CN105471634B - A kind of simulated maneuver communication network construction method, device and system - Google Patents

A kind of simulated maneuver communication network construction method, device and system Download PDF

Info

Publication number
CN105471634B
CN105471634B CN201510794682.2A CN201510794682A CN105471634B CN 105471634 B CN105471634 B CN 105471634B CN 201510794682 A CN201510794682 A CN 201510794682A CN 105471634 B CN105471634 B CN 105471634B
Authority
CN
China
Prior art keywords
node
network
pseudo channel
communication network
simulated maneuver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510794682.2A
Other languages
Chinese (zh)
Other versions
CN105471634A (en
Inventor
蒲长春
冯国仕
冯志先
王俊
周金全
武明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CETC 30 Research Institute
Original Assignee
CETC 30 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CETC 30 Research Institute filed Critical CETC 30 Research Institute
Priority to CN201510794682.2A priority Critical patent/CN105471634B/en
Publication of CN105471634A publication Critical patent/CN105471634A/en
Application granted granted Critical
Publication of CN105471634B publication Critical patent/CN105471634B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/14Network analysis or design
    • H04L41/145Network analysis or design involving simulating, designing, planning or modelling of a network

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Telephonic Communication Services (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of simulated maneuver communication network construction methods, comprising: is initialized to analogue transmission node and simulation road by switching node according to training planning;Using after initialization analogue transmission node and simulation road by the pseudo channel sublayer in switching node, control the analogue transmission node building pseudo channel;It controls the simulation road and is calculated the whole network routing using the connection relationship of the pseudo channel by switching node, form simulated maneuver communication network;This method is by establishing pseudo channel, for connecting semi-physical object simulating route switching node, can react transmission channel dynamic variation characteristic under motor-driven environment, and can be independently of the connection relationship of physical network;When task scene switching needs to change network topology structure, topological switching can be realized by way of software reconfiguration, and transparent to training terminal traffic;The invention also discloses a kind of simulated maneuver communication network construction device and systems.

Description

A kind of simulated maneuver communication network construction method, device and system
Technical field
The present invention relates to network technique field, in particular to a kind of simulated maneuver communication network construction method, device and it is System.
Background technique
Mobile communication network is increasingly complicated, quickly grasps to different work personnel and application communication equipment is formd and greatly chosen War, carrying out simulated training is to solve the effective way of this challenge.Establish simulated maneuver communication network, it is possible to provide with actual load system Operate with the almost the same simulated environment of mode, be mainly characterized by training low in cost, training method flexibly, equipment is not easy Damage, place is unrestricted, training of safety is high, convenient for management and examination etc..
For constructing analog network, usual implementation includes Computer Simulation, physical simulation, HWIL simulation etc.. Computer Simulation is mainly to pass through the method for mathematical modeling and statistical analysis, is planning, design, verifying, the assessment of communication system Etc. work quantitative analysis is provided, but Computer Simulation confidence level is poor;Physical simulation higher cost, scale are not easy to expand Open up, be not easy to management evaluation etc., both modes should not be as the major way for constructing trained analog network.It adopts extensively at present Simulated training system is constructed with the mode for combining Computer Simulation, physical simulation and HWIL simulation.
But currently for simulated training HWIL simulation realize in, lay particular emphasis on the business simulating of network layer or more with And the operational simulation towards operating personnel, the communication connection relationship between each simulation node is simple, fixed, cannot react motor-driven logical The variation characteristic of transmission channel during letter, different types of terminal traffic need to construct special network or communication link, such as Speech, video, IP data, exclusive data etc., this can bring following problems:
Since each inter-node communication relationship is fixed with actual physics connection relationship, HWIL simulation dimension-limited, in demand It needs to change physical couplings when changing;
Since each connection relation between nodes are fixed, high motor-driven environment lower network change in topology cannot be simulated to system functionality The influence of energy;
Due to cannot well simulated maneuver, electromagnetic countermeasure environment lower network agreement process, to cannot be trained Personnel provide the application power that reply handles this scene.Therefore, how to solve the above problems, simulated maneuver communication network.
Summary of the invention
The object of the present invention is to provide a kind of simulated maneuver communication network construction method, this method can react under motor-driven environment Transmission channel dynamic variation characteristic, and can be independently of the connection relationship of physical network;It can be realized by way of software reconfiguration Topology switching.
In order to solve the above technical problems, the present invention provides a kind of simulated maneuver communication network construction method, comprising:
Analogue transmission node and simulation road are initialized by switching node according to training planning;
Using after initialization analogue transmission node and simulation road by the pseudo channel sublayer in switching node, described in control Analogue transmission node constructs pseudo channel;
It controls the simulation road and is calculated the whole network routing using the connection relationship of the pseudo channel by switching node, formed Simulated maneuver communication network.
Wherein, further includes:
It controls the analogue transmission node and the simulation road and remains described in such a way that the period shakes hands by switching node Simulated maneuver communication network.
Wherein, further includes:
The predefined parameter information for controlling the pseudo channel sublayer selects the virtual channel communications mode.
Wherein, further includes:
When receiving, the corresponding pseudo channel that analogue transmission node or simulation road are sent by switching node is not available When information, corresponding simulation road is excited to recalculate routing by switching node;
It is automatic to restore to connect and corresponding simulation road is excited to recalculate road by switching node when pseudo channel can be used By;
When the pseudo channel cancel an order for receiving the transmission of Training Control node, corresponding analogue communication node release is controlled Related resource.
Wherein, further includes:
The virtual channel parameters sent according to Training Control node is received carry out the simulated maneuver communication node Synchronously control.
The present invention provides a kind of simulated maneuver communication network construction device, comprising:
Module is established, for being initialized to analogue transmission node and simulation road by switching node according to training planning;
Module is constructed, for utilizing the analogue transmission node after initializing and simulation road by the pseudo channel in switching node Sublayer controls the analogue transmission node building pseudo channel;
Simulated maneuver communication network module utilizes the pseudo channel for controlling the simulation road by switching node Connection relationship calculates the whole network routing, forms simulated maneuver communication network.
Wherein, further includes:
Mode selection module selects the pseudo channel for controlling the predefined parameter information of the pseudo channel sublayer Communication pattern.
Wherein, further includes:
Synchronization module, the virtual channel parameters for being sent according to Training Control node is received, to the analog machine Dynamic communication node synchronizes control.
The present invention provides a kind of simulated maneuver communication network building system, comprising:
Basic IP transmission network, for carrying simulated maneuver communication network;
Analogue transmission node is mapped to the base by pseudo channel sublayer for running transmission device link layer protocol Plinth IP transmission network utilizes the data of basis IP transmission network carrying simulated maneuver communication network;
Simulation road is used for operational network layer protocol by switching node, and dynamic calculates network routing;
Training Control node, for sending instruction and guide instruction;
Such as the described in any item construction devices of claim 6 to 8.
Wherein, the Training Control node uses distributed deployment mode.
Simulated maneuver communication network construction method provided by the present invention, apparatus and system, comprising: according to training planning pair Analogue transmission node and simulation road are initialized by switching node;Using after initialization analogue transmission node and simulation road by Pseudo channel sublayer in switching node controls the analogue transmission node building pseudo channel;The simulation road is controlled by handing over Node is changed, using the connection relationship of the pseudo channel, the whole network routing is calculated, forms simulated maneuver communication network;
This method is by establishing pseudo channel, for connecting semi-physical object simulating route switching node, can react motor-driven environment Lower transmission channel dynamic variation characteristic, and can be independently of the connection relationship of physical network;It can according to need carry out task scene Switching can carry out the variation of network topology structure according to the change of training planning when changing network topology structure, can lead to The mode for crossing software reconfiguration realizes topological switching, and transparent to training terminal traffic.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the flow chart of simulated maneuver communication network construction method provided by the embodiment of the present invention;
Fig. 2 is a kind of flow chart of physical simulation mobile communication network establishing method provided by the embodiment of the present invention;
Fig. 3 is the structural block diagram of simulated maneuver communication network construction device provided by the embodiment of the present invention;
Fig. 4 is the structural block diagram that simulated maneuver communication network provided by the embodiment of the present invention constructs system;
Fig. 5 is the structural schematic diagram that simulated maneuver communication network provided by the embodiment of the present invention constructs system.
Specific embodiment
Core of the invention is to provide a kind of simulated maneuver communication network construction method, and this method can react under motor-driven environment Transmission channel dynamic variation characteristic, and can be independently of the connection relationship of physical network;It can be realized by way of software reconfiguration Topology switching.
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
This method can be based on Overlay network architecture thought, on traditional IP basis, be superimposed one layer of analog machine Dynamic communication network, topological structure, address space, signaling protocol, channel access mode and the actual load of the simulated maneuver communication network Systems compliant, and it is unrelated with underlying IP network structure, as long as underlying IP network is reachable, mobile communication network analog instruction can be disposed Practice system, realizes simulated maneuver communication network Expansion and the training of networking strange land.The specific method is as follows:
Referring to FIG. 1, Fig. 1 is the flow chart of simulated maneuver communication network construction method provided by the embodiment of the present invention; This method may include:
S100, analogue transmission node and simulation road are initialized by switching node according to training planning;
Wherein, training planning can be according to trained content changing, i.e., mobile communication according to actual needs is designed.
Wherein, analogue transmission node and simulation road are all half node in kind by switching node, and analogue transmission node has Agreement/signaling capability of actual load transmission device, simulation road are had agreement/signaling of actual load route switching node by switching node Function.Analogue transmission node and simulation road can be made by switching node closer to material object in this way, to guarantee The simulated maneuver network of building has the processing and respond of live network;For the topology knot of the simulated maneuver communication network Structure, address space, signaling protocol, channel access mode and actual load systems compliant provide the foundation.
Wherein, analogue transmission node and simulation road are initialized by switching node according to training planning, i.e., according to instruction Practice planning to set analogue transmission node and simulation road by the parameter in switching node, such as virtual channel identification, MAC connect Enter mode to describe, parameter required for the building mobile communication network such as channel transfer characteristic description.
It can be by, by the control of switching node, can be realized network topology structure to analogue transmission node and simulation road The simulation to network topology change during mobile communication is realized in soft reconstruct.
S110, using after initialization analogue transmission node and simulation road by the pseudo channel sublayer in switching node, control Make the analogue transmission node building pseudo channel;
Wherein, the conventional method of pseudo channel building, in half route switching node, that is, simulation road in kind by switching node, half On transmission node in kind, that is, analogue transmission node data link layer, under IP layers, it is inserted into a pseudo channel sublayer, the void Quasi- channel sublayer can safeguard mapping relations (the pseudo channel source of pseudo channel source and destination according to initialization directive Mark, pseudo channel destination mark, the description of MAC access way, channel transfer characteristic description), which is initializing It determines, and can be adjusted according to training instruction.Since pseudo channel sublayer is transparent to basic IP transmission network, independently of The physical couplings of underlying transport network, and soft reconstruct mode simulated maneuver environment lower network topologies change feelings can be passed through Condition.
Wherein, each half transmission node in kind and half transmission node in kind of opposite end establish the link relationship, work as linking relationship When establishing failure, it can be reported;System can be made to know the link situation of pseudo channel at any time, in this way to do in real time It adjusts out.That is the pseudo channel of record link failure, can also report the relevant information of the pseudo channel to Training Control section Point in.
S120, the control simulation road calculate the whole network road using the connection relationship of the pseudo channel by switching node By forming simulated maneuver communication network.
Wherein, simulation road is obtained the state of pseudo channel by the pseudo channel sublayer in switching node, and dynamic calculates network Routing.Form simulated maneuver communication network.
That is initial phase is planned according to preparatory training, network topology structure (information containing pseudo channel) is loaded into Each half node in kind;Each half node in kind is set in pseudo channel sublayer according to actual load according to the linking relationship of pseudo channel Link layer protocol and Correspondent Node between standby establish virtual linkage relationship;Meanwhile each simulation road runs actual load by switching node Routing Protocol, establishes the whole network routing of analog network, and finally converges to stable state;According to Training scene needs, mould is controlled The communications status of quasi- network, enhances liaison ability under trainee's processor rotating ring border.
Based on the above-mentioned technical proposal, simulated maneuver communication network construction method provided in an embodiment of the present invention, this method are logical It crosses and establishes pseudo channel, for connecting semi-physical object simulating route switching node, transmission channel dynamic under motor-driven environment can be reacted and become Change characteristic, and can be independently of the connection relationship of physical network;It can according to need carry out task scene switching and change network topology The variation that can carry out network topology structure when structure according to the change of training planning, can be in a manner of can be by software reconfiguration Realize topology switching, and transparent to training terminal traffic.
Based on the above-mentioned technical proposal, this method can also include:
It controls the analogue transmission node and the simulation road and remains described in such a way that the period shakes hands by switching node Simulated maneuver communication network.
Wherein, the node periodic handshake at each pseudo channel both ends, to detect whether present channel can be used;Namely it is each The pseudo channel sublayer of node pseudo channel source and mesh ground terminal use with the consistent handshake method periodic detection of actual load with Opposite end can the general character, to maintain pseudo channel.
Based on above-mentioned any technical solution, this method can also include:
The predefined parameter information for controlling the pseudo channel sublayer selects the virtual channel communications mode.
Wherein, the source of the pseudo channel sublayer maintenance pseudo channel of each node and the mapping relations of mesh ground terminal are (virtual Channel source mark, pseudo channel destination mark, the description of MAC access way, channel transfer characteristic description), wherein MAC is accessed Mode provides one group of parameter in describing, for describing different communication modes, wherein communication pattern can be point-to-point, point-to-points The communication patterns such as point, broadcast;Virtual MAC access way is mapped to basic IP transmission network using the parameter by half node in kind Carry out IP communication.
It can make pseudo channel that should be able to simulate point-to-point, point-to-multipoint, broadcast etc. in wire/wireless communication using which Operating mode, and analog network topological structure is made to can adapt to different communication modes.
Based on above-mentioned any technical solution, this method can also include:
When receiving, the corresponding pseudo channel that analogue transmission node or simulation road are sent by switching node is not available When information, corresponding simulation road is excited to recalculate routing by switching node;
It is automatic to restore to connect and corresponding simulation road is excited to recalculate road by switching node when pseudo channel can be used By;
When the pseudo channel cancel an order for receiving the transmission of Training Control node, corresponding virtual communication node release is controlled Related resource.
Wherein, the cancelling method of pseudo channel may include actively revocation and passive revocation.It actively cancels, works as pseudo channel Source or destination detect and initiate actively to cancel when current virtual channel is unavailable, and relevant information is reported to network layer (simulation road is initiated by switching node) or report to route switching node (initiations of local terminal analogue transmission node), excitation simulation road by Switching node recalculates routing;It is automatic to restore to link and routing node is excited to recalculate routing when pseudo channel can be used. Passive revocation, training are led mediator person based on the scene switching in training script progradation, are initiated by Training Control node Pseudo channel cancel an order, half node, that is, analogue transmission node and simulation road in kind discharge after receiving cancel an order by switching node Related resource leads mediator person's initiation link re-establishment instruction except non-training, which cannot restore automatically.It can need basis When task scene switching changes network topology structure, topological switching should be able to be realized by way of software reconfiguration, and eventually to training End business is transparent.
Based on above-mentioned any technical solution, this method can also include:
The virtual channel parameters sent according to Training Control node is received carry out the simulated maneuver communication node Synchronously control.
Wherein, pseudo channel control method, can be using " control/response " mode to each in simulated maneuver communication network Half node, that is, analogue transmission node and simulation road in kind synchronizes management by switching node, to realize to each of pseudo channel Class control.For point-to-point pseudo channel, pass through the source and purpose of underlying IP network and pseudo channel in a manner of IP unicast End communication passes through each of underlying IP network and pseudo channel for point-to-multipoint, broadcasting virtual channel in a manner of IP multicast Communicate participant communication.Regulation system can be led to training process according to Training Control node.
A kind of this method concrete implementation process is provided below and please refers to Fig. 2:
Step 1, it is planned according to training, issue initiation parameter to each half node in kind and executes initialization command;
Step 2, fifty-fifty node in kind receives initiation parameter and initialization apparatus, establishes pseudo channel sublayer;
Step 3, fifty-fifty node in kind initiates link setup request to the neighbor node of oneself according to pseudo channel linking relationship;
Step 4, judge whether link succeeds;
Enter step 411 if unsuccessful, the pseudo channel of record link setup failure, and by related news report to Training Control Node;
Step 412, Training Control nodes records link setup failed message;
Step 413, pseudo channel building terminates;
421 are entered step if success, each simulation road is by switching node according to established pseudo channel connection relationship weight It is new to calculate the whole network routing;
Step 5, each simulation road is shaken hands by switching node routing convergence, each virtual link hold period to maintain link;
The foundation of simulated maneuver communication network terminates.
In conclusion this method can use the network design thought of the Overlay network architecture, net of the building for training Network pseudo channel, network topology structure can be independently of physical IP transmission networks;Pseudo channel sublayer in half node in kind is real The communication patterns such as the point-to-point of pseudo channel, point-to-multipoint, broadcast are showed, network architecture can adapt to different communication mould Formula has extremely strong extended capability;By the interaction between half node in kind, it is able to carry out the soft reconstruct of network topology structure, Realize the simulation to network topology change during mobile communication.The topological structure of analog network and the physics of basis IP transmission network Connection relationship is unrelated, supports software reconfiguration network topology.
Based on the above-mentioned technical proposal, simulated maneuver communication network construction method provided in an embodiment of the present invention, this method are logical It crosses and establishes pseudo channel, for connecting semi-physical object simulating route switching node, transmission channel dynamic under motor-driven environment can be reacted and become Change characteristic, and can be independently of the connection relationship of physical network;It can according to need carry out task scene switching and change network topology The variation that can carry out network topology structure when structure according to the change of training planning, can be in a manner of can be by software reconfiguration Realize topology switching, and transparent to training terminal traffic.Pseudo channel should be able to simulate point-to-point, point-to-points in wire/wireless communication The operating modes such as point, broadcast, and analog network topological structure can adapt to different communication modes.
The embodiment of the invention provides simulated maneuver communication network construction methods, can react motor-driven by the above method Transmission channel dynamic variation characteristic under environment, and can be independently of the connection relationship of physical network;The side of software reconfiguration can be passed through Formula realizes topology switching.
Simulated maneuver communication network construction device provided in an embodiment of the present invention and system are introduced below, hereafter retouched The simulated maneuver communication network construction device and system stated can be mutual with above-described simulated maneuver communication network construction method To should refer to.
Referring to FIG. 3, Fig. 3 is the structural frames of simulated maneuver communication network construction device provided by the embodiment of the present invention Figure;The construction device may include:
Module 101 is established, it is initial for being carried out to analogue transmission node and simulation road by switching node according to training planning Change;
Module 102 is constructed, for utilizing the analogue transmission node after initializing and simulation road by virtual in switching node Channel sublayer controls the analogue transmission node building pseudo channel;
Simulated maneuver communication network module 103 utilizes the pseudo channel for controlling the simulation road by switching node Connection relationship, calculate the whole network routing, formed simulated maneuver communication network.
Based on the above-mentioned technical proposal, which can also include:
Maintenance module, for controlling the analogue transmission node and the simulation road shaken hands by switching node by the period Mode maintains the simulated maneuver communication network.
Based on above-mentioned any technical solution, which can also include:
Cancel module, for when receive analogue transmission node or simulation road by switching node sends it is corresponding virtually When the not available information of channel, corresponding simulation road is excited to recalculate routing by switching node;When pseudo channel can be used, It is automatic to restore to connect and corresponding simulation road is excited to recalculate routing by switching node;It is sent when receiving Training Control node Pseudo channel cancel an order, control corresponding virtual communication node release related resource.
Based on above-mentioned any technical solution, which can also include:
Mode selection module selects the pseudo channel for controlling the predefined parameter information of the pseudo channel sublayer Communication pattern.
Based on above-mentioned any technical solution, which can also include:
Synchronization module, the virtual channel parameters for being sent according to Training Control node is received, to the analog machine Dynamic communication node synchronizes control.
Referring to FIG. 4, Fig. 4 is the structural frames that simulated maneuver communication network provided by the embodiment of the present invention constructs system Figure;The building system may include:
Basic IP transmission network 200, for carrying simulated maneuver communication network;
Wherein, basic IP transmission network 200 leads tune and disappears for carrying all kinds of business of analog network and network-control, training Breath.Analog network is by simulation road by the pseudo channel group between switching node 400, analogue transmission node 300 and these entities At establishing logic communication linking relationship in reciprocity functional layer between each simulation entity according to network stratified structure.Wherein, By the mapping function of pseudo channel sublayer, the link layer protocol that actual load is run in simulated environment and network layer association can be supported View, so as to be provided and the consistent network environment of actual load towards trainee.
Analogue transmission node 300 is mapped to described for running transmission device link layer protocol by pseudo channel sublayer Basic IP transmission network 200 utilizes the data of the basis IP transmission network 200 carrying simulated maneuver communication network;
Wherein, analogue transmission node 300 runs actual load transmission device link layer protocol, and is mapped by pseudo channel sublayer To the ethernet physical layer of basic IP transmission network 200, to carry all kinds of of analog network on basic IP transmission network 200 Data.
Simulation road is used for operational network layer protocol by switching node 400, and dynamic calculates network routing;
Wherein, simulation road runs actual load network layer protocol by switching node 400, and can perceive mould by pseudo channel sublayer Each virtual channel state in quasi- network, so that dynamic calculates network routing.
Training Control node 500, for sending instruction and guide instruction;
Wherein, optionally, the Training Control node 500 uses distributed deployment mode.
Wherein, Training Control node 500 can use distributed deployment mode, realize cross-region, networking, customize instruction Practice control.Training leads mediator person according to task scene conversion needs, and tune instruction is led in training and is sent to construction device 100, by structure It builds device 100 and realizes to control full mesh topology and switch.
Such as the described in any item construction devices 100 of claim 6 to 8.
Wherein, network comtrol server, that is, construction device 100 can be using deployment way be concentrated, to realize that full mesh topology is same Step control, is communicated with all kinds of analog nodes by basic IP transmission network 200, completes the initialization of pseudo channel, maintain, remove The control functions such as pin, switching.
Wherein, simulated maneuver communication network uses the Overlay network architecture, and system is by basic IP transmission network 200, half reality Object route switching node, that is, simulation road is by switching node 400, half transmission node in kind, that is, analogue transmission node 300, network-control Server, that is, construction device 100, Training Control node 500 form.Basic IP transmission network 200 is by traditional router, exchange Mechanism is at for carrying analog network;Half route switching node in kind has agreement/signaling function of actual load route switching node Energy;Half transmission node in kind has agreement/signaling capability of actual load transmission device;Network comtrol server is passed for each analoglike Defeated channel access control;Training Control node leads regulation system for training process.
A kind of specific structural schematic diagram of building system is provided below, please refers to Fig. 5:
It specifically includes: semi-physical object simulating route switching node A, B;Semi-physical object simulating transmission node A, B;Network control services Device, that is, simulated maneuver mentioned here communication network construction device;Training Control node;Network layer;Pseudo channel sublayer;Data Link layer.By being interacted with IP data between each functional entity and unit, and respectively independent operating and work.
Based on the above-mentioned technical proposal, simulated maneuver communication network provided in an embodiment of the present invention constructs system, is not changing Under the premise of basic IP transmission network, can simulated maneuver environment lower network topology dynamic changes, have extremely strong extension Property, as long as basis IP transmission network is reachable, so that it may dispose all kinds of analogue communication nodes, cross-region networking instruction can be fast implemented Practice;Pseudo channel supports the communication patterns such as point-to-point, point-to-multipoint, broadcast;Analog network topological structure can pass through software dynamic Reconstruct, the link layer and network layer protocol and actual load systems compliant of analog network, can enhance training effect.The system can also answer For correlation test room, training centre, training center's construction.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration ?.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology In any other form of storage medium well known in field.
Detailed Jie has been carried out to simulated maneuver communication network construction method provided by the present invention, apparatus and system above It continues.Used herein a specific example illustrates the principle and implementation of the invention, and the explanation of above embodiments is only It is to be used to help understand method and its core concept of the invention.It should be pointed out that for those skilled in the art For, it without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention, these improve and repair Decorations are also fallen within the protection scope of the claims of the present invention.

Claims (10)

1. a kind of simulated maneuver communication network construction method characterized by comprising
Analogue transmission node and simulation road are initialized by switching node according to training planning;
Using after initialization analogue transmission node and simulation road by the pseudo channel sublayer in switching node, control the simulation Transmission node constructs pseudo channel;
It controls the simulation road and is calculated the whole network routing using the connection relationship of the pseudo channel by switching node, form simulation Mobile communication network.
2. construction method as described in claim 1, which is characterized in that further include:
It controls the analogue transmission node and the simulation road and maintains the simulation in such a way that the period shakes hands by switching node Mobile communication network.
3. construction method as described in claim 1, which is characterized in that further include:
The predefined parameter information for controlling the pseudo channel sublayer selects the virtual channel communications mode.
4. construction method as described in claim 1, which is characterized in that further include:
When the not available information of corresponding pseudo channel for receiving analogue transmission node or simulation road and being sent by switching node When, excite corresponding simulation road to recalculate routing by switching node;
It is automatic to restore to connect and corresponding simulation road is excited to recalculate routing by switching node when pseudo channel can be used;
When the pseudo channel cancel an order for receiving the transmission of Training Control node, it is related to control corresponding analogue communication node release Resource.
5. construction method as described in claim 1, which is characterized in that further include:
The virtual channel parameters sent according to Training Control node is received, synchronize control to simulated maneuver communication node System.
6. a kind of simulated maneuver communication network construction device characterized by comprising
Module is established, for being initialized to analogue transmission node and simulation road by switching node according to training planning;
Module is constructed, for utilizing the analogue transmission node after initializing and simulation road by pseudo channel in switching node Layer controls the analogue transmission node building pseudo channel;
Simulated maneuver communication network module utilizes the connection of the pseudo channel for controlling the simulation road by switching node Relationship calculates the whole network routing, forms simulated maneuver communication network.
7. construction device as claimed in claim 6, which is characterized in that further include:
Mode selection module selects the virtual channel communications for controlling the predefined parameter information of the pseudo channel sublayer Mode.
8. construction device as claimed in claim 7, which is characterized in that further include:
Synchronization module, the virtual channel parameters for being sent according to Training Control node is received, to simulated maneuver communication section Point carries out synchronously control.
9. a kind of simulated maneuver communication network constructs system characterized by comprising
Basic IP transmission network, for carrying simulated maneuver communication network;
Analogue transmission node is mapped to the basis IP by pseudo channel sublayer for running transmission device link layer protocol Transmission network utilizes the data of basis IP transmission network carrying simulated maneuver communication network;
Simulation road is used for operational network layer protocol by switching node, and dynamic calculates network routing;
Training Control node, for sending instruction and guide instruction;
Such as the described in any item construction devices of claim 6 to 8.
10. building system as claimed in claim 9, which is characterized in that the Training Control node uses distributed deployment side Formula.
CN201510794682.2A 2015-11-18 2015-11-18 A kind of simulated maneuver communication network construction method, device and system Active CN105471634B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510794682.2A CN105471634B (en) 2015-11-18 2015-11-18 A kind of simulated maneuver communication network construction method, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510794682.2A CN105471634B (en) 2015-11-18 2015-11-18 A kind of simulated maneuver communication network construction method, device and system

Publications (2)

Publication Number Publication Date
CN105471634A CN105471634A (en) 2016-04-06
CN105471634B true CN105471634B (en) 2018-12-21

Family

ID=55608948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510794682.2A Active CN105471634B (en) 2015-11-18 2015-11-18 A kind of simulated maneuver communication network construction method, device and system

Country Status (1)

Country Link
CN (1) CN105471634B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109495324B (en) * 2018-12-26 2021-12-24 武汉职业技术学院 Virtual training communication network construction method and system
CN109525465A (en) * 2018-12-26 2019-03-26 武汉职业技术学院 A kind of virtual communication network practical training method and system
CN111464367B (en) * 2020-04-21 2022-09-16 深圳信息职业技术学院 Method, device, computer equipment and storage medium for establishing virtual communication connection

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103747452A (en) * 2013-12-30 2014-04-23 重庆金美通信有限责任公司 Method for activating locomotive communication backbone network
CN103746887A (en) * 2013-12-30 2014-04-23 重庆金美通信有限责任公司 Method for activating locomotive access network

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103747452A (en) * 2013-12-30 2014-04-23 重庆金美通信有限责任公司 Method for activating locomotive communication backbone network
CN103746887A (en) * 2013-12-30 2014-04-23 重庆金美通信有限责任公司 Method for activating locomotive access network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
机动干线通信节点综合设计与实现;郭同刚;《西安电子科技大学硕士论文》;20120331;第11页第1行,16页11-19行,19页5-11行,21页,图3.1 *

Also Published As

Publication number Publication date
CN105471634A (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN103051539B (en) A kind of net control implementation method based on DHT, System and Network controller
CN105162704B (en) The method and device of multicast replication in Overlay network
CN103401786B (en) Network topology foundation, path clustering, message transmitting method and device, system
CN112311606B (en) Method for constructing virtual-real decoupling simulation network
CN105490884B (en) A kind of VXLAN tunnel detection method and device
US8428021B2 (en) Architecture using inexpensive, managed wireless switching points to deliver large scale WLAN
CN106712988B (en) A kind of virtual network management method and device
CN109039703A (en) The method and system of business scenario network rapid build under a kind of complex network simulated environment
CN106850387A (en) A kind of system and method for the virtual network networking for realizing multiple data centers
KR20120052981A (en) Method and system for deploying at least one virtual network on the fly and on demand
CN104811335A (en) Method for realizing network target range system and network target range management system
CN106452857A (en) Method for generating configuration information and network control unit
CN106454891A (en) Wireless local area network remote supervision method
CN105472632B (en) A kind of construction method of analog wireless networks, device and system
CN104378249B (en) Detection method, device, system, controller and the gateway of data link
CN104396214B (en) For using the equipment of signaling and the rich-media state and feedback of infrastructure component in path
CN105471634B (en) A kind of simulated maneuver communication network construction method, device and system
CN107949010A (en) Wireless networking route test method and system based on MESH network
CN106936712B (en) Method, server and router for establishing LSP
CN104135446A (en) System and method of implementing transition from IPv4 (Internet Protocol Version4) to IPv6 (Internet Protocol Version6) based on SDN (Software Defined Network)
CN102457348B (en) A kind of method and system realizing pseudo-line traffic control word capability negotiation
CN103401954B (en) The implementation method of virtual DHCP
CN114553752A (en) Network performance testing method and device based on simulation software and computer equipment
CN105227373A (en) Based on multi-layer topology discovery system for networks and the method for cloud controller
CN104125079B (en) A kind of method and device for determining two-node cluster hot backup configuration information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant