CN105587655A - Method for analyzing and managing energy consumption of pump station - Google Patents

Method for analyzing and managing energy consumption of pump station Download PDF

Info

Publication number
CN105587655A
CN105587655A CN201511003884.7A CN201511003884A CN105587655A CN 105587655 A CN105587655 A CN 105587655A CN 201511003884 A CN201511003884 A CN 201511003884A CN 105587655 A CN105587655 A CN 105587655A
Authority
CN
China
Prior art keywords
data
pump station
energy consumption
pumping plant
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511003884.7A
Other languages
Chinese (zh)
Other versions
CN105587655B (en
Inventor
汪伟
刘天霁
汪继红
吴立群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Haixing Tairui Intelligent Technology Co Ltd
Original Assignee
Anhui Haixing Tairui Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Haixing Tairui Intelligent Technology Co Ltd filed Critical Anhui Haixing Tairui Intelligent Technology Co Ltd
Priority to CN201511003884.7A priority Critical patent/CN105587655B/en
Publication of CN105587655A publication Critical patent/CN105587655A/en
Application granted granted Critical
Publication of CN105587655B publication Critical patent/CN105587655B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04BPOSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
    • F04B51/00Testing machines, pumps, or pumping installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention discloses a method for analyzing and managing energy consumption of a pump station. Firstly, electric energy consumption of the pump station is collected by an electric power acquisition module, water flow of the pump station is collected by a flow sensor, and running speed of the pump station is collected by a speed sensor; then, the electric energy consumption, the water flow and the running speed are transmitted to a center monitoring platform through a data acquisition node; set theoretical data of the electric energy consumption of the pump station under unit flow and set theoretical data of the running speed of the pump station under unit electric energy are stored in a database of the center monitoring platform; conversion is performed on actual collected data by the center monitoring platform to obtain actual data of the electric energy consumption of the pump station under the unit flow and actual data of the running speed of the pump station under the unit electric energy; then, the theoretical data and the actual data are compared; when an error is less than a set threshold value, the pump station runs normally; and when the error is greater than the set threshold value, working personnel is reminded by the center monitoring platform to perform on-spot detection and operation.

Description

A kind of pumping plant energy consumption analysis management method
Technical field
The present invention relates to the field of intelligent monitoring of pumping plant, specifically a kind of pumping plant energy consumption analysis management method.
Background technology
Municipal Industry is in the process of modernization, information-based great development, and the automatic technology of urban rainwater, sewage pumping station reaches its maturity. And the remote monitoring of urban rainwater, sewage pumping station and management system have significantly improved economic benefit, the social benefit of pumping plant management and operation.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of pumping plant energy consumption analysis management method, and every data of Real-time Collection pumping plant, carry out analysis monitoring, realize intelligent management.
Technical scheme of the present invention is:
A kind of pumping plant energy consumption analysis management method, first electric quantity acquisition module gathers pumping plant power consumption, flow sensor gathers pumping plant discharge, speed probe gathers pumping station operation rotating speed, then be transferred to CSRC platform by data acquisition node, the databases of CSRC platform contains under the specific discharge of setting pumping station operation rotating speed gross data under pumping plant power consumption gross data and unit of electrical energy, CSRC platform converts actual acquired data to obtain under bit traffic pumping station operation rotating speed real data under pumping plant power consumption real data and unit of electrical energy, then gross data and real data are contrasted, in the time that error is less than setting threshold values, be that pumping station operation is normal, in the time that error is greater than setting threshold values, CSRC platform reminder staff detects on the spot and operates.
Described data acquisition node and CSRC platform adopt the 3G communication technology to communicate connection.
Advantage of the present invention:
The present invention gathers rotating speed, flow and the energy consumption of pumping plant, and the historical data of setting with CSRC platform contrasts, thereby analyzes the energy consumption of pumping plant, realizes intelligent control management.
Detailed description of the invention
A kind of pumping plant energy consumption analysis management method, first electric quantity acquisition module gathers pumping plant power consumption, flow sensor gathers pumping plant discharge, speed probe gathers pumping station operation rotating speed, then be transferred to CSRC platform by data acquisition node, the databases of CSRC platform contains under the specific discharge of setting pumping station operation rotating speed gross data under pumping plant power consumption gross data and unit of electrical energy, CSRC platform converts actual acquired data to obtain under bit traffic pumping station operation rotating speed real data under pumping plant power consumption real data and unit of electrical energy, then gross data and real data are contrasted, in the time that error is less than setting threshold values, be that pumping station operation is normal, in the time that error is greater than setting threshold values, CSRC platform reminder staff detects on the spot and operates. wherein, data acquisition node and CSRC platform adopt the 3G communication technology to communicate connection.

Claims (2)

1. a pumping plant energy consumption analysis management method, it is characterized in that: first electric quantity acquisition module gathers pumping plant power consumption, flow sensor gathers pumping plant discharge, speed probe gathers pumping station operation rotating speed, then be transferred to CSRC platform by data acquisition node, the databases of CSRC platform contains under the specific discharge of setting pumping station operation rotating speed gross data under pumping plant power consumption gross data and unit of electrical energy, CSRC platform converts actual acquired data to obtain under bit traffic pumping station operation rotating speed real data under pumping plant power consumption real data and unit of electrical energy, then gross data and real data are contrasted, in the time that error is less than setting threshold values, be that pumping station operation is normal, in the time that error is greater than setting threshold values, CSRC platform reminder staff detects on the spot and operates.
2. a kind of pumping plant energy consumption analysis management method according to claim 1, is characterized in that: described data acquisition node and CSRC platform adopt the 3G communication technology to communicate connection.
CN201511003884.7A 2015-12-29 2015-12-29 A kind of pumping plant energy consumption analysis management method Expired - Fee Related CN105587655B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511003884.7A CN105587655B (en) 2015-12-29 2015-12-29 A kind of pumping plant energy consumption analysis management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511003884.7A CN105587655B (en) 2015-12-29 2015-12-29 A kind of pumping plant energy consumption analysis management method

Publications (2)

Publication Number Publication Date
CN105587655A true CN105587655A (en) 2016-05-18
CN105587655B CN105587655B (en) 2018-03-09

Family

ID=55927484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511003884.7A Expired - Fee Related CN105587655B (en) 2015-12-29 2015-12-29 A kind of pumping plant energy consumption analysis management method

Country Status (1)

Country Link
CN (1) CN105587655B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110649929A (en) * 2019-09-30 2020-01-03 郑州力通水务有限公司 Pump station energy consumption data frequency modulation transmitting circuit

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102536774A (en) * 2011-12-27 2012-07-04 酒泉钢铁(集团)有限责任公司 Operation characteristics and operation energy efficiency analyzing device of industrial circulating water pump set
CN202431503U (en) * 2011-11-29 2012-09-12 深圳市宏事达实业发展有限公司 Intelligent online operation monitor for water pump systems
US8404117B1 (en) * 2008-02-08 2013-03-26 Becs Technology, Inc. System for controlling water in an aquatic facility
CN103277291A (en) * 2013-06-07 2013-09-04 上海东方威尔自动化有限公司 Optimal scheduling method for single-stage pump station
CN104141603A (en) * 2014-06-24 2014-11-12 赛莱默(中国)有限公司 Water pump control system with energy saving function
CN104179670A (en) * 2013-05-22 2014-12-03 上海宝钢工业技术服务有限公司 Measuring method for energy-saving rate of water pump set after applying remanufacturing technology
CN104632606A (en) * 2015-01-26 2015-05-20 江苏大学 Pumping unit on-line energy consumption testing and analyzing system and method
CN105004002A (en) * 2015-07-06 2015-10-28 西安建筑科技大学 Energy saving control system and energy saving control method used for central air conditioner cooling water system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8404117B1 (en) * 2008-02-08 2013-03-26 Becs Technology, Inc. System for controlling water in an aquatic facility
CN202431503U (en) * 2011-11-29 2012-09-12 深圳市宏事达实业发展有限公司 Intelligent online operation monitor for water pump systems
CN102536774A (en) * 2011-12-27 2012-07-04 酒泉钢铁(集团)有限责任公司 Operation characteristics and operation energy efficiency analyzing device of industrial circulating water pump set
CN104179670A (en) * 2013-05-22 2014-12-03 上海宝钢工业技术服务有限公司 Measuring method for energy-saving rate of water pump set after applying remanufacturing technology
CN103277291A (en) * 2013-06-07 2013-09-04 上海东方威尔自动化有限公司 Optimal scheduling method for single-stage pump station
CN104141603A (en) * 2014-06-24 2014-11-12 赛莱默(中国)有限公司 Water pump control system with energy saving function
CN104632606A (en) * 2015-01-26 2015-05-20 江苏大学 Pumping unit on-line energy consumption testing and analyzing system and method
CN105004002A (en) * 2015-07-06 2015-10-28 西安建筑科技大学 Energy saving control system and energy saving control method used for central air conditioner cooling water system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110649929A (en) * 2019-09-30 2020-01-03 郑州力通水务有限公司 Pump station energy consumption data frequency modulation transmitting circuit
CN110649929B (en) * 2019-09-30 2021-04-27 郑州力通水务有限公司 Pump station energy consumption data frequency modulation transmitting circuit

Also Published As

Publication number Publication date
CN105587655B (en) 2018-03-09

Similar Documents

Publication Publication Date Title
CN103336508B (en) Information-based energy-conservation air lock automatic control system
CN105178387A (en) Intelligent control system for comprehensive utilization of rainwater and control method of intelligent control system
CN204875932U (en) Use multipurposely intelligence control system of rainwater
CN103713675A (en) Remote industrial sewage treatment monitoring system
CN103744409A (en) Monitoring and pre-warning system and method for rural methane pools
CN204215254U (en) Tap water secondary water-supply remote supervision system for boosting pump stations
CN203720687U (en) Remote monitoring system for industrial wastewater treatment
CN105587655A (en) Method for analyzing and managing energy consumption of pump station
CN203096816U (en) Remote monitoring system based on constant pressure frequency converting control water supply network
CN204924358U (en) Reservoir flood control monitoring system based on GPRS communication and internet
CN107605721A (en) A kind of ore slurry pipeline high-pressure diaphragm pump health status Prediction System and method
CN104633460B (en) Water floor heating pipe permeates the control method of online monitoring system
CN203373204U (en) Lake and reservoir or slow flowing type river pollution treatment intelligent control system
CN203811206U (en) Enterprise carbon discharge metering and analysis device
CN203008100U (en) Drainage network of barrier-free drainage facility
CN105242610A (en) Ground wire supervision system and method
CN204166355U (en) Remote Intelligent Monitoring System for Oil Wells
CN204883330U (en) A water conservation control system for intelligence building
CN104850075A (en) Tap water secondary water supply booster pump station remote monitoring system
CN202995998U (en) Automatic meter-reading system
CN207337175U (en) Synthesis energy saving saving water measurement system
CN208938313U (en) A kind of ponding monitoring and warning terminal control system
CN203812054U (en) Rural biogas digester monitoring and early warning system
CN112462709A (en) Wisdom water utilities integrated management platform
CN105354783A (en) Residential landscaping management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180309

Termination date: 20211229

CF01 Termination of patent right due to non-payment of annual fee