CN105525772B - Fitup provided with dry ice tank - Google Patents
Fitup provided with dry ice tank Download PDFInfo
- Publication number
- CN105525772B CN105525772B CN201510972233.2A CN201510972233A CN105525772B CN 105525772 B CN105525772 B CN 105525772B CN 201510972233 A CN201510972233 A CN 201510972233A CN 105525772 B CN105525772 B CN 105525772B
- Authority
- CN
- China
- Prior art keywords
- dry ice
- draw ring
- fitup
- open portion
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H3/00—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
- E04H3/10—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
- E04H3/22—Theatres; Concert halls; Studios for broadcasting, cinematography, television or similar purposes
- E04H3/24—Constructional features of stages
- E04H3/28—Shiftable or portable platforms
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63J—DEVICES FOR THEATRES, CIRCUSES, OR THE LIKE; CONJURING APPLIANCES OR THE LIKE
- A63J5/00—Auxiliaries for producing special effects on stages, or in circuses or arenas
- A63J5/02—Arrangements for making stage effects; Auxiliary stage appliances
- A63J5/025—Devices for making mist or smoke effects, e.g. with liquid air
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Multimedia (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Tents Or Canopies (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The present invention relates to fitup.A kind of fitup provided with dry ice tank, including table top, table top has wheel carrier, it is connected to the road wheel of wheel carrier and the drive mechanism of driving road wheel, table top is provided with dry ice tank, dry ice tank includes the tank body of opening and covers the cover in the opening of tank body, cover includes roof and cylindrical sidewall, cylindrical sidewall is sealed connected together with tank body, roof includes fixed part and open portion, fixed part homonymy wall links together, open portion is sealed connected together by tear line with fixed part, fixed part, open portion and tear line three are linked together in the way of integrative-structure, one end of open portion is provided with contiguous block, contiguous block is connected with draw ring being erected by fulcrum of contiguous block relative to open portion and in horizontal state.The present invention has the advantages that performing artist can easily discharge dry ice, and solving existing fitup needs the problem of stage performance caused by other people's release dry ice formation smog is inconvenient.
Description
Technical field
The present invention relates to fitup, more particularly to a kind of fitup provided with dry ice tank.
Background technology
Stage be in theater or outdoor sports on the space platform that is provided for actor performance, it can make the notice of spectators
Concentrate on the performance of performer and obtain preferable appreciation effect.What stage had can lift, and what is had cannot lift.The class of stage
Type has picture-frame stage, extended position stage, circular arc stage and rotary-type stage etc..It is in Chinese Patent Application No.
2014106963879th, one is disclosed in Publication No. CN104358430A, the patent document of entitled " direction movement stage "
The stage planted in existing fitup, the patent document includes table top, and table top has wheel carrier, is connected to the road wheel of wheel carrier
With the drive mechanism of driving road wheel.The stage has the following disadvantages:Needed in stage performance during spray drying ice, it is necessary to which other people enter
Row spray, makes troubles to stage performance.
The content of the invention
The invention provides the fitup provided with dry ice tank that a kind of performing artist can easily discharge dry ice, solve
Existing fitup needs the problem of stage performance caused by other people's release dry ice formation smog is inconvenient.
Above technical problem is solved by following technical proposal:A kind of fitup provided with dry ice tank, including platform
Face, the table top has wheel carrier, the road wheel for being connected to wheel carrier and the drive mechanism for driving road wheel, and the table top is provided with
Dry ice tank, the dry ice tank includes the tank body of opening and covers the cover in the opening of tank body, and the cover includes roof and cylinder
Shape side wall, the cylindrical sidewall is sealed connected together with the tank body, and the roof includes fixed part and open portion, described solid
Determine portion to link together with the side wall, the open portion is sealed connected together by tear line with the fixed part, described solid
Determine portion, open portion and tear line three to link together in the way of integrative-structure, one end of the open portion is provided with contiguous block,
The contiguous block is connected with draw ring being erected by fulcrum of contiguous block relative to open portion and in horizontal state.Dance
, it is necessary to which when spraying dry ice, performing artist erects draw ring required for using contiguous block as fulcrum relative to roof during platform performance
Angle, open portion is then drawn by draw ring and causes tear line tear and realizes open portion with fixed part from now existing
The dry ice that the position of roof correspondence open portion is formed in a spray orifice, tank body flows out through spray orifice and forms smog.Because open portion is
It is structure as a whole what is linked together with fixed part, i.e., produces together, so conveniently and to the close of spray orifice when makes tank bar
Envelope property is good.It can be opened by drawing and be designed with draw ring therefore open convenient.
Preferably, the tear line is provided with starting tear section, the contiguous block is to be set in elastic construction, the contiguous block
There is air cavity, the air cavity is provided with the gas outlet that the starting tear end is blown." starting tear section " refers to open by draw ring
The position that tear line during open portion is torn first is opened, the position is by contiguous block.During tear, tear
The moment that line may produce the action pushed towards in container at starting tear section and just be torn can produce larger vibration,
If starting tear section and its periphery have dust, if above procedure dust can be caused to enter in tank body after spray together in company with dry ice
Go out, the dust-proof ejection has potential safety hazard.The technical program before opening, up and down pressing draw ring and open portion is extruded to reduce
During the tearing strength of tear line, air cavity produces the action outwards blown and will originate dust of tear section and its periphery etc.
Dirt is blown away, so that avoid dirt in opening process from falling in container and sprayed together in company with dry ice, therefore security is good.
Preferably, the gas outlet is provided with diaphragm seal, the contiguous block is provided with the knife rotated together in company with the draw ring
Seat, the tool rest rotates and poked the second sword of the diaphragm seal in company with draw ring together when holding up the draw ring provided with rotation
Mouthful;During rotating and holding up the draw ring, earlier than the tear line at the time of second cutting edge pokes the diaphragm seal
At the time of rupture.Diaphragm seal is designed, dust enters what is then blown out if dust in air cavity, air cavity during can preventing storage
Just contain dust in gas, can cause to be not easy when blowing to blow clean starting tear section.Second cutting edge is set, it is possible to increase opened
Convenience during diaphragm seal.
Preferably, rotating and poking described together in company with draw ring when the tool rest is additionally provided with rotation and holds up the draw ring
3rd cutting edge of tear line;During rotating and holding up the draw ring, second cutting edge poke the diaphragm seal when
At the time of quarter pokes the tear line earlier than the 3rd cutting edge.In opening process, tear line can be pierced by the 3rd cutting edge
Break or stab so that draw draw ring just to tear tear line by less power.
Preferably, the air pressure in the air cavity is more than 1.5 standard atmospheric pressures.Rotate draw ring and puncture diaphragm seal
Afterwards, it separately need not extrude contiguous block and air cavity deformation is can be realized as air cavity blow gas and go to carry out clearly starting tear section
It is clean.Convenience when using is good.
Preferably, the draw ring between the roof provided with prizing gap.It can be realized pair by pushing draw ring
Open portion pushes to reduce the intensity of tear line.
Preferably, the lower surface of the draw ring is provided with the first cutting edge, the cutting edge line of first cutting edge is located at described tear
Split the surface of line.By pushing draw ring and realizing can produce to the first cutting edge during the pushing of open portion to tear line
Downcutting so that the intensity fall of tear line is bigger, so as to more effortlessly opening open portion.
Preferably, being additionally provided with bar on the table top, the outer resilient sleeve of the bar is provided with sleeve pipe, the bar
Elastic adjusting mechanism provided with the elastic force between adjusting sleeve pipe and bar between sleeve pipe, the elastic adjusting mechanism includes set
It is located at outside bar and is located in the base tube in sleeve pipe and the holding sheet being looped around outside the base tube, the holding sheet is by some
Block is constituted along the circumferentially distributed fricting strip of base tube, and the fricting strip is provided with some slide bars radially extended along base tube, described
Sliding bar is arranged in the base tube, and the inner of the slide bar drives fricting strip to be abutted with sleeve pipe provided with shift-in outside driving slide bar
The 3rd spring together, the elastic adjusting mechanism is additionally provided with the pretightning force regulation knot for the pretightning force for adjusting the 3rd spring
Structure.Bar is set, the diversity of stage performance is disclosure satisfy that.Bar in the technical program is flexible, so as to improve
Elastic effect in comfortableness when using, the technical program can also change, the need for adapting to difference.Bar elasticity
Specific regulation process is to drive the 3rd spring moving radially along base tube by pretightning force adjustment structure, so that friction
Bar changes with the normal pressure of sleeve pipe, so as to realize the change of pretightning force so that size of the sleeve pipe relative to the power that bar is rocked
Change to reach different elastic effects.
Preferably, the pretightning force adjustment structure includes the cone of two tubular structures being supported on base tube outside bar
Driving structure and some push rods that forming head, driving conical head move axially and conical head can be made to stop at setting position, institute
State two conical heads to be slidably connected in the way of miner diameter end is arranged oppositely in the two ends of the base tube, the two ends of the push rod are put
Put on the conical surface of described two conical heads, all slide bars of same fricting strip are by the spring supporting same
Described in root on push rod, the slide bar of each piece of fricting strip is respectively supported by a push rod.During regulation, pass through axial direction
Change the position of conical head to realize push rod moving radially, so as to realize change of the push rod along base tube radial position along base tube,
So as to realize the change of the 3rd initial tension of spring.Convenience during regulation is good.
Preferably, the driving structure includes two jacking blocks being threaded in the two ends of the base tube, described two
Individual conical head is located between described two jacking blocks.Drive conical head to realize regulation by rotating jacking block, adjust then automatic in place
Position, convenience when using is more preferable.
Preferably, the road wheel includes driving wheel and universal wheel, the universal wheel is spherical, on the support ball
It is arranged with and scrapes set.The dirt scraping on back-up roller bead surface can be removed by scraping set so that what universal wheel can keep clear for a long time
Rotate.
Preferably, it is described scrape set with it is described support ball between be mating spherical surfaces.Scrape set and remove the dirt of back-up roller bead surface
Effect during thing is good.
Preferably, the set of scraping is provided with annular mounting groove with the mating surface of the support ball, it is provided with mounting groove
Scrape the circumferentially extending of set in drying lamp, the mounting groove edge.When the dirt of back-up roller bead surface is moist, then it is not easy to be scraped set and scrapes
Totally.Set drying lamp the dirt on back-up roller bead surface can be dried with increase the fragility of dirt, enable dirt compared with
Thoroughly set is scraped to scrape, it is good to the cleaning effect of support ball.
It is described to receive dirty groove and prolong along the circumference for scraping set preferably, the lower wall of the mounting groove receives dirty groove provided with annular
Stretch.Dirt can be avoided to be again introduced into the mating surface of support ball and door body and scratch the mating surface.
Receive dirty groove medial surface preferably, described and towards the ball bank and extend to the support ball.Fall down
Dirt, which can be entered more swimmingly, to be received in dirty groove.
Present invention tool has the advantage that:Performing artist oneself can easily open dry ice tank, when improving stage performance
Convenience.
Brief description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention one.
Fig. 2 is the section view enlarged diagram of dry ice tank.
Fig. 3 be Fig. 2 in bar cross-sectional view.
Fig. 4 be Fig. 2 in bar axial schematic cross-sectional view.
Fig. 5 is the close-up schematic view at Fig. 1 B.
Fig. 6 be the embodiment of the present invention two in cover structural representation;
Fig. 7 is the close-up schematic view at Fig. 6 A.
In figure:Cover 1, roof 11, fixed part 111, open portion 112, side wall 12, tear line 13, prize gap 14, connection
Block 2, air cavity 21, gas outlet 211, tool rest 22, the second cutting edge 221, the 3rd cutting edge 222, diaphragm seal 23, draw ring 3, the first cutting edge
31st, scrape set 4, mounting groove 41, drying lamp 42, receive dirty groove 43, receive dirty groove medial surface 44, dry ice tank 5, tank body 51, opening 52, elastic force
Governor motion 6, base tube 61, holding sheet 62, fricting strip 621, slide bar 622, the 3rd spring 623, pretightning force adjustment structure 63, taper
First 631, push rod 632, driving structure 633, jacking block 6331, bar 7, sleeve pipe 71, table top 8, driving wheel carrier 81, Universal castor
82nd, drive mechanism 83, road wheel 84, universal wheel 85, stand 86.
Embodiment
The present invention is further illustrated with embodiment below in conjunction with the accompanying drawings.
Embodiment one, referring to Fig. 1, a kind of fitup provided with dry ice tank, including table top 8.Table top 8 has driving wheel
Frame 81, Universal castor 82 and drive mechanism 83.Wheel carrier 81 is driven to be provided with road wheel 84.Road wheel 84 is driven by drive mechanism 83
Walked.Universal castor 82 is provided with universal wheel 85.Universal wheel 85 is spherical.It is arranged with universal wheel 85 and scrapes set 4.Scrape set 4 same
Universal castor 82 is fixed together.The present invention is supported to be walked jointly by road wheel 84 and universal wheel 85.
Table top 8 is provided with bar 7 and stand 86.The dry ice tank 5 provided with opening 52 is fixed with stand 86.Bar 7
It is arranged with sleeve pipe 71.
Referring to Fig. 2, tank body 51 is built with dry ice.Dry ice tank 5 also includes the cover 1 on lid opening 52.Cover 1 includes top
Wall 11 and cylindrical sidewall 12.Side wall 12 is sealed connected together with opening 52.Roof 11 includes fixed part 111 and open portion 112.
The homonymy wall 12 of fixed part 111 links together.The wall thickness of open portion 112 is less than the wall thickness of fixed part 111.Open portion 112 is by tearing
Line 13 is split to be sealed connected together with fixed part 111.Fixed part 111, open portion 112 and the three of tear line 13 are with integrative-structure
Mode links together.
Tear line 13 is arranged at the inner surface of roof 11.The position that the outer surface of roof 11 corresponds to tear line 13 is plane.
The structural relation enables to be not easy laying dust at tear line, can keep the spatter property of top wall outer surface, so that opening
The generation of pollution is not easily leaded to during open portion.
Tear line 13 is that the groove formed by the inner surface of roof 11 is recessed is constituted.Enable to open open portion when can
Torn by ground along tear line.It can make it that the bonding strength of tear place declines by pushing open portion during unlatching, from
And required power declines when to open, opening force declines not allowing then to be also easy to produce draw ring to be opened with the junction of contiguous block
Phenomenon of rupture is produced in journey and causes to open by draw ring.
The groove for constituting tear line 13 is sharp kerve.It can further improve and cause tear place by pushing open portion
The effect that bonding strength declines.
One end of open portion 112 is provided with contiguous block 2.Contiguous block 2 is connected to by way of integrative-structure with open portion 112
Together.Contiguous block 2 is connected with the draw ring 3 in horizontal state.Contiguous block 2 is elastic construction.Air cavity 21 is provided with contiguous block 2.
Air cavity 21 is provided with the gas outlet 211 that the starting tear section of tear line 13 is blown.
Draw ring 3 between roof 11 provided with prizing gap 14.It can realize and open portion is pushed by pushing draw ring
To reduce the intensity of tear line.
The lower surface of draw ring 3 is provided with the first cutting edge 31.The cutting edge line of first cutting edge 31 is located at the surface of tear line 13, i.e.,
When pushing draw ring 13, the first cutting edge 31 can switch to tear line 13.The mistake pushed to open portion is realized by pushing draw ring
The first cutting edge can produce downcutting to tear line in journey so that the intensity fall of tear line is bigger, so as to more
Plus effortlessly open open portion.
When needing to produce smog scene during stage performance, contiguous block 2 is pressed repeatedly first so that the first 31 pairs of cutting edge
Gas while tear line 13 produces incision, in air cavity 21 is blown out through gas outlet 211 and the starting to tear line 13 tears section
Cleaned.Then right-hand member i.e. one end away from contiguous block 2 of draw ring 3 is pushed so that the first cutting edge 31 is produced to tear line 13
Incision acts and destroyed the intensity of tear line 13, then rotates counterclockwise draw ring 3 to draw ring relative to top with contiguous block 2 for fulcrum
Wall 11 erects required angle, then by draw ring draw 3 and pull up open portion 112, so that tear line 13 tear and realize by
Open portion 112 is separated with fixed part 111, now forms a manhole appendix at the position of the correspondence open portion of roof 11.In tank body 51
Dry ice warp this portal outflow and form smog.
Referring to Fig. 3, elastic adjusting mechanism 6 is provided between bar 7 and sleeve pipe 71.Elastic adjusting mechanism 6 include base tube 61,
Holding sheet 62 and pretightning force adjustment structure 63.Base tube 61 is set in outside bar 7.Base tube 61 is located in sleeve pipe 71.Holding sheet
62 are made up of some pieces of fricting strips 621.Fricting strip 621 is circumferentially distributed along base tube 61.Fricting strip 621 is provided with some along base tube
Radially extend the slide bar 622 of axially distribution.Slide bar 622 slides and is arranged in base tube 61.The inner of slide bar 622 is provided with the 3rd spring
623.3rd spring 623 drives fricting strip to be abutted together with sleeve pipe 71 by slide bar.The pretightning force adjustment structure 63 of outer shifting is wrapped
Include two conical heads 631 and some push rods 632.Conical head 631 is tubular structure.Conical head 631 is set on bar 7 and worn
It is located in base tube 61 and base tube 61 links together with bar 7.Conical head 631 is only slidably connected in base tube 61.Top
Bar 632 is along the circumferentially distributed axially extending of base tube 61.All slide bars 622 of same fricting strip 621 pass through the 3rd spring 623
It is supported on same push rod 632, the slide bar of each piece of fricting strip is respectively supported by a push rod.
Referring to Fig. 4, two conical heads 631 are slidably connected in the way of miner diameter end is arranged oppositely in the two ends of base tube 61.
The two ends of push rod 632 are shelved on the conical surface of two conical heads 631.Pretightning force adjustment structure 63 also includes driving structure 633..
Driving structure 633 includes two jacking blocks 6331 being threaded in the two ends of base tube 61.Jacking block 6331 is set in bar 7
On.Two conical heads 631 are located between two jacking blocks 6331.
Referring to Fig. 1, it is necessary to which during handgrip, hand is held on sleeve pipe 71 during stage performance.
Referring to Fig. 4 and Fig. 3, the process for adjusting the elastic effect of sleeve pipe is:Conical head 631 is driven by rotating jacking block 6331
Moved along the axial direction of base tube 61, driving the moving radially along base tube 61 of push rod 632 of conical head 631, the extruding of push rod 632 the 3rd
Spring 623 and change pretightning force.
Referring to Fig. 5, universal wheel 85 is with being mating spherical surfaces between Universal castor 82.Scrape set 4 and seal affixed with Universal castor 82
Together.Scrape set 4 between universal wheel 85 be mating spherical surfaces.The sealing of set 4 is scraped to be set on universal wheel 85.Scrape 4 same universal wheels of set
85 mating surface is provided with annular mounting groove 41.Mounting groove 41 covers 4 circumferentially extending along scraping.Drying lamp is provided with mounting groove 41
42.The infrared lamp of drying lamp 42.The lower wall of mounting groove 41 receives dirty groove 43 provided with annular.Dirty groove 43 of receiving prolongs along the circumference for scraping set 4
Stretch.Dirty groove medial surface 44 of receiving tilts towards universal wheel 85 and extends to universal wheel 85.
Embodiment two, the difference of be the same as Example one is:
Referring to Fig. 6, contiguous block 2 is also associated with tool rest 22.Gas outlet 211 is to close provided with diaphragm seal 23, i.e. gas outlet
's.Inert gas or nitrogen are filled with air cavity 21.Air pressure in air cavity 21 is more than 1.5 standard atmospheric pressures.
Referring to Fig. 7, tool rest 22 is provided with the second cutting edge 221 and the 3rd cutting edge 222.
During use, during rotation draw ring 3 holds up draw ring 3, contiguous block 2 is deformed and rotated, even
Connect when block 2 is rotated so that tool rest 22 is also rotated counterclockwise, tool rest 22 drives the second cutting edge 221 and the 3rd cutting edge 222 also to turn together
It is dynamic.The second cutting edge 221 punctures diaphragm seal 23, so that the gas in air cavity 21 is discharged and to tear line 13 first in rotation process
Starting tear section cleaned, then the 3rd cutting edge 222 puncture or stab tear line 13 starting tear section, enter through drawing
Tear line is completely torn apart and realizes and remove open portion 112 by ring 3.
Claims (8)
1. a kind of fitup provided with dry ice tank, including table top, the table top have wheel carrier, are connected to the road wheel of wheel carrier
With the drive mechanism of driving road wheel, it is characterised in that the table top is provided with dry ice tank, the dry ice tank includes being provided with opening
Tank body and the cover that covers in opening, the cover includes roof and cylindrical sidewall, and the cylindrical sidewall is close with the tank body
Envelope links together, and the roof includes fixed part and open portion, and the fixed part links together with the side wall, described to open
Open portion to be sealed connected together with the fixed part by tear line, the fixed part, open portion and tear line three are with integral knot
The mode of structure links together, and one end of the open portion is provided with contiguous block, the contiguous block be connected with can using contiguous block as
Fulcrum and erected relative to open portion and in horizontal state draw ring, the tear line provided with starting tear section, the company
Block is connect for elastic construction, air cavity is provided with the contiguous block, the air cavity is provided with the outlet that the starting tear end is blown
Mouthful, the gas outlet is provided with diaphragm seal, and the contiguous block is provided with the tool rest rotated together in company with the draw ring, and the tool rest is provided with
Rotate and poke the second cutting edge of the diaphragm seal when rotating and holding up the draw ring together in company with draw ring;Rotate and hold up institute
During stating draw ring, at the time of second cutting edge ruptures at the time of poking the diaphragm seal earlier than the tear line.
2. the fitup according to claim 1 provided with dry ice tank, it is characterised in that the tool rest be additionally provided with rotation and
Rotate and poke the 3rd cutting edge of the tear line when holding up the draw ring together in company with draw ring;Rotate and hold up the draw ring
During, at the time of second cutting edge pokes the diaphragm seal earlier than the 3rd cutting edge poke the tear line when
Carve.
3. the fitup according to claim 1 or 2 provided with dry ice tank, it is characterised in that the draw ring is with the top
It is provided between wall and prizes gap.
4. the fitup according to claim 3 provided with dry ice tank, it is characterised in that the lower surface of the draw ring is provided with
First cutting edge, the cutting edge line of first cutting edge is located at the surface of the tear line.
5. the fitup according to claim 1 or 2 provided with dry ice tank, it is characterised in that be additionally provided with the table top
Bar, the outer resilient sleeve of the bar is provided with sleeve pipe, between the bar and sleeve pipe provided with adjusting sleeve pipe and bar it
Between elastic force elastic adjusting mechanism, it is outer and be located in the base tube in sleeve pipe that the elastic adjusting mechanism includes being set in bar
With the holding sheet being looped around outside the base tube, the holding sheet is constituted by some pieces along the circumferentially distributed fricting strip of base tube,
The fricting strip is provided with some slide bars radially extended along base tube, and the sliding bar is arranged in the base tube, the slide bar
The inner drive fricting strip to abut the 3rd spring together with sleeve pipe provided with shift-in outside driving slide bar, the elastic force adjusts machine
Structure is additionally provided with the pretightning force adjustment structure for the pretightning force for adjusting the 3rd spring.
6. the fitup according to claim 5 provided with dry ice tank, it is characterised in that the pretightning force adjustment structure bag
The conical head of two tubular structures being supported on base tube outside bar, driving conical head is included to move axially and conical head can be made
The driving structure and some push rods of setting position are stopped at, described two conical heads are slided in the way of miner diameter end is arranged oppositely
In the two ends for being connected to the base tube, the two ends of the push rod are shelved on the conical surface of described two conical heads, same friction
All slide bars of bar are by the spring supporting on the same push rod, and the slide bar of each piece of fricting strip is each
It is supported by a push rod.
7. the fitup according to claim 6 provided with dry ice tank, it is characterised in that the driving structure includes two
The jacking block in the two ends of the base tube is threaded in, described two conical heads are located between described two jacking blocks.
8. the fitup according to claim 1 or 2 provided with dry ice tank, it is characterised in that the road wheel includes driving
Driving wheel and universal wheel, the universal wheel are spherical, are arranged with the universal wheel and scrape set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510972233.2A CN105525772B (en) | 2015-12-22 | 2015-12-22 | Fitup provided with dry ice tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510972233.2A CN105525772B (en) | 2015-12-22 | 2015-12-22 | Fitup provided with dry ice tank |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105525772A CN105525772A (en) | 2016-04-27 |
CN105525772B true CN105525772B (en) | 2017-09-22 |
Family
ID=55768266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510972233.2A Active CN105525772B (en) | 2015-12-22 | 2015-12-22 | Fitup provided with dry ice tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105525772B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107143163A (en) * | 2016-05-24 | 2017-09-08 | 江山行诚科技信息咨询服务有限公司 | Revolving stage provided with overload self-protecting electric motor |
CN107136234A (en) * | 2016-05-24 | 2017-09-08 | 江山行诚科技信息咨询服务有限公司 | Lift convenient withering groove for tea |
CN107143160A (en) * | 2016-05-24 | 2017-09-08 | 江山行诚科技信息咨询服务有限公司 | Fitup provided with dry ice tank and suspension ring |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1194586A (en) * | 1996-05-31 | 1998-09-30 | 巴克斯特国际有限公司 | Solution delivery system with individual integrated final packaging and a method for packaging the same |
JP3887476B2 (en) * | 1998-01-26 | 2007-02-28 | 戸田建設株式会社 | Judo stage equipment |
CN2503016Y (en) * | 2001-11-06 | 2002-07-31 | 顺德市容桂镇万成金属包装有限公司 | Disposable cap with ring-pull for chemical tank |
CN202054266U (en) * | 2011-05-06 | 2011-11-30 | 苏州威尔盖包装有限公司 | Disposable bottle cap for iron tin opening |
CN204833765U (en) * | 2015-08-07 | 2015-12-02 | 吴建忠 | Remove theater display device |
-
2015
- 2015-12-22 CN CN201510972233.2A patent/CN105525772B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105525772A (en) | 2016-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105525772B (en) | Fitup provided with dry ice tank | |
CN105604354B (en) | Revolving stage provided with color powder dispenser | |
CN109984546B (en) | Spiral J-shaped umbrella placing rack capable of slowly rotating and draining J-shaped umbrella | |
CN107804498B (en) | Intelligent fruit box separating device | |
CN108722974A (en) | A kind of high-temperature steam cleaning device | |
CN206750361U (en) | A kind of easily changeable liquid cosmetic bottle | |
CN106080335A (en) | For the beverage storage facilities being placed on beach buggy | |
CN206265371U (en) | A kind of automatic film rolling machine | |
CN205217972U (en) | Hair -dryer removes convenient dog cooler bin | |
CN111889485B (en) | Regenerated glass recovery device | |
CN115055412A (en) | Energy-saving intelligent monitoring system based on green building | |
CN111282691B (en) | Rod diameter and folium artemisiae argyi separating device based on preparation moxa | |
KR101978577B1 (en) | A preventing unit of snow pile up | |
CN213725389U (en) | Keel for dust removal bag | |
CN207413176U (en) | A kind of high expansion foam production device being easily installed | |
CN104828532A (en) | Screening apparatus of bottle cap hoop | |
CN206802800U (en) | Lamp is worn in one kind tourism | |
CN105757845A (en) | Water-cooling air-conditioner heat exchanger provided with supporting feet | |
CN204588037U (en) | Bottle cap hoop screening plant | |
CN205217961U (en) | Hair -dryer removes vibration isolation type dog cooler bin that makes things convenient for difficult damage of wire | |
KR102647344B1 (en) | Separation and discharge device for foreign substances attached to the deodorizing filter and activated carbon dust | |
CN211829975U (en) | Threading construction device for building electrical engineering | |
CN220349968U (en) | Unmanned aerial vehicle recognition device | |
CN208593352U (en) | A kind of mounting structure of automobile rearview camera | |
CN209632899U (en) | A kind of nozzle removal device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |