CN105552897A - Configuration method for secondary frequency modulation reserve capacity of direct current islanded sending power grid - Google Patents

Configuration method for secondary frequency modulation reserve capacity of direct current islanded sending power grid Download PDF

Info

Publication number
CN105552897A
CN105552897A CN201511028203.2A CN201511028203A CN105552897A CN 105552897 A CN105552897 A CN 105552897A CN 201511028203 A CN201511028203 A CN 201511028203A CN 105552897 A CN105552897 A CN 105552897A
Authority
CN
China
Prior art keywords
frequency modulation
frequency
direct current
reserve capacity
condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511028203.2A
Other languages
Chinese (zh)
Other versions
CN105552897B (en
Inventor
谢岩
王皓怀
申旭辉
杨林
李晶
刘起兴
唐晓骏
王坚
李晓珺
梁彦杰
李慧玲
宋新立
仲悟之
苏志达
吴国旸
刘涛
叶小晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Power Research Institute Co Ltd CEPRI
China Southern Power Grid Co Ltd
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI, China Southern Power Grid Co Ltd filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN201511028203.2A priority Critical patent/CN105552897B/en
Publication of CN105552897A publication Critical patent/CN105552897A/en
Application granted granted Critical
Publication of CN105552897B publication Critical patent/CN105552897B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a configuration method for secondary frequency modulation reserve capacity of a direct current islanded sending power grid, comprising: quitting the FLC function of the direct current islanded sending power grid; under the condition of maximum power shortage delta P1 resulted from the N-1 fault of the sending power grid, calculating primary frequency modulation reserve capacity P1-1 needed to be reserved for recovering the power grid frequency to a primary frequency modulation control objective F1; under the condition of power shortage delta P1, calculating the secondary frequency modulation reserve capacity P1-2 needed to be reserved on the basis of the P1-1 for recovering the power grid frequency to a secondary frequency modulation control objective F2; under the condition of maximum power shortage delta P2 resulted from the N-2 fault of the sending power grid, calculating primary frequency modulation reserve capacity P2-1 needed to be reserved for recovering the power grid frequency to the F1; under the condition of power shortage delta P2, calculating second frequency modulation reserve capacity P2-2 of the system on the basis of the P2-1 needed to be reserved for recovering the power grid frequency to the F2; injecting the FLC function; under the condition of power shortage delta P2, calculating secondary frequency modulation reserve capacity P3-2 needed to be reserved for recovering the power grid frequency to the F2 and recovering the FLC direct current power modulation quantity to 0 before the secondary frequency modulation action.

Description

Direct current isolated island sends electric grid secondary frequency modulation reserve capacity collocation method
Technical field
Present invention relates in general to electrical network field, more specifically, relate to a kind of direct current isolated island and send electric grid secondary frequency modulation reserve capacity collocation method.
Background technology
Frequency stabilization is the important content that power system safety and stability runs, and configures rational reserve capacity, is the important measures ensureing that mains frequency is stable.Secondary reserve capacity and system AGC (AUTOMATICGENERATIONCONTROL) capacity, reasonable disposition secondary system capacity, gives full play to the effect of AGC frequency modulation frequency modulation, coordinates primary frequency modulation and three frequency modulation, thus the frequency quality of common guarantee system.
For frequency modulation frequency modulation reserve capacity allocation problem, not having ripe theoretical calculation method in world wide, is all generally empirically, regulation frequency modulation frequency modulation capacity is a certain ratio of system total installed capacity or load, as the 2%-5% of system peak load, Iarge-scale system gets the small value, and mini system takes large values.In addition, also have two thinkings to be respectively and consider economy and the frequency modulation frequency modulation reserve capacity collocation method based on historical datas such as each type load, mains frequency examination parameters based on electricity market.
Such as, certain electric grid secondary frequency modulation standby configuration method domestic is:
1, the whole network load minimum value for subsequent use is 2% of the whole network peak load;
2, primary frequency modulation target is determined and to obtain primary frequency modulation for subsequent use;
3, frequency modulation frequency modulation is for subsequent use is that the load primary frequency modulation that deducts for subsequent use is for subsequent use;
Realizing in process of the present invention, applicant finds that above-mentioned prior art exists following technological deficiency:
(1) when determining the whole network load minimum value for subsequent use, empirically, adopt 2% of the whole network peak load, need follow-up its reasonability of a large amount of calculation check;
(2) frequency modulation frequency modulation is for subsequent use be by deduct in the whole network load minimum value for subsequent use primary frequency modulation for subsequent use after obtain, whether can meet frequency modulation frequency modulation target cannot determine;
(3) when configuring frequency modulation frequency modulation capacity, system network shelf structure characteristic is not considered.
Summary of the invention
The invention provides a kind of direct current isolated island and send electric grid secondary frequency modulation reserve capacity collocation method, it is characterized in that, the method comprises the steps:
It is F1 that step 1, clear and definite direct current isolated island send primary frequency regulation of power network control objectives, and frequency modulation frequency modulation control objectives is F2;
It is Δ P1 that step 2, clear and definite direct current isolated island send the power shortage maximum that electrical network N-1 fault causes; The power shortage maximum that N-2 fault causes is Δ P2;
If electrical network acquiescence of sending step 3 direct current isolated island drops into direct current frequency restriction control FLC function, then exit this function, otherwise omit step 3;
Step 4, adopt full dynamic simulation program, calculate under power shortage Δ P1 condition, island-grid frequency retrieval to F1, the required reserved primary frequency modulation reserve capacity P1-1 of system;
Step 5, employing full dynamic simulation program, calculate under power shortage Δ P1 condition, and island-grid frequency retrieval is to F2, and system, on P1-1 basis, also needs to increase reserved frequency modulation frequency modulation reserve capacity P1-2;
Step 6, adopt full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval to F1, the required reserved primary frequency modulation reserve capacity P2-1 of system;
Step 7, employing full dynamic simulation program, calculate under power shortage Δ P2 condition, and island-grid frequency retrieval is to F2, and system, on P2-1 basis, also needs to increase reserved frequency modulation frequency modulation reserve capacity P2-2;
Step 8, input direct current isolated island send electrical network FLC function;
Step 9, employing full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval is to F2, and FLC DC power modulation amount reverts to 0 before frequency modulation frequency modulation action, the required reserved frequency modulation frequency modulation reserve capacity P3-2 of system;
Step 10, P1-2 and P2-2 are direct current isolated island transmitting system without the two-stage frequency modulation frequency modulation reserve capacity configuration can resisting N-1 and N-2 fault in FLC situation, and P3-2 can resist the frequency modulation frequency modulation reserve capacity configuration of N-2 fault under being direct current isolated island transmitting system configuration FLC.
Alternatively, in described step 1, F1 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.2HZ; F2 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.1HZ.
Accompanying drawing explanation
In order to more completely understand the present invention and advantage thereof, referring now to following description by reference to the accompanying drawings, wherein:
Fig. 1 shows and sends electric grid secondary frequency modulation reserve capacity collocation method flow chart according to the stream isolated island of the embodiment of the present invention.
Fig. 2 shows south electric network Asynchronous Interconnection configuration of power network.
Fig. 3 shows and under power shortage Δ P1 (700MW) condition, meets F1 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
Fig. 4 shows and under power shortage Δ P1 (700MW) condition, meets F2 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
Fig. 5 shows and under power shortage Δ P2 (3000MW) condition, meets F1 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
Fig. 6 shows and under power shortage Δ P2 (3000MW) condition, meets F2 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
Fig. 7 shows and under power shortage Δ P2 (3000MW) condition, meets F2 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
Fig. 8 shows and under power shortage Δ P2 (3000MW) condition, meets F2 target each direct current FLC DC power modulation amount action situation according to the embodiment of the present invention.
Embodiment
According to by reference to the accompanying drawings to the following detailed description of exemplary embodiment of the present, other side of the present invention, advantage and prominent features will become apparent for those skilled in the art.
In the present invention, term " comprises " and " containing " and derivative thereof mean and to comprise and unrestricted; Term "or" is inclusive, mean and/or.
In this manual, the following various embodiments for describing the principle of the invention just illustrate, should not be interpreted as by any way limiting scope of invention.With reference to the following description of accompanying drawing for helping complete understanding by the exemplary embodiment of the present invention of claim and equivalents thereof.Following description comprises multiple detail and helps understand, but these details should think it is only exemplary.Therefore, those of ordinary skill in the art it should be understood that when not deviating from scope and spirit of the present invention, can carry out multiple change and amendment to embodiment described herein.In addition, for clarity and brevity, the description of known function and structure is eliminated.In addition, run through accompanying drawing, same reference numbers is used for identity function and operation.
Fig. 1 shows direct current isolated island of the present invention and sends electric grid secondary frequency modulation reserve capacity collocation method flow chart.
As shown in Figure 1, send electric grid secondary frequency modulation reserve capacity collocation method according to the direct current isolated island of the embodiment of the present invention to comprise the steps:
It is F1 that step 1, clear and definite direct current isolated island send primary frequency regulation of power network control objectives, and frequency modulation frequency modulation control objectives is F2;
It is Δ P1 that step 2, clear and definite direct current isolated island send the power shortage maximum that electrical network N-1 fault causes; The power shortage maximum that N-2 fault causes is Δ P2;
If electrical network acquiescence of sending step 3 direct current isolated island drops into direct current frequency restriction control FLC function, then exit this function, otherwise omit step 3;
Step 4, adopt full dynamic simulation program, calculate under power shortage Δ P1 condition, island-grid frequency retrieval to F1, the required reserved primary frequency modulation reserve capacity P1-1 of system;
Step 5, employing full dynamic simulation program, calculate under power shortage Δ P1 condition, and island-grid frequency retrieval is to F2, and system, on P1-1 basis, also needs to increase reserved frequency modulation frequency modulation reserve capacity P1-2;
Step 6, adopt full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval to F1, the required reserved primary frequency modulation reserve capacity P2-1 of system;
Step 7, employing full dynamic simulation program, calculate under power shortage Δ P2 condition, and island-grid frequency retrieval is to F2, and system, on P2-1 basis, also needs to increase reserved frequency modulation frequency modulation reserve capacity P2-2;
Step 8, input direct current isolated island send electrical network FLC function;
Step 9, employing full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval is to F2, and FLC DC power modulation amount reverts to 0 before frequency modulation frequency modulation action, the required reserved frequency modulation frequency modulation reserve capacity P3-2 of system;
Step 10, P1-2 and P2-2 are direct current isolated island transmitting system without the two-stage frequency modulation frequency modulation reserve capacity configuration can resisting N-1 and N-2 fault in FLC situation, and P3-2 can resist the frequency modulation frequency modulation reserve capacity configuration of N-2 fault under being direct current isolated island transmitting system configuration FLC.
Alternatively, in described step 1, F1 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.2HZ; F2 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.1HZ.
Above-mentioned full dynamic simulation program and PSD-FDS (FULLDYNAMICSIMULATIONPROGRAM), dynamo-electric for electric power system transient state, medium and long term dynamic process organically can be united and are emulated, can analog electrical Force system be disturbed after whole continuous print dynamic process.
Below with reference to Fig. 2 ~ Fig. 8, the said method according to the embodiment of the present invention is described.Fig. 2 shows south electric network Asynchronous Interconnection configuration of power network.For the Yunnan Power System of south electric network Asynchronous Interconnection, set up Yunnan Power System by direct current in Chu Sui direct current, general emigrant's direct current, gold, ox from direct current, forever rich direct current and western Shandong back-to-back DC with southern host's net (Guangdong, Guangxi, Guizhou, Hainan) asynchronous interconnected operation mode, 6 times direct currents are sent electricity outside and are amounted to 21150MW, and direct current FLC function frequency dead band limited field is 0.3HZ.And in the net of Yunnan large sized unit many, no longer include southern host's net and provide frequency to support, frequency stabilization problem becomes topmost stable problem, needs reasonable disposition frequency modulation frequency modulation for subsequent use.
In step 1, specifying direct current isolated island, to send primary frequency regulation of power network control objectives be F1, and frequency modulation frequency modulation control objectives is F2.According to the embodiment of the present invention, F1 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.2HZ.F2 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.1HZ.
In step 2, specifying direct current isolated island, to send the power shortage maximum that electrical network N-1 fault causes be Δ P1; The power shortage maximum that N-2 fault causes is Δ P2.Comprehensive combing Yunnan Power System N-1 disturbance, maximum N-1 disturbance is that small stream Lip river is crossed 700MW unit and tripped at full capacity, and therefore Δ P1 is 700MW; Maximum N-2 disturbance is kwan-yin rock power plant egress line fault, and this fault may cause grid loss 5 600MW units, and therefore Δ P2 is 3000MW.
In step 3, if direct current isolated island sends electrical network acquiescence drop into direct current frequency restriction control FLC function, then exit this function, otherwise omit step 3.
In step 4, adopt full dynamic simulation program, calculate under power shortage Δ P1 (700MW) condition, island-grid frequency retrieval is to F1 (49.8HZ), the required reserved primary frequency modulation reserve capacity P1-1 of system is 370MW, whole process simulation result as shown in Figure 3, illustrated therein is and under power shortage Δ P1 (700MW) condition, meets F1 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
In step 5, adopt full dynamic simulation program, calculate under power shortage Δ P1 condition, island-grid frequency retrieval is to F2 (49.9HZ), system is on P1-1 basis, also needing to increase reserved frequency modulation frequency modulation reserve capacity P1-2 is 200MW, and whole process simulation result as shown in Figure 4, illustrated therein is and under power shortage Δ P1 (700MW) condition, meets F2 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
In step 6, adopt full dynamic simulation program, calculate under power shortage Δ P2 (3000MW) condition, island-grid frequency retrieval is to F1 (49.8HZ), the required reserved primary frequency modulation reserve capacity P2-1 (3000MW) of system, whole process simulation result as shown in Figure 5, illustrated therein is and under power shortage Δ P2 (3000MW) condition, meets F1 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.As seen from the figure, Yunnan isolated island sends mains frequency intelligent restoration to 49.75HZ, this is because unit primary frequency modulation is droop control, the primary frequency modulation characteristic inherent characteristic that Yunnan isolated island sends electrical network can only make frequency retrieval to 49.75HZ, primary frequency modulation recovery of aiming at steady frequency more than more than 3000MW for subsequent use is played and will do not had better effect, therefore configuration primary frequency modulation reserve capacity is P2-1 be 3000MW is rational.
In step 7, adopt full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval is to F2, system is on P2-1 basis, also needing to increase reserved frequency modulation frequency modulation reserve capacity P2-2 is 1800MW, and whole process simulation result as shown in Figure 6, illustrated therein is and under power shortage Δ P2 (3000MW) condition, meets F2 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.
In step 8, drop into direct current isolated island and send electrical network FLC function.
In step 9, adopt full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval is to F2, and FLC DC power modulation amount reverts to 0 before frequency modulation frequency modulation action, the required reserved frequency modulation frequency modulation reserve capacity P3-2 of system is 1800MW, and whole process simulation result as shown in Figure 7, illustrated therein is and under power shortage Δ P2 (3000MW) condition, meets F2 target Yunnan isolated island according to the embodiment of the present invention and send mains frequency recovery situation outside.Fig. 8 shows and under power shortage Δ P2 (3000MW) condition, meets F2 target each direct current FLC DC power modulation amount action situation according to the embodiment of the present invention, before frequency modulation frequency modulation action (180 seconds), each direct current FLC DC power modulation amount reverts to 0.
In step 10, P1-2 (200MW) and P2-2 (1800MW) is the two-stage frequency modulation frequency modulation reserve capacity configuration that direct current isolated island transmitting system can resist N-1 and N-2 fault, and P3-2 can resist the frequency modulation frequency modulation reserve capacity configuration of N-2 fault under being direct current isolated island transmitting system configuration FLC.
The present invention has following one or more beneficial effect:
(1) scheme, when determining the whole network load minimum value for subsequent use, empirically, adopts a certain ratio (2%-8%) of the whole network peak load, needs follow-up its reasonability of a large amount of calculation check in the past.Adopt the technical program, by analyzing the outer pushing electric network mode of direct current isolated island, finding out the power shortage that N-1, N-2 are maximum, in this, as the rational fault of checkschema, can amount of calculation be alleviated.
(2) scheme frequency modulation frequency modulation was for subsequent use be in the past by deduct in the whole network load minimum value for subsequent use primary frequency modulation for subsequent use after obtain, whether can meet frequency modulation frequency modulation target cannot determine.Adopt the technical program, set up F2 standard to carry out target and send electric grid secondary frequency modulation situation to assess direct current isolated island, can guarantee that gained frequency modulation frequency modulation reserve capacity can meet frequency modulation frequency modulation requirement.
(3) scheme, when configuring frequency modulation frequency modulation capacity, does not consider system network shelf structure characteristic in the past.Adopt the technical program, consider direct current isolated island send electrical network configuration FLC after impact.
Although illustrate and describe the present invention with reference to certain exemplary embodiments of the present invention, but those skilled in the art should understand that, when not deviating from the spirit and scope of the present invention of claims and equivalents thereof, the multiple change in form and details can be carried out to the present invention.Therefore, scope of the present invention should not be limited to above-described embodiment, but should not only be determined by claims, is also limited by the equivalent of claims.

Claims (2)

1. direct current isolated island sends an electric grid secondary frequency modulation reserve capacity collocation method, and it is characterized in that, the method comprises the steps:
It is F1 that step 1, clear and definite direct current isolated island send primary frequency regulation of power network control objectives, and frequency modulation frequency modulation control objectives is F2;
It is Δ P1 that step 2, clear and definite direct current isolated island send the power shortage maximum that electrical network N-1 fault causes; The power shortage maximum that N-2 fault causes is Δ P2;
If electrical network acquiescence of sending step 3 direct current isolated island drops into direct current frequency restriction control FLC function, then exit this function, otherwise omit step 3;
Step 4, adopt full dynamic simulation program, calculate under power shortage Δ P1 condition, island-grid frequency retrieval to F1, the required reserved primary frequency modulation reserve capacity P1-1 of system;
Step 5, employing full dynamic simulation program, calculate under power shortage Δ P1 condition, and island-grid frequency retrieval is to F2, and system, on P1-1 basis, also needs to increase reserved frequency modulation frequency modulation reserve capacity P1-2;
Step 6, adopt full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval to F1, the required reserved primary frequency modulation reserve capacity P2-1 of system;
Step 7, employing full dynamic simulation program, calculate under power shortage Δ P2 condition, and island-grid frequency retrieval is to F2, and system, on P2-1 basis, also needs to increase reserved frequency modulation frequency modulation reserve capacity P2-2;
Step 8, input direct current isolated island send electrical network FLC function;
Step 9, employing full dynamic simulation program, calculate under power shortage Δ P2 condition, island-grid frequency retrieval is to F2, and FLC DC power modulation amount reverts to 0 before frequency modulation frequency modulation action, the required reserved frequency modulation frequency modulation reserve capacity P3-2 of system;
Step 10, P1-2 and P2-2 are direct current isolated island transmitting system without the two-stage frequency modulation frequency modulation reserve capacity configuration can resisting N-1 and N-2 fault in FLC situation, and P3-2 can resist the frequency modulation frequency modulation reserve capacity configuration of N-2 fault under being direct current isolated island transmitting system configuration FLC.
2. the method for claim 1, is characterized in that:
In described step 1, F1 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.2HZ;
F2 is determined by following principle, and after being namely disturbed, system frequency returns to 50 ± 0.1HZ.
CN201511028203.2A 2015-12-30 2015-12-30 Direct current isolated island sends out electric grid secondary frequency modulation spare capacity collocation method Active CN105552897B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511028203.2A CN105552897B (en) 2015-12-30 2015-12-30 Direct current isolated island sends out electric grid secondary frequency modulation spare capacity collocation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511028203.2A CN105552897B (en) 2015-12-30 2015-12-30 Direct current isolated island sends out electric grid secondary frequency modulation spare capacity collocation method

Publications (2)

Publication Number Publication Date
CN105552897A true CN105552897A (en) 2016-05-04
CN105552897B CN105552897B (en) 2017-11-14

Family

ID=55831911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511028203.2A Active CN105552897B (en) 2015-12-30 2015-12-30 Direct current isolated island sends out electric grid secondary frequency modulation spare capacity collocation method

Country Status (1)

Country Link
CN (1) CN105552897B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106655260A (en) * 2016-11-15 2017-05-10 许继集团有限公司 Micro-grid and connected-grid-to-off-grid seamless switching method thereof
CN106953363A (en) * 2017-05-04 2017-07-14 西南交通大学 Power network spinning reserve Optimal Configuration Method under a kind of wind power plant limit power operating states
CN112039092A (en) * 2020-09-23 2020-12-04 华北电力大学 Island Direct Current (DC) outgoing Automatic Gain Control (AGC) model prediction control method considering energy storage System On Chip (SOC) recovery
CN113422377A (en) * 2021-08-25 2021-09-21 中国电力科学研究院有限公司 DC modulation and secondary frequency modulation coordinated optimization configuration method and device
CN112039092B (en) * 2020-09-23 2024-07-09 华北电力大学 Island direct-current output AGC model prediction control method considering energy storage SOC recovery

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102680858A (en) * 2012-05-30 2012-09-19 陕西长岭光伏电气有限公司 Detection method for islanding effect of grid-connected inverter
US20120293095A1 (en) * 2011-05-16 2012-11-22 Denso Corporation Control unit of rotary device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120293095A1 (en) * 2011-05-16 2012-11-22 Denso Corporation Control unit of rotary device
CN102680858A (en) * 2012-05-30 2012-09-19 陕西长岭光伏电气有限公司 Detection method for islanding effect of grid-connected inverter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
BEHROOZ GHAHREMANI, ET AL: "Simulation and dynamic control of a hybrid system for controlling the voltage and frequency of an island network", 《ELECTRIC POWER AND ENERGY CONVERSION SYSTEMS (EPECS), 2013 3RD INTERNATIONAL CONFERENCE ON》 *
郭洪芹: "异步联网对云南电网稳定特性影响研究", 《云南电力技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106655260A (en) * 2016-11-15 2017-05-10 许继集团有限公司 Micro-grid and connected-grid-to-off-grid seamless switching method thereof
CN106655260B (en) * 2016-11-15 2019-04-09 许继集团有限公司 A kind of micro-capacitance sensor and its grid-connected leave net seamless handover method
CN106953363A (en) * 2017-05-04 2017-07-14 西南交通大学 Power network spinning reserve Optimal Configuration Method under a kind of wind power plant limit power operating states
CN106953363B (en) * 2017-05-04 2019-06-04 西南交通大学 Power grid spinning reserve Optimal Configuration Method under a kind of wind power plant limit power operating states
CN112039092A (en) * 2020-09-23 2020-12-04 华北电力大学 Island Direct Current (DC) outgoing Automatic Gain Control (AGC) model prediction control method considering energy storage System On Chip (SOC) recovery
CN112039092B (en) * 2020-09-23 2024-07-09 华北电力大学 Island direct-current output AGC model prediction control method considering energy storage SOC recovery
CN113422377A (en) * 2021-08-25 2021-09-21 中国电力科学研究院有限公司 DC modulation and secondary frequency modulation coordinated optimization configuration method and device

Also Published As

Publication number Publication date
CN105552897B (en) 2017-11-14

Similar Documents

Publication Publication Date Title
Sadeghkhani et al. Low‐voltage ride‐through of a droop‐based three‐phase four‐wire grid‐connected microgrid
Wang et al. Fault analysis for distribution networks with current-controlled three-phase inverter-interfaced distributed generators
Meegahapola et al. Characterisation of large disturbance rotor angle and voltage stability in interconnected power networks with distributed wind generation
CN102684224B (en) Unit combination method for resolving and considering wind power volatility
Abedini et al. Adaptive load shedding scheme to preserve the power system stability following large disturbances
CN105552897A (en) Configuration method for secondary frequency modulation reserve capacity of direct current islanded sending power grid
CN105391050A (en) Checking method and system of high-cycle cutting machine configuration scheme
Said et al. Coordinated fuzzy logic‐based virtual inertia controller and frequency relay scheme for reliable operation of low‐inertia power system
CN110503214A (en) DC grid voltage transient based on additional electricity stablizes the method for restoring control
Xie et al. Adaptive master-slave control strategy for medium voltage DC distribution systems based on a novel nonlinear droop controller
Okedu Effect of ECS low‐pass filter timing on grid frequency dynamics of a power network considering wind energy penetration
Wang et al. The fault analysis method of islanded microgrid based on the U/f and PQ control strategy
CN102710244B (en) A kind of mesohigh series connection electronic switch
Miranbeigi et al. Unified control (unicon) strategies for grid-connected inverters
CN107196319B (en) Fan frequency modulation control method based on power disturbance value response
CN106655167B (en) The emulation mode and device of power grid cascading failure
CN104465233A (en) Configuration method with voltage dip character of low-voltage releasing devices taken into consideration
CN105870930B (en) A kind of low-frequency load shedding control method of intelligent appliance
Paspatis et al. Current-limiting droop controller with fault-ride-through capability for grid-tied inverters
CN105552917B (en) Load model construction method considering load low-voltage release characteristics
CN103762587A (en) Optimized networking method of distributed power supply system end users
Fan et al. Controlled islanding algorithm for AC/DC hybrid power systems utilising DC modulation
CN104253433B (en) A kind of method reducing massive blackout accident
CN202663374U (en) Medium and high voltage series connection electronic switch
CN105226630B (en) The control method and system of a kind of direct current micro-grid system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant