CN105488616A - Data recording method and device after replacement of drawer type power distribution cabinet - Google Patents

Data recording method and device after replacement of drawer type power distribution cabinet Download PDF

Info

Publication number
CN105488616A
CN105488616A CN201510831258.0A CN201510831258A CN105488616A CN 105488616 A CN105488616 A CN 105488616A CN 201510831258 A CN201510831258 A CN 201510831258A CN 105488616 A CN105488616 A CN 105488616A
Authority
CN
China
Prior art keywords
distribution cabinet
power distribution
sequence number
change
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510831258.0A
Other languages
Chinese (zh)
Inventor
刘坤鹏
吴军强
程华兵
柯贤康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CEIEC ELECTRIC TECHNOLOGY Inc
Original Assignee
CEIEC ELECTRIC TECHNOLOGY Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CEIEC ELECTRIC TECHNOLOGY Inc filed Critical CEIEC ELECTRIC TECHNOLOGY Inc
Priority to CN201510831258.0A priority Critical patent/CN105488616A/en
Publication of CN105488616A publication Critical patent/CN105488616A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a data recording method after the replacement of a drawer type power distribution cabinet. The method comprises the following steps: collecting a preset serial number in the power distribution cabinet and the ammeter bottom value of a power distribution cabinet ammeter; judging whether the currently collected serial number of the power distribution cabinet is changed or not; and if the currently collected serial number of the power distribution cabinet is changed, judging the current power distribution cabinet is changed, and recording log data information before and after the current power distribution cabinet is changed. The data recording method can automatically judge whether the power distribution cabinet is changed or not, and records the data according to a judgment result so as to cause an operation to be simple and be unlikely to make mistakes.

Description

A kind ofly change the data record method after drawer-type distribution box and device
Technical field
The invention belongs to power domain, particularly relate to and a kind ofly change the data record method after drawer-type distribution box and device.
Background technology
Power distribution cabinet (case) is the final stage device of distribution system.Power distribution cabinet is used in the occasion that duty ratio is comparatively disperseed, loop is less, concentrates, occasion that loop is more for load.Power distribution cabinet gives load nearby the power distribution of a certain for upper level controller switching equipment circuit, provides protection, monitoring and controlling to load.Wherein, the interchangeability of drawer-type distribution box is good, replaces the drawout cubicle of fault, can shorten power off time with drawout cubicle for subsequent use, reduces the impact on producing.Electric energy collection device in drawout cubicle is replaced along with drawout cubicle is overall together, different with the table floors of the electric energy after replacing before changing, Master Station Software generates power consumption form by the table floors reading electric energy collection device, and the table floors change before and after changing then can cause power consumption not conform to the actual conditions.
In order to address this problem, have two kinds of processing modes at present, a kind of maintenance personal of being is reported to data run personnel, by operations staff's manual correction power consumption form the end angle value of the electric energy before replacing and after changing; , by maintenance personal, the end angle value of the electric energy before replacing and after changing is reported to an operations staff, the manual typing Master Station Software of operations staff, by Master Station Software auto modification power consumption form.
These two kinds of processing modes, all depend on maintenance personal and the table floors of the electric energy before replacing and after changing is reported to operations staff, its operation comparatively bothers, cause the data recording or transmit to have problem if maintenance personal or operations staff lack a sense of responsibility or not by regulation record or transmit these information, last power consumption form will be caused to there is very big error.
Summary of the invention
The object of the present invention is to provide and a kind ofly change the data record method after drawer-type distribution box, solving prior art when changing drawer-type distribution box, depending on and manually carrying out record, operation comparatively bothers, and the problem of easily makeing mistakes.
First aspect, embodiments provide and a kind ofly change the data record method after drawer-type distribution box, described method comprises:
Gather the table floors of sequence number and the power distribution cabinet ammeter preset in power distribution cabinet;
Judge whether the sequence number of the power distribution cabinet of current collection changes;
If the sequence number of the power distribution cabinet of current collection changes, then judge that current power distribution cabinet changes, and record the daily record data information before and after power distribution cabinet change.
In conjunction with first aspect, may in implementation in the first of first aspect, before the sequence number preset in described collection power distribution cabinet and the table floors step of power distribution cabinet ammeter, described method also comprises:
Judge whether described power distribution cabinet is provided with sequence number;
If described power distribution cabinet does not arrange sequence number, then whether change according to the power consumption velocity estimated current power distribution cabinet gathered.
May implementation in conjunction with the first of first aspect, may in implementation at the second of first aspect, the described power consumption velocity estimated current power distribution cabinet according to the gathering step that whether changes comprises:
Obtain the variable quantity of electric energy meter according to the table floors of the electric energy meter of front and back twi-read, and the time point of electric energy meter that front and back are chosen for twice obtains transformation period;
According to variable quantity and the power consumption variable quantity of described transformation period unit of account time of described electric energy meter, described unit interval power consumption is compared with the threshold value preset;
If unit interval power consumption is greater than default threshold value, then judge that current power distribution cabinet changes.
May implementation in conjunction with the first of first aspect or first aspect, may in implementation at the third of first aspect, the daily record data information before and after described power distribution cabinet change comprises:
The table floors of power distribution cabinet ammeter corresponding before and after time of acquisition sequence number, the sequence number gathered and power distribution cabinet change before and after power distribution cabinet change.
May implementation in conjunction with the first of first aspect or first aspect, may in implementation at the 4th kind of first aspect, described method also comprises:
If current power distribution cabinet does not change, be then updated to Virtual table floors according to the power consumption of electric energy meter record.
Second aspect, embodiments provide and a kind ofly change the data recording equipment after drawer-type distribution box, described device comprises:
Collecting unit, for gathering the table floors of sequence number and the power distribution cabinet ammeter preset in power distribution cabinet;
Sequence number change judging unit, for judging whether the sequence number of the power distribution cabinet of current collection changes;
Record cell, if changed for the sequence number of the power distribution cabinet of current collection, then judges that current power distribution cabinet changes, and records the daily record data information before and after power distribution cabinet change.
In conjunction with second aspect, in the first possibility implementation of second aspect, described device also comprises:
Sequence number arranges judging unit, for judging whether described power distribution cabinet is provided with sequence number;
