CN105464356A - Steel pipe pole operating platform - Google Patents

Steel pipe pole operating platform Download PDF

Info

Publication number
CN105464356A
CN105464356A CN201610018279.5A CN201610018279A CN105464356A CN 105464356 A CN105464356 A CN 105464356A CN 201610018279 A CN201610018279 A CN 201610018279A CN 105464356 A CN105464356 A CN 105464356A
Authority
CN
China
Prior art keywords
steel pipe
pipe pole
bases
operating platform
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610018279.5A
Other languages
Chinese (zh)
Inventor
吴仁光
史斌
李凯鹏
徐振平
胡友定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Xiangshan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Xiangshan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Ningbo Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Xiangshan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610018279.5A priority Critical patent/CN105464356A/en
Publication of CN105464356A publication Critical patent/CN105464356A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/243Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the outside contour of a building

Abstract

The invention discloses a steel pipe pole operating platform. The steel pipe pole operating platform comprises two bases, wherein the ends of the two bases are connected in an aligned and matched mode. An assembly cavity matched with a steel pipe pole in a sleeving mode is formed between the two bases, bearing poles are arranged outside the peripheral surfaces of the bases in the circumferential direction of the bases, and a plurality of supporting beams are connected between the bearing poles and the bases. In the assembly use process, the two bases are arranged on the steel pipe pole needing operating in a sleeving mode, the ends of the two bases are connected in the aligned mode, and then a worker can step on the operating platform formed by the upper surfaces of the bases, the bearing rods and the supporting beams to carry out related operation. As an annular platform structure located on the periphery of the steel pipe pole in a sleeving mode is formed after the two bases are connected, the operation area and the operation space are effectively increased for the worker, and the operation convenience and the operation safety are improved; meanwhile, the worker can fix one end of a safety belt to one bearing rod, so that the safety belt is reliably and effectively fixed, and accordingly potential safety hazards in the operation process are further reduced.

Description

A kind of steel pipe pole operating platform
Technical field
The present invention relates to power transmission and transforming equipment necessary accessories technical field, particularly a kind of steel pipe pole operating platform.
Background technology
Steel pipe pole is a kind of common construction of line and fastening in power transmission and transformation field, and power transmission and transformation line is safeguarded and in erection operating process, usually needed staff to climb and carry out operation to steel pipe pole.
In the relevant operation process of current existing steel pipe pole, after staff's climbing is to steel pipe pole, the operating space that can utilize for staff is limited, the equipment such as pin nail only can be relied under normal circumstances to carry out stopping over and trample with support works personnel, although this existing apparatus can meet basic operation needs, but because it can be very narrow and small for the scope of activities of operation, and staff moves very inconvenience during multistation operation, bring inconvenience not only to the relevant efficient fast processing of operation, bring potential safety hazard also to the actual mechanical process of staff.
Therefore, how to provide one can expand operated by personnel space, ensure that the steel pipe pole operating platform of safe and reliable operation is the important technological problems that those skilled in the art need to solve at present.
Summary of the invention
The object of this invention is to provide a kind of steel pipe pole operating platform, this steel pipe pole operating platform can expand operated by personnel space, ensures safe and reliable operation.
For solving the problems of the technologies described above, the invention provides a kind of steel pipe pole operating platform, comprise two end contrapositions and connect adaptive pedestal, formed between pedestal described in two and be set with adaptive assembly cavity with steel pipe pole, the outer peripheral face outside of described pedestal is provided with support bar along its circumference, is connected with some brace summers between described support bar and described pedestal.
Preferably, the assembling end arranged outside of described pedestal has stiffener.
Preferably, described stiffener is metallic article.
Preferably, the assembling end of described pedestal has location-plate, and described location-plate has pilot hole, the pilot hole one_to_one corresponding of pedestal described in two, and the bolt passing through to run through successively two corresponding pilot holes described in two between pedestal fixes.
Preferably, described pedestal, described support bar and described brace summer are metallic article.
Relative above-mentioned background technology, steel pipe pole operating platform provided by the present invention, in its assembling use procedure, two base sleeve are located at and need carry out on the steel pipe pole of operation, and two base ends contrapositions are connected, staff can trample to by the enterprising line correlation operation of the operating platform formed between pedestal upper surface, support bar and brace summer afterwards, because two pedestals connect the ring-shaped platform structure that rear formation is set in steel pipe pole peripheral part, thus increase effectively working area and the operating space of staff, improve operation ease and safety; Meanwhile, safety belt one end can be fixed on support bar by staff, thus it is reliable effectively fixing that safety belt is obtained, thus reduces the potential safety hazard in operation process further.
In another preferred version of the present invention, the assembling end arranged outside of described pedestal has stiffener.In actual mechanical process, described stiffener can ensure the structural reliability in pedestal and the associated component course of work thereof further, avoid pedestal or its associated component in actual job process to produce excessive deformation or dislocation, make the overall structure reliability of described steel pipe pole operating platform and fatigue strength be able to corresponding raising.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The structure elevation of the steel pipe pole operating platform that Fig. 1 provides for a kind of detailed description of the invention of the present invention;
Fig. 2 is the top view of Fig. 1.
Detailed description of the invention
Core of the present invention is to provide a kind of steel pipe pole operating platform, and this steel pipe pole operating platform can expand operated by personnel space, ensures safe and reliable operation.
In order to make those skilled in the art person understand the present invention program better, below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Please refer to Fig. 1 and Fig. 2, the structure elevation of the steel pipe pole operating platform that Fig. 1 provides for a kind of detailed description of the invention of the present invention; Fig. 2 is the top view of Fig. 1.
In a specific embodiment, steel pipe pole operating platform provided by the present invention, comprise two end contrapositions and connect adaptive pedestal 11, formed between two pedestals 11 and be set with adaptive assembly cavity with steel pipe pole, the outer peripheral face outside of pedestal 11 is provided with support bar 12 along its circumference, is connected with some brace summers 13 between support bar 12 and pedestal 11.
In assembling use procedure, two pedestals 11 are sheathed on and need carry out on the steel pipe pole of operation, and two pedestal 11 end contrapositions are connected, staff can trample to by the enterprising line correlation operation of the operating platform formed between pedestal 11 upper surface, support bar 12 and brace summer 13 afterwards, because two pedestals 11 connect the ring-shaped platform structure that rear formation is set in steel pipe pole peripheral part, thus increase effectively working area and the operating space of staff, improve operation ease and safety; Meanwhile, safety belt one end can be fixed on support bar 12 by staff, thus it is reliable effectively fixing that safety belt is obtained, thus reduces the potential safety hazard in operation process further.
Should be understood that, when applying specific to practical set, because steel pipe pole under actual condition is generally the cylindrical body of rod, therefore said base 11 and support bar 12 are all preferably semicircular structure as illustrated in the drawing, certainly, the shape of said base 11 and support bar 12 is not limited to the semicircular structure shown in figure, as long as can meet the actual use needs of described steel pipe pole operating platform.
Further, the assembling end arranged outside of pedestal 11 has stiffener 14.In actual mechanical process, stiffener 14 can ensure the structural reliability in pedestal 11 and the associated component course of work thereof further, avoid pedestal 11 or its associated component in actual job process to produce excessive deformation or dislocation, make the overall structure reliability of steel pipe pole operating platform and fatigue strength be able to corresponding raising.
More specifically, stiffener 14 is metallic article.The rigidity of metallic article is higher, effectively can ensure the structural rigidity of stiffener 14 self and the structural strengthening effect of stiffener 14 pairs of steel pipe pole operating platforms.
On the other hand, the assembling end of pedestal 11 has location-plate 111, location-plate 111 has pilot hole 112, pilot hole 112 one_to_one corresponding of two pedestals 11, and the bolt passing through to run through successively two corresponding pilot holes 112 between two pedestals 11 fixes.The fastening structure of this kind of bolt contraposition assembling contributes to the structural reliability improving described steel pipe pole operating platform further, and reduces its assembly and disassembly difficulty, improves its dismounting efficiency.
In addition, pedestal 11, support bar 12 and brace summer 13 are metallic article.The rigidity of metallic article is higher, can ensure structural strength and the assembly reliability thereof of steel pipe pole operating platform associated component further.
Specific in actual mechanical process, for ensureing the overall structure rigidity of described steel pipe pole operating platform, said base 11, support bar 12 and brace summer 13, and the material of previously described stiffener 14 is all preferably steelwork, but the material of above-mentioned each parts is not limited to steelwork, can also be the higher and metal material product that material is light of aluminium alloys or other rigidity, as long as the actual use needs of described steel pipe pole operating platform that is, can be met.
In summary, the steel pipe pole operating platform provided in the present invention, comprise two end contrapositions and connect adaptive pedestal, formed between pedestal described in two and be set with adaptive assembly cavity with steel pipe pole, the outer peripheral face outside of described pedestal is provided with support bar along its circumference, is connected with some brace summers between described support bar and described pedestal.In assembling use procedure, two base sleeve are located at and need carry out on the steel pipe pole of operation, and two base ends contrapositions are connected, staff can trample to by the enterprising line correlation operation of the operating platform formed between pedestal upper surface, support bar and brace summer afterwards, because two pedestals connect the ring-shaped platform structure that rear formation is set in steel pipe pole peripheral part, thus increase effectively working area and the operating space of staff, improve operation ease and safety; Meanwhile, safety belt one end can be fixed on support bar by staff, thus it is reliable effectively fixing that safety belt is obtained, thus reduces the potential safety hazard in operation process further.
Above steel pipe pole operating platform provided by the present invention is described in detail.Apply specific case herein to set forth principle of the present invention and embodiment, the explanation of above embodiment just understands method of the present invention and core concept thereof for helping.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some improvement and modification to the present invention, these improve and modify and also fall in the protection domain of the claims in the present invention.

Claims (5)

1. a steel pipe pole operating platform, it is characterized in that: comprise two end contrapositions and connect adaptive pedestal, formed between pedestal described in two and be set with adaptive assembly cavity with steel pipe pole, the outer peripheral face outside of described pedestal is provided with support bar along its circumference, is connected with some brace summers between described support bar and described pedestal.
2. steel pipe pole operating platform as claimed in claim 1, is characterized in that: the assembling end arranged outside of described pedestal has stiffener.
3. steel pipe pole operating platform as claimed in claim 2, is characterized in that: described stiffener is metallic article.
4. steel pipe pole operating platform as claimed in claim 1, it is characterized in that: the assembling end of described pedestal has location-plate, described location-plate has pilot hole, the pilot hole one_to_one corresponding of pedestal described in two, and the bolt passing through to run through successively two corresponding pilot holes described in two between pedestal fixes.
5. steel pipe pole operating platform as claimed in claim 1, is characterized in that: described pedestal, described support bar and described brace summer are metallic article.
CN201610018279.5A 2016-01-12 2016-01-12 Steel pipe pole operating platform Pending CN105464356A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610018279.5A CN105464356A (en) 2016-01-12 2016-01-12 Steel pipe pole operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610018279.5A CN105464356A (en) 2016-01-12 2016-01-12 Steel pipe pole operating platform

Publications (1)

Publication Number Publication Date
CN105464356A true CN105464356A (en) 2016-04-06

Family

ID=55602471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610018279.5A Pending CN105464356A (en) 2016-01-12 2016-01-12 Steel pipe pole operating platform

Country Status (1)

Country Link
CN (1) CN105464356A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004350417A (en) * 2003-05-22 2004-12-09 Fujikura Ltd Fixing clamp for identifying utility pole and method for managing utility pole employing the same
CN103401180A (en) * 2013-07-18 2013-11-20 国家电网公司 Operation platform for replacing flange screw of steel tube tower
CN104251053A (en) * 2013-06-28 2014-12-31 国家电网公司 Steel tube tower mounting platform
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel
CN205476396U (en) * 2016-01-12 2016-08-17 国网浙江象山县供电公司 Steel pipe pole operation platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004350417A (en) * 2003-05-22 2004-12-09 Fujikura Ltd Fixing clamp for identifying utility pole and method for managing utility pole employing the same
CN104251053A (en) * 2013-06-28 2014-12-31 国家电网公司 Steel tube tower mounting platform
CN103401180A (en) * 2013-07-18 2013-11-20 国家电网公司 Operation platform for replacing flange screw of steel tube tower
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel
CN205476396U (en) * 2016-01-12 2016-08-17 国网浙江象山县供电公司 Steel pipe pole operation platform

Similar Documents

Publication Publication Date Title
CN1856644B (en) Method of conducting service on a wind turbine using equipment mounted on the hub
US9651019B2 (en) Arrangement to align a part of a wind turbine
CN103061506A (en) Construction method of steel structure dome
CN105398990B (en) Electric power angle steel tower auxiliary lifting apparatus
CN104847122B (en) Device assembly for tensioning fork ear type stay rope or steel pull rod and tensioning construction method of device assembly
CN105464356A (en) Steel pipe pole operating platform
CN206937191U (en) A kind of adjustable type hydraulic spanner special stand
KR20170001882U (en) Generator rotor support device
JP2013227822A (en) Construction method of string beam structure
CN109958314B (en) Device and method for replacing and protecting angle steel tower material of power transmission line iron tower
CN109818284B (en) 1000kV extra-high voltage transformer low-voltage lead dismounting platform
CN205476396U (en) Steel pipe pole operation platform
CN205646578U (en) Special lifting rope of bridge formula transformer installation
CN202417295U (en) Insulating single-leg ladder leg stabilizer
CN109208959B (en) Electrode connecting platform mounted on conductive cross arm
CN202632942U (en) Safety belt fixing support for transformer
CN208005112U (en) A kind of disassembling fixture of belt pulley
CN104948483A (en) Long-leg simple fan
CN203742185U (en) Hanging bar mounting operating rod
CN206467511U (en) Track fix tool
CN204175175U (en) Circuit tower cable maintenance ladder
CN104192740B (en) Engineering machinery, for the safety protecting method of work high above the ground and device
CN204710621U (en) A kind of tower cylinder application supporting and adjusting device
CN210710382U (en) Auxiliary device is corrected to hoist gate leg
CN103498848A (en) Quick mounting bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160406