CN105587655A - Method for analyzing and managing energy consumption of pump station - Google Patents
Method for analyzing and managing energy consumption of pump station Download PDFInfo
- Publication number
- CN105587655A CN105587655A CN201511003884.7A CN201511003884A CN105587655A CN 105587655 A CN105587655 A CN 105587655A CN 201511003884 A CN201511003884 A CN 201511003884A CN 105587655 A CN105587655 A CN 105587655A
- Authority
- CN
- China
- Prior art keywords
- data
- pump station
- energy consumption
- pumping plant
- electric energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F04—POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
- F04B—POSITIVE-DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS
- F04B51/00—Testing machines, pumps, or pumping installations
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The invention discloses a method for analyzing and managing energy consumption of a pump station. Firstly, electric energy consumption of the pump station is collected by an electric power acquisition module, water flow of the pump station is collected by a flow sensor, and running speed of the pump station is collected by a speed sensor; then, the electric energy consumption, the water flow and the running speed are transmitted to a center monitoring platform through a data acquisition node; set theoretical data of the electric energy consumption of the pump station under unit flow and set theoretical data of the running speed of the pump station under unit electric energy are stored in a database of the center monitoring platform; conversion is performed on actual collected data by the center monitoring platform to obtain actual data of the electric energy consumption of the pump station under the unit flow and actual data of the running speed of the pump station under the unit electric energy; then, the theoretical data and the actual data are compared; when an error is less than a set threshold value, the pump station runs normally; and when the error is greater than the set threshold value, working personnel is reminded by the center monitoring platform to perform on-spot detection and operation.
Description
Technical field
The present invention relates to the field of intelligent monitoring of pumping plant, specifically a kind of pumping plant energy consumption analysis management method.
Background technology
Municipal Industry is in the process of modernization, information-based great development, and the automatic technology of urban rainwater, sewage pumping station reaches its maturity. And the remote monitoring of urban rainwater, sewage pumping station and management system have significantly improved economic benefit, the social benefit of pumping plant management and operation.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of pumping plant energy consumption analysis management method, and every data of Real-time Collection pumping plant, carry out analysis monitoring, realize intelligent management.
Technical scheme of the present invention is:
A kind of pumping plant energy consumption analysis management method, first electric quantity acquisition module gathers pumping plant power consumption, flow sensor gathers pumping plant discharge, speed probe gathers pumping station operation rotating speed, then be transferred to CSRC platform by data acquisition node, the databases of CSRC platform contains under the specific discharge of setting pumping station operation rotating speed gross data under pumping plant power consumption gross data and unit of electrical energy, CSRC platform converts actual acquired data to obtain under bit traffic pumping station operation rotating speed real data under pumping plant power consumption real data and unit of electrical energy, then gross data and real data are contrasted, in the time that error is less than setting threshold values, be that pumping station operation is normal, in the time that error is greater than setting threshold values, CSRC platform reminder staff detects on the spot and operates.
Described data acquisition node and CSRC platform adopt the 3G communication technology to communicate connection.
Advantage of the present invention:
The present invention gathers rotating speed, flow and the energy consumption of pumping plant, and the historical data of setting with CSRC platform contrasts, thereby analyzes the energy consumption of pumping plant, realizes intelligent control management.
Detailed description of the invention
A kind of pumping plant energy consumption analysis management method, first electric quantity acquisition module gathers pumping plant power consumption, flow sensor gathers pumping plant discharge, speed probe gathers pumping station operation rotating speed, then be transferred to CSRC platform by data acquisition node, the databases of CSRC platform contains under the specific discharge of setting pumping station operation rotating speed gross data under pumping plant power consumption gross data and unit of electrical energy, CSRC platform converts actual acquired data to obtain under bit traffic pumping station operation rotating speed real data under pumping plant power consumption real data and unit of electrical energy, then gross data and real data are contrasted, in the time that error is less than setting threshold values, be that pumping station operation is normal, in the time that error is greater than setting threshold values, CSRC platform reminder staff detects on the spot and operates. wherein, data acquisition node and CSRC platform adopt the 3G communication technology to communicate connection.
Claims (2)
1. a pumping plant energy consumption analysis management method, it is characterized in that: first electric quantity acquisition module gathers pumping plant power consumption, flow sensor gathers pumping plant discharge, speed probe gathers pumping station operation rotating speed, then be transferred to CSRC platform by data acquisition node, the databases of CSRC platform contains under the specific discharge of setting pumping station operation rotating speed gross data under pumping plant power consumption gross data and unit of electrical energy, CSRC platform converts actual acquired data to obtain under bit traffic pumping station operation rotating speed real data under pumping plant power consumption real data and unit of electrical energy, then gross data and real data are contrasted, in the time that error is less than setting threshold values, be that pumping station operation is normal, in the time that error is greater than setting threshold values, CSRC platform reminder staff detects on the spot and operates.
2. a kind of pumping plant energy consumption analysis management method according to claim 1, is characterized in that: described data acquisition node and CSRC platform adopt the 3G communication technology to communicate connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511003884.7A CN105587655B (en) | 2015-12-29 | 2015-12-29 | A kind of pumping plant energy consumption analysis management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511003884.7A CN105587655B (en) | 2015-12-29 | 2015-12-29 | A kind of pumping plant energy consumption analysis management method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105587655A true CN105587655A (en) | 2016-05-18 |
CN105587655B CN105587655B (en) | 2018-03-09 |
Family
ID=55927484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511003884.7A Expired - Fee Related CN105587655B (en) | 2015-12-29 | 2015-12-29 | A kind of pumping plant energy consumption analysis management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105587655B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110649929A (en) * | 2019-09-30 | 2020-01-03 | 郑州力通水务有限公司 | Pump station energy consumption data frequency modulation transmitting circuit |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102536774A (en) * | 2011-12-27 | 2012-07-04 | 酒泉钢铁(集团)有限责任公司 | Operation characteristics and operation energy efficiency analyzing device of industrial circulating water pump set |
CN202431503U (en) * | 2011-11-29 | 2012-09-12 | 深圳市宏事达实业发展有限公司 | Intelligent online operation monitor for water pump systems |
US8404117B1 (en) * | 2008-02-08 | 2013-03-26 | Becs Technology, Inc. | System for controlling water in an aquatic facility |
CN103277291A (en) * | 2013-06-07 | 2013-09-04 | 上海东方威尔自动化有限公司 | Optimal scheduling method for single-stage pump station |
CN104141603A (en) * | 2014-06-24 | 2014-11-12 | 赛莱默(中国)有限公司 | Water pump control system with energy saving function |
CN104179670A (en) * | 2013-05-22 | 2014-12-03 | 上海宝钢工业技术服务有限公司 | Measuring method for energy-saving rate of water pump set after applying remanufacturing technology |
CN104632606A (en) * | 2015-01-26 | 2015-05-20 | 江苏大学 | Pumping unit on-line energy consumption testing and analyzing system and method |
CN105004002A (en) * | 2015-07-06 | 2015-10-28 | 西安建筑科技大学 | Energy saving control system and energy saving control method used for central air conditioner cooling water system |
-
2015
- 2015-12-29 CN CN201511003884.7A patent/CN105587655B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8404117B1 (en) * | 2008-02-08 | 2013-03-26 | Becs Technology, Inc. | System for controlling water in an aquatic facility |
CN202431503U (en) * | 2011-11-29 | 2012-09-12 | 深圳市宏事达实业发展有限公司 | Intelligent online operation monitor for water pump systems |
CN102536774A (en) * | 2011-12-27 | 2012-07-04 | 酒泉钢铁(集团)有限责任公司 | Operation characteristics and operation energy efficiency analyzing device of industrial circulating water pump set |
CN104179670A (en) * | 2013-05-22 | 2014-12-03 | 上海宝钢工业技术服务有限公司 | Measuring method for energy-saving rate of water pump set after applying remanufacturing technology |
CN103277291A (en) * | 2013-06-07 | 2013-09-04 | 上海东方威尔自动化有限公司 | Optimal scheduling method for single-stage pump station |
CN104141603A (en) * | 2014-06-24 | 2014-11-12 | 赛莱默(中国)有限公司 | Water pump control system with energy saving function |
CN104632606A (en) * | 2015-01-26 | 2015-05-20 | 江苏大学 | Pumping unit on-line energy consumption testing and analyzing system and method |
CN105004002A (en) * | 2015-07-06 | 2015-10-28 | 西安建筑科技大学 | Energy saving control system and energy saving control method used for central air conditioner cooling water system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110649929A (en) * | 2019-09-30 | 2020-01-03 | 郑州力通水务有限公司 | Pump station energy consumption data frequency modulation transmitting circuit |
CN110649929B (en) * | 2019-09-30 | 2021-04-27 | 郑州力通水务有限公司 | Pump station energy consumption data frequency modulation transmitting circuit |
Also Published As
Publication number | Publication date |
---|---|
CN105587655B (en) | 2018-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103336508B (en) | Information-based energy-conservation air lock automatic control system | |
CN105178387A (en) | Intelligent control system for comprehensive utilization of rainwater and control method of intelligent control system | |
CN204875932U (en) | Use multipurposely intelligence control system of rainwater | |
CN103713675A (en) | Remote industrial sewage treatment monitoring system | |
CN103744409A (en) | Monitoring and pre-warning system and method for rural methane pools | |
CN204215254U (en) | Tap water secondary water-supply remote supervision system for boosting pump stations | |
CN203720687U (en) | Remote monitoring system for industrial wastewater treatment | |
CN105587655A (en) | Method for analyzing and managing energy consumption of pump station | |
CN203096816U (en) | Remote monitoring system based on constant pressure frequency converting control water supply network | |
CN204924358U (en) | Reservoir flood control monitoring system based on GPRS communication and internet | |
CN107605721A (en) | A kind of ore slurry pipeline high-pressure diaphragm pump health status Prediction System and method | |
CN104633460B (en) | Water floor heating pipe permeates the control method of online monitoring system | |
CN203373204U (en) | Lake and reservoir or slow flowing type river pollution treatment intelligent control system | |
CN203811206U (en) | Enterprise carbon discharge metering and analysis device | |
CN203008100U (en) | Drainage network of barrier-free drainage facility | |
CN105242610A (en) | Ground wire supervision system and method | |
CN204166355U (en) | Remote Intelligent Monitoring System for Oil Wells | |
CN204883330U (en) | A water conservation control system for intelligence building | |
CN104850075A (en) | Tap water secondary water supply booster pump station remote monitoring system | |
CN202995998U (en) | Automatic meter-reading system | |
CN207337175U (en) | Synthesis energy saving saving water measurement system | |
CN208938313U (en) | A kind of ponding monitoring and warning terminal control system | |
CN203812054U (en) | Rural biogas digester monitoring and early warning system | |
CN112462709A (en) | Wisdom water utilities integrated management platform | |
CN105354783A (en) | Residential landscaping management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20211229 |
|
CF01 | Termination of patent right due to non-payment of annual fee |