Whether power consumption rate judging unit, if do not arrange sequence number for described power distribution cabinet, then change according to the power consumption velocity estimated current power distribution cabinet gathered.
In conjunction with the first possibility implementation of second aspect, in the second possibility implementation of second aspect, described power consumption rate judging unit comprises:
Variable quantity obtains subelement, and the table floors for the electric energy meter according to front and back twi-read obtains the variable quantity of electric energy meter, and the time point of electric energy meter that front and back are chosen for twice obtains transformation period;
Threshold value compares subelement, for according to the variable quantity of described electric energy meter and the power consumption variable quantity of described transformation period unit of account time, is compared by described unit interval power consumption with the threshold value preset;
Power distribution cabinet change judges subelement, if be greater than default threshold value for unit interval power consumption, then judges that current power distribution cabinet changes.
May implementation in conjunction with the first of second aspect or second aspect, may in implementation at the third of second aspect, the daily record data information before and after described power distribution cabinet change comprises:
The table floors of power distribution cabinet ammeter corresponding before and after time of acquisition sequence number, the sequence number gathered and power distribution cabinet change before and after power distribution cabinet change.
May implementation in conjunction with the first of second aspect or second aspect, may in implementation at the 4th kind of second aspect, described device also comprises:
Updating block, if do not changed for current power distribution cabinet, is then updated to Virtual table floors according to the power consumption of electric energy meter record.
In the present invention, by arranging sequence number in advance in power distribution cabinet, and whether changed by the value of monitoring data sequent number, if changed, then automatically record the daily record data information before and after power distribution cabinet change, when the present invention can make power distribution cabinet change, do not need the record adjustment manually carrying out data, whether the present invention can change by automatic decision power distribution cabinet, carry out data record according to judged result, thus make operation more simple, and be not easy to make mistakes.
Accompanying drawing explanation
Fig. 1 is the realization flow figure of the data record method of the replacing drawer-type distribution box that first embodiment of the invention provides;
Fig. 2 is the realization flow figure of the data record method of the replacing drawer-type distribution box that second embodiment of the invention provides;
Fig. 3 is the structural representation of the data recording equipment of the replacing drawer-type distribution box that third embodiment of the invention provides.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
The data record method of drawer-type distribution box is changed described in the embodiment of the present invention, when object is to solve and changes for drawer-type distribution box in prior art, because electric energy meter is arranged in described power distribution cabinet, after having changed power distribution cabinet, also corresponding change can be there is in the table floors of electric energy meter, for the ease of carrying out record to the energy data of electric energy meter, need staff manual by the end angle value of the electric energy meter before replacing, and the end tabular value of electric energy meter after changing is entered into Master Station Software, makes Master Station Software to revise power consumption.But, owing to being carried out the mode of manual record correction during replacing power distribution cabinet by staff, need staff to read data and input and revise data accordingly, while troublesome poeration, also easily cause data easily to be made mistakes.For solving this problem, be specifically described below in conjunction with accompanying drawing.
Embodiment one:
Fig. 1 shows the realization flow of the data record method after the replacing drawer-type distribution box that first embodiment of the invention provides, and details are as follows:
In step S101, gather the table floors of sequence number and the power distribution cabinet ammeter preset in power distribution cabinet.
Concrete, the power distribution cabinet described in the embodiment of the present invention can be drawer-type distribution box, also can be other removable power distribution cabinet, and in power distribution cabinet, being provided with electric energy meter, for recording energy value or other control data relevant to power consumption of consumption, such as buying former electric energy etc.
The sequence number of described power distribution cabinet, as the unique identification identifying power distribution cabinet, can configure unique sequence number when producing.In preferred a kind of embodiment, described sequence number can also comprise the out of Memory etc. of date of manufacture, production firm and power distribution cabinet.
The table floors of described power distribution cabinet, the electric degree value of the electric energy meter namely in power distribution cabinet, 10.4 degree are designated as before the electric degree of the electric energy meter in such as power distribution cabinet is worthwhile, after described power distribution cabinet is arranged on, along with the conveying of electric energy, the table floors of the electric energy meter in described power distribution cabinet also can along with change, such as user consume newly consume 5 degree of electricity time, electric degree value on electric energy meter reflects this changing value accordingly, such as can be changed to 15.4 degree by original 10.4 degree.
In addition, due to the development of electric energy meter technology, can also arrange on described electric energy meter electricity card or other is for identifying the identification information of user, after the purchase of electricity of the identification information of user and user is bound, can be used for monitor user ' power consumption and purchase of electricity compares, when purchase of electricity is exhausted, corresponding reminder message can be sent to user, or cut off electric power supply.
