CN105545018A - Fast-installation prefabricated house shed cover - Google Patents

Fast-installation prefabricated house shed cover Download PDF

Info

Publication number
CN105545018A
CN105545018A CN201610050493.9A CN201610050493A CN105545018A CN 105545018 A CN105545018 A CN 105545018A CN 201610050493 A CN201610050493 A CN 201610050493A CN 105545018 A CN105545018 A CN 105545018A
Authority
CN
China
Prior art keywords
frame
fast
movable plank
plank house
prefabricated house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610050493.9A
Other languages
Chinese (zh)
Inventor
陈科州
覃荣山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Liwan Technology Co Ltd
Original Assignee
Liuzhou Liwan Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Liwan Technology Co Ltd filed Critical Liuzhou Liwan Technology Co Ltd
Priority to CN201610050493.9A priority Critical patent/CN105545018A/en
Publication of CN105545018A publication Critical patent/CN105545018A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a fast-installation prefabricated house shed cover and relates to the technical field of prefabricated house manufacturing. The fast-installation prefabricated house shed cover comprises a prefabricated house, and a plurality of installing columns are arranged close to the prefabricated house; a shed frame is arranged and comprises a plurality of triangular supporting units and a top beam arranged on the tops of the triangular supporting units, the top beam is provided with a plurality of staggered triangular top beam units, the top beam is covered with a top face, and a fence is arranged outside the triangular supporting units; the shed frame is provided with a plurality of vertical pipe beams, and the shed frame is installed on the installing columns through the vertical pipe beams. Compared with the prior art, the problem that when used as a public facility in a sightseeing scenic spot, an existing prefabricated house cannot be easily integrated with landscape of the sightseeing scenic spot can be solved.

Description

Fast-assembling movable plank house canopy lid
Technical field
The present invention relates to movable plank house manufacturing technology field, especially a kind of fast-assembling movable plank house canopy lid for movable plank house in scenic spot of going sightseeing.
Background technology
Movable plank house be a kind of with light steel for skeleton, with bolts and the one off houses of assembly and disassembly can be carried out quickly; This one off houses can be used for building site, the lodge of build the road building site and mine worker uses, and also can be used for the communal facility of some interim construction or Long-Time Service; In some sightseeing scenic spots, usually movable plank house can be used for selling booth, recreating facility etc., but because these movable plank house structures are simple, the view at the single difficulty of exterior wall color and sightseeing scenic spot combines together, how to develop the movable plank house canopy lid coordinated a kind of and specific Landscape Region, realize the seriation exploitation of the interim public building in sightseeing scenic spot, energy-conserving and environment-protective are movable plank house practitioner problem demanding prompt solution.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of and fast-assembling movable plank house canopy lid, to solve the existing problem using movable plank house view that is difficult as communal facility and sightseeing scenic spot to combine together in sightseeing scenic spot.
The technical scheme that technical solution problem of the present invention adopts is: this fast-assembling movable plank house canopy lid comprises movable plank house, is provided with many erection columns at nearly described movable plank house place; There is a frame, described frame comprises multiple triangular support unit and is located at the back timber at multiple described triangular support unit top, described back timber has multiple staggered gable-top beam element, and described back timber is covered with end face, outside multiple described triangular support unit, be provided with fence;
Described frame is provided with many VERTICAL TUBE beams, and described frame is contained on described erection column by described VERTICAL TUBE beam.
In above-mentioned fast-assembling movable plank house canopy lid technical scheme, technical scheme can also be more specifically: described gable-top beam element has the oblique upper beam that three roots and tops connect, and wherein the tail end of three described oblique upper beams connects with the angle of the triangle frame beam of a level successively; Described triangular support unit has the cant beam that three foundation ends connect, and the top of three described cant beams is connected with described back timber respectively.
Owing to have employed technique scheme, the present invention compared with prior art has following beneficial effect: when 1, using, first in the surrounding of movable plank house, many erection columns are installed, again the frame completing installation is contained on many erection columns by VERTICAL TUBE beam casing, color is painted the fence that adapts with scenic spot color and end face and load onto and namely complete; 2, quick for installation, simple, energy-conserving and environment-protective also can mass production.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention.
Fig. 2 is the structural representation of the end face of the embodiment of the present invention.
Fig. 3 is the structural representation of the fence of the embodiment of the present invention.
Fig. 4 is the structural representation of the frame of the embodiment of the present invention.
Fig. 5 is the structural representation that the embodiment of the present invention is equipped with the movable plank house of erection column.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described:
Fast-assembling movable plank house canopy lid as depicted in figs. 1 and 2 includes movable plank house 2, and the present embodiment is equipped with four erection columns 5 respectively in the surrounding at nearly movable plank house 2 place; There is a frame, this frame 3 comprises six triangular support unit 3-2, wherein three triangular support unit 3-2 are arranged in a row, back timber is contained at the top of two its six triangular support unit 3-2 of row, back timber has five staggered gable-top beam element 3-1, and one of them drift angle of adjacent gable-top beam element 3-1 and the end of another gable-top beam element 3-1 connect and be connected; Gable-top beam element has the oblique upper beam that three roots and tops connect, and wherein the tail end of three oblique upper beams connects with the angle of the triangle frame beam of a level successively; Triangular support unit 3-2 has the cant beam that three foundation ends connect, and the top of three cant beams is connected with back timber respectively; Back timber is covered with the end face 1 that shape dress is corresponding with back timber, outside six triangular support unit 3-2, is with fence 4; Frame 3 is provided with four VERTICAL TUBE beams, and in this, root VERTICAL TUBE beam is VERTICAL TUBE beam 3-3, VERTICAL TUBE beam 3-4, VERTICAL TUBE beam 3-5, VERTICAL TUBE beam 3-6 respectively; Frame 3 is contained on four erection columns 5 by four VERTICAL TUBE beam casings.
During use, first in the surrounding of movable plank house, many erection columns 5 are installed, then the frame completing installation is contained on erection column 5 by VERTICAL TUBE beam casing, color is painted the fence 4 that adapts with scenic spot color and end face 1 and load onto and namely complete.

Claims (2)

1. a fast-assembling movable plank house canopy lid, comprises movable plank house (2), it is characterized in that: be provided with many erection columns (5) at nearly described movable plank house (2) place; There is a frame, described frame (3) comprises multiple triangular support unit (3-2) and is located at the back timber at multiple described triangular support unit (3-2) top, described back timber has multiple staggered gable-top beam element (3-1), described back timber is covered with end face (1), outside multiple described triangular support unit (3-2), is provided with fence (4);
Described frame (3) is provided with many VERTICAL TUBE beams, and described frame (3) is contained on described erection column (5) by described VERTICAL TUBE beam.
2. fast-assembling movable plank house canopy lid according to claim 1, is characterized in that: described gable-top beam element has the oblique upper beam of three roots and tops handing-over, and wherein the tail end of three described oblique upper beams connects with the angle of the triangle frame beam of a level successively; Described triangular support unit (3-2) has the cant beam that three foundation ends connect, and the top of three described cant beams is connected with described back timber respectively.
CN201610050493.9A 2016-01-26 2016-01-26 Fast-installation prefabricated house shed cover Pending CN105545018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610050493.9A CN105545018A (en) 2016-01-26 2016-01-26 Fast-installation prefabricated house shed cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610050493.9A CN105545018A (en) 2016-01-26 2016-01-26 Fast-installation prefabricated house shed cover

Publications (1)

Publication Number Publication Date
CN105545018A true CN105545018A (en) 2016-05-04

Family

ID=55824532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610050493.9A Pending CN105545018A (en) 2016-01-26 2016-01-26 Fast-installation prefabricated house shed cover

Country Status (1)

Country Link
CN (1) CN105545018A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3419737A1 (en) * 1984-05-26 1985-11-28 Walter 7293 Pfalzgrafenweiler Reinhardt Roofing
US4951432A (en) * 1989-11-27 1990-08-28 Wilkinson Don G Folding building structure
CN2102967U (en) * 1991-10-23 1992-04-29 胡子凡 Folding moving shed device
JPH04216734A (en) * 1990-12-14 1992-08-06 Toho Sheet & Frame Co Ltd Structure of assembling type and its assembling method
CN200985646Y (en) * 2006-12-14 2007-12-05 陈能森 Light component cote and house opened with dormer windows
CN201786077U (en) * 2010-09-21 2011-04-06 广州新新日用制品有限公司 Ceiling support device used for tent

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3419737A1 (en) * 1984-05-26 1985-11-28 Walter 7293 Pfalzgrafenweiler Reinhardt Roofing
US4951432A (en) * 1989-11-27 1990-08-28 Wilkinson Don G Folding building structure
JPH04216734A (en) * 1990-12-14 1992-08-06 Toho Sheet & Frame Co Ltd Structure of assembling type and its assembling method
CN2102967U (en) * 1991-10-23 1992-04-29 胡子凡 Folding moving shed device
CN200985646Y (en) * 2006-12-14 2007-12-05 陈能森 Light component cote and house opened with dormer windows
CN201786077U (en) * 2010-09-21 2011-04-06 广州新新日用制品有限公司 Ceiling support device used for tent

Similar Documents

Publication Publication Date Title
CN102912972B (en) Multifunctional lifting steel platform switching jig and construction method
CN205647362U (en) Large -span prestressing force cable photovoltaic support
US10480172B2 (en) Building structure, building, and building construction method
CN109235902A (en) Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
CN206481251U (en) A kind of photovoltaic bracket device of use truss string structure beam
CN1077944C (en) Modular building framework
CN104532850B (en) Foundation pit support system
CN104358318B (en) A kind of building using concrete steel structural upright
CN105545018A (en) Fast-installation prefabricated house shed cover
CN107558613A (en) A kind of installation method of hexagonal pavilion
US20160201326A1 (en) Modular Roof Structure
CN208063088U (en) Roofing is without support type roof photovoltaic power station
CN202913677U (en) Multifunctional conversion scaffold capable of lifting steel platform
KR200347869Y1 (en) A installation pole for meteorological appliances
CN211369216U (en) Assembled light steel structure archaized roof
TWM634299U (en) Combination structure with tall and short concrete piles combined with steel members
CN107542286B (en) Structure of pavilion
CN105839783A (en) Magic cube units and magic cube type integrated house
CN208733965U (en) Assembled stairs
CN207348509U (en) A kind of structure in pavilion
CN108104583B (en) Sky curtain wall system
CN207526141U (en) A kind of small bore tower steel structure assembling formula operating platform
CN205776779U (en) A kind of magic square unit and magic cube type integrated house
JP2007107180A (en) Snow falling protective fence
CN202611145U (en) Assembled stainless steel glass fence

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160504