CN105544988B - Control pours the ash cake and turnover extracting tool of ground elevation - Google Patents

Control pours the ash cake and turnover extracting tool of ground elevation Download PDF

Info

Publication number
CN105544988B
CN105544988B CN201610014602.1A CN201610014602A CN105544988B CN 105544988 B CN105544988 B CN 105544988B CN 201610014602 A CN201610014602 A CN 201610014602A CN 105544988 B CN105544988 B CN 105544988B
Authority
CN
China
Prior art keywords
cake
ash cake
ash
face
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610014602.1A
Other languages
Chinese (zh)
Other versions
CN105544988A (en
Inventor
张鑫磊
汪焱宏
李峰
侯立伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201610014602.1A priority Critical patent/CN105544988B/en
Publication of CN105544988A publication Critical patent/CN105544988A/en
Application granted granted Critical
Publication of CN105544988B publication Critical patent/CN105544988B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/10Devices for levelling, e.g. templates or boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention relates to ash cakes and matched turnover extracting tool that a kind of control pours ground elevation, ash cake device includes ash cake pedestal and ash cake top surface, ash cake pedestal lower end is in A-frame shape and is fixed on ground, the bolt of A-frame upper end welding perpendicular to the ground, ash cake top surface includes the sleeve that upper end is circular cake face and lower part, ash cake cake is provided with circular hole on face, the sleeve perpendicular to cake face is welded at the center of cake face, ash cake top surface adjusts cake face height by the rotation of sleeve and ash cake pedestal upper end bolt, to achieve the purpose that control pours ground elevation, furthermore, additionally provide a kind of turnover extracting tool for ash cake device installing and dismounting and the method with its installation and removal ash cake device.Construction and installation of the present invention are simple, control floor leveling absolute altitude for the husky grey ash cake of cement, and absolute altitude precise control is highly more specifications, flexibly adjustable, detachable after construction, can reuse, without waiting for the solidification of the husky grey ash cake of cement, improve construction efficiency.

Description

Control pours the ash cake and turnover extracting tool of ground elevation
Technical field
The invention belongs to construction class field, it is related to a kind of controlling the ash cake for pouring ground elevation and turnover disassembly work Tool.
Background technique
With the high speed development of economic construction, construction amount is increasing, ground, the floor ground of nearly all building Be required to carry out concreting it is levelling or plastering, control pour or levelling absolute altitude in terms of, it is most common in construction to be exactly Several ash cakes are stamped on the ground with the husky ash of cement, then carry out pouring levelling construction according to the height of ash cake, the method needs The husky ash of cement is first configured, wet work is comparatively laborious, it is also necessary to could construct after waiting ash cake to solidify, if in addition design becomes More, the fixation of ash cake height can not change, it is also necessary to reset ash cake, waste of manpower, material resources and financial resources, it is often more important that construction Efficiency decline, the inferior capabilities of autonomous adjusting elevation are carried out according to field working conditions.
Summary of the invention
The present invention in view of the above problems, provide it is a kind of it is low in cost, easy to operate, height, no can be controlled from main modulation It is poured the ash cake of ground elevation with the control for waiting setting time, improving construction efficiency and is had enough to meet the need extracting tool and the tool Application method, and then solve the problems, such as above-mentioned.
Provide a kind of ash cake for controlling and pouring ground elevation to achieve the purpose of the present invention: the ash cake is by metal material It is made, preferably steel or stainless steel, the ash cake includes ash cake pedestal and ash cake top surface, and the ash cake pedestal includes spiral shell Bolt and A-frame, the A-frame are located at the lower end of ash cake " pedestal " and are fixed on ground by steel nail, and described three The bolt of the upper end welding of angle support perpendicular to the ground;The ash cake top surface includes the set that upper end is circular cake face and lower part Cylinder, is provided with circular hole on ash cake cake face, and the sleeve perpendicular to cake face is welded at the center of cake face;Ash cake top surface by sleeve with Ash cake pedestal upper end bolt rotates to adjust the height in cake face.
A further improvement of the present invention is that the outer silk screw thread of the bolt band, the sleeve band internal thread screw thread, the two Matching is, it can be achieved that a variety of height specifications.
A further improvement of the present invention is that the circular hole is monosymmetric the opening up along cake face diameter, number is Two.
A kind of matching used turnover of ash cake that ground elevation is poured with control is additionally provided to achieve the purpose of the present invention Extracting tool, the turnover extracting tool includes the T-shaped handle of upper end and the disassembly head of lower end, and the disassembly head is Reverse U shape, reverse U shape are dismantled and weld the T-shaped handle on head, on the width and cake face of the reverse U shape disassembly head Two circular holes opened up are wide, and the two stabilizer blades insertion circular hole rotation of reverse U shape can be adjusted the height in cake face and carry out to ash cake Installation and disassembly.
A kind of control is additionally provided to achieve the purpose of the present invention pours the ash cake of ground elevation and matched Have enough to meet the need the manufacturing method of extracting tool, step 1): one tripod of welding, there are drift bolt holes for every foot, perpendicular in vertical tripod Straight welding upwards one has the bolt of outer silk screw thread, forms ash cake pedestal;Step 2: it is opened in one piece of circular steel plate two big Small consistent circular hole, then the sleeve with internal thread with above-mentioned bolt matching is taken, its circle is welded on perpendicular to circular steel plate The heart is made into ash cake top surface;Step 3): being made into the disassembly head that lower end is in reverse U shape with reinforcing bar, in disassembly head upper end connection T-shaped Handle, be welded at the top of reverse U shape, turnover extracting tool be made.
Additionally provide to achieve the purpose of the present invention a kind of turnover extracting tool to control pour the ash cake of ground elevation into The application method of row installation and disassembly: in use, dismantling head insertion ruler therewith with the reverse U shape in special turnover extracting tool The circular hole of very little matched ash cake top surface, rotates ash cake top surface, by sleeve and bolt be rotated up to adjustment height and The purpose of disassembly;It requires to adjust height according to ground level, every 4 ~ 8 square metres are fixed an ash cake device, and construction terminates, disassembly Ash cake device.
Technical solution of the present invention compared with prior art, has the advantage that
1, the husky grey ash cake of cement is substituted to control floor leveling absolute altitude, without waiting for the solidification of the husky grey ash cake of cement, raising Construction efficiency.
It 2, is highly more specifications, precise control is adjusted by rotation, flexible and changeable.
3, detachable after constructing, it can repeatedly be installed again in work progress, reuse rate is high, save the cost.
Detailed description of the invention
Fig. 1 is the ash cake schematic diagram of base structure for the ash cake that control of the invention pours ground elevation.
Fig. 2 is the ash cake top surface structure schematic diagram for the ash cake that control of the invention pours ground elevation.
Fig. 3 is the ash cake overall structure diagram that control of the invention pours ground elevation.
Fig. 4 is the ash cake matching used turnover extracting tool schematic diagram of the invention that ground elevation is poured with control.
Figure label: 1, ash cake pedestal, 1a, bolt, 1b, A-frame, 2, ash cake top surface, 2a, circular hole, 2b, sleeve, 3, Ash cake, 4, turnover extracting tool.
Specific embodiment
In order to deepen the understanding of the present invention, below in conjunction with the drawings and specific embodiments, the invention will be further described Illustrate:
A kind of to control the ash cake 3 for pouring ground elevation and turnover extracting tool 4, it is by 2 groups of ash cake pedestal 1, ash cake top surface At.It is made by metal material, can be steel or stainless steel etc., ash cake 3 is by ash cake pedestal 1 and ash cake top surface 2 two Geometry body component composition, the special rotation of turnover extracting tool 4 in ash cake top surface 2 are rotated up to tune by sleeve and bolt The purpose of whole height and installation and disassembly.
Ash cake pedestal 1 is made of A-frame 1b and bolt 1a, and A-frame foot can be fixed on the ground with steel nail, ash cake Top surface is made of the cake face with double circular hole and sleeve, and sleeve adjusts height by the rotation on bolt, with special when rotation Turnover extracting tool operated.
The tool of ash cake device turnover disassembly, the tool lower end are designed as reverse U shape, and T-shaped handle is welded in U-shaped, Two circular holes opened on the width of reverse U shape and cake face are wide, and the insertion circular hole rotation of reverse U shape foot can be adjusted height and tear open It unloads.
When production, an A-frame is welded, the long 35mm of every foot of A-frame, there are drift bolt holes for every foot, vertical A-frame welds the bolt with outer silk of a high 40mm, ash cake pedestal 1 straight up;It is again 50mm's in one piece of diameter The circular hole of two distance 30mm is opened up in circular steel plate, then takes the sleeve with internal thread of one with above-mentioned outer silk bolt matching, It is welded on its center of circle perpendicular to circular steel plate, is made into ash cake top surface 2;It is made into the disassembly head that lower end is in reverse U shape with reinforcing bar, U Font foot spacing 30mm, upper end are T-shaped handle, are welded on the top of reverse U shape disassembly head, turnover extracting tool is made.
In use, being inserted into the matched ash cake top of size therewith with the reverse U shape disassembly head in special turnover extracting tool The circular hole in face rotates ash cake top surface, passes through the purpose for being rotated up to adjustment height and disassembly of sleeve and bolt;According to Ground level requires to adjust height, and every 4 ~ 8 square metres are fixed an ash cake device, and construction terminates, and dismantles ash cake device.
The present invention and its embodiments have been described above, description is not limiting, for the common of this field For technical staff, do not depart from the principles of the present invention and spirit in the case where, can to these specific embodiments into The a variety of change, modification, replacement and modification of row, these are not inventively designed and the same or similar structure of the technical program Device or product and its application method, shall fall within the scope of the present invention.

Claims (2)

1. a kind of matching used turnover extracting tool of ash cake for pouring ground elevation with control, it is characterised in that: the ash Cake includes ash cake pedestal and ash cake top surface, and the ash cake pedestal includes bolt and A-frame, and the A-frame is located at Ground, the bolt of the upper end welding of the A-frame perpendicular to the ground are simultaneously fixed on by steel nail in the lower end of ash cake pedestal;Institute The ash cake top surface stated includes the sleeve that upper end is circular cake face and lower part, circular hole is provided on ash cake cake face, and in cake face The sleeve perpendicular to cake face is welded at the heart, the circular hole is monosymmetric the opening up along cake face diameter, and number is two;Ash Cake top surface adjusts the height in cake face by the rotation of sleeve and ash cake pedestal upper end bolt;Wherein, the outer silk of the bolt band Screw thread, the sleeve band internal thread screw thread, outer silk screw thread match with internal thread screw thread;The long 35mm of every foot of the A-frame, There are drift bolt holes for every foot;The high 40mm of the bolt with outer silk screw thread;The spacing of two circular holes is 30mm;Described Turnover extracting tool includes the T-shaped handle of upper end and the disassembly head of lower end, and the disassembly head is reverse U shape, reverse U shape The T-shaped handle, two circular holes opened up on the width of the reverse U shape disassembly head and cake face are welded on disassembly head Wide, the two stabilizer blades insertion circular hole rotation of reverse U shape can be adjusted the height in cake face and be installed and be dismantled to ash cake.
2. a kind of user that the extracting tool of turnover as described in claim 1 is installed and dismantled to the ash cake Method, it is characterised in that: in use, size is matched therewith with the reverse U shape disassembly head insertion in special turnover extracting tool The circular hole of ash cake top surface rotates ash cake top surface, passes through the mesh for being rotated up to adjustment height and disassembly of sleeve and bolt 's;According to ground level require adjust height, every 4~8 square metres fix one described in ash cake, construction terminates, described in disassembly Ash cake.
CN201610014602.1A 2016-01-11 2016-01-11 Control pours the ash cake and turnover extracting tool of ground elevation Expired - Fee Related CN105544988B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610014602.1A CN105544988B (en) 2016-01-11 2016-01-11 Control pours the ash cake and turnover extracting tool of ground elevation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610014602.1A CN105544988B (en) 2016-01-11 2016-01-11 Control pours the ash cake and turnover extracting tool of ground elevation

Publications (2)

Publication Number Publication Date
CN105544988A CN105544988A (en) 2016-05-04
CN105544988B true CN105544988B (en) 2019-01-29

Family

ID=55824502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610014602.1A Expired - Fee Related CN105544988B (en) 2016-01-11 2016-01-11 Control pours the ash cake and turnover extracting tool of ground elevation

Country Status (1)

Country Link
CN (1) CN105544988B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201386396Y (en) * 2009-02-27 2010-01-20 山东精典建筑科技股份有限公司 Net-rack simple leveling support
CN203175052U (en) * 2013-01-30 2013-09-04 陈开泰 Leveler for building floor beam slab construction
CN105220883A (en) * 2015-10-28 2016-01-06 中国建筑第八工程局有限公司 Monolithic ground level controller and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2796809B2 (en) * 1988-08-27 1998-09-10 株式会社竹中工務店 Concrete press-in method
WO2002099208A1 (en) * 2001-06-02 2002-12-12 Jazzar M Omar A A composite precast cast insitue building system
CN201495782U (en) * 2009-09-11 2010-06-02 中冶京唐建设有限公司 Concrete thickness control frame
CN202913704U (en) * 2012-10-25 2013-05-01 中建六局第三建筑工程有限公司 Controlling flat supporting frame used for a one-time shaping wear resistant terrace safe edge assembly
CN104878677A (en) * 2015-06-01 2015-09-02 马宏 Rotary fine-tuning tool for construction blocks
CN205476514U (en) * 2016-01-11 2016-08-17 中国建筑第二工程局有限公司 Ground concreting construction controlling means

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201386396Y (en) * 2009-02-27 2010-01-20 山东精典建筑科技股份有限公司 Net-rack simple leveling support
CN203175052U (en) * 2013-01-30 2013-09-04 陈开泰 Leveler for building floor beam slab construction
CN105220883A (en) * 2015-10-28 2016-01-06 中国建筑第八工程局有限公司 Monolithic ground level controller and construction method thereof

Also Published As

Publication number Publication date
CN105544988A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN104196235B (en) A kind of movable stencil supports truss and constructional method thereof
CN207526120U (en) Wall is poured with aluminum alloy pattern plate levelling device
CN109667422A (en) A kind of aluminum alloy mould plate bracing device and construction method
CN105544988B (en) Control pours the ash cake and turnover extracting tool of ground elevation
CN207525738U (en) The quick hangs muscle of steel reinforcement cage
CN207392771U (en) A kind of guide type steel column locator
CN205476514U (en) Ground concreting construction controlling means
CN204510255U (en) A kind of levelling device
CN209011568U (en) A kind of adjustable-angle template reinforcing device
CN106121227B (en) A kind of moldboard reinforcing tool and the method using its progress pier formwork reinforcement
CN208152581U (en) A kind of concreting bucket device flexible and convenient to use
CN106284683A (en) A kind of novel conjoined weldment being embedded between frame structure and filling wall
CN203050207U (en) Cone hopper bin jig frame formwork
CN114790755A (en) Concrete raft board post-cast strip construction joint template
CN210421911U (en) Early-dismantling supporting device for building engineering
CN210342669U (en) Anti-bank activity reinforcing apparatus of cast in situ concrete
CN107419897A (en) A kind of reinforcing mould of windowsill coping formwork
CN208328716U (en) A kind of auxiliary construction structure of bridge box and beam
CN209308414U (en) A kind of builder's road formula stair step punching block
CN106437144B (en) Turn over beam die plate reinforcing device
CN208281966U (en) Built-in fitting is used in a kind of installation of street lamp
CN205857703U (en) On turn over beam die plate reinforcing device
CN207793818U (en) The support construction of concrete blinding
CN205572190U (en) System of sandblasting of controllable flow
CN209350470U (en) The fixed device of unidirectional adjustable built-in fitting for casting concrete prefabricated member

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190129

CF01 Termination of patent right due to non-payment of annual fee