CN105451104B - The system and method for work order navigation is carried out using Intelligent management terminal - Google Patents
The system and method for work order navigation is carried out using Intelligent management terminal Download PDFInfo
- Publication number
- CN105451104B CN105451104B CN201510777213.XA CN201510777213A CN105451104B CN 105451104 B CN105451104 B CN 105451104B CN 201510777213 A CN201510777213 A CN 201510777213A CN 105451104 B CN105451104 B CN 105451104B
- Authority
- CN
- China
- Prior art keywords
- management terminal
- intelligent management
- work order
- port
- eid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q11/00—Selecting arrangements for multiplex systems
- H04Q11/0001—Selecting arrangements for multiplex systems using optical switching
- H04Q11/0062—Network aspects
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q11/00—Selecting arrangements for multiplex systems
- H04Q11/0001—Selecting arrangements for multiplex systems using optical switching
- H04Q11/0062—Network aspects
- H04Q11/0067—Provisions for optical access or distribution networks, e.g. Gigabit Ethernet Passive Optical Network (GE-PON), ATM-based Passive Optical Network (A-PON), PON-Ring
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Computer And Data Communications (AREA)
Abstract
The invention discloses a kind of system and methods carrying out work order navigation using Intelligent management terminal, are related to intelligent Optical Distribution Network field.The system includes ODN NM servers, Intelligent management terminal, to fine device, several ODN equipment, babinet eID, Intelligent management terminal is communicated by 2G/3G/Wifi with ODN NM servers, Intelligent management terminal is also by USB or bluetooth connection to fine device, fine device is communicated by USB or commodity ethernet line with ODN equipment, each ODN equipment connects a babinet eID, ODN NM servers provide work order to be onstructed, Intelligent management terminal receives data or order from ODN NM servers, it is issued to ODN equipment, and network connection data is acquired by ODN equipment and uploads to ODN NM servers, ODN NM servers receive the worksheet result that Intelligent management terminal reports.The present invention can realize the intelligent navigation of work order destination address, the intelligence of work order construction is guided.
Description
Technical field
The present invention relates to intelligent Optical Distribution Network field, it is specifically related to a kind of carrying out work order using Intelligent management terminal and lead
The system and method for boat.
Background technology
In optical transfer network, ODN (Optical Distribution Network, Optical Distribution Network) plays crucial bone
Dry net linkage function, under PON (Passive Optical Network, passive optical network) network, ODN is OLT (Optical
Line Terminal, optical line terminal) and ONU (Optical Network Unit, optical network unit) the two active equipments
Between all passive fibers, inactive component (optical branching device) composition a network, effect be to be carried between OLT and ONU
For transmission line.
Intelligent management terminal is typically mobile communication terminal, has spy that is small, portable, can using the long period
Point.As long as can install network management system needs integrated management software to be used, can be used as Intelligent management terminal, example
Such as:The electronic products such as mobile phone, tablet computer.In the management software and general intelligence management terminal that are integrated in Intelligent management terminal
Various software application methods are identical, have the characteristics that loading, unloading, upgrading can be pacified, easy to operate, it is only necessary to be used by simple
Training, so that it may with association.
The major function of Intelligent management terminal is exactly to provide patterned management tool to the user, and management object is ODN
In all-network resource, allow users to accurately grasp all fiber optic network resources, may be implemented to network by the tool
Resource, port status, circuit jumper connection, optical line by real-time management, and can accurately position and network connectivity fai_lure occur
Point improves network service quality so as to quickly exclude network connectivity fai_lure, realize to ODN Internet resources it is visual, can
It manages, is controllable.ODN NM servers are direct-connected by Ethernet interface and ODN equipment, after the completion of light circuit planning, so that it may with by ODN
Data inputting is to ODN NM servers.After ODN NM servers are handled data, can directly it be handed down to direct-connected with it
ODN equipment execute.ODN equipment refers to being combined by software and hardware, completing specific work(in the operation and maintenance of ODN networks
The equipment of energy, such as:Optical cross box, to fine device etc..ODN equipment be realize Optical Distribution Network intelligent management basis, it with realize
The various Internet resources of optical link connection are combined closely, can be by making ODN nets to passing Optical Distribution Network progress smooth upgrade
Network has the characteristic of intelligent management.
Babinet eID (Electronic Identity, electronic tag) information is a kind of information that electronic tag is stored,
The position of ODN equipment containing upgrading in need, the information of the device attributes such as unit type inside babinet eID.It does not preserve and case
The Intelligent management terminal of the corresponding username and password of body eID information can not find username and password, or can not find
Correct username and password, therefore the interface that Intelligent management terminal carries out device upgrade cannot be logged on to, it can not be to ODN equipment
Upgrading, cannot prevent maloperation of the Intelligent management terminal of lack of competence to ODN equipment.
Jumping fiber eID information is a kind of information that electronic tag is stored, and the class of jumping fiber needed for construction is contained inside jumping fiber eID
Type, the unique mark for required jumping fiber of constructing, the eID of jumping fiber is pairs of, it is known that the eID of jumping fiber one end, so that it may to know the jump
The eID of the fine other end.
There are the function for the eID for reading equipment, Intelligent management terminal that cannot directly read the eID letters of ODN equipment to fine utensil
Breath, can only be by being transmitted to Intelligent management terminal, to fine device to fine device reading eID information, then by the eID information read to fine device
ODN equipment can also be managed, is the module for realizing ODN equipment and the information interaction of Intelligent management terminal to fine device.
In traditional ODN, construction has to rely on Construction Specifications drawing to carry out, and after construction personnel gets drawing, arrives specified
Target of constructing location is carried out port jumper connection or the dismounting of optical fiber by drawing, the hand of construction information is carried out after the completion of construction
Work counts, and then transfers to record personnel will be in result recording device information database.Due to using hand in this work progress
It moves construction and device port is relatively more, port location difficulty, operate easy error and meeting is because be difficult to find mistake at the scene
And cause to do over again;After the completion of construction, optical fiber routing iinformation hand-kept is easy error of omission or incorrect posting.In addition, record personnel are inciting somebody to action
When being this time managed in construction results craft input database, typing is error-prone, and construction by hand causes to construct in traditional ODN wrong
Accidentally rate height, inefficiency, fiber resource waste are serious.
Invention content
The purpose of the invention is to overcome the shortcomings of above-mentioned background technology, provide a kind of using Intelligent management terminal progress
The intelligence of the system and method for work order navigation, the intelligent navigation, work order construction that can realize work order destination address is guided.
The present invention provides a kind of system carrying out work order navigation using Intelligent management terminal, including ODN NM servers, intelligence
Can management terminal, to fine device, several ODN equipment, several babinet eID, Intelligent management terminal passes through 2G/3G/Wifi and ODN webmasters
Server is communicated, and Intelligent management terminal passes through USB or general ether also by USB or bluetooth connection to fine device to fine device
Cable is communicated with several ODN equipment, and each ODN equipment connects babinet eID, ODN a NM server and navigates in work order
The middle details for providing work order to be onstructed, Intelligent management terminal receive data or order from ODN NM servers, under
It sends out data or ODN equipment is arrived in order, and network connection data is acquired by ODN equipment and uploads to ODN NM servers, ODN nets
Pipe server receives the worksheet result that Intelligent management terminal reports.
Based on the above technical solution, the Intelligent management terminal downloads work order to be onstructed, according to electronic map
The accurate geographical location where target construction equipment is indicated, Intelligent management terminal is according to the ground of target construction equipment in work order information
Location information or coordinate information carry out positioning and turn-by-turn navigation.
Based on the above technical solution, the Intelligent management terminal sends corresponding instruction, obtains simultaneously calibration equipment
Babinet eID, judge whether babinet eID and the equipment eID in work order information consistent, if it is inconsistent, display current device
It is mismatched with work order equipment;If consistent, then it represents that current device is work order equipment, and display starts to execute work order.
Based on the above technical solution, the flow of the babinet eID of the Intelligent management terminal calibration equipment is as follows:
Step 101, Intelligent management terminal start to execute work order by connecting ODN equipment to fine device;
Include the babinet EID of work order equipment in work order information performed by step 102, Intelligent management terminal, intelligence is managed
Manage the babinet eID information that terminal obtains current device;
The babinet eID of the babinet eID that step 103, Intelligent management terminal are relatively got and work order equipment in work order information
It is whether consistent, if unanimously, going to step 104;Otherwise step 105 is gone to;
If step 104, consistent, Intelligent management terminal shows that work order starts to execute;
If step 105, inconsistent, Intelligent management terminal display current device and work order equipment mismatch, stopping execution
Work order.
Based on the above technical solution, the Intelligent management terminal only passes through in the babinet eID verifications of ODN equipment
In the case of just construction personnel is allowed to construct, when executing work order, Intelligent management terminal provides visualized operation interface, control
The state of the LED light of ODN device ports, to guide construction personnel to construct.
Based on the above technical solution, the state of the LED light of the ODN device ports is as follows:
State 001:Extinguish, indicates that port is all gone well;
State 002:It is always on, expression port is port to be onstructed;
State 003:Slow flash indicates that present port is to guide port, a slow flash port is only existed in work progress;
State 004:Quick flashing indicates that exception, operating mistake occurs in present port.
Based on the above technical solution, the Intelligent management terminal real-time update work order port status, timely responds to
The faulty operation of maintenance personnel, and timely error correction.
Based on the above technical solution, the Intelligent management terminal supports a variety of fault tolerant mechanisms when executing work order,
Construction results are calculated in real time according to condition of construction, ensure the uniqueness and accuracy of used jumping fiber, tail optical fiber or optical branching device.
Based on the above technical solution, the operating system of the Intelligent management terminal is android operating systems.
The method that work order navigation is carried out using Intelligent management terminal based on above system that the present invention also provides a kind of, including
Following steps:
The LED light status modifier of all ports to be onstructed is to be always on by S1, Intelligent management terminal, will guide the port of construction
LED light status modifier be slow flash;
S2, wait for construction personnel that jumping fiber is inserted into port to be onstructed;
S3, judge to be inserted into whether the port of jumping fiber eID is otherwise port to be onstructed is gone to if it is, going to step S5
Step S4;
The status modifier of the LED of current operation port is quick flashing by S4, Intelligent management terminal, shows user's operation mistake,
Return to step S2;
S5, judge that the type of jumping fiber that should be inserted into the type and work order information of the eID for the jumping fiber that present port is inserted into is
It is no consistent, if it is inconsistent, going to step S4;If consistent, step S6 is gone to;
S6, Peer-Port is judged whether, if it is present going to step S7;If it does not exist, then going to step
S11;
S7, judge whether Peer-Port inserts jumping fiber eID, if being not inserted into jumping fiber eID, go to step S8;Such as
Fruit inserts jumping fiber eID, then goes to step S9;
S8, Intelligent management terminal knock out the LED light of present port, and light the LED light of Peer-Port, go to step S2;
S9, judge whether the jumping fiber eID that present port is inserted into matches with the eID of opposite end, if successful match, go to step
Rapid S11;If it fails to match, step S10 is gone to;
The LED light of present port is revised as quick flashing state by S10, Intelligent management terminal, and display is mismatched with opposite end eID,
Return to step S2;
S11, Intelligent management terminal knock out the LED light of present port, go to step S12;
S12, judge whether current work order is completed, if it is not complete, then going to step S13;If completed, turn
To step S15;
S13, the LED light for judging whether slow flash, if it does not exist, then going to step S14;If it is present returning
Step S2;
The status modifier of the LED light of next guide port is slow flash, return to step S2 by S14, Intelligent management terminal;
S15, Intelligent management terminal show that work order is completed, and work order flow is guided to terminate.
Compared with prior art, advantages of the present invention is as follows:
(1) present invention can accurately tell construction personnel's destination address constructed, and realize that the intelligence of work order destination address is led
Boat.
(2) present invention provides the intelligence guide of work order construction in the construction process, can ensure that construction personnel is quick, accurate
Complete work order in ground.
(3) present invention in the construction process can real-time update work order port status, timely respond to the mistake of maintenance personnel
Operation, and timely error correction.
(4) present invention supports a variety of fault tolerant mechanisms in the construction process, can calculate construction knot in real time according to condition of construction
Fruit, to ensure the uniqueness and accuracy of used jumping fiber, tail optical fiber or optical branching device.
Description of the drawings
Fig. 1 is Intelligent management terminal and ODN NM servers, the connection block diagram of OND equipment in the embodiment of the present invention.
Fig. 2 is the flow chart that equipment box eID is verified in the embodiment of the present invention.
Fig. 3 is the flow chart of the method intelligently guided provided using Intelligent management terminal construction in the embodiment of the present invention.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described in further detail.
Shown in Figure 1, the embodiment of the present invention provides a kind of system carrying out work order navigation using Intelligent management terminal, packet
Include ODN NM servers, Intelligent management terminal, to fine device, several ODN equipment, several babinet eID, Intelligent management terminal passes through
2G/3G/Wifi is communicated with ODN NM servers, Intelligent management terminal also by USB (Universal SerialBUS,
Universal serial bus) or bluetooth connection to fine device, USB or commodity ethernet line are passed through to fine device and carried out with several ODN equipment
Communication, each ODN equipment connect a babinet eID.
ODN NM servers provide the details of work order to be onstructed in work order navigation, and Intelligent management terminal receives
Data from ODN NM servers or order, issue data or ODN equipment is arrived in order, and acquire network by ODN equipment and connect
It connects data and uploads to ODN NM servers, ODN NM servers receive the worksheet result that Intelligent management terminal reports.
Intelligent management terminal downloads work order to be onstructed, according to electronic map indicate target construction equipment where accurately
Manage position;Intelligent management terminal carries out positioning and line according to the address information of target construction equipment in work order information or coordinate information
It navigates on road.
Intelligent management terminal sends corresponding instruction, obtains the babinet eID of simultaneously calibration equipment, judges babinet eID and work order
Whether the equipment eID in information is consistent, if it is inconsistent, display current device is mismatched with work order equipment;If consistent,
Expression current device is work order equipment, and display starts to execute work order.
Shown in Figure 2, the flow of the babinet eID of Intelligent management terminal calibration equipment is as follows:
Step 101, Intelligent management terminal start to execute work order by connecting ODN equipment to fine device;
Include the babinet EID of work order equipment in work order information performed by step 102, Intelligent management terminal, intelligence is managed
Manage the babinet eID information that terminal obtains current device;
The babinet eID of the babinet eID that step 103, Intelligent management terminal are relatively got and work order equipment in work order information
It is whether consistent, if unanimously, going to step 104;Otherwise step 105 is gone to;
If step 104, consistent, Intelligent management terminal shows that work order starts to execute;
If step 105, inconsistent, Intelligent management terminal display current device and work order equipment mismatch, stopping execution
Work order.
Intelligent management terminal only just allows construction personnel to carry out in the case where the babinet eID verifications of ODN equipment pass through
Construction.
When executing work order, Intelligent management terminal provides visualized operation interface, controls the shape of the LED light of ODN device ports
State, to guide construction personnel to construct.
The state of the LED light of ODN device ports is as follows:
State 001:Extinguish, indicates that port is all gone well;
State 002:It is always on, expression port is port to be onstructed;
State 003:Slow flash (1 second primary) indicates that present port is to guide port, a slow flash is only existed in work progress
Port;
State 004:Quick flashing (1 second twice) indicates that exception, operating mistake occurs in present port.
Intelligent management terminal can real-time update work order port status, and the faulty operation of maintenance personnel can be timely responded to, and
Timely error correction.
Intelligent management terminal provides a set of efficient, accurate intelligent construction for construction personnel and guides flow, to ensure
The convenience of construction.
Intelligent management terminal supports a variety of fault tolerant mechanisms when executing work order, can calculate construction in real time according to condition of construction
As a result, to ensure the uniqueness and accuracy of used jumping fiber, tail optical fiber or optical branching device.
The operating system of the mobile communication terminal of current main-stream has the IOS of apple, the Android of Google, Hewlett-Packard
The QNX etc. of WebOS, the MeeGo to increase income and Microsoft Win7 and blackberry, blueberry, wherein again with the IOS's of the apple and Android of Google
It is most widely used.Compared with the IOS of apple, android system is due to being open source code, so supporting its mobile phone very
More, the software that can freely use is also very much, can constantly upgrade;Compared with the IOS of apple, android system is in price
With prodigious advantage, under the price of Android device can to 700, on can also cause 5000, user can be allowed to possess more multiselect
It selects.The operating system that the embodiment of the present invention gives tacit consent to Intelligent management terminal is android operating systems.
Shown in Figure 3, the embodiment of the present invention provides a kind of use Intelligent management terminal progress work based on above system
The method singly navigated, includes the following steps:
The LED light status modifier of all ports to be onstructed is to be always on by S1, Intelligent management terminal, will guide the port of construction
LED light status modifier be slow flash;
S2, wait for construction personnel that jumping fiber is inserted into port to be onstructed;
S3, judge to be inserted into whether the port of jumping fiber eID is otherwise port to be onstructed is gone to if it is, going to step S5
Step S4;
The status modifier of the LED of current operation port is quick flashing by S4, Intelligent management terminal, shows user's operation mistake,
Return to step S2;
S5, judge that the type of jumping fiber that should be inserted into the type and work order information of the eID for the jumping fiber that present port is inserted into is
It is no consistent, if it is inconsistent, going to step S4;If consistent, step S6 is gone to;
S6, Peer-Port is judged whether, if it is present going to step S7;If it does not exist, then going to step
S11;
S7, judge whether Peer-Port inserts jumping fiber eID, if being not inserted into jumping fiber eID, go to step S8;Such as
Fruit inserts jumping fiber eID, then goes to step S9;
S8, Intelligent management terminal knock out the LED light of present port, and light the LED light of Peer-Port, go to step S2;
S9, judge whether the jumping fiber eID that present port is inserted into matches with the eID of opposite end, if successful match, go to step
Rapid S11;If it fails to match, step S10 is gone to;
The LED light of present port is revised as quick flashing state by S10, Intelligent management terminal, and display is mismatched with opposite end eID,
Return to step S2;
S11, Intelligent management terminal knock out the LED light of present port, go to step S12;
S12, judge whether current work order is completed, if it is not complete, then going to step S13;If completed, turn
To step S15;
S13, the LED light for judging whether slow flash, if it does not exist, then going to step S14;If it is present returning
Step S2;
The status modifier of the LED light of next guide port is slow flash, return to step S2 by S14, Intelligent management terminal;
S15, Intelligent management terminal show that work order is completed, and work order flow is guided to terminate.
Those skilled in the art can be carry out various modifications to the embodiment of the present invention and modification, if these modifications and change
For type within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present invention
Within.
The prior art that the content not being described in detail in specification is known to the skilled person.
Claims (10)
1. a kind of system carrying out work order navigation using Intelligent management terminal, including ODN NM servers, it is characterised in that:Also
Including Intelligent management terminal, to fine device, several ODN equipment, several babinet eID, Intelligent management terminal by 2G/3G/Wifi with
ODN NM servers are communicated, and Intelligent management terminal passes through USB or logical also by USB or bluetooth connection to fine device to fine device
It is communicated with ethernet line with several ODN equipment, each ODN equipment connects babinet eID, ODN a NM server in work
The details of work order to be onstructed are provided in single navigation, Intelligent management terminal receive data from ODN NM servers or
Order, issues data or ODN equipment is arrived in order, and acquires network connection data by ODN equipment and upload to ODN network manager services
Device, ODN NM servers receive the worksheet result that Intelligent management terminal reports;
Use Intelligent management terminal carry out work order navigation process for:
The LED light status modifier of all ports to be onstructed is to be always on by S1, Intelligent management terminal, will guide the port of construction
LED light status modifier is slow flash;
S2, wait for construction personnel that jumping fiber is inserted into port to be onstructed;
S3, judge to be inserted into whether the port of jumping fiber eID is otherwise port to be onstructed goes to step if it is, going to step S5
S4;
The status modifier of the LED of current operation port is quick flashing by S4, Intelligent management terminal, is shown user's operation mistake, is returned
Step S2;
S5, judge the type of jumping fiber that should be inserted into the type and work order information of the eID for the jumping fiber that present port is inserted into whether one
It causes, if it is inconsistent, going to step S4;If consistent, step S6 is gone to;
S6, Peer-Port is judged whether, if it is present going to step S7;If it does not exist, then going to step S11;
S7, judge whether Peer-Port inserts jumping fiber eID, if being not inserted into jumping fiber eID, go to step S8;If inserted
Enter jumping fiber eID, then goes to step S9;
S8, Intelligent management terminal knock out the LED light of present port, and light the LED light of Peer-Port, go to step S2;
S9, judge whether the jumping fiber eID that present port is inserted into matches with the eID of opposite end, if successful match, go to step
S11;If it fails to match, step S10 is gone to;
The LED light of present port is revised as quick flashing state by S10, Intelligent management terminal, and display is mismatched with opposite end eID, is returned
Step S2;
S11, Intelligent management terminal knock out the LED light of present port, go to step S12;
S12, judge whether current work order is completed, if it is not complete, then going to step S13;If completed, step is gone to
Rapid S15;
S13, the LED light for judging whether slow flash, if it does not exist, then going to step S14;If it is present return to step
S2;
The status modifier of the LED light of next guide port is slow flash, return to step S2 by S14, Intelligent management terminal;
S15, Intelligent management terminal show that work order is completed, and work order flow is guided to terminate.
2. the system for carrying out work order navigation using Intelligent management terminal as described in claim 1, it is characterised in that:The intelligence
Management terminal downloads work order to be onstructed, and the accurate geographical location where target construction equipment, intelligence are indicated according to electronic map
Management terminal carries out positioning and turn-by-turn navigation according to the address information of target construction equipment in work order information or coordinate information.
3. the system for carrying out work order navigation using Intelligent management terminal as described in claim 1, it is characterised in that:The intelligence
Management terminal sends corresponding instruction, obtains the babinet eID of simultaneously calibration equipment, judges babinet eID and the equipment in work order information
Whether eID is consistent, if it is inconsistent, display current device is mismatched with work order equipment;If consistent, then it represents that current device
For work order equipment, display starts to execute work order.
4. the system for carrying out work order navigation using Intelligent management terminal as claimed in claim 3, it is characterised in that:The intelligence
The flow of the babinet eID of management terminal calibration equipment is as follows:
Step 101, Intelligent management terminal start to execute work order by connecting ODN equipment to fine device;
Include the babinet EID of work order equipment in work order information performed by step 102, Intelligent management terminal, intelligent management is whole
End obtains the babinet eID information of current device;
Whether the babinet eID of work order equipment in babinet eID and work order information that step 103, Intelligent management terminal are relatively got
Unanimously, if unanimously, going to step 104;Otherwise step 105 is gone to;
If step 104, consistent, Intelligent management terminal shows that work order starts to execute;
If step 105, inconsistent, Intelligent management terminal display current device and work order equipment mismatch, stopping execution work order.
5. the system for carrying out work order navigation using Intelligent management terminal as claimed in claim 3, it is characterised in that:The intelligence
Management terminal only just allows construction personnel to construct in the case where the babinet eID verifications of ODN equipment pass through, and executes work order
When, Intelligent management terminal provides visualized operation interface, the state of the LED light of ODN device ports is controlled, to guide construction personnel
It constructs.
6. the system for carrying out work order navigation using Intelligent management terminal as claimed in claim 5, it is characterised in that:The ODN
The state of the LED light of device port is as follows:
State 001:Extinguish, indicates that port is all gone well;
State 002:It is always on, expression port is port to be onstructed;
State 003:Slow flash indicates that present port is to guide port, a slow flash port is only existed in work progress;
State 004:Quick flashing indicates that exception, operating mistake occurs in present port.
7. such as the system according to any one of claims 1 to 6 for carrying out work order navigation using Intelligent management terminal, feature exists
In:The Intelligent management terminal real-time update work order port status, timely responds to the faulty operation of maintenance personnel, and entangle in time
It is wrong.
8. such as the system according to any one of claims 1 to 6 for carrying out work order navigation using Intelligent management terminal, feature exists
In:The Intelligent management terminal supports a variety of fault tolerant mechanisms when executing work order, calculates construction knot in real time according to condition of construction
Fruit ensures the uniqueness and accuracy of used jumping fiber, tail optical fiber or optical branching device.
9. such as the system according to any one of claims 1 to 6 for carrying out work order navigation using Intelligent management terminal, feature exists
In:The operating system of the Intelligent management terminal is android operating systems.
10. a kind of method for carrying out work order navigation using Intelligent management terminal based on system described in claim 1, feature exist
In including the following steps:
The LED light status modifier of all ports to be onstructed is to be always on by S1, Intelligent management terminal, will guide the port of construction
LED light status modifier is slow flash;
S2, wait for construction personnel that jumping fiber is inserted into port to be onstructed;
S3, judge to be inserted into whether the port of jumping fiber eID is otherwise port to be onstructed goes to step if it is, going to step S5
S4;
The status modifier of the LED of current operation port is quick flashing by S4, Intelligent management terminal, is shown user's operation mistake, is returned
Step S2;
S5, judge the type of jumping fiber that should be inserted into the type and work order information of the eID for the jumping fiber that present port is inserted into whether one
It causes, if it is inconsistent, going to step S4;If consistent, step S6 is gone to;
S6, Peer-Port is judged whether, if it is present going to step S7;If it does not exist, then going to step S11;
S7, judge whether Peer-Port inserts jumping fiber eID, if being not inserted into jumping fiber eID, go to step S8;If inserted
Enter jumping fiber eID, then goes to step S9;
S8, Intelligent management terminal knock out the LED light of present port, and light the LED light of Peer-Port, go to step S2;
S9, judge whether the jumping fiber eID that present port is inserted into matches with the eID of opposite end, if successful match, go to step
S11;If it fails to match, step S10 is gone to;
The LED light of present port is revised as quick flashing state by S10, Intelligent management terminal, and display is mismatched with opposite end eID, is returned
Step S2;
S11, Intelligent management terminal knock out the LED light of present port, go to step S12;
S12, judge whether current work order is completed, if it is not complete, then going to step S13;If completed, step is gone to
Rapid S15;
S13, the LED light for judging whether slow flash, if it does not exist, then going to step S14;If it is present return to step
S2;
The status modifier of the LED light of next guide port is slow flash, return to step S2 by S14, Intelligent management terminal;
S15, Intelligent management terminal show that work order is completed, and work order flow is guided to terminate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510777213.XA CN105451104B (en) | 2015-11-13 | 2015-11-13 | The system and method for work order navigation is carried out using Intelligent management terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510777213.XA CN105451104B (en) | 2015-11-13 | 2015-11-13 | The system and method for work order navigation is carried out using Intelligent management terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105451104A CN105451104A (en) | 2016-03-30 |
CN105451104B true CN105451104B (en) | 2018-10-09 |
Family
ID=55560817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510777213.XA Active CN105451104B (en) | 2015-11-13 | 2015-11-13 | The system and method for work order navigation is carried out using Intelligent management terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105451104B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107071593A (en) * | 2017-04-25 | 2017-08-18 | 烽火通信科技股份有限公司 | A kind of system and method for the convenient management ODN equipment of movable type |
CN107612732A (en) * | 2017-09-20 | 2018-01-19 | 广东电网有限责任公司汕头供电局 | A kind of maintaining method and device for intelligent ODN Optical Distribution Networks |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103957474A (en) * | 2014-04-11 | 2014-07-30 | 烽火通信科技股份有限公司 | Port tag management method of optical divider |
CN204086628U (en) * | 2014-09-19 | 2015-01-07 | 常州太平通讯科技有限公司 | Based on the intelligent optical fiber distribution frame of eID infotech |
CN104301143A (en) * | 2014-10-14 | 2015-01-21 | 烽火通信科技股份有限公司 | ODN network management method of different scenes |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9123217B2 (en) * | 2009-06-29 | 2015-09-01 | Commscope, Inc. Of North Carolina | Methods of automatically recording patching changes at passive patch panels and network equipment |
CN103634152A (en) * | 2013-12-12 | 2014-03-12 | 烽火通信科技股份有限公司 | Network management system of intelligent light distribution equipment and implementation method of network management system |
CN103701640B (en) * | 2013-12-18 | 2016-09-28 | 烽火通信科技股份有限公司 | Use the method and system of Intelligent management terminal upgrading ODN equipment |
CN103763134A (en) * | 2014-01-07 | 2014-04-30 | 烽火通信科技股份有限公司 | Dual-control device and method based on intelligent terminal |
CN103746850B (en) * | 2014-01-13 | 2017-02-15 | 中国联合网络通信集团有限公司 | Method and device for positioning fault and PON (Passive Optical Network) system |
CN104932065B (en) * | 2015-06-29 | 2016-06-29 | 烽火通信科技股份有限公司 | Without the fibre system of pcb board and optical fiber wiring method in fiber distribution module |
CN104953313B (en) * | 2015-06-29 | 2017-05-17 | 烽火通信科技股份有限公司 | Optical fiber connection device for electric connection, electric connector and control wire |
-
2015
- 2015-11-13 CN CN201510777213.XA patent/CN105451104B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103957474A (en) * | 2014-04-11 | 2014-07-30 | 烽火通信科技股份有限公司 | Port tag management method of optical divider |
CN204086628U (en) * | 2014-09-19 | 2015-01-07 | 常州太平通讯科技有限公司 | Based on the intelligent optical fiber distribution frame of eID infotech |
CN104301143A (en) * | 2014-10-14 | 2015-01-21 | 烽火通信科技股份有限公司 | ODN network management method of different scenes |
Also Published As
Publication number | Publication date |
---|---|
CN105451104A (en) | 2016-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103701640B (en) | Use the method and system of Intelligent management terminal upgrading ODN equipment | |
US10332314B2 (en) | Hands-free asset identification, location and management system | |
CN107589952A (en) | Intelligent upgrade method, device and system | |
CN108390791A (en) | The determination of port status in storage area network | |
US20130181816A1 (en) | Mechanism and method for rfid cable path labeling, identification, and inventory | |
US9905089B2 (en) | Physical layer system with support for multiple active work orders and/or multiple active technicians | |
CN105451104B (en) | The system and method for work order navigation is carried out using Intelligent management terminal | |
CN109656767A (en) | A kind of acquisition methods, system and the associated component of CPLD status information | |
CN109039788A (en) | Port configuration method, device and the storage medium of the network equipment | |
CN105307062B (en) | The sODN system and method for support proximal end operation and distal end guiding construction based on eID | |
CN106330520A (en) | Method and device of extracting feature information of terminal equipment | |
WO2017219914A1 (en) | Mobile terminal, and passive optical network information collection method and apparatus | |
CN105306267A (en) | Optical cable network management system | |
CN107911251A (en) | A kind of method for configuring network equipment, device and medium | |
CN110019158A (en) | A kind of method and apparatus of monitoring data quality | |
CN105574130B (en) | A kind of data transmission method and operation system | |
US11567819B2 (en) | Fabric connection assist system | |
JP2013223131A5 (en) | ||
CN104301143A (en) | ODN network management method of different scenes | |
US20170293545A1 (en) | Redundant cable routing management in storage systems | |
CN110149241A (en) | A kind of automated testing method and storage medium based on IMS equipment | |
CN105656648A (en) | ODN resource organizing method and system | |
CN104394042B (en) | A kind of method of MIB tests ONU system upgrades | |
CN105511025B (en) | Quartz plastic composite fiber component, recognition methods and device | |
CN109582334A (en) | The upgrade method and device of programmable logic device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |