switching method of a kind of path switching method is used for being controlled at the first netThe first switch unit arranging between network equipment and second network equipment and the second switch unit, wherein, theOne switch unit has by the first gear of first network equipment and the first checkout equipment conducting and byThe second gear of one network equipment and the second checkout equipment conducting, the second switch unit has second networkThe third gear of equipment and the first checkout equipment conducting and by second network equipment and the second checkout equipmentThe fourth speed position of conducting;
This path switching method comprises:
Detect the first checkout equipment by the power supply signal that gathers the first checkout equipment and the second checkout equipmentState with the second checkout equipment;
And, switch gear according to testing result control the first switch unit and the second switch unit, make theBetween one network equipment and second network equipment, form guiding path.
Alternatively, this path switching method is by the USB interface of the first checkout equipment and the second checkout equipmentGather the power supply signal of the first checkout equipment and the second checkout equipment.
Alternatively, it is characterized in that, when the state of the first checkout equipment is while being normal, this path switching sideMethod control the first switch unit switches to the first gear, and controls the second switch unit and switch to third gear;In the time that to only have the state of the second checkout equipment in the first checkout equipment and the second checkout equipment be normal, this roadFootpath changing method control the first switch unit switches to the second gear, and controls the second switch unit and switch toFourth speed position.
Alternatively, the first switch unit further has first network equipment and the first checkout equipment andThe 5th gear that two checkout equipments all disconnect, the second switch unit further have by second network equipment withThe 6th gear that the first checkout equipment and the second checkout equipment all disconnect, and, the 5th gear and the 6th gradePosition conducting.
Alternatively, when the state of the first checkout equipment and the second checkout equipment is when abnormal, cut in this pathChange method control the first switch unit and switch to the 5th gear, and control the second switch unit switches to the 6thGear.
The above embodiments can be controlled first and second according to the state of the first and second checkout equipments and cutChange the gear switch of unit, to detect and to establish by the active and standby switching support between the first and second checkout equipmentsStandby high reliability of disposing. And the above embodiments can be by gathering the first and second checkout equipmentsPower supply signal identify the state of the first and second checkout equipments, and do not rely on the first and second networksEquipment, therefore, the first and second checkout equipments can be by the first and second network equipment perception. Thereby,Can avoid the characteristic phase of the high reliability subordinate of checkout equipment and the unaware of checkout equipment and transparent accessBe contrary to.
Brief description of the drawings
Fig. 1 is the structural representation of a path switching device in embodiment;
Fig. 2 a and Fig. 2 b are the schematic diagram installing as shown in Figure 1;
Fig. 3 is an example schematic of installing as shown in Figure 1;
Fig. 4 a and Fig. 4 b are the schematic diagram of example as shown in Figure 3;
Fig. 5 is the structural representation of the path switching device in another embodiment;
Fig. 6 a to Fig. 6 c is the schematic diagram installing as shown in Figure 4;
Fig. 7 is an example schematic of device as shown in Figure 5;
Fig. 8 a to Fig. 8 c is the schematic diagram of example as shown in Figure 7;
Fig. 9 is the schematic flow sheet of a path switching method in embodiment.
Detailed description of the invention
For making object of the present invention, technical scheme and advantage clearer, referring to accompanying drawing alsoFor embodiment, the present invention is described in more detail.
Refer to Fig. 1, in one embodiment, path switching device 30 comprises:
The first switch unit 31, has of first network equipment 11 and the first checkout equipment 21 conductingsOne gear 31a and by the second gear 31b of first network equipment 11 and the second checkout equipment 22 conductings;
The second switch unit 32, has of second network equipment 12 and the first checkout equipment 21 conductingsThree gear 32a and by the fourth speed position 32b of second network equipment 12 and the second checkout equipment 22 conductings;
Logical block 33, by gathering power supply signal S1 and second checkout equipment of the first checkout equipment 2122 power supply signal S2 detects the state of the first checkout equipment 21 and the second checkout equipment 22, for example,Logical block 33 can be by the USB (Universal of the first checkout equipment 21 and the second checkout equipment 22SerialBus, USB) interface gathers respectively power supply signal S1 and S2;
And logical block 33 is according to testing result control the first switch unit 31 and the second switch unit32 switch gear makes to form guiding path between first network equipment 11 and second network equipment 12.
Above-mentioned switching gear can be understood as, and the first switch unit 31 and the second switch unit 32 are cut respectivelyChange to the first gear 31a and third gear 32a, or, the first switch unit 31 and the second switch unit32 switch to respectively the second gear 31b and fourth speed position 32b, that is, and and first network equipment 11 and the second netNetwork equipment 12 and same checkout equipment conducting.
Correspondingly, as shown in Figure 2 a, when the first switch unit 31 and the second switch unit 32 switch respectivelyDuring to the first gear 31a and third gear 32a, between first network equipment 11 and second network equipment 12Can form guiding path P1 by the first checkout equipment 21; As shown in Figure 2 b, when the first switch unit31 and second switch unit 32 while switching to respectively the second gear 31b and fourth speed position 32b, first networkBetween equipment 11 and second network equipment 12, can form guiding path P2 by the second checkout equipment 22.
Visible, in this embodiment, logical block 33 detects and establishes according to the first checkout equipment 21 and secondStandby 22 state, can control the gear switch of the first switch unit 31 and the second switch unit 32, withSupport checkout equipment to dispose by the active and standby switching between the first checkout equipment 21 and the second checkout equipment 22High reliability.
And, right to realize in order to identify the state of the first checkout equipment 21 and the second checkout equipment 22The control of gear switch, logical block 33 can gather the first checkout equipment 21 and the second checkout equipment 22Power supply signal S1 and S2, and do not need to depend on first network equipment 11 and second network equipment 12,Therefore, the first checkout equipment 21 and the second checkout equipment 22 can be by first network equipment 11 and secondThe network equipment 22 perception.
Thereby, can avoid the high reliability subordinate of checkout equipment and the unaware of checkout equipment and transparentThe characteristic entering is runed counter to.
In the first checkout equipment 21 and the second checkout equipment 22, can default setting the first checkout equipment 21 beHost apparatus, correspondingly:
When the state of the first checkout equipment 21 is while being normal, logical block 33 can not considered the second detectionEquipment 22 state now, and logical block 33 can be controlled the first switch unit 31 and second and cutChange unit 32 and switch to respectively and the first gear 31a and the third gear 32a of the first checkout equipment 21 conductings,, state as shown in Figure 2 a;
When only having the state of the second checkout equipment 22 to be in the first checkout equipment 21 and the second checkout equipment 22When normal, logical block 33 can control the first switch unit 31 and the second switch unit 32 switches respectivelyTo with the second gear 31b and the fourth speed position 32b of the second checkout equipment 22 conductings, that is, as shown in Figure 2 bState.
Refer to Fig. 3, for the path switching device 30 shown in Fig. 1, can adopt following modeBe achieved:
The first switch unit 31 comprises relay R 310, and one end of this relay R 310 connects said apparatus30 for connecting the network interface N11 of first network equipment 11, and the other end of this relay R 310 has contact310a and 310b, wherein, contact 310a connects said apparatus 30 for connecting the first checkout equipment 21Network interface N21a, contact 310b connect said apparatus 30 for connecting the network interface of the second checkout equipment 22N22a, thereby, contact 310a and 310b form respectively the first switch unit 31 the first gear 31a andThe second gear 31b.
The second switch unit 32 comprises relay R 320, and one end of this relay R 320 connects said apparatus30 for connecting the network interface N12 of second network equipment 12, and the other end of this relay R 320 has contact320a and 320b, wherein, contact 320a connects said apparatus 30 for connecting the first checkout equipment 21Network interface N21b, contact 320b connect said apparatus 30 for connecting the network interface of the second checkout equipment 22N22b, thereby, contact 320a and 320b form respectively the second switch unit 32 third gear 32a andFourth speed position 32b.
Logical block 33 is selected PLD, for example CPLD (ComplexProgrammableLogicDevice, CPLD). And logical block 33 has connection first and detectsThe sampling pin Samp1 of the USB interface U1 of device 21, the USB of connection second detection device 22 connectThe sampling pin Samp2 of mouth U2 and the control being connected with the control end of relay R 310 and R320Pin Ctrl[1:0].
Wherein, sampling pin Samp1 gathers the power supply signal of the USB interface U1 of the first checkout gear 21S1, sampling pin Samp2 gathers the power supply signal S2 of the USB interface U2 of second detection device 22;And, control pin Ctrl[1:0] high-order Ctrl[1] level state represents to identify according to power supply signal S1The state of the first checkout gear 21, control pin Ctrl[1:0] low level Ctrl[0] level state represents to comply withThe state of the second detection device 22 identifying according to power supply signal S2.
Suppose to control pin Ctrl[1:0] taking high level " 1 " represents normally, low level " 0 " represents extremely as example,The state of relay R 310 and R320 can be as shown in table 1. And, in table 1, also disclosed above-mentionedDevice 30 guiding paths that form under the different conditions of relay R 310 and R320, as Fig. 4 a and figureShown in 4b.
Table 1
Refer to Fig. 5, in the path switching device 40 providing at another embodiment:
The first switch unit 41 is except having first network equipment 11 and the first checkout equipment 21 conductingsThe first gear 41a and by the second gear 41b of first network equipment 11 and the second checkout equipment 22 conductingsOutside, also further have first network equipment 11 and the first checkout equipment 21 and the second checkout equipment22 the 5th gear 41c that all disconnect;
The second switch unit 42 is except having second network equipment 12 and the first checkout equipment 21 conductingsThird gear 42a and by the fourth speed position of second network equipment 12 and the second checkout equipment 22 conductingsOutside 42b, also further have second network equipment 12 and the first checkout equipment 21 and second are detected and establishedStandby 22 the 6th gear 42c that all disconnect;
And, the 5th gear 41c of the first switch unit 41 and the 6th gear of the second switch unit 4242c conducting, to be formed for the path of the first checkout equipment 21 and the second checkout equipment bypass.
Logical block 43 still can detect by the power supply signal S1 and second that gathers the first checkout equipment 21The power supply signal S2 of equipment 22 detects the state of the first checkout equipment 21 and the second checkout equipment 22,And switch gear according to testing result control the first switch unit 31 and the second switch unit 32 and make the first netBetween network equipment 11 and second network equipment 12, form guiding path.
Above-mentioned switching gear is cut respectively except comprising the first switch unit 41 and the second switch unit 42Change to the first gear 41a and third gear 42a and the first switch unit 41 and the second switch unit 42Switch to respectively outside the second gear 41b and fourth speed position 42b both of these case, further bagDraw together the first switch unit 41 and the second switch unit 42 and switch to respectively the 5th gear 41c and the 6th gearThe situation of 42c.
Correspondingly, as shown in Figure 6 a, when the first switch unit 41 and the second switch unit 42 switch respectivelyDuring to the first gear 41a and third gear 42a, can between first network 11 and second network equipment 12Form guiding path P1 by the first checkout equipment 21; As shown in Figure 6 b, when the first switch unit 41While switching to respectively the second gear 41b and fourth speed position 42b with the second switch unit 42, first network 11And can form guiding path P2 by the second checkout equipment 22 between second network equipment 12; And,As shown in Fig. 6 c, when the first switch unit 41 and the second switch unit 42 switch to respectively the 5th gear 41cDuring with the 6th gear 42c, between first network 11 and second network equipment 12, can form the first detectionThe guiding path P3 of equipment 21 and the second checkout equipment 22 bypasses.
Visible, the device 40 in this embodiment can be avoided high reliability subordinate and the inspection of checkout equipment equallyThe unaware of measurement equipment and the characteristic of transparent access are runed counter to. And the device 40 in this embodiment also canFurther support to form leading of bypass checkout equipment between first network equipment 11 and second network equipment 12Path, to eliminate first network equipment 11 and second network equipment 12 the first checkout equipment 21 andWhen two checkout equipments 22 are all abnormal, cannot form the hidden danger of guiding path.
If be still host apparatus according to previously described mode default setting the first checkout equipment 21:
When the state of the first checkout equipment 21 is while being normal, logical block 43 now can not consider secondThe state of checkout equipment 22, and logical block 43 can be controlled the first switch unit 41 and second and cutChange unit 42 and switch to respectively and the first gear 41a and the third gear 42a of the first checkout equipment 21 conductings,, state as shown in Figure 6 a;
