CN105571325A - Fireproof device of ring cooling machine receiving hopper - Google Patents

Fireproof device of ring cooling machine receiving hopper Download PDF

Info

Publication number
CN105571325A
CN105571325A CN201510989239.0A CN201510989239A CN105571325A CN 105571325 A CN105571325 A CN 105571325A CN 201510989239 A CN201510989239 A CN 201510989239A CN 105571325 A CN105571325 A CN 105571325A
Authority
CN
China
Prior art keywords
proofing
fire
central cooler
stones
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510989239.0A
Other languages
Chinese (zh)
Inventor
万成
廖远峰
向成功
杨百顺
赵力
麦吉昌
周平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Desheng Group Vanadium Titanium Co Ltd
Original Assignee
Sichuan Desheng Group Vanadium Titanium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Desheng Group Vanadium Titanium Co Ltd filed Critical Sichuan Desheng Group Vanadium Titanium Co Ltd
Priority to CN201510989239.0A priority Critical patent/CN105571325A/en
Publication of CN105571325A publication Critical patent/CN105571325A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • F27D1/16Making or repairing linings increasing the durability of linings or breaking away linings
    • F27D1/1621Making linings by using shaped elements, e.g. bricks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • F27D1/16Making or repairing linings increasing the durability of linings or breaking away linings
    • F27D1/1678Increasing the durability of linings; Means for protecting
    • F27D1/1684Increasing the durability of linings; Means for protecting by a special coating applied to the lining
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D15/00Handling or treating discharged material; Supports or receiving chambers therefor
    • F27D15/02Cooling
    • F27D15/0206Cooling with means to convey the charge

Abstract

The invention discloses a fireproof device of a ring cooling machine receiving hopper. The fireproof device is formed by laying prefabricated abrasive brick layers and pouring material layers, wherein the prefabricated abrasive brick layers are formed by connection of a plurality of prefabricated abrasive bricks, the pouring material layers are formed by pouring a pouring material and have a certain thickness, and the prefabricated abrasive brick layers and the pouring material layers are alternately laid in layers. The fireproof device can effectively shorten baking time before use to be within 2 days, so as to achieve consistence with the heating-up time of a rotary kiln; and the strength is higher, the scouring resistant performance is stronger, the structure stability is higher, and the service life is effectively prolonged.

Description

A kind of fire-proofing of central cooler hopper
Technical field
The present invention relates to central cooler equipment technical field, be specifically related to a kind of fire-proofing of central cooler hopper.
Background technology
Along with China's chain-return-fast development of global explained hereafter acid pellet, this technique is progressively subject to the accreditation of industry.Central cooler is as the visual plant of cooling ball nodulizing, the secure of its internal mechanical structure, it is the key point ensureing that central cooler normally runs, wherein the fire-proofing of central cooler is the key factor affecting central cooler frame for movement, there is pelletizing temperature high in central cooler one, secondary cooling zone, the features such as gas flow rate is fast, requirement built by laying bricks or stones by the fire-proofing in these two sections, and to have intensity high, the characteristics such as resistance to erosion.The mainly heavy pouring material of building by laying bricks or stones of the fire-proofing of central cooler adopted integral type cast in the past, the shortcoming of such form is, the fire-proofing that integral type is built is owing to containing a large amount of wander about as a refugee water and the crystallization water in inside, need the low-temperature bake carrying out 4-5 days before use according to drying out curve, fully scattered and disappeared to make device internal moisture, thus making fire-proofing reach some strength, baking time is longer; In addition the high-temperature roasting ball in rotary kiln is in the process entering central cooler, fire-proofing central cooler hopper surrounding being comprised to air cooling wall washes away very serious, service life of position fire-proofing become to be limited the important step of about production line overall time between overhauls(TBO), production line is forced to stop production completely maintenance, because hopper maintenance relates to the maintenance of heating and cooling process and fire-proofing, repair time minimum 72 hours, have a strong impact on carrying out smoothly of production, considerably increase production cost.
Summary of the invention
In view of this, the application provides a kind of fire-proofing of central cooler hopper, within described fire-proofing effectively can shorten the baking time to 2 before use day, realize consistent with the heating-up time of rotary kiln, and intensity is higher, flushing resistance is stronger, and structural stability is higher, effectively improves service life.
For solving above technical problem, technical scheme provided by the invention is a kind of fire-proofing of central cooler hopper, described fire-proofing is by prefabricated wear-resisting brick layer and build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones.
Preferably, in described prefabricated wear-resisting brick layer, have gap between adjacent described prefabricated abrasive brick, the width in described gap is 10-30mm, inserts pouring material in described gap, is connected by adjacent described prefabricated abrasive brick.
More preferred, the width in described gap is 20mm.
Preferably, described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 0-40mm.
More preferred, described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 25mm.
Preferably, described prefabricated abrasive brick, before building by laying bricks or stones, first toasts according to drying out curve in baking box, makes described prefabricated abrasive brick inner without free water or the crystallization water.
Preferably, after formation built by laying bricks or stones by described fire-proofing, toast according to drying out curve, make fire-proofing inner without free water or the crystallization water.
More preferred, after formation built by laying bricks or stones by described fire-proofing, the time of carrying out toasting according to drying out curve is 1-2 days.
Preferably, described drying out curve is rotary kiln drying out curve.
The application compared with prior art, it is described in detail as follows: technical scheme provides a kind of fire-proofing of central cooler hopper, described fire-proofing is by prefabricated wear-resisting brick layer and build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones.
Described fire-proofing effectively can shorten baking time, in prior art, the fire-proofing of one-piece casting is owing to containing a large amount of wander about as a refugee water and the crystallization water in inside, need the low-temperature bake carrying out 4-5 days before use according to drying out curve, to make device internal moisture fully be scattered and disappeared, this ensures fire-proofing intensity and the basic assurance in service life.The normal service time of production line fire-proofing, the temperature of the baking time after maintenance and bake process controlled all to be difficult to carry out in strict accordance with heating curve generally at about 10 days.And the prefabricated abrasive brick described in the application is in strict accordance with the product after heating curve baking in baking box, inner without free water, the crystallization water, directly can use, within the baking time after maintenance can reduce to 2 days, realize consistent with the rotary kiln baker heating-up time.
Simultaneously, the flushing resistance of described fire-proofing is stronger, because the prefabricated abrasive brick in the application is in strict accordance with the product after heating curve baking in baking box, can reach the requirement of strength of region fire-proofing completely at the use initial stage, later stage flushing resistance is stronger.
In addition, the structural stability of described fire-proofing is higher, fire-proofing described in the application adopts prefabricated wear-resisting brick layer and builds bed of material layering alternately builds formation by laying bricks or stones, overcoming simple preformed bricks in prior art, to build stability by laying bricks or stones bad, easy entirety comes off, and simple pouring material builds the defects such as expansion clearance is uneven, and built-in thermal stress is uneven, structural stability is stronger, effectively can improve service life.
Detailed description of the invention
In order to make those skilled in the art understand technical scheme of the present invention better, below in conjunction with specific embodiment, the present invention is described in further detail.
Embodiment 1
The fire-proofing of a kind of central cooler hopper described in the present embodiment, by prefabricated wear-resisting brick layer with build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones; In described prefabricated wear-resisting brick layer, have gap between adjacent described prefabricated abrasive brick, the width in described gap is 20mm, inserts pouring material in described gap, connected by adjacent described prefabricated abrasive brick, described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 25mm.
Wherein, described prefabricated abrasive brick is before building by laying bricks or stones, first toast according to rotary kiln drying out curve in baking box, make described prefabricated abrasive brick inner without free water or the crystallization water, after formation built by laying bricks or stones by described fire-proofing, carry out baking 1-2 days according to rotary kiln drying out curve, make fire-proofing inner without free water or the crystallization water.
Through pilot production, the baking time of above-mentioned fire-proofing reduces, and intensity is higher, and flushing resistance is stronger, and structural stability is higher, and service life can reach more than 9 months.
Embodiment 2
The fire-proofing of a kind of central cooler hopper described in the present embodiment, by prefabricated wear-resisting brick layer with build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones; In described prefabricated wear-resisting brick layer, have gap between adjacent described prefabricated abrasive brick, the width in described gap is 10mm, inserts pouring material in described gap, connected by adjacent described prefabricated abrasive brick, described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 25mm.
Wherein, described prefabricated abrasive brick is before building by laying bricks or stones, first toast according to rotary kiln drying out curve in baking box, make described prefabricated abrasive brick inner without free water or the crystallization water, after formation built by laying bricks or stones by described fire-proofing, carry out baking 1-2 days according to rotary kiln drying out curve, make fire-proofing inner without free water or the crystallization water.
Through pilot production, the baking time of above-mentioned fire-proofing reduces, and intensity is higher, and flushing resistance is stronger, and structural stability is higher, and service life can reach 9 months.
Embodiment 3
The fire-proofing of a kind of central cooler hopper described in the present embodiment, by prefabricated wear-resisting brick layer with build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones; In described prefabricated wear-resisting brick layer, have gap between adjacent described prefabricated abrasive brick, the width in described gap is 30mm, inserts pouring material in described gap, connected by adjacent described prefabricated abrasive brick, described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 25mm.
Wherein, described prefabricated abrasive brick is before building by laying bricks or stones, first toast according to rotary kiln drying out curve in baking box, make described prefabricated abrasive brick inner without free water or the crystallization water, after formation built by laying bricks or stones by described fire-proofing, carry out baking 1-2 days according to rotary kiln drying out curve, make fire-proofing inner without free water or the crystallization water.
Through pilot production, the baking time of above-mentioned fire-proofing reduces, and intensity is higher, and flushing resistance is stronger, and structural stability is higher, and service life can reach 10 months.
Embodiment 4
The fire-proofing of a kind of central cooler hopper described in the present embodiment, by prefabricated wear-resisting brick layer with build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones; In described prefabricated wear-resisting brick layer, have gap between adjacent described prefabricated abrasive brick, the width in described gap is 20mm, inserts pouring material in described gap, is connected by adjacent described prefabricated abrasive brick, and described prefabricated wear-resisting brick layer is identical with described thickness of building the bed of material.
Wherein, described prefabricated abrasive brick is before building by laying bricks or stones, first toast according to rotary kiln drying out curve in baking box, make described prefabricated abrasive brick inner without free water or the crystallization water, after formation built by laying bricks or stones by described fire-proofing, carry out baking 1-2 days according to rotary kiln drying out curve, make fire-proofing inner without free water or the crystallization water.
Through pilot production, the baking time of above-mentioned fire-proofing reduces, and intensity is higher, and flushing resistance is stronger, and structural stability is higher, and service life can reach 7 months.
Embodiment 5
The fire-proofing of a kind of central cooler hopper described in the present embodiment, by prefabricated wear-resisting brick layer with build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones; In described prefabricated wear-resisting brick layer, have gap between adjacent described prefabricated abrasive brick, the width in described gap is 20mm, inserts pouring material in described gap, connected by adjacent described prefabricated abrasive brick, described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 40mm.
Wherein, described prefabricated abrasive brick is before building by laying bricks or stones, first toast according to rotary kiln drying out curve in baking box, make described prefabricated abrasive brick inner without free water or the crystallization water, after formation built by laying bricks or stones by described fire-proofing, carry out baking 1-2 days according to rotary kiln drying out curve, make fire-proofing inner without free water or the crystallization water.
Through pilot production, the baking time of above-mentioned fire-proofing reduces, and intensity is higher, and flushing resistance is stronger, and structural stability is higher, and service life can reach 7 months.
Below be only the preferred embodiment of the present invention, it should be pointed out that above-mentioned preferred embodiment should not be considered as limitation of the present invention, protection scope of the present invention should be as the criterion with claim limited range.For those skilled in the art, without departing from the spirit and scope of the present invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (9)

1. the fire-proofing of a central cooler hopper, it is characterized in that: described fire-proofing is by prefabricated wear-resisting brick layer and build the bed of material and build by laying bricks or stones and formed, described prefabricated wear-resisting brick layer is interconnected to form by multiple prefabricated abrasive brick, the described bed of material of building is formed by pouring material cast, and there is certain thickness, described prefabricated wear-resisting brick layer and describedly build bed of material layering and alternately build by laying bricks or stones.
2. the fire-proofing of a kind of central cooler hopper according to claim 1, it is characterized in that: in described prefabricated wear-resisting brick layer, between adjacent described prefabricated abrasive brick, there is gap, the width in described gap is 10-30mm, insert pouring material in described gap, adjacent described prefabricated abrasive brick is connected.
3. the fire-proofing of a kind of central cooler hopper according to claim 2, is characterized in that: the width in described gap is 20mm.
4. the fire-proofing of a kind of central cooler hopper according to claim 1, is characterized in that: described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 0-40mm.
5. the fire-proofing of a kind of central cooler hopper according to claim 4, is characterized in that: described prefabricated wear-resisting brick layer and described thickness difference of building the bed of material are 25mm.
6. the fire-proofing of a kind of central cooler hopper according to claim 1, is characterized in that: described prefabricated abrasive brick, before building by laying bricks or stones, first toasts according to drying out curve in baking box, makes described prefabricated abrasive brick inner without free water or the crystallization water.
7. the fire-proofing of a kind of central cooler hopper according to claim 1, is characterized in that: after formation built by laying bricks or stones by described fire-proofing, toast according to drying out curve, makes fire-proofing inner without free water or the crystallization water.
8. the fire-proofing of a kind of central cooler hopper according to claim 7, is characterized in that: after formation built by laying bricks or stones by described fire-proofing, and the time of carrying out toasting according to drying out curve is 1-2 days.
9. the fire-proofing of a kind of central cooler hopper according to any one of claim 6 or 7, is characterized in that: described drying out curve is rotary kiln drying out curve.
CN201510989239.0A 2015-12-24 2015-12-24 Fireproof device of ring cooling machine receiving hopper Pending CN105571325A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510989239.0A CN105571325A (en) 2015-12-24 2015-12-24 Fireproof device of ring cooling machine receiving hopper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510989239.0A CN105571325A (en) 2015-12-24 2015-12-24 Fireproof device of ring cooling machine receiving hopper

Publications (1)

Publication Number Publication Date
CN105571325A true CN105571325A (en) 2016-05-11

Family

ID=55881736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510989239.0A Pending CN105571325A (en) 2015-12-24 2015-12-24 Fireproof device of ring cooling machine receiving hopper

Country Status (1)

Country Link
CN (1) CN105571325A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110926221A (en) * 2019-12-13 2020-03-27 扬州泰富特种材料有限公司 Method for preventing bursting of refractory material of receiving hopper of annular cooling machine

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101672576A (en) * 2009-09-29 2010-03-17 沈阳东大三建工业炉制造有限公司 Furnace hearth of maintaining room of aluminum alloy melting furnace built by combining casting materials with precast bricks
CN201514122U (en) * 2009-09-29 2010-06-23 沈阳东大三建工业炉制造有限公司 Aluminum alloy melting furnace holding chamber hearth built with casting and precast bricks
CN101984323A (en) * 2010-12-09 2011-03-09 二十三冶建设集团有限公司 Sidewall structure of roasting furnace
CN202532902U (en) * 2012-05-07 2012-11-14 中冶北方(大连)工程技术有限公司 Reinforcement concrete fire-resistant and durable receiving hopper for circular cooler
CN102788508A (en) * 2011-07-21 2012-11-21 宁波连通设备制造有限公司 Furnace drying method of industrial furnace module and furnace drying device for industrial furnace module
CN103278014A (en) * 2013-05-30 2013-09-04 德清县钢友耐火材料有限公司 Combined type pendulum groove brick
CN203323574U (en) * 2013-05-27 2013-12-04 中冶北方(大连)工程技术有限公司 Masonry structure of top portion of ring cooler feeding bin material blocking wall
CN203629308U (en) * 2013-10-31 2014-06-04 河南龙兴钛业有限公司 Lining structure of chlorination furnace in titanium tetrachloride production process
CN204373427U (en) * 2014-11-26 2015-06-03 攀枝花钢企米易白马球团有限公司 Central cooler hopper

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101672576A (en) * 2009-09-29 2010-03-17 沈阳东大三建工业炉制造有限公司 Furnace hearth of maintaining room of aluminum alloy melting furnace built by combining casting materials with precast bricks
CN201514122U (en) * 2009-09-29 2010-06-23 沈阳东大三建工业炉制造有限公司 Aluminum alloy melting furnace holding chamber hearth built with casting and precast bricks
CN101984323A (en) * 2010-12-09 2011-03-09 二十三冶建设集团有限公司 Sidewall structure of roasting furnace
CN102788508A (en) * 2011-07-21 2012-11-21 宁波连通设备制造有限公司 Furnace drying method of industrial furnace module and furnace drying device for industrial furnace module
CN202532902U (en) * 2012-05-07 2012-11-14 中冶北方(大连)工程技术有限公司 Reinforcement concrete fire-resistant and durable receiving hopper for circular cooler
CN203323574U (en) * 2013-05-27 2013-12-04 中冶北方(大连)工程技术有限公司 Masonry structure of top portion of ring cooler feeding bin material blocking wall
CN103278014A (en) * 2013-05-30 2013-09-04 德清县钢友耐火材料有限公司 Combined type pendulum groove brick
CN203629308U (en) * 2013-10-31 2014-06-04 河南龙兴钛业有限公司 Lining structure of chlorination furnace in titanium tetrachloride production process
CN204373427U (en) * 2014-11-26 2015-06-03 攀枝花钢企米易白马球团有限公司 Central cooler hopper

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110926221A (en) * 2019-12-13 2020-03-27 扬州泰富特种材料有限公司 Method for preventing bursting of refractory material of receiving hopper of annular cooling machine
CN110926221B (en) * 2019-12-13 2021-12-03 扬州泰富特种材料有限公司 Method for preventing bursting of refractory material of receiving hopper of annular cooling machine

Similar Documents

Publication Publication Date Title
CN100578127C (en) Fluidized calcining furnace ball arc furnace top and method of forming same
CN103192063B (en) Casting mold for producing high-temperature alloy single crystal blades and directional solidification device thereof
CN103639376A (en) Copper smelting insulation chute device
CN103512349A (en) Rotary kiln applied to ferronickel reduction production technology and construction method thereof
CN105571325A (en) Fireproof device of ring cooling machine receiving hopper
CN105924024A (en) Fireproof brick for lining of limestone vertical kiln
CN207276500U (en) A kind of cooled-preheated circulator of light calcined magnesia shaft furnace
CN103157785B (en) Construction method of ladle lining
CN104596288B (en) A kind of connection quirk of carbon element anode roasting furnace
CN104355643B (en) A kind of 5000T cement kiln coal injection pipe dedicated pouring material
CN101608864A (en) A kind of carbon-calcining rotary kiln lining and second tuyere structure thereof
CN206375936U (en) Blast furnace ironmaking cracking resistance swing runner
CN204373427U (en) Central cooler hopper
CN202734561U (en) Liquid outlet launder for calcium carbide furnace
CN103307883B (en) Fire-proof fabricated part for tertiary air duct of dry process cement kiln and manufacturing method of fire-proof fabricated part
CN105237017B (en) A kind of cement kiln outlet dedicated pouring material
CN105819713A (en) Vertical wedge-shaped refractory brick for rotary limestone kiln
CN103157783B (en) A kind of building method of bottom of steel ladle
CN205676367U (en) A kind of Limestone rotary kiln erects wedge shape refractory brick
CN201506765U (en) Furnace door on clean type coke furnace
CN205368424U (en) Submerged RH dip pipe structure of lining brick in preventing
CN203364625U (en) Masonry structure of brackets of inner upper covers and outer upper covers of primary cooling section and secondary cooling section of annular cooler
CN204329576U (en) Titanium slag furnace combination stove mouth structure
CN203464721U (en) Material shoveling plate device and novel water beam of material shoveling plate device
CN204388631U (en) A kind of heat insulation header board of grate-cooler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511