CN105559613B - Boil gallbladder and drinking equipment - Google Patents

Boil gallbladder and drinking equipment Download PDF

Info

Publication number
CN105559613B
CN105559613B CN201410632098.2A CN201410632098A CN105559613B CN 105559613 B CN105559613 B CN 105559613B CN 201410632098 A CN201410632098 A CN 201410632098A CN 105559613 B CN105559613 B CN 105559613B
Authority
CN
China
Prior art keywords
limiting section
nonmetallic
inner liner
heating inner
water gauge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410632098.2A
Other languages
Chinese (zh)
Other versions
CN105559613A (en
Inventor
曹伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Midea Group Co Ltd
Foshan Shunde Midea Water Dispenser Manufacturing Co Ltd
Original Assignee
Midea Group Co Ltd
Foshan Shunde Midea Water Dispenser Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Foshan Shunde Midea Water Dispenser Manufacturing Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201410632098.2A priority Critical patent/CN105559613B/en
Publication of CN105559613A publication Critical patent/CN105559613A/en
Application granted granted Critical
Publication of CN105559613B publication Critical patent/CN105559613B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Water, Waste Water Or Sewage (AREA)
  • Cookers (AREA)

Abstract

The invention discloses a kind of boiling gallbladders; the boiling gallbladder includes heating inner liner; and it is sheathed on the anti-scald protective shell on the heating inner liner top, boiling gallbladder further includes the nonmetallic lateral water gauge being mounted on the anti-scald protective shell, and the nonmetallic lateral water gauge is communicated with the inside of the heating inner liner.The invention also discloses a kind of drinking equipment, which includes above-mentioned boiling gallbladder.When the water level of boiling gallbladder of the invention in heating inner liner reaches full-water level, water in heating inner liner enters in nonmetallic lateral water gauge, since nonmetallic lateral water gauge is non-metallic material, water level signal is transmitted outward by nonmetallic lateral water gauge, external sensor is enabled to be accurately detected the water level in heating inner liner through nonmetallic lateral water gauge, so as to realize the accurate detection of water level in boiling gallbladder, and then it can accurately control the water level in boiling gallbladder.

Description

Boil gallbladder and drinking equipment
Technical field
The present invention relates to drinking-water technical field of water purification more particularly to a kind of boiling gallbladders and drinking equipment.
Background technique
Boiling refill drinking machine, can be sufficiently boiled by water since the heating inner liner of its gallbladder that boils is external, will not generate thousand rollings Water, and convenient for cleaning heating inner liner, therefore liked deeply by users.But since the heating inner liner of boiling gallbladder generally uses Stainless steel material is made, however the signal that stainless steel has been completely cut through in external sensor and boiling gallbladder between water level transmits, and leads Cause external sensor that cannot be accurately detected the water level in boiling gallbladder, so that the water level in boiling gallbladder cannot be controlled accurately.
Summary of the invention
It is a primary object of the present invention to realize the accurate detection of water level in boiling gallbladder, with the water in accurate control boiling gallbladder Position.
In order to achieve the above object, the present invention provides a kind of boiling gallbladder, which includes heating inner liner, and is sheathed on The anti-scald protective shell on the heating inner liner top, the boiling gallbladder further includes the nonmetallic cross being mounted on the anti-scald protective shell To water gauge, the nonmetallic lateral water gauge is communicated with the inside of the heating inner liner.
Preferably, the heating inner liner offers gas vent and apopore in the full-water level region of the heating inner liner, institute Apopore is stated lower than the gas vent;
The top edge of the nonmetallic lateral water gauge is provided with the air inlet pipe being adapted to the gas vent, the nonmetallic cross The water inlet pipe being adapted to the apopore is provided with to the lower edge of water gauge;The air inlet pipe protrudes into described through the gas vent In heating inner liner, and it is fixedly connected with the heating inner liner;The water inlet pipe protrudes into the heating inner liner through the apopore It is interior, and be fixedly connected with the heating inner liner.
Preferably, the position that the gas vent and apopore are corresponded on the periphery of the anti-scald protective shell is provided with and institute The mounting groove of nonmetallic lateral water gauge adaptation is stated, the nonmetallic lateral water gauge is mounted in the mounting groove.
Preferably, 1/3 times of the perimeter of circle where the arc length of the mounting groove is at least the mounting groove.
Preferably, the edge of the nonmetallic lateral water gauge is convexly equipped with several compression stabilizer blades, on the cell wall of the mounting groove It is recessed with and is adapted to detent with the compression stabilizer blade, the nonmetallic lateral water gauge passes through the compression stabilizer blade and the detent and institute Anti-scald protective shell is stated to be fixedly connected.
Preferably, the air inlet pipe and water inlet pipe are located at the interposition of the lower edges of the nonmetallic lateral water gauge It sets;The nonmetallic lateral water gauge inclines gradually downward from the air inlet pipe to the both ends of the nonmetallic lateral water gauge top edge Tiltedly, exhaust slope is formed;The nonmetallic lateral water gauge is from the water inlet pipe to the two of the nonmetallic lateral water gauge lower edge End gradually inclination upwards, forms drainage slope.
Preferably, it is arranged with the first elastic seal ring in the air inlet pipe, it is close that the second elasticity is arranged on the water inlet pipe Seal, first elastic seal ring are fixedly connected with the side wall of the gas vent on the heating inner liner, second bullet Property sealing ring is fixedly connected with the side wall of the apopore on the heating inner liner.
Preferably, first elastic seal ring includes the first fixed part for connecting the side wall of the gas vent, with And the first limiting section and the second limiting section for fixing first elastic seal ring, first fixed part are connected to described Between first limiting section and second limiting section;
Second elastic seal ring includes the second fixed part for connecting the side wall of the apopore, and for solid The third limiting section and the 4th limiting section of fixed second elastic seal ring, second fixed part are connected to the third limit Between portion and the 4th limiting section.
Preferably, second limiting section is extended with the first guide part far from one end of first fixed part, and described Four limiting sections are extended with the second guide part far from one end of second fixed part;First fixed part, the second fixed part, One limiting section, the second limiting section, third limiting section and the cylindrical setting of the 4th limiting section, first guide part and described Second guide part is in hollow round table-like setting;
The outer diameter that first guide part connects the side of second limiting section is greater than far from second limiting section The outer diameter of side, the outer diameter of first guide part are respectively less than the outer diameter of first limiting section and the second limiting section;
The outer diameter that second guide part connects the side of the 4th limiting section is greater than far from the 4th limiting section The outer diameter of side, the outer diameter of second guide part are respectively less than the outer diameter of the third limiting section and the 4th limiting section.
In addition, in order to achieve the above object, the present invention also provides a kind of drinking equipment, which includes boiling gallbladder, The boiling gallbladder includes heating inner liner, and is sheathed on the anti-scald protective shell on the heating inner liner top, and the boiling gallbladder further includes The nonmetallic lateral water gauge being mounted on the anti-scald protective shell, the inside of the nonmetallic lateral water gauge and the heating inner liner It communicates.
Boiling gallbladder and drinking equipment provided by the invention, by installing nonmetallic lateral water gauge on anti-scald protective shell, and Nonmetallic transverse direction water gauge is communicated with the inside of heating inner liner, thus when the water level in heating inner liner reaches full-water level, in heating Water in gallbladder enters in nonmetallic lateral water gauge, since nonmetallic lateral water gauge is non-metallic material, enables water level signal It is transmitted outward by nonmetallic lateral water gauge, external sensor is enabled to be accurately detected heating through nonmetallic lateral water gauge Water level in liner so as to realize the accurate detection of water level in boiling gallbladder, and then can accurately control the water in boiling gallbladder Position.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of present invention boiling gallbladder preferred embodiment;
Fig. 2 is the configuration schematic diagram of Fig. 1;
Fig. 3 is the enlarged drawing in Fig. 2 at A.
The realization of the purpose of the present invention, functional characteristics and advantage will in conjunction with the embodiments, and be made furtherly referring to attached drawing It is bright.
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The present invention provides a kind of boiling gallbladder, the boiling gallbladder be applied to drinking equipment (such as water dispenser, purifying drinking appliance, Drinking fountain and Pipeline machine).
Referring to Fig.1, Fig. 1 is the structural schematic diagram of present invention boiling gallbladder preferred embodiment.
In present pre-ferred embodiments, boiling gallbladder includes heating inner liner 100, and is sheathed on 100 top of heating inner liner Anti-scald protective shell 200, boiling gallbladder further include the nonmetallic lateral water gauge 300 being mounted on anti-scald protective shell 200, nonmetallic transverse direction Water gauge 300 is communicated with the inside of heating inner liner 100.
In the present embodiment, nonmetallic lateral water gauge 300 is installed on anti-scald protective shell 200, and makes nonmetallic transverse direction Water gauge 300 is communicated with the inside of heating inner liner 100, thus when the water level in heating inner liner 100 reaches full-water level, heating inner liner Water in 100 enters in nonmetallic lateral water gauge 300, since nonmetallic lateral water gauge 300 is non-metallic material, so that water level is believed Number external sensor (not shown) can be enabled through nonmetallic transverse direction by the nonmetallic lateral transmitting outward of water gauge 300 Water gauge 300 is accurately detected the water level in heating inner liner 100, so as to realize the accurate detection of water level in boiling gallbladder, in turn The water level in boiling gallbladder can accurately be controlled.
Fig. 2 and Fig. 3 are referred again to, Fig. 2 is the configuration schematic diagram of Fig. 1;Fig. 3 is the enlarged drawing in Fig. 2 at A.
As shown in Figures 2 and 3, heating inner liner 100 offers 110 He of gas vent in the full-water level region of heating inner liner 100 Apopore 120, apopore 120 are lower than gas vent 110.
The top edge of nonmetallic transverse direction water gauge 300 is provided with the air inlet pipe 310 being adapted to gas vent 110, nonmetallic transverse direction The lower edge of water gauge 300 is provided with the water inlet pipe 320 being adapted to apopore 120;Air inlet pipe 310 is protruded into through gas vent 110 to be added In hot liner 100, and it is fixedly connected with heating inner liner 100;Water inlet pipe 320 protrudes into heating inner liner 100 through apopore 120, And it is fixedly connected with heating inner liner 100.
When the water level in heating inner liner 100 reaches full-water level, the water in heating inner liner 100 is entered by water inlet pipe 320 In nonmetallic transverse direction water gauge 300, to detect to add when external sensor, which senses, has water in nonmetallic lateral water gauge 300 Water level in hot liner 100 sends testing result at this time and (schemes not to the control system of drinking equipment to reach full-water level Show), to stop water filling by the control system of drinking equipment control boiling gallbladder.When the water boiling in heating inner liner 100, heating Vapor in liner 100 is entered in nonmetallic lateral water gauge 300 by air inlet pipe 310, thus when external sensor sense incudes When having vapor in nonmetallic lateral water gauge 300, detect that the water in heating inner liner 100 has boiled, and send inspection at this time Result is surveyed to the control system of drinking equipment, to stop by the control system of drinking equipment control boiling gallbladder to heating inner liner Water heating in 100.
As shown in Figures 2 and 3, the position of gas vent 110 and apopore 120 is corresponded on the periphery of anti-scald protective shell 200 It is provided with the mounting groove 210 being adapted to nonmetallic lateral water gauge 300, nonmetallic transverse direction water gauge 300 is mounted in mounting groove 210.
Nonmetallic lateral water gauge 300 is installed by setting mounting groove 210, so that nonmetallic transverse direction water gauge 300 is embedded in On anti-scald protective shell 200, and except non-bulging anti-scald protective shell 200, to maintain the aesthetic effect of anti-scald protective shell 200.
Specifically, 1/3 times of the perimeter of circle where the arc length of mounting groove 210 is at least mounting groove 210.Boiling gallbladder is mounted on After drinking equipment, when the gallbladder that boils works, in the boiling gallbladder course of work, heating inner liner 100 is along its axis rotation, due to peace The length long enough of tankage 210, so that heating inner liner 100 is during rotation, external sensor can penetrate nonmetallic cross The water level signal on nonmetallic lateral water gauge 300 is sensed to water gauge 300.
As shown in Figures 2 and 3, the edge of nonmetallic lateral water gauge 300 is convexly equipped with several compression stabilizer blades 330, mounting groove 210 Cell wall be concavely provided with and compress stabilizer blade 330 and be adapted to detent (not shown), nonmetallic transverse direction water gauge 300 passes through compression stabilizer blade 330 It is fixedly connected with detent with anti-scald protective shell 200.By compressing the cooperation of stabilizer blade 330 and detent, by nonmetallic lateral water gauge 300 It is embedded in the mounting groove 210 of anti-scald protective shell 200, thus anti-scald protective shell 200 is fixed, prevent nonmetallic lateral water gauge 300 fall off in the boiling gallbladder course of work.
Specifically, air inlet pipe 310 and water inlet pipe 320 are located at the centre of the lower edges of nonmetallic lateral water gauge 300 Position;Nonmetallic transverse direction water gauge 300 tilts gradually downward from air inlet pipe 310 to the both ends of 300 top edge of nonmetallic lateral water gauge, Form exhaust slope;Nonmetallic transverse direction water gauge 300 from water inlet pipe 320 to the both ends of nonmetallic lateral 300 lower edge of water gauge gradually Inclination upwards forms drainage slope.
Nonmetallic transverse direction water gauge 300 is arranged to be vented slope in the two sides of air inlet pipe 310, sets in the two sides of water inlet pipe 320 It is set to drainage slope, so that water flow and airflow smooth in nonmetallic transverse direction water gauge 300, so that external sensor is through nonmetallic Lateral water gauge 300 is easy to sense the state of the water and steam in nonmetallic lateral water gauge 300.
As shown in Figures 2 and 3, it is arranged with the first elastic seal ring 410 in air inlet pipe 310, is arranged on water inlet pipe 320 Two elastic seal rings 420, the first elastic seal ring 410 are fixedly connected with the side wall of the gas vent 110 on heating inner liner 100, the Two elastic seal rings 420 are fixedly connected with the side wall of the apopore 120 on heating inner liner 100.
It is arranged the first elastic seal ring 410 in air inlet pipe 310, the second elastic seal ring 420 is arranged on water inlet pipe 320, Air inlet pipe 310 is fixedly connected by the first elastic seal ring 410 with heating inner liner 100, and water inlet pipe 320 passes through the second elastic packing Circle 420 is fixedly connected with heating inner liner 100, so that nonmetallic lateral water gauge 300 and heating inner liner 100 is fixed.Due to first Elastic seal ring 410 and the second elastic seal ring 420 have elasticity, so that the first elastic seal ring 410 is close to gas vent 110 Side wall, the second elastic seal ring 420 are close to the side wall of apopore 120, the water and steam in heating inner liner 100 are avoided to flow to The outside of anti-scald protective shell 200 is leaked out during nonmetallic 300, water gauge of transverse direction.
As shown in Figures 2 and 3, the first elastic seal ring 410 includes the first fixation for connecting the side wall of gas vent 110 Portion 411, and the first limiting section 412 and the second limiting section 413 for fixing the first elastic seal ring 410, the first fixed part 411 are connected between the first limiting section 412 and the second limiting section 413.
Second elastic seal ring 420 includes the second fixed part 421 for connecting the side wall of apopore 120, and is used for The third limiting section 422 and the 4th limiting section 423 of the second elastic seal ring 420 are fixed, the second fixed part 421 is connected to third limit Between position portion 422 and the 4th limiting section 423.
During installing nonmetallic lateral water gauge 300, due to the first elastic seal ring 410 and the second elastic seal ring 420 with elasticity, when the air inlet pipe 310 that will be arranged with the first elastic seal ring 410 is directed at gas vent 110 and is pressed into gas vent 110, and the water inlet pipe 320 for being arranged with the second elastic seal ring 420 is directed at apopore 120 and when being pressed into apopore 120, first Second limiting section 413 of elastic seal ring 410 and the 4th limiting section 423 of the second elastic seal ring 420 are squeezed, the second limit Position portion 413 protrudes into heating inner liner 100 through gas vent 110, and makes the side wall card of the first fixed part 411 and gas vent 110 It connects, meanwhile, the 4th limiting section 423 protrudes into heating inner liner 100 through apopore 120, and makes the second fixed part 421 and water outlet The side wall in hole 120 is clamped, so that nonmetallic lateral water gauge 300 and heating inner liner 100 is fixed.
As shown in Figures 2 and 3, the second limiting section 413 is extended with the first guide part far from one end of the first fixed part 411 414, the 4th limiting section 423 is extended with the second guide part 424 far from one end of the second fixed part 421;First fixed part 411, Two fixed parts 421, the first limiting section 412, the second limiting section 413, third limiting section 422 and the 4th limiting section 423 are in cylinder Shape setting, the first guide part 414 and the second guide part 424 are in hollow round table-like setting.
The outer diameter that first guide part 414 connects the side of the second limiting section 413 is greater than the side far from the second limiting section 413 Outer diameter, the outer diameter of the first guide part 414 is respectively less than the outer diameter of the first limiting section 412 and the second limiting section 413.
The outer diameter that second guide part 424 connects the side of the 4th limiting section 423 is greater than the side far from the 4th limiting section 423 Outer diameter, the outer diameter of the second guide part 424 is respectively less than the outer diameter of third limiting section 422 and the 4th limiting section 423.
First guide part 414 and the second guide part 424 are arranged to hollow round table-like lateral water gauge 300 nonmetallic to installation Play guiding function.Since the outer diameter of the first limiting section 412 and the second limiting section 413 is greater than the outer diameter of the first guide part 414, the One limiting section 412 blocks the outer wall of heating inner liner 100, and the second limiting section 413 blocks the inner wall of heating inner liner 100, so that The side wall of first fixed part 411 and gas vent 110 is clamped.Similarly, outer due to third limiting section 422 and the 4th limiting section 423 Diameter is greater than the outer diameter of the second guide part 424, and third limiting section 422 blocks the outer wall of heating inner liner 100, the 4th limiting section 423 card The firmly inner wall of heating inner liner 100, so that the side wall of the second fixed part 421 and apopore 120 is clamped.
The present invention also provides a kind of drinking equipment, which includes boiling gallbladder, the structure and institute's band of the boiling gallbladder The beneficial effect come is referring to above-described embodiment, and details are not described herein again.
The above description is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all utilizations Equivalent structure or equivalent flow shift made by description of the invention and accompanying drawing content is applied directly or indirectly in other correlations Technical field, be included within the scope of the present invention.

Claims (6)

1. a kind of boiling gallbladder, including heating inner liner, and it is sheathed on the anti-scald protective shell on the heating inner liner top, feature exists In the boiling gallbladder further includes the nonmetallic lateral water gauge being mounted on the anti-scald protective shell, the nonmetallic lateral water gauge It is communicated with the inside of the heating inner liner;The heating inner liner the full-water level region of the heating inner liner offer gas vent and Apopore, the apopore are lower than the gas vent;
The top edge of the nonmetallic lateral water gauge is provided with the air inlet pipe being adapted to the gas vent, the nonmetallic lateral water The lower edge of ruler is provided with the water inlet pipe being adapted to the apopore;The air inlet pipe protrudes into the heating through the gas vent In liner, and it is fixedly connected with the heating inner liner;The water inlet pipe protrudes into the heating inner liner through the apopore, and It is fixedly connected with the heating inner liner;
The air inlet pipe and water inlet pipe are located at the middle position of the lower edges of the nonmetallic lateral water gauge;The non-gold Belong to lateral water gauge to tilt gradually downward from the air inlet pipe to the both ends of the nonmetallic lateral water gauge top edge, it is oblique to form exhaust Slope;The nonmetallic lateral water gauge is from the water inlet pipe to the both ends of the nonmetallic lateral water gauge lower edge gradually to updip Tiltedly, drainage slope is formed;
The position that the gas vent and apopore are corresponded on the periphery of the anti-scald protective shell is provided with and the nonmetallic cross The mounting groove being adapted to water gauge, the nonmetallic lateral water gauge are mounted in the mounting groove;
1/3 times of the perimeter of circle where the arc length of the mounting groove is at least the mounting groove.
2. boiling gallbladder as described in claim 1, which is characterized in that if the edge of the nonmetallic lateral water gauge is convexly equipped with dry-pressing Tight stabilizer blade, the cell wall of the mounting groove are concavely provided with and are adapted to detent with the compression stabilizer blade, and the nonmetallic lateral water gauge passes through The compression stabilizer blade and the detent are fixedly connected with the anti-scald protective shell.
3. boiling gallbladder as described in claim 1, which is characterized in that be arranged with the first elastic seal ring, institute in the air inlet pipe It states and is arranged with the second elastic seal ring on water inlet pipe, the gas vent on first elastic seal ring and the heating inner liner Side wall be fixedly connected, second elastic seal ring is fixedly connected with the side wall of the apopore on the heating inner liner.
4. boiling gallbladder as claimed in claim 3, which is characterized in that first elastic seal ring includes for connecting the row First fixed part of the side wall of stomata, and the first limiting section and the second limit for fixing first elastic seal ring Portion, first fixed part are connected between first limiting section and second limiting section;
Second elastic seal ring includes the second fixed part for connecting the side wall of the apopore, and for fixing State the third limiting section and the 4th limiting section of the second elastic seal ring, second fixed part be connected to the third limiting section and Between 4th limiting section.
5. as claimed in claim 4 boiling gallbladder, which is characterized in that second limiting section far from first fixed part one End is extended with the first guide part, and the 4th limiting section is extended with the second guide part far from one end of second fixed part;Institute Stating the first fixed part, the second fixed part, the first limiting section, the second limiting section, third limiting section and the 4th limiting section is in cylinder Shape setting, first guide part and second guide part are in hollow round table-like setting;
The outer diameter that first guide part connects the side of second limiting section is greater than the side far from second limiting section Outer diameter, the outer diameter of first guide part is respectively less than the outer diameter of first limiting section and the second limiting section;
The outer diameter that second guide part connects the side of the 4th limiting section is greater than the side far from the 4th limiting section Outer diameter, the outer diameter of second guide part is respectively less than the outer diameter of the third limiting section and the 4th limiting section.
6. a kind of drinking equipment, which is characterized in that the drinking equipment includes boiling described in any one of claim 1 to 5 Rise gallbladder.
CN201410632098.2A 2014-11-10 2014-11-10 Boil gallbladder and drinking equipment Expired - Fee Related CN105559613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410632098.2A CN105559613B (en) 2014-11-10 2014-11-10 Boil gallbladder and drinking equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410632098.2A CN105559613B (en) 2014-11-10 2014-11-10 Boil gallbladder and drinking equipment

Publications (2)

Publication Number Publication Date
CN105559613A CN105559613A (en) 2016-05-11
CN105559613B true CN105559613B (en) 2018-12-25

Family

ID=55870678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410632098.2A Expired - Fee Related CN105559613B (en) 2014-11-10 2014-11-10 Boil gallbladder and drinking equipment

Country Status (1)

Country Link
CN (1) CN105559613B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106213998A (en) * 2016-09-05 2016-12-14 芜湖美的厨卫电器制造有限公司 Purifying drinking appliance and body set thereof and boiling gallbladder
CN113267527B (en) * 2021-05-19 2023-05-30 天津大学 Experimental device for can be used to carry out steady state pool boiling under different saturation pressures

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2251327Y (en) * 1996-03-27 1997-04-09 赵明辉 Electric kettle
CN201870439U (en) * 2010-10-15 2011-06-22 美的集团有限公司 Water gauge structure of electric kettle
CN203195437U (en) * 2013-02-19 2013-09-18 九阳股份有限公司 Water dispenser with water level intelligent detection function

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2533578A (en) * 1946-12-04 1950-12-12 Mcgraw Electric Co Water level indicator
EP0159149A1 (en) * 1984-03-24 1985-10-23 D.H. Haden Limited Water heating vessel having a water level indicator
US5447248A (en) * 1994-01-26 1995-09-05 Rodriguez; Kimberly J. Indicator for liquid container
GB2336292B (en) * 1996-12-23 2000-08-16 Strix Ltd Liquid heating vessels
GB2362806B (en) * 2000-05-31 2002-04-24 Better Electrical Products Fty A method of securing articles and an electric kettle made by such a method
CN1268265C (en) * 2002-03-26 2006-08-09 基泰实业有限公司 Water level gauge structure in stainless steel electronics pot
CN2808004Y (en) * 2005-07-15 2006-08-23 陈士礼 Liquid level controller structure improvement of drinking machine
CN201441293U (en) * 2009-07-02 2010-04-28 董月卿 Heat preservation thermos bottle
CN204181478U (en) * 2014-11-10 2015-03-04 佛山市顺德区美的饮水机制造有限公司 Boiling courage and drinking equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2251327Y (en) * 1996-03-27 1997-04-09 赵明辉 Electric kettle
CN201870439U (en) * 2010-10-15 2011-06-22 美的集团有限公司 Water gauge structure of electric kettle
CN203195437U (en) * 2013-02-19 2013-09-18 九阳股份有限公司 Water dispenser with water level intelligent detection function

Also Published As

Publication number Publication date
CN105559613A (en) 2016-05-11

Similar Documents

Publication Publication Date Title
US8756992B2 (en) Level detector for measuring foam and aerated slurry level in a wet flue gas desulfurization absorber tower
CN105559613B (en) Boil gallbladder and drinking equipment
WO2017065312A1 (en) Sensor device
CN106017775A (en) Pipe with testing function
CN203203017U (en) Built-in type balancing container for boiler
CN204181478U (en) Boiling courage and drinking equipment
CN209727517U (en) A kind of device for the default depth acquisition water sample in hole, measurement water level and water temperature
CN216303755U (en) Steam inlet and outlet and water inlet and outlet system of grain steaming pot
EP2667092B1 (en) Radial nozzle assembly for a pressure vessel
US8505568B2 (en) Nuclear grade air accumulation, indication and venting device
CN204128638U (en) The anti-device that waves of a kind of fluid reservoir water-level gauge
CN206876254U (en) One kind is impregnated into size vat device
MX2022002158A (en) A method for measuring a liquid level in a pressure vessel.
CN106872111B (en) Water tap leakage quality detection device conforming to industrial engineering
CN202119505U (en) Boiler steam drum water level gauge with steam condensation chamber
CN207455558U (en) Sub-cylinder steam
CN210458114U (en) Household wine brewing barrel
CN205379187U (en) Pan of braised system spareribs hot water
KR101973989B1 (en) Gasrange
CN205026400U (en) Environment -friendly coal gas comdenstion water safety eduction gear
JPWO2016052710A1 (en) Sensor device
CN204269319U (en) Leak detection mechanism
CN105806421A (en) Test pipeline
CN209100793U (en) A kind of automatic cooling stainless steel tube
CN108195506A (en) A kind of condenser vacuum measuring device for large and medium-sized Steam Turbine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181225

Termination date: 20211110

CF01 Termination of patent right due to non-payment of annual fee