Background technology
Deep layer soft soil foundation processing is the technical barrier that harbour, water conservancy, traffic engineering construction are frequently encountered.Conventional at present
Soft-soil foundation treatment method has cement mixing pile method, draining concretion method, cushion, vacuum method etc..It was verified that vacuum is pre-
Platen press is a kind of soft-soil foundation treatment method of the economic and reliable grown up based on native consolidation theory.This method is earliest
Taught and proposed in nineteen fifty-two by the Jie Erman (Kjellman) of imperial ground institute of Sweden, by the theoretical developments and reality of decades
Application is trampled, the construction technology and design method of maturation have been formd at present, and it is actual to be widely used in engineering.This method exists
During implementation, vertical row water body (general using vertical drainage plate at present) is plugged in weak soil, and sealed with air-locked diaphragm seal
Place is reinforced, negative pressure is then formed in vertical drainage body by vacuum plant pumping, makes the moisture in weak soil in negative pressure load
In the presence of discharge, and then reach that reduction is become silted up native moisture content, the consolidation effect that improves soil strength.
However, there is a key technology bottleneck problem when handling deep soft soil foundation in technique of soft soil foundation treatment:Vacuum is born
Pressure is difficult to effectively be transferred to deep layer weak soil.During the technology is implemented, due to being hindered and smear effect by vertical drainage plate well
When being transmitted along drain bar to ground depth direction obvious linear loss can occur for influence, negative pressure of vacuum【Qiu Qingchang, Mo Hai
Drawdown analysis [J] the South China Science & Engineering University journal (natural science of fluid in letter, the good Soft Ground Improved By Vacuum Preloadings vertical drainage bodies of Dong Zhi
Version) .2007 (03):132-136.;Zhu Qunfeng, Gao Changsheng, Yang Shouhua, wait vacuum transmission in ultra-soft silt ground treatments special
Journal of Sex Research [J] Geotechnical Engineering journal .2010 (09):1429-1433.】, cause vacuum to be difficult to effectively transmit to deep layer weak soil.
Therefore, when technique of soft soil foundation treatment is applied in deep layer soft soil foundation processing engineering, often occur because vacuum transmission depth is limited
And cause the soft base disposal effect of deep layer not satisfactory, and the pumpdown time is long, it is difficult to meet construction period.
It follows that a kind of device of the native foundation stabilization of the deep silt for finding the achievable effective vacuum preloading of deep layer weak soil and
Method, is this area technical problem urgently to be resolved hurrily.The invention provides a kind of deep silt soil of tunneling boring vacuum pre-press reinforcing
At the device of base and the method using the deep silt soil base of the device ground preloading, the reinforcing that deep layer weak soil/silt soil can be realized
Reason.
The content of the invention
In view of there is above-mentioned technical problem in the prior art, the defect that the present invention exists for prior art breaks through tradition
The shallow bottleneck of technique of soft soil foundation treatment soft soil foundation effective reinforcement depth there is provided one kind with can effectively improving Deep Thick Soft Ground
The device and its application method of the deep silt soil base of tunneling boring high vacuum ground preloading of base integral reinforcing effect.
The device of the deep silt soil base of tunneling boring high vacuum ground preloading of the present invention includes, vacuum extractor, true
Vacant duct system and tunneling boring high vacuum displacement hull, vacuum pipe system include supervisor and branch pipe, and one end of supervisor is with vacuumizing
Device is connected, and supervisor punishes out a branch pipe in the position of every row's displacement hull.The tunneling boring high vacuum displacement hull by drain bar,
Vacuum pipe and many types of splice combinations are formed by connecting, and many type joints include two template interfaces and two cast interfaces, by many
The template interface tandem drain bar of type joint, cast interface tandem vacuum tube.The length of the every drain bar and vacuum pipe
For 4-10m, the drain bar or vacuum pipe total length of the series connection are higher by design and plug depth 0.3m-0.5m, the vacuum tube
A diameter of 1cm-2cm in road, the total length of the tunneling boring high vacuum displacement hull is determined according to ground design reinforcement depth.It is described
Every branch pipe of vacuum pipe system is connected by connecting tube with the vacuum pipe, by connecting tube and hand-type joint with it is described
Drain bar is connected, entire row of having connected displacement hull, wherein, hand-type joint includes a template interface and a cast interface.
The method of the deep silt soil base of use said apparatus ground preloading of the present invention, is by following technical solution
Realize, comprise the following steps:
The first step, make tunneling boring high vacuum displacement hull --- the tunneling boring high vacuum displacement hull is by drain bar (draining
Its typical structure of plate is referring to the patent document that number of patent application is 200620014821.1《Drain bar》), vacuum pipe and many types of
Splice combinations are formed by connecting, and many type joints include two template interfaces and two cast interfaces, are connect by the template of many type joints
Mouth series connection drain bar, cast interface tandem vacuum tube.The length of every drain bar and vacuum pipe is 4-10m, the draining of series connection
Plate or vacuum pipe total length are higher by displacement hull design and plug depth 0.3m-0.5m, a diameter of 1cm-2cm of vacuum tube.
Second step, plug tunneling boring high vacuum displacement hull --- the pending soil layer of leveling, and inserted according to predetermined space
If displacement hull is to projected depth;
3rd step, pipeline connection --- ground surface on the scene lays the supervisor that one end is connected with vacuum extractor, and supervisor is every
A branch pipe is punished out in the position of row's displacement hull, and every branch pipe is connected by connecting tube with vacuum pipe, passes through connecting tube and hand
Type joint is connected vacuum pipe with the drain bar of tunneling boring high vacuum displacement hull, entire row of having connected displacement hull, wherein, hand-type joint
Including a template interface and a cast interface;
4th step, covering sealing --- at least one layer of geotechnique of covering on the pending soil layer of laying pipe-line system
Cloth, then lays at least one layer of diaphragm seal;
5th step, vacuum drainage consolidation --- open vacuum extractor, when under diaphragm seal vacustat in > 85kPa
When, the stable high vacuum angle value in > 70kPa of displacement hull tunneling boring realizes that deep silt soil base tunneling boring high vacuum draining is consolidated
Knot.
The apparatus and method of the deep silt soil base of tunneling boring high vacuum ground preloading of the present invention, are arranged using tunneling boring high vacuum
Water body replaces traditional drain bar, and negative pressure source is become to be dispersed throughout deep silt soil base by traditional surface single vacuum acting surface
Multi-level vacuum action face.By multi-level vacuum action face collective effect, negative pressure of vacuum can smoothly be transferred to the row in deep
Water plate, make the negative pressure of vacuum in the drain bar of entire depth section maintain high-level operation, and deep silt soil base is needed
Processing soil layer is effectively and rapidly reinforced, so as to greatly accelerate discharging consolidation, shortens the construction period, and ensure that
Deep silt soil base integral reinforcing effect, it is simple and reliable, it is economical and practical.
Brief description of the drawings
Fig. 1 is the structural representation of tunneling boring high vacuum displacement hull of the present invention and vacuum extractor;
Fig. 2 is the schematic diagram of many type joints of the present invention;
Fig. 3 is the schematic diagram of hand-type joint of the present invention.
Wherein, 1 is vacuum pipe, and 2 be drain bar, and 3 be many type joints, and 4 be tunneling boring high vacuum displacement hull, and 5 be supervisor,
6 be branch pipe, and 7 be vacuum extractor, and 8 be hand-type joint, and 9 be connecting tube, and 10 be geotextiles, and 11 be press mold ditch, and 12 connect for cast
Mouthful, 13 be template interface, and 14 be diaphragm seal.
Embodiment
Make lower explanation to technical scheme with specific embodiment below in conjunction with the accompanying drawings:
The method of the deep silt soil base of tunneling boring high vacuum ground preloading of the present embodiment adds in certain dyke vulnerable spots levee foundation
Gu implement in engineering, as shown in figure 1, Soft Soil Layer is distributed under the vulnerable spots complex geologic conditions, levee body in 20m depth boundses, it is soft
Soil thickness is big, moisture content is high, low intensity, and levee body sedimentation is unstable.
The device of the deep silt soil base of tunneling boring high vacuum ground preloading of the present embodiment, as shown in figure 1, including taking out true
Empty device 7, vacuum pipe system and tunneling boring high vacuum displacement hull 4, vacuum pipe system include supervisor 5 and branch pipe 6, supervisor 5
One end be connected with vacuum extractor 7, supervisor 5 punishes out a branch pipe 6 in the position of every row's displacement hull 4.The tunneling boring is high
Vacuum drainage body 4 is formed by connecting by the combination of drain bar 2, vacuum pipe 1 and many type joints 3, and many type joints 3 connect including two templates
Mouth 13 and two cast interfaces 12, pass through the series connection drain bar 2 of template interface 13 of many type joints 3, the series connection vacuum of cast interface 12
Pipeline 1;The every branch pipe 6 of the vacuum pipe system is connected by connecting tube 9 with the vacuum pipe 1, passes through the He of connecting tube 9
Hand-type joint 8 is connected with the drain bar 2, entire row of having connected displacement hull 4, wherein, hand-type joint 8 includes a template interface 13
With a cast interface 12.
The length of the every drain bar 2 and vacuum pipe 1 is 4-10m, the drain bar 2 or vacuum pipe 1 of the series connection
Total length is higher by design and plugs depth 0.3m-0.5m, a diameter of 1cm-2cm of the vacuum pipe 1, the tunneling boring high vacuum
The total length of displacement hull 4 is determined according to ground design reinforcement depth.
Said apparatus is when in use, it is necessary to which at least one layer of geotextiles 10 of ground on the scene covering, and laying at least one layer are sealed
Film 14.
Specific implementation step is as follows:
The first step, making tunneling boring high vacuum displacement hull 4 --- tunneling boring high vacuum displacement hull 4 is by drain bar 2, vacuum tube
Road 1 and the combination of many type joints 3 are formed by connecting, and many type joints 3 include two template interfaces 13 and two cast interfaces;By many types of
The series connection drain bar 2 of template interface 13 of joint 3, the series connection vacuum pipe 1 of cast interface 12.Wherein, tunneling boring high vacuum displacement hull 4
Total length passes through the template interface 13 of many type joints 3 respectively for projected depth 20m, 4 5.1m drain bar 2 and vacuum pipe 1
Connected with cast interface 12, vacuum pipe diameter 1.5cm.
Second step, smooth location and tunneling boring high vacuum displacement hull 4 --- place in the range of smooth stabilization zone is plugged, and
Displacement hull 4 is plugged to 20m depth with 1.0m interval on pending soil layer;
3rd step, pipeline connection --- lay the master that one end is connected with vacuum extractor 7 on pending soil layer surface
Pipe 5, supervisor 5 separates a branch pipe 6 in the position of every row's displacement hull, and each branch pipe 6 is connected by connecting tube 9 with vacuum pipe 1,
It is connected by connecting tube 9 and hand-type joint 8 with the drain bar 2 of tunneling boring high vacuum displacement hull 4, entire row of having connected displacement hull 4, its
In, hand-type joint 8 includes a template interface 13 and a cast interface 12.
4th step, covering sealing --- one layer of 300g/m2 soil is covered on the pending soil layer of laying pipe-line system
Work cloth 10, then lays 3 thickness degree not less than 0.12mm diaphragm seals 14, press mold ditch 11 is excavated on place periphery;
5th step, vacuum drainage consolidation --- vacuum extractor 7 is opened, when 14 times vacustats of diaphragm seal are in >
During 85kPa, the stable high vacuum angle value in > 70kPa of the tunneling boring of displacement hull 4 realizes deep silt soil base tunneling boring high vacuum row
Water is consolidated.
After 90 days dispose, the levee foundation degree of consolidation reaches 95%, more than design load 90%, while different depth is soft after processing
The foundation bearing capacity of soil is improved significantly, and bearing capacity reaches 80kPa, and consolidation effect is notable.
In addition to the implementation, the present invention can also have other embodiment.All use equivalent substitution or equivalent transformation shape
Into technical scheme, all fall within the protection domain of application claims.