In embodiments of the present invention, to the collection of the sequence number of described power distribution cabinet and the table floors of power distribution cabinet ammeter, the cycle preset can be adopted to carry out the collection of data, such as set and gathered the sequence number of primary power distribution cabinet, the table floors etc. of power distribution cabinet ammeter every 60 seconds.Certainly, the described default cycle can adjust as required, also can be real-time gather the table floors of described power distribution cabinet sequence number, power distribution cabinet.
In step s 102, judge whether the sequence number of the power distribution cabinet of current collection changes.
In embodiments of the present invention, the sequence number of the power distribution cabinet gathered by the mode record of form, after having gathered at every turn, the sequence number that the last time before the sequence number of collection and current collection gathers is compared, if two sequence numbers are identical, then confirm that current power distribution cabinet does not change, the end angle value in current power distribution cabinet can be continued use.
When the cycle gathered is set to shorter, when changing power distribution cabinet, then the replacement operation that can complete power distribution cabinet through multiple collection period may be needed.Therefore, the present invention can also be undertaken changing the judgement of power distribution cabinet by the shorter collection period of setting, and the collection period such as set is 5 seconds etc.
If the sequence number of power distribution cabinet changes, or the duration of interrupt acquisition is greater than default duration, when being such as greater than 10 seconds, then judge that current power distribution cabinet changes, need to carry out collection analysis to the data in power distribution cabinet, so that carry out data correction by Master Station Software.The benefit done like this to avoid disabled user to extract power distribution cabinet, and the data exception caused after illegally distorting ammeter numerical value wherein, such as turns down original electric degree value.
In step s 103, if the sequence number of the power distribution cabinet of current collection changes, then judge that current power distribution cabinet changes, and record the daily record data information before and after power distribution cabinet change.
When detecting that the sequence number of collection changes, then illustrate that staff changes to current power distribution cabinet, the end angle value of the watt-hour meter changed in forward and backward power distribution cabinet, sequence number and other relevant information is then needed to carry out record, and renewable in Master Station Software, so that adjustment management is carried out to the user corresponding to power distribution cabinet.
The embodiment of the present invention by arranging sequence number in advance in power distribution cabinet, and whether changed by the value of monitoring data sequent number, if changed, then automatically record the daily record data information before and after power distribution cabinet change, the present invention does not need the record adjustment manually carrying out data when power distribution cabinet can be made to change, whether system can be changed by automatic decision power distribution cabinet, carries out data record according to judged result, thus make operation more simple, and be not easy to make mistakes.
Embodiment two:
Fig. 2 shows the realization flow of the data record method after the replacing drawer-type distribution box that second embodiment of the invention provides, and details are as follows:
In step s 201, judge whether described power distribution cabinet is provided with sequence number.
Concrete, the embodiment of the present invention by the identification information of setting power distribution cabinet sequence number, if there is the identification information of setting, then can represent that this power distribution cabinet is preset with power distribution cabinet sequence number, if do not had, then there is not power distribution cabinet sequence number.
Due in the equipment before replacing, the storage information do not upgraded in time wherein, such as sequence number information is not set, so can not judge whether to change power distribution cabinet according to the change of the sequence number in equipment, therefore, the verification method that the power distribution cabinet of non-configuration sequence number is changed also is comprised in the embodiment of the present invention.
In step S202, if described power distribution cabinet does not arrange sequence number, then whether change according to the power consumption velocity estimated current power distribution cabinet gathered.
Concrete, for the equipment of non-configuration sequence number, need the power consumption speed gathering power distribution cabinet, described power consumption speed can comprise the power consumption speed under normal operation.
Wherein, can comprise according to the power consumption velocity estimated current power distribution cabinet step that whether changes gathered:
Obtain the variable quantity of electric energy meter according to the table floors of the electric energy meter of front and back twi-read, and the time point of electric energy meter that front and back are chosen for twice obtains transformation period;
According to variable quantity and the power consumption variable quantity of described transformation period unit of account time of described electric energy meter, described unit interval power consumption is compared with the threshold value preset;
If unit interval power consumption is greater than default threshold value, then judge that current power distribution cabinet changes.
Such as, first moment and the second moment are two time points of continuous acquisition, end angle value, the acquisition time that the first moment can be gathered, and end angle value, acquisition time that the second moment gathered are poor, obtain the changing value of power consumption and transformation period corresponding to this changing value.
End angle value corresponding to such as the first moment is 125 degree, and acquisition time is 12: 15, and end angle value corresponding to the second moment is 191 degree, acquisition time is 12: 25, so, according to above-mentioned data, the power consumption variable quantity that can obtain the unit interval (minute) is 6.6 degree.
For described threshold value, the power consumption variable quantity of the unit interval under normal operating conditions can being adopted, such as not affecting for changing power distribution cabinet the scene that equipment normally works, the value that can certainly set for other.If the power consumption variable quantity calculated current is greater than default threshold value, then illustrate that power distribution cabinet changes, needs the parameter information in the power distribution cabinet after gathering change.
In step S203, if described power distribution cabinet arranges sequence number, gather the table floors of sequence number and the power distribution cabinet ammeter preset in power distribution cabinet.
In step S204, judge whether the sequence number of the power distribution cabinet of current collection changes.
In step S205, if the sequence number of the power distribution cabinet of current collection changes, then judge that current power distribution cabinet changes, and record the daily record data information before and after power distribution cabinet change.
Step S203-S205 is substantially identical with the step S101-S103 in embodiment one, does not repeat at this.
In step S206, if current power distribution cabinet does not change, be then updated to Virtual table floors according to the power consumption of electric energy meter record.
In embodiments of the present invention, if judge that current power distribution cabinet does not change, then according to the power consumption information recorded in power distribution cabinet, be updated to Virtual table floors, such as be updated to the accumulation electricity consumption value added up in system, can be the moon total electricity consumption, all total electricity consumptions etc.
The embodiment of the present invention is on the basis of embodiment one, further whether the equipment of the power distribution cabinet without sequence number is changed and carried out effective judgement, thus can be suitable for and automatically can select judgment mode to different equipment, according to judged result, timely and effectively data being revised when having changed power distribution cabinet, making to change power distribution cabinet more safe and reliable.
Embodiment three:
Fig. 3 shows the structural representation of the data recording equipment after the replacing drawer-type distribution box that third embodiment of the invention provides, and details are as follows:
Change the data recording equipment after drawer-type distribution box described in the embodiment of the present invention, comprising:
Collecting unit 301, for gathering the table floors of sequence number and the power distribution cabinet ammeter preset in power distribution cabinet;
Sequence number change judging unit 302, for judging whether the sequence number of the power distribution cabinet of current collection changes;
Record cell 303, if changed for the sequence number of the power distribution cabinet of current collection, then judges that current power distribution cabinet changes, and records the daily record data information before and after power distribution cabinet change.
Preferably, described device also comprises:
Sequence number arranges judging unit, for judging whether described power distribution cabinet is provided with sequence number;
Whether power consumption rate judging unit, if do not arrange sequence number for described power distribution cabinet, then change according to the power consumption velocity estimated current power distribution cabinet gathered.
Preferably, described power consumption rate judging unit comprises:
Variable quantity obtains subelement, and the table floors for the electric energy meter according to front and back twi-read obtains the variable quantity of electric energy meter, and the time point of electric energy meter that front and back are chosen for twice obtains transformation period;
Threshold value compares subelement, for according to the variable quantity of described electric energy meter and the power consumption variable quantity of described transformation period unit of account time, is compared by described unit interval power consumption with the threshold value preset;
Power distribution cabinet change judges subelement, if be greater than default threshold value for unit interval power consumption, then judges that current power distribution cabinet changes.
Preferably, the daily record data information before and after described power distribution cabinet change comprises:
The table floors of power distribution cabinet ammeter corresponding before and after time of acquisition sequence number, the sequence number gathered and power distribution cabinet change before and after power distribution cabinet change.
Preferably, described device also comprises:
Updating block, if do not changed for current power distribution cabinet, is then updated to Virtual table floors according to the power consumption of electric energy meter record.
Change the data recording equipment after drawer-type distribution box described in the embodiment of the present invention corresponding with the data record method after the replacing drawer-type distribution box described in embodiment one, two, do not repeat at this.
In several embodiment provided by the present invention, should be understood that, disclosed apparatus and method, can realize by another way.Such as, device embodiment described above is only schematic, such as, the division of described unit, be only a kind of logic function to divide, actual can have other dividing mode when realizing, such as multiple unit or assembly can in conjunction with or another system can be integrated into, or some features can be ignored, or do not perform.Another point, shown or discussed coupling each other or direct-coupling or communication connection can be by some interfaces, and the indirect coupling of device or unit or communication connection can be electrical, machinery or other form.
The described unit illustrated as separating component or can may not be and physically separates, and the parts as unit display can be or may not be physical location, namely can be positioned at a place, or also can be distributed in multiple network element.Some or all of unit wherein can be selected according to the actual needs to realize the object of the present embodiment scheme.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, also can be that the independent physics of unit exists, also can two or more unit in a unit integrated.Above-mentioned integrated unit both can adopt the form of hardware to realize, and the form of SFU software functional unit also can be adopted to realize.
If described integrated unit using the form of SFU software functional unit realize and as independently production marketing or use time, can be stored in a computer read/write memory medium.Based on such understanding, the part that technical scheme of the present invention contributes to prior art in essence in other words or all or part of of this technical scheme can embody with the form of software product, this computer software product is stored in a storage medium, comprising some instructions in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) perform all or part of of method described in each embodiment of the present invention.And aforesaid storage medium comprises: USB flash disk, portable hard drive, ROM (read-only memory) (ROM, Read-OnlyMemory), random access memory (RAM, RandomAccessMemory), magnetic disc or CD etc. various can be program code stored medium.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. change the data record method after drawer-type distribution box, it is characterized in that, described method comprises:
Gather the table floors of sequence number and the power distribution cabinet ammeter preset in power distribution cabinet;
Judge whether the sequence number of the power distribution cabinet of current collection changes;
If the sequence number of the power distribution cabinet of current collection changes, then judge that current power distribution cabinet changes, and record the daily record data information before and after power distribution cabinet change.
2. method according to claim 1, is characterized in that, before the sequence number preset in described collection power distribution cabinet and the table floors step of power distribution cabinet ammeter, described method also comprises:
Judge whether described power distribution cabinet is provided with sequence number;
If described power distribution cabinet does not arrange sequence number, then whether change according to the power consumption velocity estimated current power distribution cabinet gathered.
3. method according to claim 2, is characterized in that, the described power consumption velocity estimated current power distribution cabinet according to the gathering step that whether changes comprises:
Obtain the variable quantity of electric energy meter according to the table floors of the electric energy meter of front and back twi-read, and the time point of electric energy meter that front and back are chosen for twice obtains transformation period;
According to variable quantity and the power consumption variable quantity of described transformation period unit of account time of described electric energy meter, described unit interval power consumption is compared with the threshold value preset;
If unit interval power consumption is greater than default threshold value, then judge that current power distribution cabinet changes.
4. method according to claim 1 or 2, is characterized in that, the daily record data information before and after described power distribution cabinet change comprises:
The table floors of power distribution cabinet ammeter corresponding before and after time of acquisition sequence number, the sequence number gathered and power distribution cabinet change before and after power distribution cabinet change.
5. method according to claim 1 or 2, is characterized in that, described method also comprises:
If current power distribution cabinet does not change, be then updated to Virtual table floors according to the power consumption of electric energy meter record.
6. change the data recording equipment after drawer-type distribution box, it is characterized in that, described device comprises:
Collecting unit, for gathering the table floors of sequence number and the power distribution cabinet ammeter preset in power distribution cabinet;
Sequence number change judging unit, for judging whether the sequence number of the power distribution cabinet of current collection changes;
Record cell, if changed for the sequence number of the power distribution cabinet of current collection, then judges that current power distribution cabinet changes, and records the daily record data information before and after power distribution cabinet change.
7. device according to claim 6, it is characterized in that, described device also comprises:
Sequence number arranges judging unit, for judging whether described power distribution cabinet is provided with sequence number;
Whether power consumption rate judging unit, if do not arrange sequence number for described power distribution cabinet, then change according to the power consumption velocity estimated current power distribution cabinet gathered.
8. device according to claim 7, it is characterized in that, described power consumption rate judging unit comprises:
Variable quantity obtains subelement, and the table floors for the electric energy meter according to front and back twi-read obtains the variable quantity of electric energy meter, and the time point of electric energy meter that front and back are chosen for twice obtains transformation period;
Threshold value compares subelement, for according to the variable quantity of described electric energy meter and the power consumption variable quantity of described transformation period unit of account time, is compared by described unit interval power consumption with the threshold value preset;
Power distribution cabinet change judges subelement, if be greater than default threshold value for unit interval power consumption, then judges that current power distribution cabinet changes.
9. device according to claim 6 or 7, is characterized in that, the daily record data information before and after described power distribution cabinet change comprises:
The table floors of power distribution cabinet ammeter corresponding before and after time of acquisition sequence number, the sequence number gathered and power distribution cabinet change before and after power distribution cabinet change.
10. device according to claim 6 or 7, is characterized in that, described device also comprises:
Updating block, if do not changed for current power distribution cabinet, is then updated to Virtual table floors according to the power consumption of electric energy meter record.
CN201510831258.0A 2015-11-25 2015-11-25 Data recording method and device after replacement of drawer type power distribution cabinet Pending CN105488616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510831258.0A CN105488616A (en) 2015-11-25 2015-11-25 Data recording method and device after replacement of drawer type power distribution cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510831258.0A CN105488616A (en) 2015-11-25 2015-11-25 Data recording method and device after replacement of drawer type power distribution cabinet

Publications (1)

Publication Number Publication Date
CN105488616A true CN105488616A (en) 2016-04-13

Family

ID=55675585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510831258.0A Pending CN105488616A (en) 2015-11-25 2015-11-25 Data recording method and device after replacement of drawer type power distribution cabinet

Country Status (1)

Country Link
CN (1) CN105488616A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109144033A (en) * 2018-09-19 2019-01-04 珠海格力电器股份有限公司 Method for collecting replacement records of parts of equipment and air conditioning system
CN111768611A (en) * 2018-06-12 2020-10-13 广东电网有限责任公司 Ammeter data checking method and device
CN114945828A (en) * 2020-01-16 2022-08-26 三菱电机楼宇解决方案株式会社 Energy usage amount calculation device, usage electric power amount monitoring system, and program

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216982A (en) * 2007-12-29 2008-07-09 深圳市科陆电子科技股份有限公司 A 2D relay-type automatic route meter reading method and carrier route dynamic maintenance method
CN102592422A (en) * 2012-02-02 2012-07-18 深圳市科陆电子科技股份有限公司 Centralized ammeter reading system collector and ammeter asset number collection and management method
CN102608962A (en) * 2011-12-09 2012-07-25 绍兴电力局 Automatic maintenance method for bottom-up electricity-consumption information acquisition equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216982A (en) * 2007-12-29 2008-07-09 深圳市科陆电子科技股份有限公司 A 2D relay-type automatic route meter reading method and carrier route dynamic maintenance method
CN102608962A (en) * 2011-12-09 2012-07-25 绍兴电力局 Automatic maintenance method for bottom-up electricity-consumption information acquisition equipment
CN102592422A (en) * 2012-02-02 2012-07-18 深圳市科陆电子科技股份有限公司 Centralized ammeter reading system collector and ammeter asset number collection and management method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111768611A (en) * 2018-06-12 2020-10-13 广东电网有限责任公司 Ammeter data checking method and device
CN111768611B (en) * 2018-06-12 2021-05-11 广东电网有限责任公司 Ammeter data checking method and device
CN109144033A (en) * 2018-09-19 2019-01-04 珠海格力电器股份有限公司 Method for collecting replacement records of parts of equipment and air conditioning system
CN109144033B (en) * 2018-09-19 2020-06-16 珠海格力电器股份有限公司 Method for collecting replacement records of parts of equipment and air conditioning system
CN114945828A (en) * 2020-01-16 2022-08-26 三菱电机楼宇解决方案株式会社 Energy usage amount calculation device, usage electric power amount monitoring system, and program
CN114945828B (en) * 2020-01-16 2024-03-12 三菱电机楼宇解决方案株式会社 Monitoring system for using electric power

Similar Documents

Publication Publication Date Title
CN101441506B (en) Blade server system and power consumption management method thereof
CN105247759B (en) System and method for configuring UPS accessory power outlets
CN105929923B (en) A kind of management method and device of power
CN102687094B (en) Processing method and appliance for multi-power supply
EP2721706B1 (en) Method and apparatus for controlling energy services based on market data
CN110687367B (en) System and method for characterizing power quality events in an electrical system
CN101937264B (en) Power supply power management method and device as well as modularizing equipment
CN106030437A (en) Systems and methods for error monitoring and handling in control systems
CN108462175A (en) A kind of electric heating equipment demand response interactive approach, system and device
CN105488616A (en) Data recording method and device after replacement of drawer type power distribution cabinet
KR101809205B1 (en) Factory Energy Management System
CN102521662A (en) Consumption charging method in cloud computing environment
CN109884537B (en) Intelligent power distribution terminal backup storage battery state evaluation method and system
KR102665459B1 (en) Capacity design apparatus for performing the solar power generation of residential complex
CN104242453A (en) Voltage alarm method used for buses of main electric network
CN101895138B (en) Method and system for storage battery management
CN105958639A (en) Commercial power and diesel engine power generation type judgment method and judgment equipment therefor
JP2016163445A (en) Contract menu generation method
CN104901335B (en) A kind of generator intelligent grid connection control method and device
CN104092240A (en) Method and system for recognizing connection mode of photovoltaic modules
CN104184612A (en) Power supply fault processing method and device
CN106160232A (en) A kind of load monitoring equipment for power system
CN115549234A (en) Power management self-adaptive charging and discharging control method, system and equipment
CN111178729B (en) Stable section self-adaptive calculation method and system based on parent-child relationship
JP2016220384A (en) Power demand adjustment device, power demand adjustment method and power demand adjustment program

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160413