CN105484689B - A kind of horizontal well liner-type well completion enters well instrument - Google Patents

A kind of horizontal well liner-type well completion enters well instrument Download PDF

Info

Publication number
CN105484689B
CN105484689B CN201510877993.5A CN201510877993A CN105484689B CN 105484689 B CN105484689 B CN 105484689B CN 201510877993 A CN201510877993 A CN 201510877993A CN 105484689 B CN105484689 B CN 105484689B
Authority
CN
China
Prior art keywords
instrument
thread
giving
well
short circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510877993.5A
Other languages
Chinese (zh)
Other versions
CN105484689A (en
Inventor
邹祥富
王娟
陆遥
瞿丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201510877993.5A priority Critical patent/CN105484689B/en
Publication of CN105484689A publication Critical patent/CN105484689A/en
Application granted granted Critical
Publication of CN105484689B publication Critical patent/CN105484689B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of horizontal well liner-type well completion to enter well instrument, it includes releasing tool, insertion instrument and waits the instrument of inserting, the releasing tool is connected to insertion instrument upper end by drilling rod, insertion instrument is combined by sealing structure and plugs in instrument upper end waiting, with when plug in instrument and be attached with releasing tool by bushing pipe and bunch tube.The present invention can realize bushing pipe bottom cycle, once it is hampered or bit freezing can use bushing pipe bottom cycle, the bubble measure unfreezing such as acid.

Description

A kind of horizontal well liner-type well completion enters well instrument
Technical field
The present invention relates to the manufacturing technology field of underground operation tool, specifically relates to a kind of liner-type well completion and enters well work Tool, for realizing long horizontal sections bushing pipe bottom cycle.
Background technology
As the continuous development of drilling technology, high-inclination horizontal well are more and more.In recent years, high-inclination horizontal well is mainly used Crack is crossed in exploitation low permeability fractured stratum, because High angle horizontal segment can tiltedly wear, flat payzone of wearing is longer, is considerably increased The bare area of oil gas, so as to greatly improve oil and gas production.But high-inclination horizontal well is to deep-well Holes of Complicated Wells well-completing process Propose severe challenge.Liner-type well completion technology is due to low etc. all with reservoir protec-tion, formation damage, cost simple to operate More advantages, horizontal well selective completion is more and more using liner-type well completion technology both at home and abroad at present, and liner-type well completion turns into level One of important completion mode of well.Do not carry out systematic research also for deep-well, Holes of Complicated Wells liner-type well completion technology both at home and abroad at present, Deep-well, Holes of Complicated Wells, high angle hole liner-type well completion technology not yet obtain important breakthrough.
Publication No. CN2310148, publication date disclose a kind of level for the Chinese patent literature on March 10th, 1999 Well Multifunction complete well tube, be mainly made up of hydraulic releasing tool, completion tubular column and washover pipe, wherein completion tubular column mainly by Sleeve pipe, hanging packer, centralizer, slotted liner, sealing shroud and guide shoe etc. form;Washover pipe is mainly by flush pipe and sealing Intubation composition.The tripping in construction of this Multifunction complete well tube, can be to well while slotted liner completion is realized It is rinsed and acidizing treatment, reduces oil layer pollution, improves oil well productivity, hydraulic releasing tool is given up reliably, easy for construction.
But the prior art using above-mentioned patent document as representative, however it remains following technical barrier:Ensure in High angle water Sent under horizontal well section bushing pipe smoothly in place, the card that is hampered can establish circulation scouring pipe shoe and annular space, and dredge reduce annular space resistance turn into Important problem urgently to be resolved hurrily.
The content of the invention
It is contemplated that the defects of present in above-mentioned prior art and deficiency, there is provided a kind of horizontal well liner-type well completion enters Well instrument, the present invention can realize bushing pipe bottom cycle, once it is hampered or bit freezing can use bushing pipe bottom cycle, the bubble measure solution such as acid Card.
The present invention is realized by using following technical proposals:
A kind of horizontal well liner-type well completion enters well instrument, it is characterised in that including releasing tool, insertion instrument and the instrument of inserting is waited, The releasing tool is connected to insertion instrument upper end by drilling rod, and insertion instrument is combined on the instrument of inserting is waited by sealing structure End, with when plug in instrument and be attached with releasing tool by bushing pipe and bunch tube.
Described releasing tool is provided with dual bearing structure, and upper bearing (metal) is arranged on lifting short circuit lower end, and lower bearing is arranged on Insertion instrument upper end.
Described releasing tool mainly by lifting short circuit, sand cap, tie-back sleeve, give up left-hand thread pin end and give up left-hand thread mother Joint is formed, and is provided with upper bearing (metal) in lifting short circuit lower end, and upper bearing (metal) lower end is provided with upper bearing (metal) underlay, lifting short circuit top with Drill rod thread connects, and lifting short circuit and sand cap mode connects for screw, lift short circuit lower internal thread and left-hand thread pin end of giving up is trapezoidal Threaded connection, left-hand thread female joint upper external thread of giving up are threadedly coupled with tie-back sleeve, give up left-hand thread female joint internal thread and function The left-handed trapezoidal thread connection of thread bush, left-hand thread pin end of giving up are connected with function thread bush keyway, left-hand thread pin end bottom of giving up It is threadedly coupled with turning to male, turns to male with turning to female and be provided with sealing structure, left-hand thread pin end bottom of giving up is with turning to Female is provided with lower bearing between top, and left-hand thread female joint bottom of giving up is threadedly coupled by variable buckle pin end with bottom bushing pipe, Female bottom is turned to be connected with bottom drill rod thread by variable buckle pin end.
Insertion instrument adjusts deep intubation and target seeker to form by sealing, and sealing adjusts deep intubation top to connect with variable buckle public access head thread Connect, bottom is threadedly coupled with target seeker.
Wait the instrument of inserting to be made up of pin and box sub, insertion seat and insertion seat interior sealing, pin and box sub top connects with bushing pipe screw thread Connect, sealing structure is provided between pin and box sub and insertion seat, insert inside seat and adjust deep insert by inserting seat interior sealing and sealing The seal of tube combines.
Compared with prior art, what the present invention was reached has the beneficial effect that:
1st, bushing pipe bottom cycle can be realized.The tool tubular column is waited in socket using interior insertion drilling rod insertion, when turn on pump circulates Drilling fluid is returned out by interior insertion drilling rod through guide shoe, realizes the circulation of drilling fluid of full well section, while without slip design, in lower brill When being hampered can turn on pump circulation, not by circulation pump pressure limited.
2nd, can realize without in point of neutralization back-off.Due to not sitting extension, certain suspending weight being hung with inside and outside releasing tool and outer outstanding It is more difficult that weight is less big, design size space is small, horizontal segment fixed point is given up, therefore the instrument does not use hydraulic releasing mode, and The ripe back-off of selection is given up technology, and back-off part of giving up has used thrust bearing, will be fed into drilling tool decentralization and is carried in back-off portion Point high friction rotational resistance load transfer be low friction rotational resistance load, be sent into drilling tool and liner portion give up back-off when can Need not strictly find the point of neutralization, improve back-off reliability, the thick left-hand thread of fixation is changed be set to can axial movable thick left-hand thread, It is sent into drilling tool and liner portion and gives up and the back-off without axial load can be achieved during the entire process of back-off rotate, avoids appearance of giving up It is abnormal.
Interior insertion drilling rod does not rotate when the 3rd, being sent into the rotation of drilling tool back-off.Increase between releasing tool and interior insertion drilling rod If cylindrical roller thrust bearing, during back-off rotates, rotation torque is not transferred on the interior insertion drilling rod of lower section, It ensure that interior insertion drilling rod will not rotate, interior insertion drilling rod can rise with the trip-out for being sent into drilling tool.
4th, completed in small design size space.
5th, can tieback.
Brief description of the drawings
Below in conjunction with specification drawings and specific embodiments, the present invention is described in further detail, wherein:
Fig. 1 is the releasing tool structural representation of the present invention;
Fig. 2 is the insertion tool construction schematic diagram of the present invention;
The time that Fig. 3 is the present invention inserts tool construction schematic diagram.
Marked in figure:
Lifting short circuit 1, sand cap 2, tie-back sleeve 3, left-hand thread pin end 4 of giving up, upper bearing (metal) 5, upper bearing (metal) underlay 6, give up it is anti- Deep be intubated is adjusted in mother buckle joint 7, function thread bush 8, lower bearing 9, steering male 10, steering female 11, variable buckle pin end 12, sealing 14th, target seeker 15, pin and box sub 16, insertion seat 17, insertion seat interior sealing 18.
Embodiment
Embodiment 1
As a better embodiment of the invention, it includes releasing tool, insertion instrument and waits the instrument of inserting, the work of giving up Tool is connected to insertion instrument upper end by drilling rod, and insertion instrument is combined by sealing structure and waiting plug in instrument upper end, with when insert Instrument is attached with releasing tool by bushing pipe and bunch tube.Described releasing tool is provided with dual bearing structure, upper bearing (metal) Lifting short circuit lower end is arranged on, lower bearing is arranged on insertion instrument upper end.
Embodiment 2
As the preferred forms of the present invention, with reference to Figure of description 1-3, it mainly includes releasing tool, insertion work Tool, wait the instrument of inserting;Releasing tool by lifting short circuit 1, sand cap 2, tie-back sleeve 3, give up left-hand thread pin end 4 and the left-hand thread mother that gives up connects First 7 are formed, and lifting short circuit 1 lower end are provided with upper bearing (metal) 5, the lower end of upper bearing (metal) 5 is provided with upper bearing (metal) underlay 6, is lifted on short circuit 1 Portion is connected with drill rod thread, lifting short circuit 1 and the mode connects for screw of sand cap 2, the lifting lower internal thread of short circuit 1 and left-hand thread public access of giving up First 4 trapezoidal thread connection, the upper external thread of left-hand thread female joint 7 of giving up are threadedly coupled with tie-back sleeve 3, given up in left-hand thread female joint 7 Screw thread is connected with 8 left-handed trapezoidal thread of function thread bush, and left-hand thread pin end 4 of giving up is connected with the keyway of function thread bush 8, is given up anti- The button bottom of pin end 4 is threadedly coupled with turning to male 10, is turned to male 10 and is provided with sealing structure with turning to female 11, is given up anti- Lower bearing 9 is provided between the button bottom of pin end 4 and steering female 11 top, it is public that the bottom of left-hand thread female joint 7 of giving up passes through variable buckle Joint 12 is threadedly coupled with bottom bushing pipe, is turned to the bottom of female 11 and is connected by variable buckle pin end 12 with bottom drill rod thread;Insert Enter instrument adjusts deep intubation 14 and target seeker 15 to form by sealing, and sealing adjusts 14 tops of deep intubation to connect with the screw thread of variable buckle pin end 12 Connect, bottom is threadedly coupled with target seeker 15;The instrument of inserting is waited to be made up of pin and box sub 16, insertion seat 17 and insertion seat interior sealing 18, The top of pin and box sub 16 is threadedly coupled with bushing pipe, internal that insertion seat 17 is provided with sealing structure, is inserted inside seat 17 by inserting Interior sealing of taking a seat 18 adjusts 14 seal combinations of deep intubation with sealing.
Fashionable under tubing string, the instrument of inserting and bushing pipe, then tripping in insertion instrument and drilling rod are waited in first tripping in, finally by releasing tool Successively instrument is inserted with insertion instrument and time to be connected.In construction, mud can establish circulation by reaching shaft bottom inside drilling rod.Apply When work finishes, reversely rotate lifting short circuit 1 separated with left-hand thread female joint 7 of giving up, realize horizontal well liner-type well completion it is special enter well work Tool separates with bushing pipe, acts shaft bottom.

Claims (4)

1. a kind of horizontal well liner-type well completion enters well instrument, it is characterised in that including releasing tool, insertion instrument and waits the instrument of inserting, institute To state releasing tool and insertion instrument upper end is connected to by drilling rod, insertion instrument is combined by sealing structure and is waiting plug in instrument upper end, With when plug in instrument and be attached with releasing tool by bushing pipe and bunch tube;Described releasing tool is provided with duplex bearing knot Structure, upper bearing (metal)(5)It is arranged on lifting short circuit(1)Lower end, lower bearing(9)It is arranged on insertion instrument upper end.
2. horizontal well liner-type well completion according to claim 1 enters well instrument, it is characterised in that:Described releasing tool is main By lifting short circuit(1), sand cap(2), tie-back sleeve(3), left-hand thread pin end of giving up(4)With left-hand thread female joint of giving up(7)Form, Lift short circuit(1)Lower end is provided with upper bearing (metal)(5), upper bearing (metal)(5)Lower end is provided with upper bearing (metal) underlay(6), lift short circuit(1)On Portion is connected with drill rod thread, lifts short circuit(1)With sand cap(2)Mode connects for screw, lift short circuit(1)Lower internal thread is anti-with giving up Detain pin end(4)Trapezoidal thread connects, left-hand thread female joint of giving up(7)Upper external thread and tie-back sleeve(3)Threaded connection, give up anti- Mother buckle joint(7)Internal thread and function thread bush(8)Left-handed trapezoidal thread connection, left-hand thread pin end of giving up(4)With function screw thread Set(8)Keyway connects, left-hand thread pin end of giving up(4)Bottom is with turning to male(10)Threaded connection, turn to male(10)With steering Female(11)Sealing structure is provided with, left-hand thread pin end of giving up(4)Bottom is with turning to female(11)Lower axle is provided between top Hold(9), left-hand thread female joint of giving up(7)Bottom is threadedly coupled by the short double public affairs of variable buckle with bottom bushing pipe, turns to female(11)Bottom Pass through variable buckle pin end(12)It is connected with bottom drill rod thread.
3. horizontal well liner-type well completion according to claim 2 enters well instrument, it is characterised in that:Insertion instrument is adjusted deep by sealing Intubation(14)And target seeker(15)Form, deep intubation is adjusted in sealing(14)Top and variable buckle pin end(12)Threaded connection, bottom with Target seeker(15)Threaded connection.
4. horizontal well liner-type well completion according to claim 3 enters well instrument, it is characterised in that:The instrument of inserting is waited by pin and box sub (16), insertion seat(17)With insertion seat interior sealing(18)Form, pin and box sub(16)Top is threadedly coupled with bushing pipe, pin and box sub (16)With inserting seat(17)Between be provided with sealing structure, insert seat(17)Inside is by inserting seat interior sealing(18)Adjusted with sealing Deep intubation(14)Seal combination.
CN201510877993.5A 2015-12-04 2015-12-04 A kind of horizontal well liner-type well completion enters well instrument Active CN105484689B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510877993.5A CN105484689B (en) 2015-12-04 2015-12-04 A kind of horizontal well liner-type well completion enters well instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510877993.5A CN105484689B (en) 2015-12-04 2015-12-04 A kind of horizontal well liner-type well completion enters well instrument

Publications (2)

Publication Number Publication Date
CN105484689A CN105484689A (en) 2016-04-13
CN105484689B true CN105484689B (en) 2018-02-16

Family

ID=55671934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510877993.5A Active CN105484689B (en) 2015-12-04 2015-12-04 A kind of horizontal well liner-type well completion enters well instrument

Country Status (1)

Country Link
CN (1) CN105484689B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209276A (en) * 2018-10-11 2019-01-15 中核通辽铀业有限责任公司 A kind of method for repairing and mending of In-situ Leaching Uranium Mine production borehole damage

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2310148Y (en) * 1997-11-25 1999-03-10 胜利石油管理局采油工艺研究院 Multifunctional well completion pipe string for horizontal well
CN2846712Y (en) * 2005-11-16 2006-12-13 辽河石油勘探局 Back-off bearing anti-drop device of tail tube suspension device neutral point
CN201045292Y (en) * 2007-06-05 2008-04-09 新疆蓝海石油工程技术有限责任公司 Circulation composite hanger for sieve tube well completion
CN203296727U (en) * 2013-06-05 2013-11-20 中国石油集团川庆钻探工程有限公司 Mechanical-hydraulic double-action release rotary tail pipe hanger
CN105041267A (en) * 2015-08-24 2015-11-11 山东普瑞思德石油技术有限公司 Third-section acid pickling integrated well completion pipe string and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7147068B2 (en) * 1994-10-14 2006-12-12 Weatherford / Lamb, Inc. Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2310148Y (en) * 1997-11-25 1999-03-10 胜利石油管理局采油工艺研究院 Multifunctional well completion pipe string for horizontal well
CN2846712Y (en) * 2005-11-16 2006-12-13 辽河石油勘探局 Back-off bearing anti-drop device of tail tube suspension device neutral point
CN201045292Y (en) * 2007-06-05 2008-04-09 新疆蓝海石油工程技术有限责任公司 Circulation composite hanger for sieve tube well completion
CN203296727U (en) * 2013-06-05 2013-11-20 中国石油集团川庆钻探工程有限公司 Mechanical-hydraulic double-action release rotary tail pipe hanger
CN105041267A (en) * 2015-08-24 2015-11-11 山东普瑞思德石油技术有限公司 Third-section acid pickling integrated well completion pipe string and method

Also Published As

Publication number Publication date
CN105484689A (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN102777155B (en) A kind of shale gas bridge plug subsection completion method
CN208792974U (en) A kind of dual-grip, can bore remove, solvable bridge plug
CN103835678B (en) Horizontal well inner-pipe-free drilling-plug-free grading cementing well completion method
US9493993B1 (en) Work string and method of completing long lateral well bores
CN104912479B (en) Method for drilling and completion of horizontal branched well for coal bed gas
CN106567676B (en) Buckling type tail drillng operation device and its operational method
CN106837172A (en) A kind of radial well solves the boring method of thin interbed
CN104847263A (en) Coal bed methane far-end butt joint horizontal well drilling method
CN102704876A (en) Method and tool for putting well completion pipe down by utilizing drill rod
CN103711457A (en) Design method of six-spud-in wellbore structure
CN102678059B (en) Mechanical type drilling tool accumulation of energy protection instrument
CN103835677A (en) Two-stage sealing bumping-pressure salvageable well completion device for horizontal well
CN106121548A (en) A kind of sand prevention integrated tubing string of righting and operational approach thereof
CN105484689B (en) A kind of horizontal well liner-type well completion enters well instrument
CN107178315A (en) The nearly compound drop of drill bit turns round broken rock device
CN105888606A (en) Fast drilling bridge plug made of composite material
CN107542422A (en) The milling method and combined type junk mill and application method of different hole diameters
CN205135486U (en) A releasing tool that is used for horizontal well liner -type well completion to go into well instrument
CN202596585U (en) Energy-storage protection tool for mechanical drilling tool
CN204175184U (en) Multilateral Wells window opening tool
CN109854203B (en) Windowing sidetracking plugging device and method for branch well
CN201103360Y (en) Underground falling objects salvaging barrel
CN203248074U (en) Sidetracking well casing windowing whipstock
CN103628834A (en) Locking type expansion tail pipe hanger
CN201068750Y (en) Rotating tail tube hanger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200918

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Chuanqing Drilling Engineering Co.,Ltd.

Address before: Chenghua District Green Road 610051 Chengdu City, Sichuan province 1 No. 3 Chuanqing drilling Department of Science & Technology

Patentee before: CNPC Chuanqing Drilling Engineering Co.,Ltd.