When in the first checkout equipment 21 and the second checkout equipment 22 only the state of the second checkout equipment 22 for justChang Shi, logical block 43 can control the first switch unit 41 and the second switch unit 42 switches to respectivelyWith the second gear 41b and the fourth speed position 42b of the second checkout equipment 22 conductings, that is, as shown in Figure 6 bState;
When the state of the first checkout equipment 21 and the second checkout equipment 22 is when abnormal, logical block 43Can control the first switch unit 41 and the second switch unit 42 switches to respectively and the first checkout equipment 21All disconnect with the second checkout equipment 22 and the 5th gear 41c and the 6th gear 42c of conducting each other,, the state as shown in Fig. 6 c.
Refer to Fig. 7, for the path switching device 40 shown in Fig. 5, can adopt following modeBe achieved:
The first switch unit 41 comprises relay R 410, and one end of this relay R 410 connects said apparatus40 for connecting the network interface N11 of first network equipment 11, and the other end of this relay R 410 has contact410a and 410b and 410c, wherein, contact 410a connects said apparatus 40 for connecting the first detectionThe network interface N21a of equipment 21, contact 410b connects said apparatus 40 for connecting the second checkout equipment 22Network interface N22a, contact 410c and network interface N21a and N22a all disconnect, thereby, contact 410a and 410bAnd 410c forms respectively the first gear 41a and the second gear 41b and the 5th of the first switch unit 41Gear 41c.
The second switch unit 42 comprises relay R 420, and one end of this relay R 420 connects said apparatus40 for connecting the network interface N12 of second network equipment 12, and the other end of this relay R 420 has contact420a and 420b and 420c, wherein, contact 420a connects said apparatus 40 for connecting the first detectionThe network interface N21a of equipment 21, contact 420b connects said apparatus 40 for connecting the second checkout equipment 22Network interface N22b, contact 420c and network interface N21a and N22a all disconnect, thereby, contact 420a and420b and 420c form respectively the third gear 42a of the second switch unit 42 and fourth speed position 42b withAnd the 6th gear 42c.
Logical block 43 is selected PLD, for example CPLD. And logical block 43 hasConnect sampling pin Samp1, the connection second detection device of the USB interface U1 of the first checkout gear 21The sampling pin Samp2 of 22 USB interface U2 and with the control end of relay R 410 and R420Connected control pin Ctrl[1:0].
Wherein, sampling pin Samp1 gathers the power supply signal of the USB interface U1 of the first checkout gear 21S1, sampling pin Samp2 gathers the power supply signal S2 of the USB interface U2 of second detection device 22;
And, control pin Ctrl[1:0] high-order Ctrl[1] level state represents to identify according to power supply signal S1The state of the first checkout gear 21, control pin Ctrl[1:0] low level Ctrl[0] level state represents to comply withThe state of the second detection device 22 identifying according to power supply signal S2.
Suppose to control pin Ctrl[1:0] taking high level " 1 " represents normally, low level " 0 " represents extremely as example,
The state of relay R 410 and R420 can be as shown in table 2. And, in table 2, also disclosed above-mentionedDevice 40 guiding paths that form under the different conditions of relay R 410 and R420, if Fig. 8 a is to figureShown in 8c.
Table 2
The path switching device 30 and 40 providing in above each embodiment, in following realityExecute a kind of path switching method is also provided in example.
This path switching method for be controlled between first network equipment and second network equipment, arrange theOne switch unit and the second switch unit, wherein, the first switch unit described herein and second switches singleThe gear that has of unit can be identical with situation as shown in Figure 1, also can with situation as shown in Figure 5Identical.
And, referring to Fig. 9, this path switching method can comprise:
S901, detects the first inspection by the power supply signal that gathers the first checkout equipment and the second checkout equipmentThe state of measurement equipment and the second checkout equipment, for example, by the first checkout equipment and the second checkout equipmentUSB interface gathers respectively power supply signal.
S902, switches gear according to testing result control the first switch unit and the second switch unit, makes theBetween one network equipment and second network equipment, form guiding path, for example, the mode of switching gear canDevice 30 and 40 with reference to the foregoing repeats no more herein.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all at thisWithin the spirit and principle of invention, any amendment of making, be equal to replacement, improvement etc., all should be included inWithin the scope of protection of the invention.

Claims (10)

1. a path switching device, is characterized in that, comprising:
The first switch unit, have by the first gear of first network equipment and the first checkout equipment conducting,And by the second gear of first network equipment and the second checkout equipment conducting;
The second switch unit, have by the third gear of second network equipment and the first checkout equipment conducting,And by the fourth speed position of second network equipment and the second checkout equipment conducting;
Logical block, detects by gathering the power supply signal of the first checkout equipment and the second checkout equipmentThe state of one checkout equipment and the second checkout equipment, and according to testing result control the first switch unit andTwo switch units switch gear, make to form guiding path between first network equipment and second network equipment.
2. path switching device according to claim 1, is characterized in that, logical block is by theThe USB interface of one checkout equipment and the second checkout equipment gathers the first checkout equipment and the second checkout equipmentPower supply signal.
3. path switching device according to claim 1, is characterized in that,
When the state of the first checkout equipment is while being normal, logical block control the first switch unit switches toOne gear, and control the second switch unit and switch to third gear;
In the time that to only have the state of the second checkout equipment in the first checkout equipment and the second checkout equipment be normal,Logical block control the first switch unit switches to the second gear, and controls the second switch unit and switch toFourth gear position.
4. according to the path switching device described in any one in claims 1 to 3, it is characterized in that, theOne switch unit further has all disconnected to first network equipment and the first checkout equipment and the second checkout equipmentThe 5th gear of opening, the second switch unit further have second network equipment and the first checkout equipment andThe 6th gear that the second checkout equipment all disconnects, and, the 5th gear and the 6th gear conducting.
5. path switching device according to claim 4, is characterized in that, when the first checkout equipmentBe when abnormal with the state of the second checkout equipment, logical block control the first switch unit switches to the 5thGear, and control the second switch unit switches to the 6th gear.
6. a path switching method, is characterized in that, this path switching method is used for being controlled at the first netThe first switch unit arranging between network equipment and second network equipment and the second switch unit, wherein, theOne switch unit has by the first gear of first network equipment and the first checkout equipment conducting and byThe second gear of one network equipment and the second checkout equipment conducting, the second switch unit has second networkThe third gear of equipment and the first checkout equipment conducting and by second network equipment and the second checkout equipmentThe fourth speed position of conducting;
This path switching method comprises:
Detect the first checkout equipment by the power supply signal that gathers the first checkout equipment and the second checkout equipmentState with the second checkout equipment;
And, switch gear according to testing result control the first switch unit and the second switch unit, make theBetween one network equipment and second network equipment, form guiding path.
7. path switching method according to claim 6, is characterized in that, this path switching methodGathering the first checkout equipment and second by the USB interface of the first checkout equipment and the second checkout equipment detectsThe power supply signal of equipment.
8. path switching method according to claim 6, is characterized in that,
When the state of the first checkout equipment is while being normal, this path switching method control first switch unit is cutChange to the first gear, and control the second switch unit and switch to third gear;
In the time that to only have the state of the second checkout equipment in the first checkout equipment and the second checkout equipment be normal,This path switching method control first switch unit switches to the second gear, and controls the second switch unit and cutChange to fourth speed position.
9. according to the path switching method described in any one in claim 6 to 8, it is characterized in that, theOne switch unit further has all disconnected to first network equipment and the first checkout equipment and the second checkout equipmentThe 5th gear of opening, the second switch unit further have second network equipment and the first checkout equipment andThe 6th gear that the second checkout equipment all disconnects, and, the 5th gear and the 6th gear conducting.
10. path switching method according to claim 9, is characterized in that, when the first detection is establishedState standby and the second checkout equipment is when abnormal, and this path switching method control first switch unit is cutChange to the 5th gear, and control the second switch unit switches to the 6th gear.
CN201510390100.4A 2015-07-02 2015-07-02 Path switching device and path switching method Active CN105591906B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510390100.4A CN105591906B (en) 2015-07-02 2015-07-02 Path switching device and path switching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510390100.4A CN105591906B (en) 2015-07-02 2015-07-02 Path switching device and path switching method

Publications (2)

Publication Number Publication Date
CN105591906A true CN105591906A (en) 2016-05-18
CN105591906B CN105591906B (en) 2019-05-03

Family

ID=55931145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510390100.4A Active CN105591906B (en) 2015-07-02 2015-07-02 Path switching device and path switching method

Country Status (1)

Country Link
CN (1) CN105591906B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108650101A (en) * 2018-03-30 2018-10-12 新华三信息安全技术有限公司 A kind of method and apparatus of data transmission

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020018466A1 (en) * 2000-08-01 2002-02-14 Nec Corporation Communication parts comprising operating system and waiting system therein
CN201699472U (en) * 2010-03-22 2011-01-05 易丰兴业有限公司 Dual-power automatic switching circuit and isolating device thereof
CN202309715U (en) * 2011-10-19 2012-07-04 深圳市锦粤达科技有限公司 Multichannel optical-fiber communication network with automatic protection function
CN203119929U (en) * 2013-01-17 2013-08-07 研华股份有限公司 A network connecting device capable of switching paths
CN204031208U (en) * 2014-07-31 2014-12-17 深圳市双赢伟业科技股份有限公司 data communication path switching circuit, vehicle-mounted router and automobile
CN104597797A (en) * 2013-10-30 2015-05-06 鸿富锦精密工业(深圳)有限公司 Switching device and detection system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020018466A1 (en) * 2000-08-01 2002-02-14 Nec Corporation Communication parts comprising operating system and waiting system therein
CN201699472U (en) * 2010-03-22 2011-01-05 易丰兴业有限公司 Dual-power automatic switching circuit and isolating device thereof
CN202309715U (en) * 2011-10-19 2012-07-04 深圳市锦粤达科技有限公司 Multichannel optical-fiber communication network with automatic protection function
CN203119929U (en) * 2013-01-17 2013-08-07 研华股份有限公司 A network connecting device capable of switching paths
CN104597797A (en) * 2013-10-30 2015-05-06 鸿富锦精密工业(深圳)有限公司 Switching device and detection system
CN204031208U (en) * 2014-07-31 2014-12-17 深圳市双赢伟业科技股份有限公司 data communication path switching circuit, vehicle-mounted router and automobile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108650101A (en) * 2018-03-30 2018-10-12 新华三信息安全技术有限公司 A kind of method and apparatus of data transmission

Also Published As

Publication number Publication date
CN105591906B (en) 2019-05-03

Similar Documents

Publication Publication Date Title
RU2743506C2 (en) Method and device for connection with possibility of field devices data transmission with remote terminal unit
US8219729B1 (en) Enumeration circuits, structures and methods for host connected devices
CN107870584B (en) Service board input power supply working state detection method and machine frame type equipment
EP2669693A1 (en) Parallel operation wire fault detection device and system
WO2019037639A1 (en) Signal transmission system and signal transmission method
CN108292998B (en) Bus coupling unit and bus system with bus coupling unit
CN105591906A (en) Path switching device and path switching method
US20190324410A1 (en) Safety Switch
CN104283712A (en) Network equipment and management internet port configuration method for same
KR20120079261A (en) Apparatus and method for detecting a switch fault
CA2983786C (en) Bus network terminator
EP4207522A1 (en) Interface circuit, protection method for same, and terminal device
US10498113B2 (en) Methods and devices for automatic communication addressing of load center breakers
US9563593B2 (en) Peripheral component interconnect adapter and computer using same
EP2875652B1 (en) Public address system and monitoring device for a public address system
JP4802971B2 (en) Analog output device
US20210159025A1 (en) Method for calculating the contact state of an electrical switch, and electrical switch with such a method
JP2013130545A (en) Switching determination device and abnormality determination method
JP4926299B1 (en) Programmable logic controller
EP3459098B1 (en) Electronic device disconnection
JP7412167B2 (en) Fire detection systems and repeaters
US9774184B2 (en) Power supply device, power supply managing device, method for detecting connection position of power supply device, and power supply system
KR100552673B1 (en) Apparatus and Method for Routing System Management using I2C Connection
CN110854803A (en) Remote signaling signal acquisition system with function of false wiring protection alarm
KR0135539B1 (en) Full exchange system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 310052 Binjiang District Changhe Road, Zhejiang, China, No. 466, No.

Applicant after: Xinhua three Technology Co., Ltd.

Address before: 310052 Binjiang District Changhe Road, Zhejiang, China, No. 466, No.

Applicant before: Huasan Communication Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant