CN105530611B - Server and control method - Google Patents
Server and control method Download PDFInfo
- Publication number
- CN105530611B CN105530611B CN201510963835.1A CN201510963835A CN105530611B CN 105530611 B CN105530611 B CN 105530611B CN 201510963835 A CN201510963835 A CN 201510963835A CN 105530611 B CN105530611 B CN 105530611B
- Authority
- CN
- China
- Prior art keywords
- processing equipment
- terminal
- information
- equipment
- control information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/02—Services making use of location information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0212—Power saving arrangements in terminal devices managed by the network, e.g. network or access point is master and terminal is slave
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0225—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal
- H04W52/0235—Power saving arrangements in terminal devices using monitoring of external events, e.g. the presence of a signal where the received signal is a power saving command
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0209—Power saving arrangements in terminal devices
- H04W52/0261—Power saving arrangements in terminal devices managing power supply demand, e.g. depending on battery level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Abstract
The present invention provides a kind of server and its control method, according to the location information of the terminal of the portable mobile phone of user, smartwatch, bracelet etc., more suitably carries out power supply status control to the processing equipment of user.Control method is applied to the control method for the server connecting at least one processing equipment, and the control method includes: the location information for obtaining first terminal corresponding with the first user;According to the location information of the first terminal, the control information for the first processing equipment corresponding with the first user at least one processing equipment is generated;The control information is sent to first processing equipment.Wherein, the control information is used to carry out power supply status control in first processing equipment.
Description
Technical field
The present invention relates to server and its control methods, and in particular to according to the location information of user come the place to the user
Manage server and its control method that equipment carries out power supply status control.
Background technique
Processing equipment of the user using PC etc., required information processing of being lived or worked.In user
After having used processing equipment, usually forget to close the processing equipment because of carelessness, so as to cause the waste of the energy.
In addition, when user opens the processing equipment of PC etc., in order to complete the initialization of hardware detection etc.
Operation and system update and need to start the time.If user need promptly using processing equipment handle, to user with
It is inconvenient to come.
Summary of the invention
The present invention completes in view of the above problems, its purpose is to provide a kind of server and its control method, according to
The location information of the terminal of the portable mobile phone in family, smartwatch, bracelet etc., more suitably sets the processing of user
It is standby to carry out power supply status control.
According to an aspect of the present invention, a kind of control applied to the server connecting at least one processing equipment is provided
Method processed.The control method includes: the location information for obtaining first terminal corresponding with the first user;Eventually according to described first
The location information at end generates the control letter for the first processing equipment corresponding with the first user at least one processing equipment
Breath;The control information is sent to first processing equipment.Wherein, the control information is used in first processing
Power supply status control is carried out in equipment.
According to another aspect of the present invention, a kind of server connecting at least one processing equipment is provided.The service
Device includes: location information acquiring unit, is configured to obtain the location information of first terminal corresponding with the first user;Control information
Generation unit, configuration come according to the location information of the first terminal, generate at least one processing equipment with first
The control information of corresponding first processing equipment of user;Communication unit can be communicated at least one processing equipment, configuration
The control information is sent to first processing equipment.Wherein, the control information is used in first processing
Power supply status control is carried out in equipment.
Server according to the present invention and its control method, can according to the location information of the portable terminal of user,
Power supply status control more suitably is carried out to the processing equipment of user, so as to energy saving, raising treatment effeciency is promoted
The usage experience of user.
Detailed description of the invention
Fig. 1 is the schematic diagram for indicating the usage scenario of embodiments of the present invention.
Fig. 2 is the functional block diagram for indicating the server of embodiments of the present invention.
Fig. 3 is the flow chart for indicating the control method of embodiments of the present invention.
Specific embodiment
In the following, being explained with reference to embodiments of the present invention.Description referring to the drawings is provided, with help to by
The understanding of example embodiment of the invention defined by appended claims and their equivalents.It include help to understand it is various specific
Details, but they can only be counted as illustratively.It therefore, it would be recognized by those skilled in the art that can be to reality described herein
The mode of applying makes various changes and modifications, without departing from scope and spirit of the present invention.Moreover, in order to keep specification clearer
Succinctly, by omission pair it is well known that the detailed description of function and construction.
Fig. 1 is the schematic diagram for indicating the usage scenario of embodiments of the present invention.Usage scenario shown in FIG. 1 is, for example, public affairs
The working environment of department, but embodiments of the present invention are not limited to this, also can be applied to others and need suitably to user
Processing equipment carry out power supply status control environment.
As shown in Figure 1, including terminal 1, network access equipment 2, service in the usage scenario of embodiments of the present invention
Device 3 and processing equipment 4.In addition, according to specific application scenarios network access facility can also be executed by server 3, thus not
Including network access equipment 2.That is, in the case where executing network access facility by server 3, including terminal 1,3 and of server
Processing equipment 4.
As shown in Figure 1, user carries the terminal 1 of mobile phone, smartwatch, bracelet etc..In use for example shown in FIG. 1
In scene, terminal 1 can at least one network access equipment 2 (for example, network access equipment 2-1, network access equipment 2-2,
Network access equipment 2-3, hereafter referred to collectively as network access equipment 2) connection, so as to be linked into internet, local area network etc.
Network.At least one network access equipment 2 is, for example, the network access equipment of router, exchanger etc., for accessing terminal 1
To network, and network access equipment 2 can be communicated with server 3.Specifically, as described later, network access equipment 2 will
Location information about terminal 1 is sent to server 3.
In addition, in the case where executing network access facility to not include network access equipment 2 by server 3, terminal
1 connect with server 3, terminal 1 is linked into network by server 3, and sent out the location information about terminal 1 by terminal 1
Give server 3.
Server 3 is connect at least one processing equipment 4, carries out electricity to processing equipment 4 based on the location information of terminal 1
The control of source state.Specifically, server 3 sends for example for making processing equipment 4 be in unlatching, closing, suspend mode processing equipment 4
Etc. states control information.Wherein, server 3 can carry out power supply to multiple processing equipment 4 corresponding with multiple users
State control.Specifically, server 3 generates corresponding with user A for controlling according to the location information of the user A terminal 1 carried
Processing equipment 4 power supply status control information.For another example, location information of the server 3 according to the user B terminal 1 carried, life
At the control information of the power supply status for controlling processing equipment 4 corresponding with user B.Server 3 for example can be to public affairs as a result,
The processing equipment 4 of PC used in the staff of department etc. carries out power supply status control respectively.
Processing equipment 4 is, for example, the processing equipment of PC etc., and is receiving the control information from server 3
In the case where, the power supply status of oneself is controlled according to the control information.For example, receiving for making processing equipment 4
In the case where control information in a dormant state, the power supply status of oneself is set dormant state by processing equipment 4.For another example,
In the case where receiving for making the control information in the open state of processing equipment 4, processing equipment 4 is by the power supply shape of oneself
State is set on state.
In the following, illustrating the server 3 of embodiments of the present invention referring to Fig. 2.Fig. 2 is to indicate implementation of the invention
The functional block diagram of the server of mode.
As shown in Fig. 2, server 3 includes location information acquiring unit 301, control information generating unit 302, communication unit
303。
Wherein, as described above, server 3 can control and the user according to the location information of the terminal 1 entrained by user
The power supply status of corresponding processing equipment 4.For example, server 3 can be directed in the case where being applied to the working environment of company
All employees of company, the location information of terminal 1 according to entrained by employee control processing equipment 4 corresponding with the employee
Power supply status.
Location information acquiring unit 301 obtains the location information of first terminal corresponding with the first user.Wherein, position is believed
Breath acquiring unit 301 is directed at least one the corresponding user of at least one processing equipment 4 connecting with the server 3, obtains
Take the location information of terminal 1 entrained by least one user.
For example, it is assumed that processing equipment 4A, 4B and 4C are connect with server 3, wherein processing equipment 4A is corresponding with user A, place
Reason equipment 4B is corresponding with user B, and processing equipment 4C is corresponding with user C.Also, the terminal that user A is carried is terminal 1A, user B
The terminal of carrying is terminal 1B, and the terminal that user C is carried is terminal 1C.Wherein, the number for the processing equipment being connect with server 3
I.e. the not limited to of user schedules 3, is also possible to other numbers.
Specifically, under scene shown in Fig. 1, server 3 is connect at least one network access equipment 2.Server 3 from
Network access equipment 2 receives the first distance information about the network access equipment at a distance from the first terminal.
Wherein, in network access equipment 2, if the terminal 1A that user A is carried enters the net of the network access equipment 2
Network coverage area, then the network access equipment 2 can execute network access facility to terminal 1A, such as according to reception power etc.
It calculates at a distance from terminal 1A, and will be sent to about the range information of the network access equipment 2 at a distance from terminal 1A
Server 3.In addition, enter the network coverages of other network equipments 2 simultaneously in the terminal 1A that user A is carried, then this its
His network access equipment 2 can also calculate at a distance from terminal 1A such as according to receiving power, and will be about this its
Range information of his network access equipment 2 at a distance from terminal 1A is sent to server 3.
As a result, in server 3, for terminal 1A can from least one network access equipment 2 receive at least one away from
From information.For example, as shown in Figure 1, server 3 can be respectively from three network access equipments 2 (network access equipment 2-1, network
Access device 2-2, network access equipment 2-3) it receives and (is connect for example, respectively indicating network about three range informations of terminal 1A
Enter equipment 2-1 and terminal 1A distance D1, network access equipment 2-2 and terminal 1A distance D2, network access equipment 2-3 and end
Hold the distance D3 of 1A).In addition, terminal 1A can also enter the network coverage of the network access equipment 2 of greater number, from
And the network access equipment 2 of greater number sends the range information with terminal 1A.
At this point, location information acquiring unit 301 can according to from least one network access equipment it is received at least one
Range information generates the location information of first terminal.
For example, the acquisition of location information acquiring unit 301 is received at a distance from terminal 1A from three network access equipments 2
D1, with terminal 1A distance D2, with terminal 1A distance D3, and referring to the allocation position of three network access equipments 2, thus
Generate the location information of terminal 1A.In addition, receiving the range information with terminal 1A from the network access equipment 2 of greater number
In the case where, it can use more range informations, to improve the accuracy of location information generated.
Wherein, in server 3, the allocation position of each network access equipment 2 can be stored in advance, it can also be by network
When access device 2 sends the first distance information about first terminal, while sending the configuration bit of network access equipment 2 oneself
It sets.
In addition, in the case where executing network access facility to not include network access equipment 2 by server 3, terminal
1 connect with server 3, so that server 3 executes network access facility.At this point, location information acquiring unit 301 can directly from
First terminal obtains the location information of first terminal corresponding with the first user.
For example, generating the location information of terminal 1A by GPS module, and connect it with server 3 in terminal 1A
The location information is sent to server 3 afterwards.Location information acquiring unit 301 can be obtained directly from terminal 1A and should as a result,
The corresponding location information of terminal 1A.Wherein, it is not limited to generate location information by GPS module in terminal 1A, can also lead to
Cross the location information that other modes obtain oneself.
In addition, in embodiments of the present invention, such as all employees of company, the terminal according to entrained by employee
1 location information controls the power supply status of processing equipment 4 corresponding with the employee.At this point, server 3 is not directed to other staff
The terminal of carrying obtains its location information.Although being serviced for example, terminal entrained by the client of company is connect with server 3
Device 3 will not receive its location information from the terminal.In addition, terminal entrained by the client of company enters network access equipment 2
Network coverage, network access equipment 2 will not calculate the position with the terminal.
In the above description, to be illustrated for obtaining the location information of terminal 1A, but in reality of the invention
It applies in mode, the location information of the location information, terminal 1C that also obtain terminal 1B is so as to processing equipment 4B and processing equipment 4C
Carry out power supply status control.That is, in embodiments of the present invention, being set at least one processing being connect with server 3
Terminal entrained by standby corresponding user, obtains its location information, all in order to all processing equipments connected to server
Carry out power supply status control.
Information generating unit 302 is controlled according to the location information of first terminal, is generated at least one processing equipment
The first processing equipment corresponding with the first user control information.
Specifically, control information generating unit 302 is generated according to the location information of terminal 1A for corresponding with terminal 1A
The control information of processing equipment 4A.Equally, control information generating unit 302 is generated according to the location information of terminal 1B for place
The control information for managing equipment 4B generates the control information for being directed to processing equipment 4C according to the location information of terminal 1C.For example,
The identifier of terminal 1A and the identifier of processing equipment 4A are stored in server 3 in association, to indicate terminal 1A and processing
Equipment 4A is corresponded to each other.It is for which thereby, it is possible to the control information for determining the location information according to first terminal and generating
The control information of processing equipment.
Preferably, control information generating unit 302 judges the movement shape of first terminal according to the location information of first terminal
State is generated in the case where the motion state of first terminal is close to the first processing equipment for being in the first processing equipment
The control information of first state.And then preferably, in the case where the motion state of first terminal is to leave the first processing equipment,
Information generating unit 302 is controlled to generate for making the first processing equipment be in the control information of the second state.
For example, control information generating unit 302 judges the motion state of terminal 1A according to the location information of terminal 1A.Tool
Body, in the case where terminal 1A becomes smaller at a distance from processing equipment 4A, it can judge that the motion state of terminal 1A is close
Processing equipment 4A can judge the motion state of terminal 1A in the case where terminal 1A becomes larger at a distance from processing equipment 4A
To leave processing equipment 4A.For example, the location information of processing equipment 4 connected to it is stored in server 3, so as to
Calculate the distance between first terminal and the first processing equipment.
Specifically, the allocation position of each processing equipment 4 is previously stored in server 3, thus judging that first is whole
The allocation position of processing equipment 4 corresponding with first terminal can be referred to when the motion state at end.For example, judging terminal 1A's
When motion state, according to the allocation position of the location information of terminal 1A and processing equipment 4A corresponding with terminal 1A come computing terminal
1A is at a distance from processing equipment 4A.In addition, the allocation position of each processing equipment 4 is not previously stored in server 3
In the case of, such as receive from first terminal the allocation position of corresponding with first terminal processing equipment, or by with the first end
Corresponding processing equipment is held to receive the allocation position of the processing equipment.
In turn, control information generating unit 302 is the feelings close to processing equipment 4A in the motion state for being judged as terminal 1A
Under condition, the control information for opening the processing equipment 4A is generated.Specifically, such as under usage scenario shown in Fig. 1,
When going to work in employee's morning, the motion state of terminal 1A entrained by user is close to processing equipment 4A.By close in employee
When processing equipment 4A, processing equipment 4A is opened in advance, so as to save complete hardware detection etc. initialization operation and
System update and the starting time needed.If user needs promptly to handle using processing equipment, due to opening in advance
Processing equipment 4A, so as to improve treatment effeciency.
In turn, control information generating unit 302 is being judged as that the motion state of terminal 1A is to leave the feelings of processing equipment 4A
Under condition, the control information for closing the processing equipment 4A is generated.Specifically, such as under usage scenario shown in Fig. 1,
When employee comes off duty at night, it may forget to close processing equipment 4A, cause processing equipment 4A one in the state of being not used
Direct-open leads to the waste of the energy.By generating for closing the processing equipment 4A when employee leaves processing equipment 4A
Control information avoid the waste of the energy so that processing equipment 4A can be automatically closed.
In addition, control information generating unit 302 is being judged as that the motion state of terminal 1A is to leave the feelings of processing equipment 4A
In the scheme for generating the control information for closing the processing equipment 4A under condition, under usage scenario shown in Fig. 1, such as
Employee leaves station and participates under the situations such as brief meeting, and processing equipment 4A may be closed.At this point, having been participated in employee
When returning to station after brief meeting, it is also necessary to reopen processing equipment 4A, lead to the open and close time of processing equipment 4A
Number increases, and has an impact to service life.
Therefore, in the present invention, control information generating unit 302 calculates at first terminal and first according to location information
The distance for managing equipment is less than the movement shape of preset range and first terminal in first terminal at a distance from the first processing equipment
State is in the case where leaving the first processing equipment, to generate for making the first processing equipment be in the control information of the third state.
Specifically, in terminal 1A at a distance from processing equipment 4A be less than preset range (be, for example, less than 100 meters, can basis
The size of working environment and suitably set) when, the motion state for being judged as terminal 1A be leave processing equipment 4A the case where
Under, it generates for making the control information of processing equipment 4A in a dormant state.In addition, in terminal 1A at a distance from processing equipment 4A
When greater than preset range, in the case where being judged as the motion state of terminal 1A is to leave processing equipment 4A, generate for making to locate
The control information that reason equipment 4A is in close state.
As a result, under usage scenario shown in Fig. 1, such as employee is of short duration in the case where leave station in office space,
It generates for making the control information of processing equipment in a dormant state, rather than generates for being in close state processing equipment
Control information.To be set as dormant state in the scenario above, therefore when employee again returns to station, Neng Gougeng
Adding rapidly makes processing equipment in the open state, and can be energy saving compared with open state.
Back to Fig. 2, communication unit 303 can be communicated at least one processing equipment, will be generated by control information
The control information that unit 302 generates is sent to the first processing equipment.
Specifically, it is being generated based on the location information of first terminal for first by control information generating unit 302
After the control information for managing equipment (corresponding with first terminal), which is sent to the first processing by communication unit 303
Equipment.For example, communication unit 303 by by control information generating unit 302 based on terminal 1A location information generate, be used to make
Processing equipment 4A is in the open state, the control information of closed state, dormant state etc., is sent to processing equipment 4A.
In addition, as described above, server 3 is connect at least one network access equipment 2 under scene shown in Fig. 1.Clothes
Business device 3 receives the first distance information about network access equipment at a distance from the first terminal from network access equipment 2.This
When, server 3 is received about network access equipment at a distance from first terminal by communication unit 303 from network access equipment 2
First distance information.
It is used to carry out electricity in the first processing equipment by the control information that communication unit 303 is sent to the first processing equipment
Source control.
For example, receiving from server 3 the control information for keeping processing equipment in the open state in processing equipment 4A
In the case where, processing equipment 4A is in the open state by this equipment.For another example, it receives and is used for from server 3 in processing equipment 4A
In the case where the control information for being in close state processing equipment, this equipment is in close state by processing equipment 4A.Locating
In the case that reason equipment 4A is received for making the control information of processing equipment in a dormant state from server 3, processing equipment
4A by this equipment in a dormant state.In addition, receiving in processing equipment 4B and processing equipment 4C from server 3
In the case where controlling information, also similarly handled.Wherein, it in processing equipment 4, can be received always from server 3
Control information.Even if processing equipment 4 is in close state, the control information from server 3 can be also received.
The server 3 of embodiment according to the present invention, can be according to the location information of the portable terminal of user, more
Add and power supply status control suitably is carried out to the processing equipment of user, so as to energy saving, raising treatment effeciency is promoted and used
The usage experience at family.
In the following, illustrating the control method of embodiments of the present invention referring to Fig. 3.Fig. 3 is to indicate embodiment party of the invention
The flow chart of the control method of formula.
Control method shown in Fig. 3 can be applied to the server connecting at least one processing equipment.For example, can answer
For the server 3 under usage scenario shown in FIG. 1.
Wherein, as described above, including terminal 1, network access equipment 2,3 and of server in usage scenario shown in Fig. 1
Processing equipment 4.In addition, according to specific application scenarios network access facility can also be executed by server 3, to not include
Network access equipment 2.For example, terminal 1 is, for example, mobile phone, smartwatch, the bracelet etc. that user carries, at least one network insertion
Equipment 2 is, for example, router, exchanger etc., and processing equipment 4 is, for example, PC etc..
Specifically, location information of the server 3 based on terminal 1 sends for example for making processing equipment 4 processing equipment 4
Control information in states such as unlatching, closing, suspend mode.Wherein, server 3 can be to corresponding with multiple users multiple
Processing equipment 4 carries out power supply status control.Specifically, server 3 is generated and is used according to the location information of the user A terminal 1 carried
In the control information for the power supply status for controlling processing equipment 4A corresponding with user A.For another example, server 3 is carried according to user B
The location information of terminal 1 generates the control information of the power supply status for controlling processing equipment 4B corresponding with user B.As a result,
Server 3 is such as processing equipment 4 capable of carrying out respectively power supply such as PC used in the staff to company
State control.
In step sl, the location information of first terminal corresponding with the first user is obtained.
Specifically, in the case where being applied to server 3 shown in Fig. 2, location information acquiring unit 301 is directed to and the clothes
At least one corresponding user of at least one processing equipment 4 that business device 3 connects, obtains entrained by least one user
The location information of terminal 1.
For example, it is assumed that processing equipment 4A, 4B and 4C are connect with server 3, wherein processing equipment 4A is corresponding with user A, place
Reason equipment 4B is corresponding with user B, and processing equipment 4C is corresponding with user C.Also, the terminal that user A is carried is terminal 1A, user B
The terminal of carrying is terminal 1B, and the terminal that user C is carried is terminal 1C.In the following description, to obtain the position of terminal 1A
It is illustrated for information, but in embodiments of the present invention, also obtain the location information of terminal 1B, the position of terminal 1C
Confidence breath is so as to processing equipment 4B and processing equipment 4C progress power supply status control.
Under scene shown in Fig. 1, server 3 is connect at least one network access equipment 2.Server 3 connects from network
Enter first distance information of the reception of equipment 2 about the network access equipment at a distance from the first terminal.
At this point, step S1 includes being received from network access equipment about network access equipment at a distance from the first terminal
First distance information the step of.
Wherein, in network access equipment 2, if the terminal 1A that user A is carried enters the net of the network access equipment 2
Network coverage area, then the network access equipment 2 can execute network access facility to terminal 1A, such as according to reception power etc.
It calculates at a distance from terminal 1A, and will be sent to about the range information of the network access equipment 2 at a distance from terminal 1A
Server 3.In addition, enter the network coverages of other network equipments 2 simultaneously in the terminal 1A that user A is carried, then this its
His network access equipment 2 can also calculate at a distance from terminal 1A such as according to receiving power, and will be about this its
Range information of his network access equipment 2 at a distance from terminal 1A is sent to server 3.
It, can be from least one network access equipment 2 for terminal 1A by communication unit 303 as a result, in server 3
Receive at least one range information.For example, as shown in Figure 1, communication unit 303 can be respectively from three 2 (nets of network access equipment
Network access device 2-1, network access equipment 2-2, network access equipment 2-3) three range information (examples of the reception about terminal 1A
Such as, network access equipment 2-1 and terminal 1A distance D1, network access equipment 2-2 and terminal 1A distance D2, net are respectively indicated
Network access device 2-3 and terminal 1A distance D3).In addition, terminal 1A can also enter the network access equipment 2 of greater number
Network coverage, so that the network access equipment 2 of greater number is sent and the range information of terminal 1A.
In turn, step S1 includes generating according to from least one received range information of at least one network access equipment
The step of location information of first terminal.
For example, location information acquiring unit 301 is obtained from three nets in the case where being applied to server 3 shown in Fig. 2
Network access device 2 it is received with terminal 1A distance D1, with terminal 1A distance D2, with terminal 1A distance D3, and referring to this
The allocation position of three network access equipments 2, to generate the location information of terminal 1A.In addition, in the net from greater number
In the case that network access device 2 receives the range information with terminal 1A, it can use more range informations, given birth to improve
At location information accuracy.Wherein, in server 3, the configuration bit of each network access equipment 2 can be stored in advance
It sets, when can also send the first distance information about first terminal by network access equipment 2, while sending network access equipment
2 oneself allocation positions.
In addition, in the case where executing network access facility to not include network access equipment 2 by server 3, terminal
1 connect with server 3, so that server 3 executes network access facility.At this point, in step sl, location information acquiring unit
301 can directly obtain the location information of first terminal corresponding with the first user from first terminal.
For example, generating the location information of terminal 1A by GPS module, and connect it with server 3 in terminal 1A
The location information is sent to server 3 afterwards.Location information acquiring unit 301 can be obtained directly from terminal 1A and should as a result,
The corresponding location information of terminal 1A.Wherein, it is not limited to generate location information by GPS module in terminal 1A, can also lead to
Cross the location information that other modes obtain oneself.
Back to Fig. 3, in step s 2, according to the location information of first terminal, generates and be directed at least one processing equipment
In the first processing equipment corresponding with the first user control information.
Specifically, in the case where being applied to server 3 shown in Fig. 2, information generating unit 302 is controlled according to terminal 1A
Location information, generate be directed to processing equipment 4A corresponding with terminal 1A control information.Equally, information generating unit is controlled
302, according to the location information of terminal 1B, generate the control information for being directed to processing equipment 4B, raw according to the location information of terminal 1C
At the control information for being directed to processing equipment 4C.For example, storing the identifier of terminal 1A in association in server 3 and processing is set
The identifier of standby 4A, to indicate that terminal 1A and processing equipment 4A is corresponded to each other.Thereby, it is possible to determine the position according to first terminal
The control information that confidence is ceased and generated is to be directed to the control information of which processing equipment.
Preferably, the step of step S2 includes the location information according to first terminal, judges the motion state of first terminal.
Specifically, control information generating unit 302 judges the motion state of terminal 1A according to the location information of terminal 1A.Specifically, exist
In the case that terminal 1A becomes smaller at a distance from processing equipment 4A, it can judge that the motion state of terminal 1A is close to processing equipment
4A can judge that the motion state of terminal 1A is to leave place in the case where terminal 1A becomes larger at a distance from processing equipment 4A
Manage equipment 4A.For example, being stored with the location information of processing equipment 4 connected to it, in server 3 so as to calculate
The distance between one terminal and the first processing equipment.Specifically, matching for each processing equipment 4 is previously stored in server 3
Seated position, so that the configuration of processing equipment 4 corresponding with first terminal can be referred in the motion state for judging first terminal
Position.For example, being set when judging the motion state of terminal 1A according to the location information of terminal 1A and processing corresponding with terminal 1A
The allocation position of standby 4A carrys out computing terminal 1A at a distance from processing equipment 4A.In addition, not being previously stored in server 3 each
In the case where the allocation position of a processing equipment 4, such as from first terminal receive corresponding with first terminal processing equipment
Allocation position, or receive by processing equipment corresponding with first terminal the allocation position of the processing equipment.
In turn, step S2 further includes generating in the case where the motion state of first terminal is close to the first processing equipment
For making first processing equipment be in the control information of first state.
Specifically, in server 3 shown in Fig. 2, information generating unit 302 is controlled in the movement shape for being judged as terminal 1A
In the case that state is close processing equipment 4A, the control information for opening the processing equipment 4A is generated.Specifically, such as
Under usage scenario shown in Fig. 1, when going to work in employee's morning, the motion state of terminal 1A entrained by user is close to processing
Equipment 4A.By in advance opening processing equipment 4A when employee is close to processing equipment 4A, hardware inspection is completed so as to save
The initialization operation and system update surveyed etc. and starting time for needing.If user needs promptly to carry out using processing equipment
When processing, due to opening processing equipment 4A in advance, so as to improve treatment effeciency.
In turn, step S2 further includes generating in the case where the motion state of first terminal is to leave the first processing equipment
For making the first processing equipment be in the control information of the second state.
Specifically, in server 3 shown in Fig. 2, information generating unit 302 is controlled in the movement shape for being judged as terminal 1A
State is in the case where leaving processing equipment 4A, to generate the control information for closing the processing equipment 4A.Specifically, such as
Under usage scenario shown in Fig. 1, when employee comes off duty at night, it may forget to close processing equipment 4A, lead to processing equipment
4A is always in the state of being not used, and leads to the waste of the energy.By generating and using when employee leaves processing equipment 4A
The wave of the energy is avoided so that processing equipment 4A can be automatically closed in the control information for closing the processing equipment 4A
Take.
And then preferably, in step s 2, according to location information, first terminal is calculated at a distance from the first processing equipment;
The motion state for being less than preset range and first terminal at a distance from the first processing equipment in first terminal is to leave at first
In the case where managing equipment, generate for making the first processing equipment be in the control information of the third state.
Specifically, in server 3 shown in Fig. 2, control information generating unit 302 calculates first according to location information
Terminal is less than preset range and first at a distance from the first processing equipment, in first terminal at a distance from the first processing equipment
The motion state of terminal is in the case where leaving the first processing equipment, to generate for making the first processing equipment be in the third state
Control information.For example, terminal 1A at a distance from processing equipment 4A be less than preset range (be, for example, less than 100 meters, can be according to work
Make the size of environment and suitably set) when, in the case where being judged as the motion state of terminal 1A is to leave processing equipment 4A,
It generates for making the control information of processing equipment 4A in a dormant state.In addition, big at a distance from processing equipment 4A in terminal 1A
When preset range, in the case where being judged as the motion state of terminal 1A is to leave processing equipment 4A, generate for making to handle
The control information that equipment 4A is in close state.
As a result, under usage scenario shown in Fig. 1, such as employee is of short duration in the case where leave station in office space,
It generates for making the control information of processing equipment in a dormant state, rather than generates for being in close state processing equipment
Control information.To be set as dormant state in the scenario above, therefore when employee again returns to station, Neng Gougeng
Adding rapidly makes processing equipment in the open state, and can be energy saving compared with open state.
Back to Fig. 3, in step s3, the control information generated in step s 2 is sent to first processing and is set
It is standby.
Specifically, in the case where being applied to server 3 shown in Fig. 2, communication unit 303 can be at least one processing
Equipment is communicated, and the control information generated by control information generating unit 302 is sent to the first processing equipment.Specifically,
It is being generated for the first processing equipment (eventually with first by control information generating unit 302 based on the location information of first terminal
Hold corresponding) control information after, which is sent to the first processing equipment by communication unit 303.For example, communication unit
Member 303 by it is being generated by control information generating unit 302 based on the location information of terminal 1A, be used to making processing equipment 4A to be in opening
The control information for opening state, closed state, dormant state etc., is sent to processing equipment 4A.
Wherein, the control information for being sent to the first processing equipment is used to carry out power supply control in the first processing equipment.
For example, in the case where processing equipment 4A is received from server 3 for making processing equipment control information in the open state,
Processing equipment 4A is in the open state by this equipment.For another example, it is received from server 3 for making processing equipment in processing equipment 4A
In the case where the control information being in close state, this equipment is in close state by processing equipment 4A.Processing equipment 4A from
In the case that server 3 is received for making the control information of processing equipment in a dormant state, processing equipment 4A is by this equipment
In a dormant state.In addition, receiving the control information from server 3 in processing equipment 4B and processing equipment 4C
In the case of, also similarly handled.Wherein, in processing equipment 4, the control information from server 3 can be received always.
Even if processing equipment 4 is in close state, the control information from server 3 can be also received.
The control method of embodiment according to the present invention, can according to the location information of the portable terminal of user,
Power supply status control more suitably is carried out to the processing equipment of user, so as to energy saving, raising treatment effeciency is promoted
The usage experience of user.
Those of ordinary skill in the art may be aware that being incorporated in each unit and step of embodiments of the present invention description
Suddenly, it can be realized with electronic hardware, computer software, or a combination of the two.And software module can be placed in arbitrary form
Computer storage medium in.In order to clearly illustrate the interchangeability of hardware and software, in the above description according to function
Each exemplary composition and step can be generally described.These functions are implemented in hardware or software actually, are depended on
In the specific application and design constraint of technical solution.Those skilled in the art can use not each specific application
Described function is realized with method, but such implementation should not be considered as beyond the scope of the present invention.
Each embodiment of the invention has been described in detail above.However, it should be appreciated by those skilled in the art that not
In the case where being detached from the principle and spirit of the invention, these embodiments can be carry out various modifications, combination or sub-portfolio, and
Such modification should be fallen within the scope of the present invention.
Claims (6)
1. a kind of control method, applied to the server connecting at least one processing equipment, the control method includes:
Obtain the location information of first terminal corresponding with the first user;
According to the location information of the first terminal, generate for corresponding with the first user at least one processing equipment
The control information of one processing equipment;
The control information is sent to first processing equipment,
Wherein, the control information is used to carry out power supply status control in first processing equipment;
Wherein,
According to the location information of the first terminal, generate for corresponding with the first user at least one processing equipment
The step of control information of one processing equipment includes:
In the case where the motion state of the first terminal is to leave first processing equipment, generate for making described first
Processing equipment is in the control information of the second state;
Wherein,
According to the location information of the first terminal, generate for corresponding with the first user at least one processing equipment
The step of control information of one processing equipment includes:
According to the positional information, the first terminal is calculated at a distance from first processing equipment;
It is less than the movement of preset range and the first terminal at a distance from first processing equipment in the first terminal
State is in the case where leaving first processing equipment, to generate for making first processing equipment be in the control of the third state
Information processed.
2. control method as described in claim 1, wherein
The server is connect at least one network access equipment,
The step of obtaining the location information of corresponding with the first user first terminal include:
The first distance about the network access equipment at a distance from the first terminal is received from the network access equipment
Information;
According to from least one received range information of at least one network access equipment, the position letter of the first terminal is generated
Breath.
3. control method according to claim 1, wherein
According to the location information of the first terminal, generate for corresponding with the first user at least one processing equipment
The step of control information of one processing equipment further include:
According to the positional information, judge the motion state of the first terminal;
The first terminal motion state be the first terminal between first processing equipment at a distance from become smaller
In the case of, it generates for making first processing equipment be in the control information of first state.
4. a kind of server is connect at least one processing equipment, the server includes:
Location information acquiring unit configures to obtain the location information of first terminal corresponding with the first user;
Information generating unit is controlled, configuration carrys out the location information according to the first terminal, generates and sets at least one processing
The control information of the first processing equipment corresponding with the first user in standby;
Communication unit can be communicated at least one processing equipment, and the control information is sent to described the by configuration
One processing equipment,
Wherein, the control information is used to carry out power supply status control in first processing equipment;
Wherein,
In the case where the motion state of the first terminal is to leave first processing equipment, the control information generates single
Member is generated for making first processing equipment be in the control information of the second state;
Wherein,
The control information generating unit according to the positional information, calculates the first terminal and first processing equipment
Distance is less than the fortune of preset range and the first terminal in the first terminal at a distance from first processing equipment
Dynamic state is in the case where leaving first processing equipment, to generate for making first processing equipment be in the third state
Control information.
5. server as claimed in claim 4, wherein
The server is connect at least one network access equipment,
The communication unit can be communicated at least one network access equipment, be configured to connect from the network access equipment
The first distance information about the network access equipment at a distance from the first terminal is received,
The location information acquiring unit is generated according to from least one received range information of at least one network access equipment
The location information of the first terminal.
6. server as claimed in claim 4,
Wherein,
The control information generating unit according to the positional information, judges the motion state of the first terminal, described
The motion state of one terminal is in the case that the distance between the first terminal and first processing equipment become smaller, to generate and use
In the control information for making first processing equipment be in first state.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510963835.1A CN105530611B (en) | 2015-12-21 | 2015-12-21 | Server and control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510963835.1A CN105530611B (en) | 2015-12-21 | 2015-12-21 | Server and control method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105530611A CN105530611A (en) | 2016-04-27 |
CN105530611B true CN105530611B (en) | 2019-07-26 |
Family
ID=55772524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510963835.1A Active CN105530611B (en) | 2015-12-21 | 2015-12-21 | Server and control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105530611B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1488542A1 (en) * | 2002-03-11 | 2004-12-22 | Ting-Mao Chang | Proximity triggered job scheduling system and method |
CN101916551A (en) * | 2010-08-24 | 2010-12-15 | 福建捷联电子有限公司 | Energy-saving display |
CN201698323U (en) * | 2010-05-26 | 2011-01-05 | 宏碁电脑(上海)有限公司 | Computer with display control function |
CN102984039A (en) * | 2012-11-06 | 2013-03-20 | 鸿富锦精密工业(深圳)有限公司 | Intelligent gateway system and intelligent housing system and intelligent control method of household appliances |
CN103546509A (en) * | 2012-07-13 | 2014-01-29 | 云联(北京)信息技术有限公司 | Resource-saving cloud service system and resource saving method |
CN104133459A (en) * | 2014-08-13 | 2014-11-05 | 英华达(南京)科技有限公司 | Method and system for controlling intelligent household device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102495617A (en) * | 2011-12-29 | 2012-06-13 | 深圳Tcl新技术有限公司 | Intelligent household air-conditioning system with linkage function |
-
2015
- 2015-12-21 CN CN201510963835.1A patent/CN105530611B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1488542A1 (en) * | 2002-03-11 | 2004-12-22 | Ting-Mao Chang | Proximity triggered job scheduling system and method |
CN201698323U (en) * | 2010-05-26 | 2011-01-05 | 宏碁电脑(上海)有限公司 | Computer with display control function |
CN101916551A (en) * | 2010-08-24 | 2010-12-15 | 福建捷联电子有限公司 | Energy-saving display |
CN103546509A (en) * | 2012-07-13 | 2014-01-29 | 云联(北京)信息技术有限公司 | Resource-saving cloud service system and resource saving method |
CN102984039A (en) * | 2012-11-06 | 2013-03-20 | 鸿富锦精密工业(深圳)有限公司 | Intelligent gateway system and intelligent housing system and intelligent control method of household appliances |
CN104133459A (en) * | 2014-08-13 | 2014-11-05 | 英华达(南京)科技有限公司 | Method and system for controlling intelligent household device |
Also Published As
Publication number | Publication date |
---|---|
CN105530611A (en) | 2016-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jia et al. | Adopting Internet of Things for the development of smart buildings: A review of enabling technologies and applications | |
CN103270466B (en) | Via timer related tasks being coordinated and selectively operated power management | |
EP3101652A1 (en) | Electronic device for outputting messages and method for controlling the same | |
CN105185085B (en) | Data communication system, method and device | |
US8489118B2 (en) | Systems and methods for event attendance notification | |
KR20110028216A (en) | Dynamic event planning through location awareness | |
CN107784481A (en) | Task timeliness method for early warning and device | |
CN107274101A (en) | Scheduling method, device | |
CN107396315A (en) | Physical examination based on geographical position is lined up accessory system and method | |
US20130120518A1 (en) | Remote Virtual Supervision System | |
CN107258092A (en) | Supported for the discovery of mobile client device and the cloud of data transfer | |
US20130040631A1 (en) | System and method for controlling a function of an electronic device through a network | |
US20150004949A1 (en) | Message processing system | |
CN106856490A (en) | A kind of method and apparatus that service is provided based on scene | |
CN107004183A (en) | Many equipment collaborations | |
JP2015526933A (en) | Sending start details from a mobile device | |
CN108289281A (en) | Method, apparatus, electronic equipment and the storage medium that location information is shared | |
CN104038406A (en) | Information prompting method and device | |
CN110347389A (en) | Processing method, the device and system of algorithm file | |
CN107111539A (en) | The monitoring method and device of terminal device | |
WO2021225867A1 (en) | Contact tracing among workers and employees | |
CN111339194A (en) | Automatic scheduling method and device for middleware of database access layer | |
CN105657195B (en) | A kind of method and apparatus of the corresponding service area of determining business personnel's communication account | |
CN105530611B (en) | Server and control method | |
CN107172077B (en) | Information display method, apparatus and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |