CN105499283A - Steel-gathering guide groove module - Google Patents

Steel-gathering guide groove module Download PDF

Info

Publication number
CN105499283A
CN105499283A CN201510946255.1A CN201510946255A CN105499283A CN 105499283 A CN105499283 A CN 105499283A CN 201510946255 A CN201510946255 A CN 201510946255A CN 105499283 A CN105499283 A CN 105499283A
Authority
CN
China
Prior art keywords
guide groove
steel guide
cover plate
movable pressing
mounting base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510946255.1A
Other languages
Chinese (zh)
Inventor
唐辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Maituo Technology Co Ltd
Original Assignee
Chongqing Maituo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Maituo Technology Co Ltd filed Critical Chongqing Maituo Technology Co Ltd
Priority to CN201510946255.1A priority Critical patent/CN105499283A/en
Publication of CN105499283A publication Critical patent/CN105499283A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B39/00Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B39/14Guiding, positioning or aligning work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a steel-gathering guide groove module. The steel-gathering guide groove module comprises steel-gathering guide groove bodies, an installation base and a cover plate; the installation base comprises threaded holes formed in the top surface of the installation base, bolts matched with the threaded holes and movable pressing plates, wherein the bolts penetrate through the movable pressing plates; protruding blocks are arranged on the side walls of the steel-gathering guide groove bodies and can extend into the position between the movable pressing plates and the top surface; clamping columns are arranged on the side walls of the installation base, and clamping grooves capable of being matched with the clamping columns for realizing the clamping effect and fixing the cover plate to the installation base are formed in the cover plate. According to the invention, the clamping columns and the clamping grooves are used for realizing clamping and fixing, the operation steps are obviously simplified, and the connection operation of the cover plate and the installation base is simpler and more convenient; meanwhile, steel-gathering guide grooves and the installation base are connected through cooperation among the bolts, the movable pressing plates and the protruding blocks, the operation steps are obviously simplified, and the connection operation of the steel-gathering guide grooves and the installation base is simpler and more convenient.

Description

And steel guide groove module
Technical field
The present invention relates to steel production equipment technical field, particularly one steel guide groove module.
Background technology
At present, on the rolling line producing bar-shaped steel (follow-up referred to as bar), be provided with and steel guide groove, the bar after upstream process processing is accepted in its effect, and make bar when by vallecular cavity, realize gathering to many bars of dispersion, and then make many bars after gathering together enter into upstream device.
Multiple and steel guide groove is fixed on mounting base, and be provided with for covering all and the cover plate of steel guide groove on mounting base, this cover plate by and the groove top closure of openings of steel guide groove cover, with avoid from and steel guide groove port enter vallecular cavity bar from groove top opening unexpected deviate from and affect the normal production of bar.
But, in the prior art, the connected mode of cover plate and mounting base, is generally non-dismountable connection (such as welding etc.) or for removably connecting, and the adopted connected mode that removably connects mostly is and uses screw bolt and nut to connect cover plate and mounting base.In these two kinds of connected modes, non-dismountable connection cannot realize and the replacing of steel guide groove, and by the connected mode of screw bolt and nut, then when carrying out dismounting to cover plate and mounting base, need to carry out the aligning location of screw bolt and nut, repeatedly screw screw bolt and nut is departed from completely or fully to screw etc. operation, whole operating process is comparatively loaded down with trivial details, makes the replacement operation of cover plate waste time and energy.
And in the prior art, multiple and steel guide groove is fixed on mounting base, and mounting base with and the connected mode of steel guide groove be generally and non-removablely weld or coordinate realization to removably connect by screw bolt and nut.In these two kinds of connected modes, non-dismountable connection cannot realize and the replacing of steel guide groove, and by the connected mode of screw bolt and nut, then needing to carry out the aligning location of screw bolt and nut when carrying out dismounting, repeatedly screwing screw bolt and nut is departed from completely or fully to screw etc. operation, whole operating process is comparatively loaded down with trivial details, makes the replacement operation of also steel guide groove waste time and energy.
Therefore, how to improve cover plate and mounting base dismounting convenience and and the dismounting convenience of steel guide groove and mounting base, be current those skilled in the art's problem demanding prompt solution.
Summary of the invention
In view of this, the invention provides a kind of also steel guide groove module, which raises dismounting convenience and and the dismounting convenience of steel guide groove and mounting base of cover plate and mounting base.
In order to achieve the above object, technical scheme of the present invention is achieved in that
A kind of also steel guide groove module, comprising: and steel guide groove body, mounting base and cover plate;
Wherein, described mounting base comprises: offer screwed hole on its top face; The bolt coordinated with described screwed hole; By the movable pressing board that described bolt passes; Described and the sidewall of steel guide groove body is provided with projection, described projection can extend between described movable pressing board and described end face;
The pedestal sidewall of described mounting base is provided with card column, described cover plate offers to coordinate with described card column and clamp, described cover plate to be fixed on the draw-in groove on described mounting base.
Further, above-mentioned and in steel guide groove module, described draw-in groove is arranged in the cover sidewall of described cover plate, and described cover sidewall is provided with multiple draw-in groove, whole described draw-in grooves is equidistantly arranged in a linear on the length direction of described cover plate.
Further, above-mentioned and in steel guide groove module, described pedestal sidewall is provided with multiple card column, the magnitude setting of the magnitude setting of described card column and position and described draw-in groove and position one_to_one corresponding.
Further, above-mentioned and in steel guide groove module, the described substrate sidewall that two of described cover plate are relative is provided with multiple draw-in groove; The described pedestal sidewall that two of described mounting base are relative is provided with multiple card column.
Further, above-mentioned and in steel guide groove module, the end face of described cover plate is provided with multiple handle.
Further, above-mentioned and in steel guide groove module, described and bar inlet that is steel guide groove body is flaring mouth, the minimum widith of described flaring mouth equals described and the vallecular cavity width of steel guide groove body.
Further, above-mentioned and in steel guide groove module, described movable pressing board is fixedly connected with described bolt.
Further, above-mentioned and in steel guide groove module, described movable pressing board is set in outside the threaded rod of described bolt, and described movable pressing board can slide on described threaded rod.
Further, above-mentioned and in steel guide groove module, described and two opposing sidewalls of steel guide groove body are provided with projection.
Further, above-mentioned and in steel guide groove module, between the nut of described movable pressing board and described bolt, be provided with packing ring.
Provided by the invention and steel guide groove module, itself and the existing and main difference part of steel guide groove are, the pedestal sidewall of mounting base is provided with card column, is on the cover board then provided with draw-in groove, this draw-in groove can coordinate with card column and clamps, to realize the connection, fixing of cover plate and mounting base; Simultaneously, when needs are by when also steel guide groove body is installed on mounting base, only projection need be made to extend between movable pressing board and end face, then bolt is screwed, bolt is made to drive movable pressing board to move to the direction near end face, until movable pressing board and bump contact gradually projection is pressed on end face, thus to realize and the installation of steel guide groove on installation base plate is fixed.When needs dismounting and steel guide groove time, only oppositely need screw bolt, cancel the pressure being applied to movable pressing board, just projection can be taken out between movable pressing board and end face, and then realize the dismounting of also steel guide groove.
Provided by the invention and steel guide groove module, realize connecting and fixing by card column and draw-in groove, both removably connecting of mounting base and cover plate had been achieved, turn avoid the use of connector, without the need to screwing set bolt, also locating without the need to aiming at nut, significantly simplify operating procedure, make the attended operation of cover plate and mounting base easier; Simultaneously, coordinated the connection realizing also steel guide groove and mounting base with projection by bolt, movable pressing board, when carrying out disassembling operations, the torquing operations of less number of times only need be carried out to bolt, without the need to bolt is all screwed out, also locating without the need to aiming at nut, significantly simplify operating procedure, make the attended operation of also steel guide groove and mounting base easier.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
Fig. 1 for the embodiment of the present invention provide and in steel guide groove module and the structural representation of steel guide groove body and mounting base;
Fig. 2 is the partial enlarged drawing of Fig. 1;
The end construction schematic diagram of the also steel guide groove module that Fig. 3 provides for the embodiment of the present invention;
The axonometric drawing of the also steel guide groove module that Fig. 4 provides for the embodiment of the present invention;
Fig. 5 is the partial enlarged drawing of Fig. 4.
In figs. 1-5:
Mounting base-1, cover plate-2, card column-3, draw-in groove-4, handle-5, and steel guide groove body-6, flaring mouth-7, bolt-8, movable pressing board-9, projection-10, packing ring-11; .
Base plate-101, top board-102, gripper shoe-103, floor-104.
Detailed description of the invention
The invention provides a kind of also steel guide groove module, which raises the dismounting convenience of cover plate and mounting base.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As Figure 1-5, the also steel guide groove module that the embodiment of the present invention provides, its main improvements are, the pedestal sidewall of mounting base 1 arranges card column 3, cover plate 2 is then provided with draw-in groove 4, this draw-in groove 4 can coordinate with card column 3 and clamps, to realize the connection, fixing of cover plate 2 and mounting base 1.
Provided by the invention and steel guide groove module, realize connecting and fixing by card column 3 and draw-in groove 4, both achieved removably connecting of mounting base 1 and cover plate 2, turn avoid the use of connector, can realize both Fast Installation and disengaging, and structure is simple, difficulty of processing is low.And, without the need to screwing set bolt, also locating without the need to aiming at nut, significantly simplify operating procedure, make cover plate 2 easier with the attended operation of mounting base 1.
Above-mentioned and another main improvements of steel guide groove module are, mounting base 1 offers screwed hole, and the bolt 8 coordinated with screwed hole is set, also comprise the movable pressing board 9 passed by bolt 8, namely movable pressing board 9 is connected with the end face of mounting base 1 by bolt 8, and and on the sidewall of steel guide groove body 6, be then provided with and protrude the projection 10 of sidewall, this projection 10 can extend between the plane of movable pressing board 9 and mounting base 1.When needs are by when also steel guide groove is installed on mounting base 1, only projection 10 need be made to extend between movable pressing board 9 and end face, then bolt 8 is screwed, bolt 8 is made to drive movable pressing board 9 to move to the direction near end face, until movable pressing board 9 contacts with projection 10 and is pressed on end face by projection 10 gradually, thus to realize and the installation of steel guide groove body 6 on mounting base 1 is fixed.When needs dismounting and steel guide groove time, only need oppositely screw bolt 8, cancel the pressure being applied to movable pressing board 9, just projection 10 can be taken out between movable pressing board 9 and end face, and then realize the dismounting of also steel guide groove body 6.
The also steel guide groove module that the present embodiment provides, coordinated the connection realizing also steel guide groove and mounting base 1 with projection 10 by bolt 8, movable pressing board 9, when carrying out disassembling operations, the torquing operations of less number of times only need be carried out to bolt 8, without the need to bolt 8 is all screwed out, also locating without the need to aiming at nut, significantly simplify operating procedure, make the attended operation of also steel guide groove and mounting base 1 easier.
In order to further optimisation technique scheme, in the also steel guide groove module that the present embodiment provides, draw-in groove 4 is arranged on cover plate 2 sidewall of cover plate 2, and cover plate 2 sidewall is provided with multiple draw-in groove 4, whole draw-in grooves 4 is equidistantly arranged in a linear on the length direction of cover plate 2, corresponding with it, pedestal sidewall is also provided with multiple card column 3, the magnitude setting of the magnitude setting of card column 3 and setting position and draw-in groove 4 and setting position one_to_one corresponding, as shown in Figure 4.In the present embodiment, in order to strengthen the connection effect of cover plate 2 and mounting base 1 further, preferably multiple draw-in groove 4 is set on cover plate 2, and simultaneously corresponding multiple card column 3 is set on mounting base 1, thus make cover plate 2 and mounting base 1 when being connected, can by many assembly close the draw-in groove 4 of clamping and card column 3 realize both connection, farthest improve connectivity robustness and stability, so as the preferred version of the present embodiment.Wherein, the arrangement mode of draw-in groove 4 and card column 3, is preferably equidistantly arranged in a linear, and can make stressed more even when being connected of cover plate 2 and mounting base 1 like this.
In addition, when cover plate 2 normally can be realized normally to be connected with mounting base 1, draw-in groove 4 and card column 3 can also be made to exchange setting, be arranged on cover plate 2 sidewall of cover plate 2 by card column 3, draw-in groove 4 is opened on the pedestal sidewall of mounting base 1.Because this kind of set-up mode also needs to change the size of cover plate 2 and mounting base 1, cause change amount comparatively large, so not as preferred design.
Further, the substrate sidewall that two of cover plate 2 are relative is provided with multiple draw-in groove 4, simultaneously two of mounting base 1 relative pedestal sidewalls are also provided with multiple card column 3, thus make cover plate 2 realize bilateral with mounting base 1 to be connected, connective stability can be made better.
In the present embodiment, the end face of preferred cover plate 2 is also provided with multiple handle 5, as shown in Figure 4.Arrange handle 5, the hand-held handle of convenient operation personnel 5 pairs of cover plates 2 are moved and dismounting, significantly facilitate the carrying out of disassembling operations.
In addition, in the present embodiment, preferably also the bar import of steel guide groove body 6 is set to flaring mouth 7, and make the minimum widith of flaring mouth 7 equal and the vallecular cavity width of steel guide groove body 6, also also can be understood as and the groove structure that a lumen width reduces gradually has been set up in the bar import of steel guide groove body 6, the less port of the width of this groove structure is connected with the bar import of also steel guide groove body 6.By arranging flaring mouth 7, the width of bar import can being increased, making bar have more large-area turnover space when entering into vallecular cavity, thus the situation that minimizing even avoids bar cannot enter in vallecular cavity occurs, better ensure that the normal production of bar.
In order to further optimisation technique scheme, in the also steel guide groove module that the present embodiment provides, movable pressing board 9 is fixedly connected with bolt 8.In the present embodiment, the effect of movable pressing board 9 realizes compressing to projection 10 under the drive of bolt 8, and in order to improve the convenience of operation, movable pressing board 9 can be made to be fixedly connected with the threaded rod of bolt 8, to avoid bolt 8 relatively rotate with movable pressing board 9 in the process screwed and make troubles to operation.
In addition, except above-mentioned set-up mode, movable pressing board 9 can also be made to be set in outside the threaded rod of bolt 8, and movable pressing board 9 can be slided on threaded rod.This kind of fit system can make movable pressing board 9 slide on threaded rod and rotate, bolt 8 is in the process be screwed, movable pressing board 9 can not rotate with bolt 8, but be naturally placed on projection 10, after bolt 8 contacts with movable pressing board 9, again pressure is applied to movable pressing board 9, and eventually through movable pressing board 9, projection 10 is pressed on end face.This kind of set-up mode avoids movable pressing board 9 in the process that bolt 8 is screwed and rotates, thus without the need to reserving revolution space for movable pressing board 9, the present embodiment is provided and the structure of steel guide groove module is compacter, think the preferred version of the present embodiment.
As shown in Figures 2 and 3, in the present embodiment, each and two sidewalls of steel guide groove body 6 are provided with projection 10, top board 102 is provided with the movable pressing board 9 that can compress projection 10, movable pressing board 9 by compress projection 10 with by and steel guide groove body 6 is fixed on the end face of mounting base 1, and between adjacent two and steel guide groove body 6, only a movable pressing board 9 need be set, can realize compressing to two projections 10 of the difference on two and steel guide groove body 6, thus decrease the magnitude setting of movable pressing board 9 and bolt 8, the number of times repeated is reduced when carrying out disassembling operations, dismounting convenience is made to significantly improve.
Concrete, in the present embodiment, mounting base 1 comprises: base plate 101; With and the top board 102 that is connected of steel guide groove body 6, the above-mentioned end face i.e. upper surface of top board 102 for this reason; Connecting bottom board 101 and top board 102, and the gripper shoe 103 of roof supporting 102; Be arranged in gripper shoe 103, and the floor 104 be connected with top board 102 and base plate 101, as shown in figures 1 and 3.The concrete structure of mounting base 1 can be multiple, and the present embodiment then preferred mounting base 1 is made up of base plate 101, top board 102, gripper shoe 103 and floor 104.Wherein, base plate 101 is the basic element of character supporting whole mounting base 1, and top board 102 is arranged on base plate 101 by gripper shoe 103, and multiple and steel guide groove body 6 is fixed on top board 102.Floor 104 is connected with base plate 101, top board 102 and gripper shoe 103, to strengthen the intensity of whole supporting construction further simultaneously.
Preferred further, be provided with packing ring 11 between the nut of movable pressing board 9 and bolt 8.Set up packing ring 11, when bolt 8 pairs of movable pressing boards 9 can be avoided to apply pressure, movable pressing board 9 is caused damage, thus protective action is played to movable pressing board 9, extend working life that is that the present embodiment provides and steel guide groove module, can also connectivity robustness be improved simultaneously, improve functional reliability.
In this description, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment remaining identical similar portion mutually see.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. and a steel guide groove module, comprising: and steel guide groove body, mounting base and cover plate; It is characterized in that,
Wherein, described mounting base comprises: offer screwed hole on its top face; The bolt coordinated with described screwed hole; By the movable pressing board that described bolt passes; Described and the sidewall of steel guide groove body is provided with projection, described projection can extend between described movable pressing board and described end face;
The pedestal sidewall of described mounting base is provided with card column, described cover plate offers to coordinate with described card column and clamp, described cover plate to be fixed on the draw-in groove on described mounting base.
2. according to claim 1 and steel guide groove module, it is characterized in that, described draw-in groove is arranged in the cover sidewall of described cover plate, and described cover sidewall is provided with multiple draw-in groove, and whole described draw-in grooves is equidistantly arranged in a linear on the length direction of described cover plate.
3. according to claim 2 and steel guide groove module, is characterized in that, described pedestal sidewall is provided with multiple card column, the magnitude setting of the magnitude setting of described card column and position and described draw-in groove and position one_to_one corresponding.
4. according to claim 3 and steel guide groove module, is characterized in that, the described substrate sidewall that two of described cover plate are relative is provided with multiple draw-in groove; The described pedestal sidewall that two of described mounting base are relative is provided with multiple card column.
5. according to claim 4 and steel guide groove module, is characterized in that, the end face of described cover plate is provided with multiple handle.
6. according to claim 5 and steel guide groove module, is characterized in that, described and bar inlet that is steel guide groove body is flaring mouth, and the minimum widith of described flaring mouth equals described and the vallecular cavity width of steel guide groove body.
7. according to claim 1 and steel guide groove module, it is characterized in that, described movable pressing board is fixedly connected with described bolt.
8. according to claim 1 and steel guide groove module, it is characterized in that, described movable pressing board is set in outside the threaded rod of described bolt, and described movable pressing board can slide on described threaded rod.
9. according to claim 1 and steel guide groove module, is characterized in that, described and two opposing sidewalls of steel guide groove body are provided with projection.
10., according to the also steel guide groove module in claim 1-9 described in any one, it is characterized in that, between the nut of described movable pressing board and described bolt, be provided with packing ring.
CN201510946255.1A 2015-12-16 2015-12-16 Steel-gathering guide groove module Pending CN105499283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510946255.1A CN105499283A (en) 2015-12-16 2015-12-16 Steel-gathering guide groove module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510946255.1A CN105499283A (en) 2015-12-16 2015-12-16 Steel-gathering guide groove module

Publications (1)

Publication Number Publication Date
CN105499283A true CN105499283A (en) 2016-04-20

Family

ID=55707802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510946255.1A Pending CN105499283A (en) 2015-12-16 2015-12-16 Steel-gathering guide groove module

Country Status (1)

Country Link
CN (1) CN105499283A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201558866U (en) * 2009-10-22 2010-08-25 江阴市西城钢铁有限公司 Rolling conduit ferrule for spraying water during steel rolling process
KR20110083228A (en) * 2010-01-14 2011-07-20 장영구 Wire rod entry and outlet guide device of wire rod rough mill
CN201900139U (en) * 2010-12-17 2011-07-20 合肥东方冶金设备有限公司 Foreplate compacting device used for slide type outlet guide and guard device
CN203400940U (en) * 2013-04-19 2014-01-22 首钢京唐钢铁联合有限责任公司 Cut front side guide
CN203955725U (en) * 2014-05-14 2014-11-26 武汉钢铁(集团)公司 For the detachable guide and guard of milling train rotary outlet
CN204052381U (en) * 2014-09-15 2014-12-31 河北钢铁股份有限公司承德分公司 A kind of Continuous mill train runout table pallet device
CN104368608A (en) * 2014-11-13 2015-02-25 武汉科技大学 Guide and guard device for rolling of profile steel with special-shaped section
CN204817488U (en) * 2015-07-31 2015-12-02 江阴东邦钢球机械有限公司 Steel ball is baffle quick replacement device for peeler
CN205518996U (en) * 2015-12-16 2016-08-31 重庆麦拓科技有限公司 And steel guide slot module

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201558866U (en) * 2009-10-22 2010-08-25 江阴市西城钢铁有限公司 Rolling conduit ferrule for spraying water during steel rolling process
KR20110083228A (en) * 2010-01-14 2011-07-20 장영구 Wire rod entry and outlet guide device of wire rod rough mill
CN201900139U (en) * 2010-12-17 2011-07-20 合肥东方冶金设备有限公司 Foreplate compacting device used for slide type outlet guide and guard device
CN203400940U (en) * 2013-04-19 2014-01-22 首钢京唐钢铁联合有限责任公司 Cut front side guide
CN203955725U (en) * 2014-05-14 2014-11-26 武汉钢铁(集团)公司 For the detachable guide and guard of milling train rotary outlet
CN204052381U (en) * 2014-09-15 2014-12-31 河北钢铁股份有限公司承德分公司 A kind of Continuous mill train runout table pallet device
CN104368608A (en) * 2014-11-13 2015-02-25 武汉科技大学 Guide and guard device for rolling of profile steel with special-shaped section
CN204817488U (en) * 2015-07-31 2015-12-02 江阴东邦钢球机械有限公司 Steel ball is baffle quick replacement device for peeler
CN205518996U (en) * 2015-12-16 2016-08-31 重庆麦拓科技有限公司 And steel guide slot module

Similar Documents

Publication Publication Date Title
CN105364559A (en) Speed reducer shaft fixture
CN205518996U (en) And steel guide slot module
CN105499283A (en) Steel-gathering guide groove module
CN102896519A (en) Fixture for machining groove on outer circular surface of workpiece with holes
CN202224969U (en) Clamp for processing connecting port of air filter base
CN202622122U (en) Locking and pressing device for tin-passing furnace jig
CN102946692A (en) Circuit board assembly and riveting tool thereof
CN103357713A (en) Arc-bending device
CN105396883A (en) Steel connection guide groove mold block
CN216370732U (en) Laser cutting on-line measuring device
CN202985157U (en) Screw pressing device
CN109454380A (en) Reinforcing beam assembly welding tooling before front wall
CN105382035A (en) Parallel steel guide groove module
CN104589029A (en) Semi-automatic pressing device for air filter iron covering
CN205270384U (en) And steel guide slot module
CN103737402A (en) Cylinder cover and rough milled cover combination face clamp
CN210046345U (en) A quick frock clamp for show shelf connecting piece
CN204400398U (en) A kind of lift car leg latching device, leg bindiny mechanism and lift car
CN203826497U (en) Lithium ion battery busbar composite clamp
CN203752095U (en) Adjustable press device for locomotive bogie axle box spring assembly
CN206967091U (en) Generator support fixture for processing with oblique empennage
CN102501110A (en) Workpiece compacting device
CN212635013U (en) Scrape fixed frock of trigger medium plate processing
CN208884809U (en) A kind of steel structures in construction works roof girder steel is connected and fixed structure
CN207896223U (en) It is melted into tooling and battery makes tooling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160420

RJ01 Rejection of invention patent application after publication