Prior art keywords
tripping
time
switch
duration
electric current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610030248.1A
Other languages
Chinese (zh)
Other versions
CN105527541A (en
Inventor
张远来
晏欢
刘乃胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Tai Hao Software Inc Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tai Hao Software Inc Co filed Critical Tai Hao Software Inc Co
Priority to CN201610030248.1A priority Critical patent/CN105527541B/en
Publication of CN105527541A publication Critical patent/CN105527541A/en
Application granted granted Critical
Publication of CN105527541B publication Critical patent/CN105527541B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention belongs to distribution network line operation and maintenance field more particularly to a kind of methods of judgement distribution line failure tripping.Distribution line failure tripping is divided into generic failure tripping, transmission test tripping, trial line charging tripping and extension wire four classes of tripping by this method; and the comprehensive judgement of tripping type is calculated and made by the telemetering of current data of switch remote signals associated by distribution line, protection act remote signals and circuit; in order to be controlled in time to distribution network line trip condition; it can targetedly assist carrying out power distribution network production maintenance work, to further increase distribution network line reliability.

Description

A method of judgement distribution line failure tripping
Technical field
The invention belongs to distribution network line operation and maintenance field more particularly to a kind of sides of judgement distribution line failure tripping Method.
Background technology
With State Grid Corporation of China's " general overhaul " management system and grab the implementation of " both ends weak link " gist of a document, power saving Power company requires power grid transport inspection department door to control the administrative power grid condition of production of the whole province and low company of the county condition of production totally, more Add precision, flattening, carry out to lean production maintenance work;But in actual operation, each Utilities Electric Co. is to administrative electricity Whole line tripping situations within the scope of net are controlled incomplete.
Due to regulating and controlling differentiated control, regulation and control centers at different levels only reflect that this grade is adjusted to transport inspection department door under normal circumstances The case where line tripping unsuccessful reclosing that control center is grasped, provincial company are difficult to grasp the complete of districts and cities and county's company line substantially The distribution line trip condition of portion's trip condition, especially the whole province is substantially unclear, also lacks effective technological means, Wu Fazhen Property is carried out line tripping renovation effectively to reduce line tripping rate.
In conclusion controlled totally to the power distribution network condition of production to realize, more precision, flattening, lean Change ground and carry out production maintenance work, urgently needs very much to study a kind of method of judgement distribution line failure tripping, it can Enough targetedly auxiliary carry out power distribution network and produce maintenance work.
Currently, on the market some be related to power industry operation system research and development with implement manufacturer, also to line tripping into The research gone in certain methods, but ripe or disclosed clear method is also had no at present, therefore, it is necessary to research and develop one kind to match The computational methods of electric line tripping can meet generic failure tripping judgement, transmission test judgement, trial line charging tripping judgement And extension wire tripping judges the demand of this few class line tripping;And need in calculating process, occupying system resources are few, right CPU and request memory are low, and the characteristics of support automatic and manual calculations.
Invention content
It is a primary object of the present invention to provide a kind of method of judgement distribution line failure tripping, accurately sentenced with meeting Break and the demand of line tripping type, achieve the effect that judgement promptly and accurately, solves distribution network line trip condition and be difficult in time The problem of control.
To solve the above-mentioned problems, the present invention provides a kind of method of judgement distribution line failure tripping, this method packets Include following steps:
1)Distribution line failure tripping is divided into generic failure tripping, transmission test trips, trial line charging trips and spare Four class of line tripping;
The generic failure tripping is divided into as reclosing success tripping and reclosing two classes of unsuccessful tripping;
The transmission test tripping refers to distribution line switch caused by carrying out transmission test operation and is produced with protection act Raw tripping;
The trial line charging tripping refers to what distribution line switch caused by carrying out trial line charging operation was generated with protection act Tripping;
The extension wire tripping refers to the tripping that switch is generated with protection act caused by extension wire switching;
2)Switch derives from " dividing ", " conjunction " signal and the protection of the switchgear on distribution line with protection signal Action state signal;The telemetering of current for obtaining the switch remote signals associated by distribution line, protecting remote signals and circuit Data, are calculated and are judged, finally obtain the type of tripping as a result, decision process is as follows:
A) generic failure tripping is determine whether:The upper position of the switch data that there is " separating brake " at some time point, and In 1 minute at the time point, there are the data of any one protection act measuring point on corresponding protection act data, that is, circuit, Then judge that the circuit trips for generic failure, and is judged as a result, dividing into reclosing success tripping and overlapping according to reclosing The unsuccessful tripping of lock;
B) transmission test tripping is determine whether:Transmission test tripping judges it is on the basis that generic failure tripping judges On, judge whether the current value of continuous two points is less than threshold values, while 15 minutes memories before this to the circuit before this It is " combined floodgates " in " combined floodgate " data and final state, is determined as transmission test tripping if setting up;Or the circuit herein it The current value of the first two point is more than threshold values, and centered on the point, whether the electric current of former and later two points is less than threshold values, if setting up It is determined as that transmission test trips;Or if the circuit deposits repair ticket at the time point, also it is determined as that transmission test trips;
C) trial line charging tripping is determine whether:Trial line charging tripping judge to be divided on the basis of transmission test tripping judges There are " combined floodgate " data in analysis, and it is " combined floodgate " to switch final state, is determined as trial line charging if meeting before this in 5 seconds Tripping;
D) determine whether that extension wire trips:
Extension wire tripping judge to be judged before this in 2 days, current value on the basis of transmission test tripping judges Whether it is the threshold values being arranged less than some always, and the previous day is all the state closed, and is determined as that extension wire is jumped if meeting Lock.
Preferably, the step of reclosing judgement is, when in switching signal in 30 seconds it is existing have again comprising SOE do not include The data of SOE take the last one not on off state for the point of SOE to take the switch of the last one point when not meeting the above situation State;Reclosing success if first current value is greater than threshold values after switch is determined as that reclosing success trips;After coincidence Electric current be then determined as the unsuccessful tripping of reclosing if it is less than 70% of electric current before tripping.
Preferably, this method further includes calculating line tripping duration step,
1) normal to calculate:
If reclosing success, restore duration=reclosure time-tripping time of origin;
If reclosing is failed, calculated by following several rule-likes:
A. after a nearest electric current restores after tripping, when a nearest switch being taken to be combined into recovery time-tripping generation Between=restore duration;
B. the time that first electric current restores in 15 days is calculated, when nearest switch before first electric current recovery time being taken to close Between, then this when m- tripping time of origin=recovery duration;
The time is closed if C. not switching, then first electric current recovery time-tripping time of origin=recovery duration;
2) if reclosing is failed and restores duration less than 30 seconds:
Restore duration=reclosure time-tripping time of origin;
If 3) reclosing success and restore duration it is very long, calculated by following several rule-likes:
A. after a nearest electric current restores after tripping, then a nearest switch is taken to be combined into recovery time-tripping generation Time=recovery duration;
B. the time that first electric current restores in 15 days is calculated, when nearest switch before first electric current recovery time being taken to close Between, then this when m- tripping time of origin=recovery duration;
The time is closed if C. not switching, then first electric current recovery time-tripping time of origin=recovery duration.
Described method provide a kind of methods of judgement distribution line failure tripping, pass through the switch associated by distribution line The telemetering of current data of remote signals, protection act remote signals and circuit are calculated and are done the comprehensive judgement to trip, with Convenient for controlling distribution network line trip condition in time, can targetedly assist carrying out power distribution network production maintenance work, from And further increase distribution network line reliability.
Description of the drawings
Fig. 1 is distribution line failure tripping familygram of the present invention;
Fig. 2 is the flow chart of judgement distribution line failure trip method of the present invention.
Specific implementation mode
The specific implementation mode of the present invention is described in further detail with embodiment below in conjunction with the accompanying drawings.Implement below Example is not limited to the scope of the present invention for illustrating the present invention.
Fig. 1 show distribution line failure tripping familygram of the present invention, and Fig. 2 is judgement distribution of the present invention The flow chart of line fault trip method, the preferred implementation for representing distribution line failure trip method according to the present invention are real Example.Sentenced according to the embodiment, including generic failure tripping, transmission test tripping, trial line charging tripping and extension wire tripping Fixed four parts, are implemented by following steps.
Step 1:Judge generic failure tripping:
The upper position of the switch that there is " separating brake " at some time point(Division)Data, and in 1 minute at the time point, There are corresponding protection act data(The data of any one protection act measuring point on circuit), that is, it is judged to the line tripping.
Step 2:Determine whether that transmission test trips:
Meet following either condition, is then judged as that transmission test trips.
If 2.1, judge the electric current of preceding 2 points when tripping have both less than threshold values (main transformer threshold values is 2, circuit threshold values for 1), Then it is judged as that transmission test trips;
If 2.2, judging that (main transformer threshold values is for 2, circuit threshold values there are one threshold values is more than for the electric currents of preceding 2 points when tripping 1) it is exactly transmission test, then to judge whether the electric current of former and later two points by this centered on putting is less than threshold values less than threshold values again It trips, is not otherwise;
2.3, judge that whether occurring 2 times or more in a front/rear hour trips, and current value is less than 3A during this, then It is determined as that transmission test trips;
2.4, judge that the circuit/main transformer whether there is the repair ticket at the time point if there is repair ticket, be then judged to being driven Experiment tripping.
Step 3:Whether calculate is trial line charging tripping:
Calculated on the basis of transmission test, divide-shut brake in 5 seconds in transmission test, final state to close a floodgate and first five There is switch to close in second
Step 4:Whether calculate is extension wire tripping:
In transmission test, before emergency stop valve trip in 2 days, switching current be always less than threshold values 1 (maximum value be less than 1), and it is preceding One day is all the state closed(The state being not turned off)It is considered as extension wire tripping.
Step 5:Calculate line tripping duration:
1) normal to calculate
If reclosing success, restore duration=reclosure time-tripping time of origin.
If reclosing is failed, calculated by following several rule-likes:
A. after a nearest electric current restores after tripping (in 1 day), a nearest switch is taken to be combined into recovery time-tripping Time of origin=recovery duration.
B. the time that first electric current restores in 15 days is calculated, when nearest switch before first electric current recovery time being taken to close Between, then this when m- tripping time of origin=recovery duration.
The time is closed if C. not switching, then first electric current recovery time-tripping time of origin=recovery duration.
2) if reclosing is failed and restores duration less than 30 seconds
Restore duration=reclosure time-tripping time of origin.
If 3) reclosing success and restore duration it is very long, calculated by following several rule-likes:
A. after a nearest electric current restores after tripping (in 1 day), then a nearest switch is taken to be combined into recovery time-jump Lock time of origin=recovery duration
B. the time that first electric current restores in 15 days is calculated, when nearest switch before first electric current recovery time being taken to close Between, then this when m- tripping time of origin=recovery duration.
The time is closed if C. not switching, then first electric current recovery time-tripping time of origin=recovery duration.
So far, this method is implemented to complete, and the above is only a kind of preferred implementation method of the present invention, it is noted that For those skilled in the art, without departing from the technical principles of the invention, if can also make Dry improvement and modification, these improvements and modifications also should be regarded as protection scope of the present invention.
Finally it should be noted that:The above embodiment is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent Invention is explained in detail with reference to aforementioned embodiment for pipe, it will be understood by those of ordinary skill in the art that:Its according to It can so modify to the technical solution recorded in aforementioned each embodiment, or which part technical characteristic is equal It replaces;And these modifications or replacements, each embodiment technical solution of the present invention that it does not separate the essence of the corresponding technical solution Spirit and scope.

Claims (3)

1. a kind of method of judgement distribution line failure tripping, which is characterized in that this approach includes the following steps:
1)Distribution line failure tripping is divided into generic failure tripping, transmission test tripping, trial line charging tripping and extension wire Trip four classes;
The generic failure tripping is divided into as reclosing success tripping and reclosing two classes of unsuccessful tripping;
The transmission test tripping refers to what distribution line switch caused by carrying out transmission test operation was generated with protection act Tripping;
The trial line charging tripping refers to the distribution line tripping that switch is generated with protection act caused by carrying out trial line charging operation;
The extension wire tripping refers to the tripping that switch is generated with protection act caused by extension wire switching;
2)Switch derives from " dividing ", " conjunction " signal and the protection act of the switchgear on distribution line with protection signal Status signal;Switch remote signals, the telemetering of current data of protection remote signals and circuit associated by distribution line are obtained, It is calculated and is judged, finally obtain the type of tripping as a result, decision process is as follows:
A) generic failure tripping is determine whether:The upper position of the switch data that there is " separating brake " at some time point, and at this In 1 minute of time point, there are the data of any one protection act measuring point on corresponding protection act data, that is, circuit, then sentence The fixed circuit trips for generic failure, and is judged as a result, dividing into reclosing success tripping and reclosing not according to reclosing Success is tripped;
B) transmission test tripping is determine whether:Transmission test tripping judge to be sentenced on the basis of generic failure tripping judges Breaking, whether the current value of continuous two points is less than threshold values to the circuit before this, while existing in 15 minutes before this and " closing Lock " data and final state are " combined floodgate ", are determined as that transmission test trips if setting up;Or if the circuit there are when this Between the repair ticket put, be also determined as that transmission test trips;
C) trial line charging tripping is determine whether:Trial line charging tripping judges it is on the basis of transmission test tripping judges, analysis exists There are " combined floodgate " data before this in 5 seconds, and it is " combined floodgate " to switch final state, is determined as that trial line charging is jumped if meeting Lock;
D) determine whether that extension wire trips:Extension wire tripping judge to be sentenced on the basis of transmission test tripping judges Break before this in 2 days, whether current value is the threshold values being arranged less than some always, and the previous day is all the state closed, if Satisfaction is then determined as that extension wire trips.
2. judgement distribution line failure trip method according to claim 1, it is characterised in that:It is overlapped described in this method The step of lock judges is to have the data not comprising SOE again comprising SOE when existing in switching signal in 30 seconds, take the last one not For the on off state of the point of SOE the on off state of the last one point is taken when not meeting the above situation;If first electricity after switch Flow valuve is greater than threshold values then reclosing success, then is determined as that reclosing success trips;Electric current after coincidence, before tripping The 70% of electric current is then determined as the unsuccessful tripping of reclosing.
3. judgement distribution line failure trip method according to claim 1, it is characterised in that:This method further includes calculating Line tripping duration step,
1) normal to calculate:
If reclosing success, restore duration=reclosure time-tripping time of origin;
If reclosing is failed, calculated by following several rule-likes:
A. after a nearest electric current restores after tripping, a nearest switch is taken to be combined into recovery time-tripping time of origin=extensive Multiple duration;
B. the time that first electric current restores in 15 days is calculated, nearest switch before first electric current recovery time is taken to close the time, Then this when m- tripping time of origin=recovery duration;
The time is closed if C. not switching, then first electric current recovery time-tripping time of origin=recovery duration;
2) if reclosing is failed and restores duration less than 30 seconds:
Restore duration=reclosure time-tripping time of origin;
If 3) reclosing success and restore duration it is very long, calculated by following several rule-likes:
A. after a nearest electric current restores after tripping, then take a nearest switch be combined into recovery time-tripping time of origin= Restore duration;
B. the time that first electric current restores in 15 days is calculated, nearest switch before first electric current recovery time is taken to close the time, Then this when m- tripping time of origin=recovery duration;
The time is closed if C. not switching, then first electric current recovery time-tripping time of origin=recovery duration.
CN201610030248.1A 2016-01-18 2016-01-18 A method of judgement distribution line failure tripping Expired - Fee Related CN105527541B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610030248.1A CN105527541B (en) 2016-01-18 2016-01-18 A method of judgement distribution line failure tripping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610030248.1A CN105527541B (en) 2016-01-18 2016-01-18 A method of judgement distribution line failure tripping

Publications (2)

Publication Number Publication Date
CN105527541A CN105527541A (en) 2016-04-27
CN105527541B true CN105527541B (en) 2018-10-26

Family

ID=55769885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610030248.1A Expired - Fee Related CN105527541B (en) 2016-01-18 2016-01-18 A method of judgement distribution line failure tripping

Country Status (1)

Country Link
CN (1) CN105527541B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107230160A (en) * 2017-05-08 2017-10-03 国网江西省电力公司电力科学研究院 A kind of 10kV line trippings wrong report is intelligent to judge implementation method
CN107202923A (en) * 2017-05-19 2017-09-26 国网江西省电力公司电力科学研究院 A kind of method of automatic identification distribution line transmission test tripping operation
CN107479070B (en) * 2017-07-28 2019-12-20 北京空间飞行器总体设计部 Automatic discrimination method for on-orbit power supply state of satellite
CN107942195A (en) * 2017-11-17 2018-04-20 国网浙江省电力公司 Controller switching equipment monitoring method
CN108667004A (en) * 2018-04-03 2018-10-16 国家电网公司 The failure analysis method and device of distribution line
CN109089361B (en) * 2018-08-31 2023-06-23 江苏新广联光电股份有限公司 Emergency lamp control method, device and system
CN109490707A (en) * 2018-11-13 2019-03-19 国网江苏省电力有限公司南通供电分公司 The automatic analysis method of electric network fault tripping based on multidimensional multi-source grid operation data
CN112433127B (en) * 2020-11-13 2023-05-12 珠海许继电气有限公司 Fault type identification method and device based on intelligent fusion terminal of transformer area

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860000A (en) * 2010-05-14 2010-10-13 河南电力试验研究院 Quick identification method for permanent fault before single-phase reclosing of power transmission line
WO2015035687A1 (en) * 2013-09-12 2015-03-19 深圳供电局有限公司 Apparatus for remotely monitoring and locating relay protection implicit fault of power grid
CN104459466A (en) * 2014-12-02 2015-03-25 国网河南偃师市供电公司 Device for judging station of automatic reclosing lock of power transmission and distribution station
CN204679582U (en) * 2015-04-29 2015-09-30 国家电网公司 A kind of small current earthing wire-selecting tripping operation reclosing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9178350B2 (en) * 2011-11-30 2015-11-03 General Electric Company Electric distribution system protection

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860000A (en) * 2010-05-14 2010-10-13 河南电力试验研究院 Quick identification method for permanent fault before single-phase reclosing of power transmission line
WO2015035687A1 (en) * 2013-09-12 2015-03-19 深圳供电局有限公司 Apparatus for remotely monitoring and locating relay protection implicit fault of power grid
CN104459466A (en) * 2014-12-02 2015-03-25 国网河南偃师市供电公司 Device for judging station of automatic reclosing lock of power transmission and distribution station
CN204679582U (en) * 2015-04-29 2015-09-30 国家电网公司 A kind of small current earthing wire-selecting tripping operation reclosing device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
基于调度运行管理系统的配电网故障研判方案;张远来 等;《电力系统自动化》;20150110;第39卷(第1期);第220-225页 *

Also Published As

Publication number Publication date
CN105527541A (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN105527541B (en) A method of judgement distribution line failure tripping
US11128127B2 (en) FLISR without communication
CN102075005B (en) Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN110148930A (en) The method of fault location and topology automatic identification in distribution network
EP2720332B1 (en) Online protection coordination for distribution management system
CN106300285A (en) It is independent of the self adaptation type feeder automation fault handling method on the spot of network topology
CN101741137B (en) Network centralized emergency power supply automatic switching method
CN107843800B (en) Power supply network monitoring method, device and system
JP6770635B2 (en) Line short circuit failure section switching system and switching method in an inverter-based stand-alone microgrid
CN104124672B (en) For the method that voltage-type fault section front end restores electricity
CN107612021A (en) A kind of region prepared auto restart control method suitable for a large amount of small power supplies access local power network
Angelo et al. Technologies of the self healing grid
CN203368127U (en) Spare power automatic switching control equipment for transformer substation network
CN105337314B (en) A kind of multi-source based on distributed power source black starting-up technology coordinates control fault handling method
CN109245072A (en) Adaptive type feeder automation fault handling method on the spot based on region serial number
JP2010161865A (en) System and method for protecting ground of distribution system and program
CN105512729A (en) Evaluation method and evaluation system for feeder automatic processing effect
CN116207702B (en) Multi-factor minimum set power distribution network fault research and judgment-based power restoration method and device
CN111555265B (en) Optimal transformation method for feeder automation equipment based on reliability constraint
CN103779846B (en) The power network line wide area current protection method of revising fast based on admittance matrix
CN106329714B (en) A kind of method that dynamic judges power network switch type
Kuru et al. Control-center-based automatic fault isolation and restoration system for rural medium voltage networks
KR20180090106A (en) Fault management system for power distribution management system
CN105576661B (en) A method of for judging that power distribution line maintenance is stopped transport
CN114825627A (en) Self-healing method for line fault of power distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190507

Address after: 330096 Taihao Building, Nanchang High-tech Development Zone, Jiangxi Province

Co-patentee after: Shijiazhuang power supply branch, Hebei Electric Power Co., Ltd.

Patentee after: Tai Hao software incorporated company

Address before: 330096 Taihao Building, Nanchang High-tech Development Zone, Jiangxi Province

Patentee before: Tai Hao software incorporated company

CF01 Termination of patent right due to non-payment of annual fee