CN105569119A - Novel water heater - Google Patents
Novel water heater Download PDFInfo
- Publication number
- CN105569119A CN105569119A CN201610016900.4A CN201610016900A CN105569119A CN 105569119 A CN105569119 A CN 105569119A CN 201610016900 A CN201610016900 A CN 201610016900A CN 105569119 A CN105569119 A CN 105569119A
- Authority
- CN
- China
- Prior art keywords
- water
- valve
- storage tank
- shower
- geyser
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B7/00—Water main or service pipe systems
- E03B7/04—Domestic or like local pipe systems
- E03B7/045—Domestic or like local pipe systems diverting initially cold water in warm water supply
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The invention discloses a novel water heater. The novel water heater mainly consists of a water storage tank, a first water valve, a second water valve, a water drainage pipe and a water heater, wherein a controller is mounted in the water heater; a gas source is provided for the water heater by a gas pipeline or a gas tank; the water outlet of the water heater is connected with a water inlet end of a three-way valve through a water outlet pipe; one outlet of the three-way valve is connected with a shower through the first water valve; and another outlet of the three-way valve is connected with the water storage tank through the second water valve. When the shower is just started, the controller opens the second water valve firstly for enabling cold water flowing out in the early stage to flow into the water storage tank, and after the water temperature meets the shower requirement, the controller opens the first water valve and closes the second water valve for enabling water flowing out of the shower to be basically all hot water suitable for taking the shower, thereby reducing water waste.
Description
Technical field
A kind of a when using New-type water heater to provide hot water, the cold water flowed out before collecting shower by water tank the device be used, belong to water-saving technology.
Background technology
In daily life, by New-type water heater for shower hot water is provided time, New-type water heater is contained in outdoor usually, usually a segment distance is had from shower, open shower, cold water in flow pipe between geyser to shower needs first to flow to end, geyser water temp. heating to the temperature being applicable to having a bath also needs some time, therefore, open shower until flow out the temperature needs a period of time being applicable to having a bath, because temperature is too low, the water flowed out during this period of time often can only leave that it flows to waste water pipe and drains, cause the waste of water.A lot of people, in order to using water wisely, have to take bucket to carry out water receiving, then bucket be withdrawn for flush toilet or other purposes, but compare trouble like this.
Therefore, need to find and a kind ofly more simply the cold water flowed out before shower can be collected the New-type water heater be used.
Summary of the invention
Object of the present invention: provide a kind of and the cold water flowed out before shower can be collected the New-type water heater be used.
Technical scheme of the present invention is: a kind of New-type water heater, form primarily of storage tank 1, first water valve 2, second water valve 3, gutter 4 and geyser 5, geyser is built with controller, geyser provides source of the gas by gas pipeline or fuel cartridge, the delivery port of geyser is connected with the water inlet end of three way cock by outlet pipe, an outlet of three way cock is connected with shower 6 through the first water valve 2, and another outlet of three way cock is connected with storage tank 1 through the second water valve 3; Storage tank 1 is connected with the drain hole be located in toilet 7 by gutter 4, and gutter 4 is provided with draining valve 41; After opening shower, controller detects that the second water valve is opened in the flowing of water immediately, close the first water valve, and igniting makes geyser heat up water, after controller detects that water temperature that the delivery port of geyser flows out is more than or equal to the water temperature that user selects on geyser first, open the first water valve, close the second water valve, hot water flows out from shower, until close shower.
Water supply pipe near storage tank is established a distributive pipe 8 to storage tank 1, the delivery port being positioned at storage tank at distributive pipe is provided with float valve, when the water in storage tank is lower than lowest water level, float valve is opened into water, when the water level in storage tank is higher than peak level, float valve is closed and is stopped water inlet.
Be provided with overfall gap on the top of storage tank, overflow pipe one end is connected with overfall gap, and the other end is connected with the blow-off pipe of washroom.
The three way cock of described geyser, the first water valve, the second water valve and storage tank are located at shower cubicle or the position near shower cubicle.
Beneficial effect
1, the delivery port of geyser is connected with three way cock by outlet pipe, an outlet of three way cock is connected with shower through the first water valve, another outlet of three way cock is connected with storage tank through the second water valve, and when just having opened shower, the second water valve first opened by controller, the cold water allowing to flow out early stage flows into storage tank, after reaching shower requirement etc. water temperature, then open the first water valve and close the second water valve, make the water that shower flows out, substantially be all the hot water of applicable shower, decrease the waste of water.
Accompanying drawing explanation
Fig. 1 is annexation schematic diagram of the present invention.
Detailed description of the invention
As shown in Figure 1, a kind of New-type water heater, form primarily of storage tank 1, first water valve 2, second water valve 3, gutter 4 and geyser 5, geyser is built with controller, geyser provides source of the gas by gas pipeline or fuel cartridge, the delivery port of geyser is connected with the water inlet end of three way cock by outlet pipe, and an outlet of three way cock is connected with shower 6 through the first water valve 2, and another outlet of three way cock is connected with storage tank 1 through the second water valve 3; Storage tank 1 is connected with the drain hole be located in toilet 7 by gutter 4, and gutter 4 is provided with draining valve 41; After opening shower, controller detects that the second water valve is opened in the flowing of water immediately, close the first water valve, and igniting makes geyser heat up water, after controller detects that water temperature that the delivery port of geyser flows out is more than or equal to the water temperature that user selects on geyser first, open the first water valve, close the second water valve, hot water flows out from shower, until close shower.
The water that shower flows out is all hot water except a small amount of cold water in early stage, and the cold water major part before hot water flows out flows to storage tank for flush toilet through the second water valve, avoids waste.
When needing to rush toilet, open draining valve 41, the water of storage tank flows to the drain hole of toilet through gutter, and from drain hole ejection, rinse toilet, this process only needs several seconds kinds usually, then closes draining valve, stops bath.
Water supply pipe near storage tank is established a distributive pipe 8 to storage tank 1, the delivery port being positioned at storage tank at distributive pipe is provided with float valve, when the water in storage tank is lower than lowest water level, float valve is opened into water, when the water level in storage tank is higher than peak level, float valve is closed and is stopped water inlet.If storage tank is contained in shower cubicle, and geyser is contained in kitchen, then the direct water supply pipe from entering shower cubicle establishes a distributive pipe 8 to storage tank.
Be provided with overfall gap on the top of storage tank, overflow pipe one end is connected with overfall gap, and the other end is connected with the blow-off pipe of washroom.If the water level in storage tank reaches peak level, at this moment open again the first water valve and prepare shower, too much water directly will be discharged to blow-off pipe by overfall gap, prevents the water overfill in storage tank from overflowing.
The three way cock of described geyser, the first water valve, the second water valve and storage tank are located at shower cubicle or the position near shower cubicle.In family's transfer, some geyser fills distant from shower cubicle, such as be arranged on kitchen, and the water of storage tank will be used for flushing toilet, also kitchen is contained in just too far away, still be contained in shower cubicle or neighbouring more satisfactory, therefore, three way cock, the first water valve and the second water valve be also contained in shower cubicle or near.
Above-described embodiment is only used to interpretation purposes of the present invention, and is not limitation of the present invention, those skilled in the art, in essential scope of the present invention, makes a variety of changes or substitutes, also should belong to protection category of the present invention.
Claims (4)
1. a New-type water heater, form primarily of storage tank (1), the first water valve (2), the second water valve (3), gutter (4) and geyser (5), geyser is built with controller, geyser provides source of the gas by gas pipeline or fuel cartridge, the delivery port of geyser is connected with the water inlet end of three way cock by outlet pipe, it is characterized in that: an outlet of three through holes is connected with shower (6) through the first water valve (2), another outlet of three way cock is connected with storage tank (1) through the second water valve (3); Storage tank (1) is connected with the drain hole be located in toilet (7) by gutter (4), and gutter (4) is provided with draining valve (41); After opening shower, controller detects that the second water valve is opened in the flowing of water immediately, close the first water valve, and igniting makes geyser heat up water, after controller detects that water temperature that the delivery port of geyser flows out is more than or equal to the water temperature that user selects on geyser first, open the first water valve, close the second water valve, hot water flows out from shower, until close shower.
2. New-type water heater according to claim 1, it is characterized in that: on the water supply pipe near storage tank, establish a distributive pipe (8) to storage tank (1), the delivery port being positioned at storage tank at distributive pipe is provided with float valve, when the water in storage tank is lower than lowest water level, float valve is opened into water, when the water level in storage tank is higher than peak level, float valve is closed and is stopped water inlet.
3. New-type water heater according to claim 1, is characterized in that: be provided with overfall gap on the top of storage tank, and overflow pipe one end is connected with overfall gap, and the other end is connected with the blow-off pipe of washroom.
4. New-type water heater according to claim 1, is characterized in that: the three way cock of described geyser, the first water valve, the second water valve and storage tank are located at shower cubicle or the position near shower cubicle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610016900.4A CN105569119A (en) | 2016-01-10 | 2016-01-10 | Novel water heater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610016900.4A CN105569119A (en) | 2016-01-10 | 2016-01-10 | Novel water heater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105569119A true CN105569119A (en) | 2016-05-11 |
Family
ID=55879697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610016900.4A Pending CN105569119A (en) | 2016-01-10 | 2016-01-10 | Novel water heater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105569119A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106123353A (en) * | 2016-08-16 | 2016-11-16 | 芜湖美的厨卫电器制造有限公司 | Turbid water system and control method thereof |
CN108331069A (en) * | 2018-01-18 | 2018-07-27 | 河海大学 | A kind of shower ineffectual cold water recycle device of integration insertion type |
CN109797812A (en) * | 2019-03-22 | 2019-05-24 | 安徽理工大学 | Rinse integrated water-saving system |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0038318A1 (en) * | 1980-04-10 | 1981-10-21 | Austria Email-EHT Aktiengesellschaft | Control system for controlling the heating of domestic water for a storage tank |
AT409659B (en) * | 1999-09-24 | 2002-10-25 | Vaillant Gmbh | LAYERS MEMORY SYSTEM |
CN2547777Y (en) * | 2002-02-26 | 2003-04-30 | 曹金兰 | Water saving apparatus |
CN103726542A (en) * | 2014-01-02 | 2014-04-16 | 上海理工大学 | Shower cycle reflux water-saving device |
CN204849936U (en) * | 2015-07-09 | 2015-12-09 | 彭凤霞 | Modified water heater cold water recycle in earlier stage device |
-
2016
- 2016-01-10 CN CN201610016900.4A patent/CN105569119A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0038318A1 (en) * | 1980-04-10 | 1981-10-21 | Austria Email-EHT Aktiengesellschaft | Control system for controlling the heating of domestic water for a storage tank |
AT409659B (en) * | 1999-09-24 | 2002-10-25 | Vaillant Gmbh | LAYERS MEMORY SYSTEM |
CN2547777Y (en) * | 2002-02-26 | 2003-04-30 | 曹金兰 | Water saving apparatus |
CN103726542A (en) * | 2014-01-02 | 2014-04-16 | 上海理工大学 | Shower cycle reflux water-saving device |
CN204849936U (en) * | 2015-07-09 | 2015-12-09 | 彭凤霞 | Modified water heater cold water recycle in earlier stage device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106123353A (en) * | 2016-08-16 | 2016-11-16 | 芜湖美的厨卫电器制造有限公司 | Turbid water system and control method thereof |
CN108331069A (en) * | 2018-01-18 | 2018-07-27 | 河海大学 | A kind of shower ineffectual cold water recycle device of integration insertion type |
CN109797812A (en) * | 2019-03-22 | 2019-05-24 | 安徽理工大学 | Rinse integrated water-saving system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107314535B (en) | Hot water system capable of realizing heat preservation of bathtub and control method thereof | |
CN105569119A (en) | Novel water heater | |
CN208202023U (en) | A kind of Mousehold water saving intelligence water storage device | |
CN103994495A (en) | Water storage type energy-saving system and energy-saving method | |
JP6852395B2 (en) | Hot water heater | |
CN210014546U (en) | Electric water heater with waste heat recovery device and preheating circulating pump | |
CN205062898U (en) | Cold water recovery device | |
CN206512779U (en) | A kind of domestic water saving system | |
CN101206076A (en) | Reflow type water-saving device of water heater | |
CN205062899U (en) | Gas water heater | |
CN206659585U (en) | A kind of self-cleaning Anti-fog mirror | |
CN104566614A (en) | Energy saving device for heating toilet through afterheat | |
CN209782999U (en) | Water-saving device for gas water heater | |
CN210216562U (en) | Water saving device for collecting and adjusting shower water temperature and waste water combined closestool | |
CN203687390U (en) | Cold water recycling device for bathroom | |
CN203323385U (en) | Household gas water heater water saving device | |
CN209801758U (en) | anti-freezing gas water heater | |
CN209243819U (en) | A kind of self-draining arrangement of domestic water system | |
CN203731545U (en) | Water-storage type energy saving system | |
CN205825474U (en) | A kind of automatic regulating device for solar water heater | |
CN205536616U (en) | Freeze proof type vacuum tube sun water heater of water conservation blowdown | |
CN205425140U (en) | Water reuse system is deposited to public bathroom pipeline | |
CN202023231U (en) | Water-saving tank | |
CN202227433U (en) | Constant-temperature and non-pressure flash tank for squatting pan | |
CN109972690A (en) | A kind of water saving fixtures used for collecting adjusting shower water temperature waste water joint closestool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160511 |