CN105512401A - Make-to-order based worker shift arrangement simulation method - Google Patents

Make-to-order based worker shift arrangement simulation method Download PDF

Info

Publication number
CN105512401A
CN105512401A CN201510908685.4A CN201510908685A CN105512401A CN 105512401 A CN105512401 A CN 105512401A CN 201510908685 A CN201510908685 A CN 201510908685A CN 105512401 A CN105512401 A CN 105512401A
Authority
CN
China
Prior art keywords
model
data
class
grade
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510908685.4A
Other languages
Chinese (zh)
Inventor
王鸿艳
毛伟
张可平
卢娟
胡健
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CMCU Engineering Co Ltd
Original Assignee
CMCU Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMCU Engineering Co Ltd filed Critical CMCU Engineering Co Ltd
Priority to CN201510908685.4A priority Critical patent/CN105512401A/en
Publication of CN105512401A publication Critical patent/CN105512401A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/04Constraint-based CAD

Abstract

The invention discloses a make-to-order based worker shift arrangement simulation method. A main procedure of the method comprises model development, data collection and processing, data importing or linking, model operation, quantification data output, model difference analysis, model modification and determination of simulation models. By means of the method, reasonability of shift arrangement of a production system can be automatically assessed, and through computer simulation, and data are constantly adjusted for simulation tests until the computer model conforms to the actual production system. The accuracy of a shift arrangement result can be improved, unnecessary manpower resource waste is avoided, meanwhile, 3D visualization of the model is realized with a simulation technology, understanding and operation are facilitated, problems in a searching model are conveniently found out, and accordingly, the shift arrangement scheme is timely perfected.

Description

A kind of based on order produce personnel arrange an order according to class and grade emulation method
Technical field
The invention belongs to technical field of system simulation, relate to a kind of method that personnel being applicable to produce based on order arrange an order according to class and grade.
Background technology
System simulation technology is exactly utilize computing machine to set up real system model also to utilize the model set up to test real system, and it is the new branch of science progressively formed along with the development of computer technology.System simulation technology is based upon on control theory, operational research, the information processing technology and computerese basis, computing machine is used to set up system model, and experimental result being analyzed and researched by means of the experimental knowledge of expert, statistics and information material, and then make a policy comprehensive experimental subject.Because it is short relative to the time of setting up required for a real system, cost is low, and model can not cause real system and stop and destroy, and can export quantitative data carries out assessment real system simultaneously.
The production system of producing based on order is along with the change of order, and personnel arrange an order according to class and grade and also should adjust, and common personnel using method of arranging an order according to class and grade is segmented model, and the first step is the personnel demand calculating day part, and second step determines order of classes or grades at school scheme again.The hypothesis of intersegmental independence when segmented model depends on, namely first be the production of order is stable, and productive temp is stablized, and second is that order between each order of classes or grades at school is separate.The personnel demand of day part calculates general according to mean value or valuation, and actual conditions can because the skill level of personnel, situation about becoming when the impact of personnel's individual factor cannot adapt to according to mean value or valuation.The generation of scheme of arranging an order according to class and grade mainly adopts linear programming model to calculate, try to achieve optimum solution, and linear programming model may exist without separating or infinite multiple optimum solution, retrain more, variable is also more, solve more complicated, the factor of consideration is also not necessarily comprehensive, and the result that causes arranging an order according to class and grade there are differences with actual production result.
Summary of the invention
In view of this, the object of this invention is to provide, based on order produce personnel arrange an order according to class and grade emulation method, the method can improve the accuracy of result of arranging an order according to class and grade, avoid unnecessary waste of human resource, utilize emulation technology to make model three-dimensional visualization, easy to understand and operation simultaneously, be convenient to search Problems existing in model, improve scheme of arranging an order according to class and grade in time.
The object of the invention is to be achieved through the following technical solutions, a kind of personnel produced based on order arrange an order according to class and grade the method for emulation, comprise the following steps:
Step 1, model development, the system of researching and producing is arranged an order according to class and grade object and influence factor, conceputal modeling, and Confirming model framework and algorithm;
Step 2, Data Collection and process, collect all related datas affecting result of arranging an order according to class and grade, and be organized into data type and the form of model requirements;
Step 3, imports or connection data, the data of importing or link model demand, or direct connection data database data;
Step 4, moving model, by three dimension dynamic simulation model, exports dynamic data in real time, and finds Problems existing in scheme;
Step 5, exports quantitative data, to arrange an order according to class and grade demand according to personnel, formulates the data analysis and the data algorithm that meet industry characteristic;
Step 6, analytical model, verification model result also analyzes difference, collects statistics actual production system data, the difference that comparative analysis analogue simulation data and real data exist;
Step 7, amendment model, adjustment data, rerun model;
Step 8, determines realistic model, determines the realistic model of realistic production system.
Further, the data framework of model development described in step 1 is consistent with the data layout handled by step 2 with form.
Advantageous Effects:
The present invention can realize automatic evaluation production system and to arrange an order according to class and grade rationality, and by Computer Simulation, constantly adjustment data carry out simulation test, until computer model conforms to actual production system.Emulation technology is when search best solution, and it can create a database for each solution and they are on the impact of model output.Relation between two model variables that this database is unknown before may be used for finding, or determine the restrictive constraint condition of that most.What use these data can obtain about model behavior is perspective.The method can improve the accuracy of result of arranging an order according to class and grade, and avoids unnecessary waste of human resource, utilizes emulation technology to make model three-dimensional visualization, easy to understand and operation simultaneously, is convenient to search Problems existing in model, improves scheme of arranging an order according to class and grade in time.
Accompanying drawing explanation
In order to make the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, the present invention is described in further detail, wherein:
Fig. 1 is that the personnel produced based on order of the present invention arrange an order according to class and grade the process flow diagram of method of emulation;
Fig. 2 is step 1 model development critical workflow.
Embodiment
Below with reference to accompanying drawing, the preferred embodiments of the present invention are described in detail; Should be appreciated that preferred embodiment only in order to the present invention is described, instead of in order to limit the scope of the invention.
As shown in Figure 1, of the present invention based on order produce personnel arrange an order according to class and grade emulation method, main flow comprises model development, Data Collection and process, importing or connection data, moving model, output quantitative data, analytical model difference, revises model, determines realistic model.
Step 1, model development, to producing the process equipment, logistics equipment, lean production key element etc. that relate to through in-site measurement, the mode such as to take pictures, obtaining relevant investigational data, mainly adopting sketchup, 3Dmax, solidworks software platform to complete 3 d geometric modeling; The three-dimensional geometric shapes software DeepExploration that can compatible be set up by various software is adopted to carry out light-weight technologg, the non-geometry information in filtering model on this basis, the display precision of conservative control model and display details.The three-dimensional model basis of light-weight technologg is carried out model parameterization and main logic exploitation, is formed and meet industry standard, there is the equipment library of factory's feature, support the Modify rapidly of virtual factory model and the model buildings of follow-up plant produced environment change.Equipment library model comprises configuration and the management of the following aspects: typical geometric parameter, technological parameter, action parameter, equipment main technique logic, logistics logic.
The system of researching and producing is arranged an order according to class and grade object and influence factor, Confirming model framework and algorithm.Exploitation sets up data importing interface and data referencing, Definition Model variable, exports all kinds of management and control point data, developing user interface, be convenient to non-programmed human users and calculating after model running.
Step 2, Data Collection and process, collect all related datas affecting result of arranging an order according to class and grade, maintenance data fitting software ExperFit, and analyzing and processing collects data, and matching closest to the Data distribution8 of reality, and is organized into data type and the form of model requirements.
Preferably, in step 1, described model development, requires that the data framework of exploitation must be consistent with the data layout handled by step 2 with form, can reduce model load like this, lift scheme travelling speed and 3-D view quality.
Step 3, imports or connection data, and data model imports the data of excel file or directly connects excel data, realizes the exchanges data between Excel and realistic model, and input basic data, Output simulation simulated data, realizes dynamic data exchange process.
Step 4, moving model, runnable interface is the distinctive interface of simulation software, there is Three-Dimensional Dynamic model interface in the simulation software used due to the present invention, Three Dimensional Interface can be passed through, monitor each important node in model running process, reduce and directly search various service data on backstage, Timeliness coverage problem.
Step 5, exports quantitative data, exports all kinds of management and control point data, is of value to optimizing producing, and improvement personnel arrange an order according to class and grade scheme; The scheme of arranging an order according to class and grade need be comprised to these data of production efficiency, production bottleneck, stand-by period, plant efficiency, personnel ' s efficiency and desired value, by the data that personnel's scheme of arranging an order according to class and grade affects, all should as management and control point data.
Step 6, analytical model, by in-site measurement, takes pictures, the modes such as statistics, compiles actual management and control point data in step 5, contrasts actual production system data and realistic model operation result, and analyzes the reason that analogue simulation data and real data there are differences.After correction model, analyze all kinds of management and control point data and whether reach desired value, whether realize cost minimum, maximizing efficiency.
Step 7, amendment model, to the management and control data of unrealized target, uses fish-bone analytic approach to analyze, finds its influence factor, and adjustment personnel scheduling data, reruns model.
Step 8, determines realistic model, and through simulation run repeatedly, test of many times, finally seeks optimum personnel and to arrange an order according to class and grade scheme, determine the realistic model of realistic production system.
The present invention can realize automatic evaluation production system and to arrange an order according to class and grade rationality, and by Computer Simulation, constantly adjustment data carry out simulation test, until computer model conforms to actual production system.Emulation technology is when search best solution, and it can create a database for each solution and they are on the impact of model output.Relation between two model variables that this database is unknown before may be used for finding, or determine the restrictive constraint condition of that most.What use these data can obtain about model behavior is perspective.The method can improve the accuracy of result of arranging an order according to class and grade, and avoids unnecessary waste of human resource, utilizes emulation technology to make model three-dimensional visualization, easy to understand and operation simultaneously, is convenient to search Problems existing in model, improves scheme of arranging an order according to class and grade in time.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, obviously, those skilled in the art can carry out various change and modification to the present invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (2)

1. based on order produce personnel arrange an order according to class and grade emulation a method, it is characterized in that: comprise the following steps:
Step 1, model development, the system of researching and producing is arranged an order according to class and grade object and influence factor, conceputal modeling, and Confirming model framework and algorithm;
Step 2, Data Collection and process, collect all related datas affecting result of arranging an order according to class and grade, and be organized into data type and the form of model requirements;
Step 3, imports or connection data, the data of importing or link model demand, or direct connection data database data;
Step 4, moving model, by three dimension dynamic simulation model, exports dynamic data in real time, and finds Problems existing in scheme;
Step 5, exports quantitative data, to arrange an order according to class and grade demand according to personnel, formulates the data analysis and the data algorithm that meet industry characteristic;
Step 6, analytical model, verification model result also analyzes difference, collects statistics actual production system data, the difference that comparative analysis analogue simulation data and real data exist;
Step 7, amendment model, adjustment data, rerun model;
Step 8, determines realistic model, determines the realistic model of realistic production system.
2. according to claim 1 based on order produce personnel arrange an order according to class and grade emulation method, it is characterized in that: the data framework of model development described in step 1 is consistent with the data layout handled by step 2 with form.
CN201510908685.4A 2015-12-08 2015-12-08 Make-to-order based worker shift arrangement simulation method Pending CN105512401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510908685.4A CN105512401A (en) 2015-12-08 2015-12-08 Make-to-order based worker shift arrangement simulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510908685.4A CN105512401A (en) 2015-12-08 2015-12-08 Make-to-order based worker shift arrangement simulation method

Publications (1)

Publication Number Publication Date
CN105512401A true CN105512401A (en) 2016-04-20

Family

ID=55720381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510908685.4A Pending CN105512401A (en) 2015-12-08 2015-12-08 Make-to-order based worker shift arrangement simulation method

Country Status (1)

Country Link
CN (1) CN105512401A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112288394A (en) * 2020-10-29 2021-01-29 中国民用航空总局第二研究所 System for verifying scheduling test of controller

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556486A (en) * 2003-12-31 2004-12-22 冶金自动化研究设计院 Integrated iron and steel enterprise production process on line planning and controlling system and method
CN103823455A (en) * 2014-03-14 2014-05-28 西安工业大学 Workshop scheduling simulation method based on equipment failure scheduling model

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1556486A (en) * 2003-12-31 2004-12-22 冶金自动化研究设计院 Integrated iron and steel enterprise production process on line planning and controlling system and method
CN103823455A (en) * 2014-03-14 2014-05-28 西安工业大学 Workshop scheduling simulation method based on equipment failure scheduling model

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
秦天宝等: ""系统仿真基础"", 《面向应用的仿真建模与分析 使用EXTENDSIM》 *
郝娜,等: "基于成本最小的公交人员排班优化模型", 《山东科学》 *
陈骏,等: "GASA混合算法在航空公司乘务员排班系统中的应用", 《计算机工程与设计》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112288394A (en) * 2020-10-29 2021-01-29 中国民用航空总局第二研究所 System for verifying scheduling test of controller
CN112288394B (en) * 2020-10-29 2024-04-19 中国民用航空总局第二研究所 Controller scheduling test verification system

Similar Documents

Publication Publication Date Title
CN107832497B (en) A kind of intelligence workshop fast custom design method and system
CN107861478B (en) A kind of parallel control method in intelligence workshop and system
CN105302096B (en) Intelligent factory scheduling method
CN111259535B (en) Method for developing logistics simulation system of ship pipeline production line
CN103500371A (en) Change control method based on BIM
CN109933923B (en) Electromechanical equipment lean design method based on digital twinning
CN107464025B (en) Supply chain demand prediction and intelligent decision method based on big data
CN112488489A (en) Method and system for tracing and dynamically controlling machining quality driven by digital twin
CN109298685A (en) Digital factory implementation method, digital factory realize system and digital factory
CN105893669A (en) Global simulation performance predication method based on data digging
Ahmad et al. BIM-based iterative tool for sustainable building design: A conceptual framework
Denysenko et al. Implementation of CALS-technologies in quality management of product life cycle processes
CN112734284A (en) Process industry energy consumption optimization decision system and operation method thereof for improving accuracy of evaluation result under abnormal working condition
CN116596483A (en) Bridge construction organization method based on three-dimensional digital technology
CN116029682A (en) Construction progress management method and system based on BIM technology
CN117454492A (en) Electromechanical construction method and system based on BIM technology
Gourlis et al. A holistic digital twin simulation framework for industrial facilities: BIM-based data acquisition for building energy modeling
Carvalho et al. Guidelines for analysing the building energy efficiency using BIM
CN105512401A (en) Make-to-order based worker shift arrangement simulation method
CN105005210B (en) Electromechanical integration analogue system and use its method
CN110377525A (en) A kind of parallel program property-predication system based on feature and machine learning when running
CN114155072B (en) Financial prediction model construction method and system based on big data analysis
CN111125855A (en) Simulation system and method for optical-mechanical system design
CN110262891B (en) Automatic multifunctional resource recycling system across virtualization platforms
Cui et al. Application research of intelligent system based on BIM and sensors monitoring technology in construction management

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160420