CN105550819A - Realization method for comprehensively monitoring decision support models - Google Patents

Realization method for comprehensively monitoring decision support models Download PDF

Info

Publication number
CN105550819A
CN105550819A CN201511010039.2A CN201511010039A CN105550819A CN 105550819 A CN105550819 A CN 105550819A CN 201511010039 A CN201511010039 A CN 201511010039A CN 105550819 A CN105550819 A CN 105550819A
Authority
CN
China
Prior art keywords
business
decision support
process map
module
business process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511010039.2A
Other languages
Chinese (zh)
Inventor
李冰
陈莉莉
张振山
徐漫江
胡波
许涛
曹子涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201511010039.2A priority Critical patent/CN105550819A/en
Publication of CN105550819A publication Critical patent/CN105550819A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Educational Administration (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a realization method for comprehensively monitoring decision support models. The method comprises the following steps: dividing the decision support models into a plurality of business modules according to logic, and adopting a BPMN2.0 standard to establish a business flow chart; carrying out topological sorting on selected business modules through a graph configuration tool and carrying out uniform configuration so as to complete the network logic relationship of the business flow chart; configuring a triggering condition, selecting a triggering mode and correlating to the business flow chart; adopting an XML manner to store the business flow chart; and when the triggering condition is satisfied, executing the business flow chart according to pre-definition. By adopting the realization method disclosed in the invention, the complicated control logics can be processed and the configuration is flexible, so that an increasing number of various requirements in the engineering applications can be satisfied.

Description

A kind of implementation method of comprehensively monitoring decision support template
Technical field
The present invention relates to a kind of comprehensively monitoring technical field, particularly relate to a kind of implementation method of comprehensively monitoring decision support template.
Background technology
Urban rail transit in China is in high-speed development period.Along with the raising of metro operation automatization level, the application of comprehensive monitoring system in subway is also more and more extensive, decision support template in comprehensive monitoring system is divided into backstage to perform service and two, logical edit interface, logical edit interface is used for carrying out logical edit, sequence, storage, backstage performs service and the logic tree being stored into database is loaded and performed, thus assists Rail Transit System to carry out emergency processing and decision support.Along with the widespread use of comprehensive monitoring system in subway, corresponding comprehensive monitoring system is disposed and implements also day by day complicated, the variation of the access way of various automation equipment, the equipment of different manufacturers, each system of operation and standard etc., changes existing operation tissue and Dispatching Scheme greatly.And current decision support template, complicated steering logic can not be processed, configuration underaction, the increasing various demands in engineer applied can not be met.
Summary of the invention
Technical matters to be solved by this invention is, provides a kind of implementation method of comprehensively monitoring decision support template, can process complicated steering logic, flexible configuration, thus meet the increasing various demands in engineer applied.
In order to solve the problems of the technologies described above, the invention provides a kind of implementation method of comprehensively monitoring decision support template, comprising:
Decision support template is logically divided into some business modules, and adopt the flow object meeting BPMN2.0 standard to describe all business module types, choose required business module according to demand, adopt the flow object meeting BPMN2.0 standard to describe function and the content of corresponding service module, thus set up business process map;
By graphical configuration tool, topological sorting is carried out to the business module chosen, and carry out unifying configuration, thus complete the cellular logic relation of described business process map;
Configure trigger condition, chooses trigger mode, and associates with described business process map;
XML mode is adopted to store described business process map;
When a triggering condition is met, described business process map performs according to predefine.
Further, described employing XML mode stores described business process map, specifically comprises:
Adopt XML mode to preserve described business process map, wherein, the content of the business module in the described business process map of storage comprises the coordinate of module, the functions of modules of the real-time status of module, the logical relation of intermodule and expansion thereof.
Further, the flow object of the described BPMN2.0 of meeting standard comprises: event Events, movable Activities and gateway Gateways, the wherein triggering of the corresponding decision process of Events event and end, the business operation that movable Activities is corresponding concrete, gateway Gateways correspondence how control flow and business lock.
Further, described business module adopts normalization design, adopt unified form and general language to describe, and the mode using Json to go here and there carries out storing and transmitting.
Further, described trigger mode is specially that condition triggers, one or more in message trigger and time triggered, and wherein, condition is triggered and caught by data point displacement, message trigger is that other services are triggered by Message Transmission mode, and time triggered is the time triggered by preset value.
Implement the present invention, there is following beneficial effect: implementation trade-off monitoring decision support template of the present invention can process complicated steering logic, flexible configuration, thus meets the increasing various demands in engineer applied.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic flow sheet of an embodiment of the implementation method of comprehensively monitoring decision support template provided by the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Fig. 1 is the schematic flow sheet of an embodiment of the implementation method of comprehensively monitoring decision support template provided by the invention, the implementation method of the comprehensively monitoring decision support template that the embodiment of the present invention provides is supported cross-platform, under each mainstream operation system such as Unix, Windows, SunOS, same set of code compiles the cross platform system of realization separately, thus it is completely the same to realize dividing into meter at each platform, interface is completely the same and operation is completely the same.Concrete, as shown in Figure 1, the embodiment of the present invention comprises step:
S101, decision support template is logically divided into some business modules, and employing meets BPMN (BusinessProcessModelingNotation, Business Process Modeling and mark) flow object of 2.0 standards describes all business module types, choose required business module according to demand, adopt the flow object meeting BPMN2.0 standard to describe function and the content of corresponding service module, thus set up business process map.
Wherein, the modeling of operation flow and mark all adopt basic BPMN2.0 standard symbol, thus realize multiple meta graph recognition and become reflection to meet the business process map of design logic.
Wherein, the flow object of the described BPMN2.0 of meeting standard specifically comprises: event Events, movable Activities and gateway Gateways, the wherein triggering of the corresponding decision process of Events event and end, the business operation that movable Activities is corresponding concrete, gateway Gateways correspondence how control flow and business lock.
Wherein, described business module adopts normalization design, adopt unified form and general language to describe, and the mode using Json to go here and there carries out storing and transmitting.
S102, by graphical configuration tool, topological sorting is carried out to the business module chosen, and carry out unifying configuration, thus complete the cellular logic relation of described business process map.
In concrete enforcement, editorial decision supports that example details is as follows: according to BPMN2.0 standard, abstract and realize atom business module, and example dissolves the corresponding function module, often kind of functional module is separate, is packaged into independent dynamic base, can dynamically increase or delete, all business modules are carried out arranging and configuration according to pre-designed logic, designs relevant work process flow diagram.
S103, configure trigger condition, choose trigger mode, and associate with described business process map.
Wherein, described trigger mode is specially that condition triggers, one or more in message trigger and time triggered, and wherein, condition is triggered and caught by data point displacement, message trigger is that other services are triggered by Message Transmission mode, and time triggered is the time triggered by preset value.
S104, employing XML mode store described business process map.
Concrete, step S104 comprises step: adopt XML mode to preserve described business process map, wherein, the content of the business module in the described business process map of storage comprises the coordinate of module, the functions of modules of the real-time status of module, the logical relation of intermodule and expansion thereof.
After preservation, send out message informing background service via messaging bus and carry out synchrodata synchronously, provide online editing, amendment model function, does not need restarting background service loaded with new data.
S105, when a triggering condition is met, described business process map performs according to predefine.
Perform time, undertaken alternately by message and background service, each walk implementation and result all real-time be presented on interface, interface provides operator participation method, can change at any time according to real-time condition, interrupt run.The inquiry of historical data function is also provided, can workflow diagram again on interface needed for filtercondition inquiry, and display is when information such as the process time to perform and results.
Implement the present invention, there is following beneficial effect: the business process map of the employing BPMN2.0 standard of novelty of the present invention is to realize comprehensively monitoring decision support template, therefore complicated steering logic can be processed, and flexible configuration, extendability is strong, in the field decision support of track traffic comprehensively monitoring, provide new method and direction, thus meet the increasing various demands in engineer applied.
It should be noted that, in this article, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or device and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or device.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the device comprising this key element and also there is other identical element.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (5)

1. an implementation method for comprehensively monitoring decision support template, is characterized in that, comprising:
Decision support template is logically divided into some business modules, and adopt the flow object meeting BPMN2.0 standard to describe all business module types, choose required business module according to demand, adopt the flow object meeting BPMN2.0 standard to describe function and the content of corresponding service module, thus set up business process map;
By graphical configuration tool, topological sorting is carried out to the business module chosen, and carry out unifying configuration, thus complete the cellular logic relation of described business process map;
Configure trigger condition, chooses trigger mode, and associates with described business process map;
XML mode is adopted to store described business process map;
When a triggering condition is met, described business process map performs according to predefine.
2. the implementation method of comprehensively monitoring decision support template as claimed in claim 1, it is characterized in that, described employing XML mode stores described business process map, specifically comprises:
Adopt XML mode to preserve described business process map, wherein, the content of the business module in the described business process map of storage comprises the coordinate of module, the functions of modules of the real-time status of module, the logical relation of intermodule and expansion thereof.
3. the implementation method of comprehensively monitoring decision support template as claimed in claim 1, it is characterized in that, the flow object of the described BPMN2.0 of meeting standard comprises: event Events, movable Activities and gateway Gateways, the wherein triggering of the corresponding decision process of Events event and end, the business operation that movable Activities is corresponding concrete, gateway Gateways correspondence how control flow and business lock.
4. the implementation method of comprehensively monitoring decision support template as claimed in claim 1, is characterized in that, described business module adopts normalization design, adopt unified form and general language to describe, and the mode using Json to go here and there carries out storing and transmitting.
5. the implementation method of comprehensively monitoring decision support template as claimed in claim 1, it is characterized in that, described trigger mode is specially that condition triggers, one or more in message trigger and time triggered, wherein, condition is triggered and is caught by data point displacement, message trigger is that other services are triggered by Message Transmission mode, and time triggered is the time triggered by preset value.
CN201511010039.2A 2015-12-29 2015-12-29 Realization method for comprehensively monitoring decision support models Pending CN105550819A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511010039.2A CN105550819A (en) 2015-12-29 2015-12-29 Realization method for comprehensively monitoring decision support models

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511010039.2A CN105550819A (en) 2015-12-29 2015-12-29 Realization method for comprehensively monitoring decision support models

Publications (1)

Publication Number Publication Date
CN105550819A true CN105550819A (en) 2016-05-04

Family

ID=55829999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511010039.2A Pending CN105550819A (en) 2015-12-29 2015-12-29 Realization method for comprehensively monitoring decision support models

Country Status (1)

Country Link
CN (1) CN105550819A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852623A (en) * 2019-11-12 2020-02-28 北京计算机技术及应用研究所 BPMN-based command control process design method
CN110901712A (en) * 2019-11-21 2020-03-24 卡斯柯信号有限公司 Inter-professional intelligent linkage method for urban rail transit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈莉莉: "基于工作流的城市轨道交通指挥中心辅助决策系统", 《铁路技术创新》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110852623A (en) * 2019-11-12 2020-02-28 北京计算机技术及应用研究所 BPMN-based command control process design method
CN110901712A (en) * 2019-11-21 2020-03-24 卡斯柯信号有限公司 Inter-professional intelligent linkage method for urban rail transit
CN110901712B (en) * 2019-11-21 2022-01-28 卡斯柯信号有限公司 Inter-professional intelligent linkage method for urban rail transit

Similar Documents

Publication Publication Date Title
CN113033001B (en) Three-dimensional digital factory modeling method and system for digital twin application
CN102411764B (en) The data management system of grid equipment and management method
CN103309988A (en) Method for automatically generating rail traffic line database
CN103530757A (en) Network based multi-mode intelligent order following management method and intelligent management system
CN101888655A (en) Method and device for configuring network element data in template way in network management system
CN105427041A (en) Standardized maintenance method for reconstruction and extension information point table of running substation
CN109146253A (en) A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking
CN109491735A (en) Integrated data generates the comprehensively monitoring human-machine interface configuration implementation method with verification
CN106779162A (en) A kind of business events flow path flexible configuration and automatic optimization method and system
CN104217306A (en) Computer modeling method of full operation flow based on structuralization
CN110232504A (en) A kind of quality manufacturing execution system platform and terminal
CN104573184A (en) Construction method and construction device for high speed train product meta-model
CN103164774A (en) Automobile complete vehicle development system based on workflow
CN110930111A (en) APP (application) for unified management of physical assets and mobile operation
CN105550819A (en) Realization method for comprehensively monitoring decision support models
CN104036358A (en) Automated banking operation scheduling system
CN105893591A (en) Intelligent compiling technology of data sharing service
KR20140115108A (en) Screen generation method of energy management system
CN102638575A (en) Layered monitoring system for battery charging and alternating
CN208506582U (en) A kind of flexible production control system in dynamic regulation production path
CN105488656A (en) Dynamic configuration technology of power grid local county office relay protection management system function module
CN101866370B (en) Processing method of subgrade engineering cross section designing template
CN102646119B (en) Method for realizing integration of standardized system and information system
CN105527920A (en) B/S-based numerical control machine tool fault diagnosis system
CN101739497A (en) Method for automatically computing figure labeling position

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160504