CN105512087A - 一种资源约束性多节点计算系统的可靠性评估方法 - Google Patents
一种资源约束性多节点计算系统的可靠性评估方法 Download PDFInfo
- Publication number
- CN105512087A CN105512087A CN201510892726.5A CN201510892726A CN105512087A CN 105512087 A CN105512087 A CN 105512087A CN 201510892726 A CN201510892726 A CN 201510892726A CN 105512087 A CN105512087 A CN 105512087A
- Authority
- CN
- China
- Prior art keywords
- node
- bdd
- branch
- constant
- cluster organization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000004364 calculation method Methods 0.000 title claims description 11
- 230000008520 organization Effects 0.000 claims abstract description 94
- 238000004891 communication Methods 0.000 claims description 19
- 238000011156 evaluation Methods 0.000 claims description 7
- 238000001514 detection method Methods 0.000 claims description 4
- 230000007257 malfunction Effects 0.000 claims 2
- 238000005457 optimization Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 15
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Landscapes
- Complex Calculations (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510892726.5A CN105512087B (zh) | 2015-12-08 | 2015-12-08 | 一种资源约束性多节点计算系统的可靠性评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510892726.5A CN105512087B (zh) | 2015-12-08 | 2015-12-08 | 一种资源约束性多节点计算系统的可靠性评估方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105512087A true CN105512087A (zh) | 2016-04-20 |
CN105512087B CN105512087B (zh) | 2021-03-26 |
Family
ID=55720082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510892726.5A Active CN105512087B (zh) | 2015-12-08 | 2015-12-08 | 一种资源约束性多节点计算系统的可靠性评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105512087B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110098609A (zh) * | 2018-01-29 | 2019-08-06 | 中国电力科学研究院有限公司 | 一种面向配电网的量测上传数据准备方法及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040103378A1 (en) * | 2002-11-13 | 2004-05-27 | Fujitsu Limited | System and method for building a binary decision diagram associated with a target circuit |
CN101035017A (zh) * | 2007-02-02 | 2007-09-12 | 南京邮电大学 | 基于移动代理的无线传感器网络分布式管理方法 |
US20080282207A1 (en) * | 2007-05-10 | 2008-11-13 | Baumgartner Jason R | Method and System for Conjunctive BDD Building and Variable Quantification Using Case-Splitting |
CN102685242A (zh) * | 2012-05-22 | 2012-09-19 | 南京邮电大学 | 一种开放网络下服务间关联关系的建立方法 |
CN103745410A (zh) * | 2013-12-09 | 2014-04-23 | 国核(北京)科学技术研究院有限公司 | 基于dft定性定量分析的系统可靠性评估方法和设备 |
-
2015
- 2015-12-08 CN CN201510892726.5A patent/CN105512087B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040103378A1 (en) * | 2002-11-13 | 2004-05-27 | Fujitsu Limited | System and method for building a binary decision diagram associated with a target circuit |
CN101035017A (zh) * | 2007-02-02 | 2007-09-12 | 南京邮电大学 | 基于移动代理的无线传感器网络分布式管理方法 |
US20080282207A1 (en) * | 2007-05-10 | 2008-11-13 | Baumgartner Jason R | Method and System for Conjunctive BDD Building and Variable Quantification Using Case-Splitting |
CN102685242A (zh) * | 2012-05-22 | 2012-09-19 | 南京邮电大学 | 一种开放网络下服务间关联关系的建立方法 |
CN103745410A (zh) * | 2013-12-09 | 2014-04-23 | 国核(北京)科学技术研究院有限公司 | 基于dft定性定量分析的系统可靠性评估方法和设备 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110098609A (zh) * | 2018-01-29 | 2019-08-06 | 中国电力科学研究院有限公司 | 一种面向配电网的量测上传数据准备方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN105512087B (zh) | 2021-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Li et al. | Coding for distributed fog computing | |
US8122281B2 (en) | System and method for dependent failure-aware allocation of distributed data-processing systems | |
CN103812949B (zh) | 一种面向实时云平台的任务调度与资源分配方法及系统 | |
CN107493334A (zh) | 一种云雾计算网络架构及增强云雾网络架构可靠性的方法 | |
CN110798517A (zh) | 去中心化集群负载均衡方法、系统、移动终端及存储介质 | |
CN105824780A (zh) | 一种基于单机多fpga的并行开发方法 | |
CN113051446A (zh) | 拓扑关系查询方法、装置、电子设备和介质 | |
CN103336756B (zh) | 一种数据计算节点的生成装置 | |
WO2022012581A1 (zh) | 数据压缩及传输方法、装置、设备、众核系统、介质 | |
CN104008012A (zh) | 一种基于虚拟机动态迁移的高性能MapReduce实现机制 | |
Yeh | A sequential decomposition method for estimating flow in a multi-commodity, multistate network | |
Duolikun et al. | An energy-efficient process migration approach to reducing electric energy consumption in a cluster of servers | |
CN104142810A (zh) | 一种形成节点导纳矩阵的并行方法 | |
CN105512087A (zh) | 一种资源约束性多节点计算系统的可靠性评估方法 | |
CN103136162B (zh) | Asic片内云架构及基于该架构的设计方法 | |
Xiao et al. | A class of data-center network models offering symmetry, scalability, and reliability | |
Gu et al. | Optimization of service addition in multilevel index model for edge computing | |
CN112019368B (zh) | 一种vnf迁移方法、装置及存储介质 | |
US10193757B2 (en) | Network topology system and method | |
KR20230049526A (ko) | 인-네트워크 관리 장치, 네트워크 스위치, 인-네트워크 데이터 집약 시스템 및 방법 | |
CN104219285B (zh) | 确定云平台中通信代理节点和虚拟机的映射关系的方法 | |
CN113296953A (zh) | 云边端异构边缘计算网络的分布式计算架构、方法与装置 | |
CN107360210B (zh) | 云计算数据中心兼顾能耗与访问延迟的虚拟机分配方法 | |
CN107463462A (zh) | 数据修复方法及数据修复装置 | |
CN103678245A (zh) | 一种低功耗的片上网络任务映射方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160420 Assignee: Zhejiang Yifei Information Technology Co.,Ltd. Assignor: ZHEJIANG NORMAL University Contract record no.: X2022980007946 Denomination of invention: A reliability evaluation method for resource constrained multi node computing system Granted publication date: 20210326 License type: Common License Record date: 20220621 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160420 Assignee: Huzhou Jiahao Information Technology Co.,Ltd. Assignor: ZHEJIANG NORMAL University Contract record no.: X2023980045418 Denomination of invention: A reliability evaluation method for resource constrained multi node computing systems Granted publication date: 20210326 License type: Common License Record date: 20231101 Application publication date: 20160420 Assignee: Zhongzhi Yingan (Zhejiang) Technology Co.,Ltd. Assignor: ZHEJIANG NORMAL University Contract record no.: X2023980045414 Denomination of invention: A reliability evaluation method for resource constrained multi node computing systems Granted publication date: 20210326 License type: Common License Record date: 20231101 Application publication date: 20160420 Assignee: Zhejiang Bingsheng Technology Co.,Ltd. Assignor: ZHEJIANG NORMAL University Contract record no.: X2023980045386 Denomination of invention: A reliability evaluation method for resource constrained multi node computing systems Granted publication date: 20210326 License type: Common License Record date: 20231101 |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20160420 Assignee: Ningbo Hengquan Technology Co.,Ltd. Assignor: ZHEJIANG NORMAL University Contract record no.: X2024980000682 Denomination of invention: A reliability evaluation method for resource constrained multi node computing systems Granted publication date: 20210326 License type: Common License Record date: 20240115 |
|
EE01 | Entry into force of recordation of patent licensing contract |